15 - Agreement with Garver to Perform Lead Service Line InventoryItem No. 15 Memorandum TO: Mayor & City Council Grayson Path, City Manager Robert Vine, Deputy City Manager Doug Harris, Assistant City Manager FROM: Michael Smith, Director of Public Works SUBJECT: AGREEMENT WITH GARVER TO PERFORM A LEAD SERVICE LINE INVENTORY DATE: October 23, 2023 :: • . s �1i1�] EPA promulgated the Lead and Copper Rule (LCR) on June 7, 1991 to protect public health by minimizing lead and copper levels in drinking water. Since then, a series of revisions have been made to the LCR, the most recent being August 4, 2022. This revision implements a mandate for public water supplies to complete a Lead Service Line Inventory (LSLI) of their distribution system by October 16, 2024. TCEQ is the regulatory authority in Texas responsible for insuring public water supplies are in compliance with the requirement. STATUS OF ISSUE: When the City received notification from TCEQ for the LSLI, staff began reviewing available options to complete the mandated work. Due to the magnitude of the project, a determination was made to seek the services of a third -party contractor. Garver submitted a professional services agreement in the amount of $118,158.00 for the scope of work. An estimate was received from a different contractor in the amount of $160,000.00. Following completion of the mandated LSLI, water distribution lines identified as containing lead will be scheduled for replacement; for this reason, there is an effect on the finalization of proposed mill & overlay projects. The City will prioritize mill & overlay projects based on information identified in the LSLI. The City Manager will be presenting an overview of mill & overlay projects at a future City Council meeting. A copy of the professional services agreement with Garver is attached. BUDGET: $118,158.00 for Garver to perform a lead service line inventory; funding from 2018 Water & Sewer General Obligation Bonds — Fund 47,. OPTIONS: 1. Authorize the City Manager to sign the agreement with Garver. 2. Request additional information and/or deny authorization to execute the agreement. RECOMMENDATION: 1. Authorize the City Manager to sign the agreement with Garver. PROFESSIONAL SERVICES AGREEMENT Project No. 2302035 ' 1.1. Services. Owner hereby engages perform following proceed�n -ExlYiUit A attached hereto ("Services"). Execution of this Agreement by Owner constitutes Owner's written authorization to %0= HAITI 411-4 Amendments. shall be entitled to an equitable adjustment in the cost and/or schedule for circumstances outside the reasonableimodifications in the createdscope of Services, applicable law, codes, or standards after the Effective Date ("Amendment"). All Amendments shall be effective only after being signed by the designated representatives of both Parties. Garver shall have no obligation to perform any additional services such Amendment untilI mutually agreeable Amendment is executed by both Parties. '{ 617111, ARS Standards4M. Owner shall be responsible for all requirements and instructions that it furnishes to Ga pursuant to this Agreement, and for the accuracy and completeness of all programs, report data, and other information furnished by Owner to Garver pursuant to this Agreement. Gary may use and rely upon such requirements, programs, instructions, reports, data, a information in performing or furnishing services under this Agreement, subject to any expre limitations or reservations applicable to the furnished items as further set forth in.Exhibit A. Performance. Garver shall perform any all accordance with generally M practices and standards employed by the applicab United States professional services industries as of the Effective Date practicing under simill conditions and locale. Garver shall not be responsible for the acts or omissions of a contractor for whom it does not have a directguarantees Garverperformance of any contractor nor assumes responsibility for any contractor's failure to furni and perform its work in accordance with the documents applicable to the contrach even when phase 1 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 5.2. Instruments of Service. All reports, specifications, record drawings, models, data, and all other information provided by Garver or its subconsultants, which is required to be delivered to Owner under Exhibit A (the "Deliverables"), shall become the property of Owner subject to the terms and conditions stated herein. All property rights of a Party, including copyright, patent, and reuse ("Intellectual Property"), shall remain the Intellectual Property of that Party. Any Intellectual Property of Garver, or any third party embedded in the Deliverables, shall remain so imbedded and may not be separated therefrom. Upon Owner fulfilling its payment obligations under this Agreement, Garver hereby grants Owner a license to use the Intellectual Property but only in the operation and maintenance of the Project for which it was provided. Use of such Intellectual Property for modification, extension, or expansion of this Project or on any other project, unless under the direction of Garver, shall be without liability to Garver and Garver's subconsultants. 