Loading...
11 - Final Plat - Golden Star Texas Addition Lot 1 Block AItem No. 11 Memorandum TO: Mayor, Mayor Pro Tem and City Council Grayson Path, City Manager FROM: Todd Mittge, City Engineer SUBJECT: Consideration of and action on the Final Plat of the Golden Star Texas Addition Lot 1 Block A DATE: June 26, 2023 BACKGROUND The applicant requests approval of a final plat for the Golden Star Texas Addition Lot 1 Block A in order to establish a building site for a residence. RECOMMENDATION Staff recommends approval of the replat subject to the following conditions: 1. The submission to and tentative approval of a preliminary plat by the Commission shall be... - Chapter 9A, V a. A revised copy of the preliminary plat that meets all conditions of approval set forth by the Planning and Zoning Commission shall be submitted. b. Any revisions required in the approval of the preliminary plat (excepting things not generally required on a final plat submission such as physical features) shall also be made to the final plat. 2. A certificate of guarantee of the workmanship and materials... - Chapter 9A, V, (11) a. In the guarantee block, Bailey Asay is listed as the guarantor. Under the signature line, Eduardo Rojas is listed as the signing party. This discrepancy shall be resolved. 3. An accurate boundary survey of the property... Chapter 9A, V, (7) a. While a point of beginning (P.O.B.) is listed in the legend, the point of beginning (P.O.B.) is not noted in the drawing. 4. An accurate boundary survey of the property... - Chapter 9A, V, (7) When delineating a boundary line as an integral portion of a survey... - Texas Engineering and Land Surveying Practice Acts and Rules, Subchapter E Professional and Technical Standards, §138.85 Boundary Construction, (2), (3)(A)(B)(C)(D) a. As all four monument pins were set during the preparation of this plat, documentation of how the locations of these pins were determined shall be provided.