10 - Annual Concrete Demolition & Construction BidsItem No. 10
Memorandum
TO: Mayor, Mayor Pro -Tem & City Council
Grayson Path, City Manager
FROM: M.A. Smith, Public Works Director
Mike Wade, Streets Department Superintendent
SUBJECT: ANNUAL CONCRETE DEMOLITION AND CONSTRUCTION BIDS
DATE: April 24, 2023
BACKGROUND: This is the annual bid for curb/gutter, standard driveway approaches, and
reinforced concrete sidewalks to be used primarily, but not exclusively, by the Street Division,
Water Distribution, Sewer Maintenance, and Parks Divisions of the Public Works Department. If
other departments are in need of concrete work, we attempt to utilize bid pricing through this
contract as it applies. The bid tabulation sheet is attached for details of the bids.
STATUS OF ISSUE: The City of Paris Public Works Department received two sealed bids for
concrete work and would like to award the bid to the lowest responsible bidder pursuant to
Resolution 2020-052 for construction project bidding. Contract period will be from May 1, 2023
through April 30, 2024.
BUDGET: Funding is budgeted in the various Public Works Departments.
RECOMMENDATION: Award the bid to Pridemore Construction as indicated on the attached
bid tabs, in the approximate amount of $308,225.00 based on listed estimated quantities. The actual
total cost will depend on projects which are as needed. The award of this bid will lock in the
quantity figures listed in the attached tabs.
CITY OF PARIS
Pridemore Construction
Richard Drake
Cole Pridemore
Construction
2023-2024 CONCRETE BIDS
600 CR 22920
Tex Horton
Paris TX 75460
6290 Hwy 271 N
903.495.2488
Powderly TX 75473
Item
903.732.4781
6" typical curb and gutter
Linear Ft.
$33.00
$36.00
Quantity 1 4500 1 LF
IRemoval
4500
$6.50
$7.00
Total
$39.50
$43.00
Subtotal
$177,750.00
$193,500.00
WPA style curb and gutter
Linear Ft.
$59.00
$69.60
Quantity 50 LF
Removal
50
$9.00
$8.50
Total
$68.00
$78.10
Subtotal
$3,400.00
$3,905.00
Driveway apporach installation
Sq. Ft.
$10.00
$11.25
Quantity 4000 SF
Removal
4000
$2.00
$3.35
Total
$12.00
$14.60
Subtotal
$48,000.00
$58,400.00
Sidewalk city standard
Sq. Ft.
$8.50
$9.40
Quantity 2500 SF
Removal
2500
$2.00
$3.70
Total
$10.50
$13.10
Subtotal
$26,250.00
$32,750.00
Valley gutters
Sq. Ft.
$14.25
$16.60
Quantity 2500 SF
Removal
2500
$5.50
$7.00
Total
$19.65
$23.60
Subtotal
$49,375.00
$59,000.00
Concrete street repairs
Sq. Ft.
$9.00
$17.00
Quantity 2001 SF
Removal
200
$9.50
$7.00
Total
$18.50
$24.00
Subtotal
$3,700.00
$294.50
Tota I Cost J.
$308,475.00
$347,849.50