5.3. O pinions of Cost,. Since Garver has no control over: (i) the cost of labor, materials, equipment, or services furnished by others; (ii) the contractor or its subcontractor(s)' methods of determining prices; (iii) competitive bidding; (iv) market conditions; or (v) similar material factors, Garver's opinions of Project costs or construction costs provided pursuant to Exhibit A, if any, are to be made on the basis of Garver's experience and qualifications and represent Garver's reasonable judgment as an experienced and qualified professional engineering firm, familiar with the construction industry; but Garver cannot and does not guarantee that proposals, bids, or actual Project or construction costs will not vary from estimates prepared by Garver. 5.4. Underground Utilities. Except to the extent expressly included as part of the Services, Garver will not provide research regarding utilities or survey utilities located and marked by their owners. In no event is Garver responsible for damage to underground utilities, unmarked or improperly marked, caused by geotechnical conditions, potholing, construction, or other contractors or subcontractors working under a subcontract to this Agreement. 5.5. Confidentiality,. Owner and Garver shall consider: (i) all information provided by the other Party that is marked as "Confidential Information" or "Proprietary Information" or identified as confidential pursuant to this Section in writing promptly after being disclosed verbally; and (ii) all documents resulting from Garver's performance of Services, to be Confidential Information. Except as legally required, Confidential Information shall not be discussed with or transmitted to any third parties, except on a "need to know basis" with equal or greater confidentiality protection or written consent of the disclosing Parry. Confidential Information shall not include and nothing herein shall limit either Party's right to disclose any information provided hereunder which: (i) was or becomes generally available to the public, other than as a result of a disclosure by the receiving Parry or its personnel; (ii) was or becomes available to the receiving Party or its representatives on a non -confidential basis, provided that the source of the information is not bound by a confidentiality agreement or otherwise prohibited from transmitting such information by a contractual, legal, or fiduciary duty; (iii) was independently developed by the receiving Parry without the use of any Confidential Information of the disclosing Party; or (iv) is required to be disclosed by applicable law or a court order. All confidentiality obligations hereunder shall expire three (3) years after completion of the Services. & INSURANCE 6.1. Insurance. Garver shall procure and maintain insurance as set forth in Exhibit C until completion of the Service. Garver shall name Owner as an additional insured on Garver's 2 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 General Liability policy to the extent of its indemnity obligations provided in this Agreement. Upon request, Garver shall furnish Owner a certificate of insurance evidencing the insurance coverages required in Exhibit C. 7, INDEMNIFICATION /WAIVERS 7.1. Indemnification. Subject to the limitations of liability set forth in Section 7.2, Garver agrees to indemnify and hold Owner and its personnel harmless from tort damages due to bodily injury (including death) or third -party tangible property damage to the extent such damages are caused by the negligent acts, errors, or omissions of Garver or any other party for whom Garver is legally liable, in the performance of the Services under this Agreement. 7.2. Waivers. Notwithstanding any other provision to the contrary, the Parties agree as follows: 7.2.1.MUTUAL WAIVER; TO THE FULLEST EXTENT PERMITTED BY LAW, NEITHER OWNER, GARVER, NOR THEIR RESPECTIVE PERSONNEL SHALL BE LIABLE FOR ANY CONSEQUENTIAL, SPECIAL, INCIDENTAL, INDIRECT, PUNITIVE OR EXEMPLARY DAMAGES, OR DAMAGES ARISING FROM OR IN CONNECTION WITH LOSS OF USE, LOSS OF REVENUE OR PROFIT (ACTUAL OR ANTICIPATED), LOSS BY REASON OF SHUTDOWN OR NON -OPERATION, INCREASED COST OF CONSTRUCTION, COST OF CAPITAL, COST OF REPLACEMENT POWER OR CUSTOMER CLAIMS, AND OWNER HEREBY RELEASES GARVER, AND GARVER RELEASES OWNER, FROM ANY SUCH LIABILITY. 7.2.2. LIMITATION. IN RECOGNITION OF THE RELATIVE RISKS AND BENEFITS OF THE PROJECT TO BOTH THE OWNER AND GARVER, OWNER HEREBY AGREES THAT GARVER'S AND ITS PERSONNEL'S TOTAL LIABILITY UNDER THE AGREEMENT SHALL BE LIMITED TO ONE HUNDRED PERCENT (100%) OF GARVER'S FEE SET FORTH IN EXHIBIT B. 7.2.3.NO OTHER WARRANTIES. NO OTHER WARRANTIES OR CAUSES OF ACTION OF ANY KIND, WHETHER STATUTORY, EXPRESS OR IMPLIED (INCLUDING ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE AND ALL WARRANTIES ARISING FROM COURSE OF DEALING OR USAGE OF TRADE), SHALL APPLY. OWNER'S EXCLUSIVE REMEDIES AND GARVER'S ONLY OBLIGATIONS ARISING OUT OF OR IN CONNECTION WITH DEFECTIVE SERVICES (PATENT, LATENT, OR OTHERWISE), WHETHER BASED IN CONTRACT, IN TORT (INCLUDING NEGLIGENCE AND STRICT LIABILITY), OR OTHERWISE, SHALL BE THOSE STATED IN THE AGREEMENT. 7.3. THE LIMITATIONS SET FORTH IN SECTION 7.2 APPLY REGARDLESS OF WHETHER THE CLAIM IS BASED IN CONTRACT, TORT, OR NEGLIGENCE, INCLUDING GROSS NEGLIGENCE, STRICT LIABILITY, WARRANTY, INDEMNITY, ERROR AND OMISSION, OR ANY OTHER CAUSE WHATSOEVER. 8. DISPUTE RESOLUTION 8.1. EACH PARTY IRREVOCABLY WAIVES, TO THE FULLEST EXTENT PERMITTED BY APPLICABLE LAWS, ANY AND ALL RIGHT TO TRIAL BY JURY. 3 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 9. TERMINATION 9.1. Termination. This Agreement may be terminated seven (7) days after written notice and a reasonable opportunity to cure by either Party in the event of failure by the other Party to perform any material obligation in accordance with the terms hereof. 10. MISCELLANEOUS 10.1. Governing Law. This Agreement is governed by the laws of the State of Texas, without regard to its choice of law provisions. 10.2. No Third -Party Beneficiaries. Nothing herein shall be construed to give any rights or benefits hereunder to anyone other than Owner and Garver. This Agreement does not contemplate any third -party beneficiaries. 10.3. Entire Agreement. This Agreement constitutes the entire agreement between Owner and Garver and supersedes all prior written or oral understandings and shall be interpreted as having been drafted by both Parties. This Agreement may be amended, supplemented, or modified only in writing by and executed by both Parties. 11. EXHIBITS 11.1. The following Exhibits are attached to and made a part of this Agreement: Exhibit A — Scope of Services Exhibit B — Fee Summary Exhibit C — Insurance If there is an express conflict between the provisions of this Agreement and any Exhibit hereto, the terms of this Agreement shall take precedence over the conflicting provisions of the Exhibit. Owner and Garver, by signing this Agreement, acknowledge that they have independently assured themselves and confirms that they individually have examined all Exhibits, and agrees that all of the aforesaid Exhibits shall be considered a part of this Agreement and agrees to be bound to the terms, provisions, and other requirements thereof, unless specifically excluded. Acceptance of this proposed Agreement is indicated by an authorized agent of the Owner signing in the space provided below. Please return one signed original of this Agreement to Garver for our records. [Signature Page to Follow] 4 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 IN WITNESS WHEREOF, Owner and Garver have executed this Agreement effective as of the date last written below ("Effective Date"). City of Paris Garver, LLC By: By: . Signature Signature Name: Name: Lance Klement Printed Name Printed Name Title: Title: North Texas Water Team Leader Date: Date: 10/12/2023 5 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 EXHIBIT A (SCOPE OF SERVICES) L Background The City of Paris ("City") selected Garver to assist with preparations for compliance with the Lead and Copper Rule Revisions (LCRR). These services will be phased based on the regulatory timeframe, i.e., the LCRR compliance date of October 16, 2024, and will be responsive to regulatory changes introduced by the Lead and Copper Rule Improvements (LCRI), which is currently in development. Generally, Garver will provide technical guidance to the City related to: • Developing a service line inventory • Assessing water quality • Updating sampling plans and protocols Developing a new lead service line replacement plan • Budgeting for LCRR and LCRI costs • Identifying funding opportunities and preparing funding applications • Communications materials IL Scope of Basic Services The following scope of work describes the services to be provided to meet the LCRR compliance date of October 16, 2024. Gamer will prepare an overall project management plan (PMP) and quality control/assurance plan (QCP) to be used for all tasks. Garver will prepare and provide monthly progress/status reports, sufficient to support monthly billings. Monthly status reports will be submitted with monthly invoices and project updates. A. Task I — Service Line Inventory Assistance 1. Garver will attend one (1) kick-off meeting to discuss project objectives, internal and external team, lines of communication, and schedule. 2. Garver will assist the City in developing a strategy for identifying service line materials using existing records, routine and emergency maintenance activities, and targeted materials inspections. The strategy and a proposed schedule will be documented in a technical memorandum (TM). 3. Garver will develop a template for the City's service line inventory, either in Microsoft Excel or as a GIS shapefile. 4. Garver will review data collected by the City using the template up to two (2) times and provide recommendations for enhancing the accuracy and completeness of the data. 5. Garver will facilitate one (1) virtual workshop to provide updates on Garver -led tasks and any regulatory developments and receive status updates on City -led tasks. Deliverables: Data request, draft and final service line inventory TM, service line data collection template, and review comments on data collected by the City. 6 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 IB.. 'Task III —Water Quality Assessiment 1. Garver will 1prelpare a data request docurnemt and submit to the City iinclludiiing: a. IHiistodcal water gualirty data frorm the City's entry points and diistrilbuutiiom systenrn, iincWiing ()Nitrification Acfiion Han (IN IP) data and d'is'infectant iresiiduall data., b„ 1Hiistorlcall irrnernthly irrniirnerall analysis reports.. c.. Hiistorical customer complaint records.. do Locations of eAstiing lead and copper sampling sites, e. Locations of eAstiing schoolls and licensed child-care facilities. f„ Any updates to the City's 6striilbutiioin systeirn rmalp, GIIS format if available. 2.. Garver wiilll ireviiew the Wstodcal water quality information received to iIdentify the meed for addiituornall testing or potentiiall irrnlproveirn"nernts to irniurn'irmize lead and copper solu.ulb'uliity„ Garver wiilll docuurment these results in a TIM. .. Garver will ffaolllltate one (1 ) virtu.uall workshop to pirovlde updates on Garver -led taslks and any regulatory devellopirrnents and receive statins updates on ity­led tasks. Dellirerable ;luta request, draft and final water quality assessment TM. C. "Task IIIA — Sampling IPlan and irotocoll Development t, Garver M1II recommend updates the Qty's existing lliist of tap samnlpfiirng sines and tap sampling 1protocolls. Updates wiilll Ibe (based on the City's service (thine inventory, rep,u fireirnennts of the LCRR, and proposed or flunall ILCIRII, if available., 2. Garver will review the City's planned approach for develolpirng and rnaintafining a Iliist of schools and licensed chIlld-care facilities and 1provlde comments. .. Garver wiill develop sampling protocols for implementation at schools and licensed child- care faciilliibes in accordance wiith the requirements of tlhe ILCRR, and proposed or firnall ILC I, if avaiillalble, SampHing (protocols wiilll include the number of samples required per facility, flow charts for sellectirng sairmphing points within each facility, 4.. Garver will facilitate one (1) virtiinal workshop to provide updates on Garver -led tasks and any regulatory developments and receive statins updates on C ty4ed Masks.. Garver wiilll) provide Ciity staff training for iurmnplerrnerntaboro of the new plans and protocols. Dellnrer-ables: Review comments, draft and final fags sampling protocols, comments on the City's approach to developing and maintaining a list of .schools and licensed child-care facilities, draft and final sampling protocol for schools and licensed child-care facilities, ID.. 'Task IIV—Lead a ice Line Replacement Plain Development 't. Garver wullll review and provide comments on theCity's existing (lead service lune replacernent plan, iif avaiillalblle.. The ireviiew will) focus on the plan's cornlplliance with -the ILCIRR or, [I avaiillalble, the LCIRL 2.. Gairver willl irecormrmemd urlpdates to ,the City's existiiung lead service (Burne replacement Allan, [ff avaiillalblep for cormpHance wiith tlhe ILCIRIR or, if available, the IL IPI. 7 Version 't Paris ILead and Copper Rule Assistance Garver IProJect No., 2302035 �M 3. Garver will facilitate one (1) virtual workshop to provide updates on Garver -led tasks and any regulatory developments and receive status updates on City -led tasks. Deliverables: Review comments. Ill. Scope of Additional Services The following scope of work describes additional services that Garver can provide if requested, depending on the results of the lead service line replacement plan. A. Task V — Budgeting for LCRR and LCRI Costs (Optional) 1. Garver will assist the City in identifying items related to LCRR, and, if available, LCRI compliance that should be included in the City's operating budget. 2. Garver will review the City's proposed LCRR/LCRI budget and provide comments. 3. Garver will facilitate one (1) virtual workshop to provide updates on Garver -led tasks and any regulatory developments and receive status updates on City -led tasks. Deliverables: List of proposed budget items, review comments on proposed budget. B. Task VI — Funding Assistance (Optional) 1. Garver will assist the City in identifying grants and loans available for projects associated with the LCRR, such as lead service line replacement projects or addressing lead in schools and licensed child-care facilities. 2. Garver will prepare a data request document for information needed to complete project information forms (PIFs) and submit to the City, including: a. System maps b. Reports c. Data d. Budget -level cost estimates e. Project information 3. Garver will coordinate with the City and the funding agency (e.g., the Texas Water Development Board, TWDB) as necessary. Garver will send the draft PIF to the City for review before submitting to the funding agency. 4. Garver will facilitate one (1) virtual workshop to provide updates on Garver -led tasks and any regulatory developments and receive status updates on City -led tasks. Deliverables: Data request, draft and final PIF. C. Task VII — Review of Communications Materials (Optional) 1. Garver will review the City's existing communications materials related to LCR compliance and identify updates or additional materials needed for LCRR, and, if available, LCRI compliance. 2. Garver will review communications materials developed by the City or the City's outside 8 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 communications firm foir LCRR, and, if avaiillalblev ILCIRII, compliance. 3. Garver willll facilitate one (1) virtual) workshop to (provide updates on Garver -Red tasks and any regulatory developments and receive status updates on City lied tasks. 4,. Garver wiill facilitate one (1) viirtuall staff training session on communications materials and delivery schedules. Dellnrerables° Review comments on existing LCR materials, review comments on newly developed communications materials. ID. Task VIII Subsurface Utility Engineering (Optional) 1. Garver wRlll (provide field work supervision of the City's utiiRity Ilocatiion field crew and Subsurface Utility Engineering (SUE) Quality Il...evei (CII...) 1:3 rmarkiings to identify Ihodzontal (locations for the test holes. 2. Garver will perform one (1) CIL A SLOE test Iholle on the city side of the irneteir Ibox and one (1) CII... A SUE test Iholle on the customer side ofthe meter box to determine the location and rmateriiall type of the service )nines. 3. Garver will survey each test We using the established project control point data. Any necessary lRiiglht-of (Entry (ROE) permits, including railroad IFRCIE, will Ibe Iproviided by the City prior to starting the field work. 4. rest holes Wil be prioritized outside of paved areas wherever possiibie.. IHowever, some test Iholles may meed to be placed in paved areas that may require traffic control) measures. Garver will establish routineford'inary traffic control whenever required. If non routine traffic control) measures are irequired, Garver will utilize a traffic control) provider at the unit rate provided in the Appendix IF3.. 5.. Garver will) utiize non -.destructive vacuuirm excavation equipment to excavate test holies at the required locations. gest We excavations wiillll be Ibackfilled with aplprolpriate material and the original surface willll be restored.. The (backfill will) be compacted in lifts by rmechanicall means to mitigate future settRerment. Defiverableso Summary of test bole coordinate data and a CARD tale containing CL A SUE data. VIA 0 0 FA MT W1 / f The following Rteirms are not iincluded under this agreement but will The considered as extra work„ 1.. Polpuiating the service line inventory. 2. Sampfing or water quality analyses.. 3. Deveiolpirnent of a (list of schools and RTicensed child. --care facilities. 4,. Estimation of labor costs for City staff.. 5. Design services of any kind.. 6. SubmMals or dehveralbies in addition to those listed herein. Garver shall (begin work under this Agreement within tern (10) callendair days of the Notice to Proceed for each task and shaill complete the work in accordance with the schedule (bellow. It is assumed that 9 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 the Notice to Proceed for each task will be accompanied by City -developed documents that Garver is to review. Task Description Basic Services Task I — Service Line Inventory Assistance Task II — Water Quality Assessment Task III — Sampling Plan and Protocol Development Task IV — Lead Service Line Replacement Plan Development Additional Services Calendar Days 35 days from Notice to Proceed 35 days after completion of Task 1 35 days after completion of Task II 35 days after completion of Task III Task V — Budgeting for LCRR and LCRI Costs (Optional) 21 days from task authorization Task VI — Funding Assistance (Optional) 42 days from task authorization Task VII — Review of Communications Materials (Optional) 21 days from task authorization Task VIII — Subsurface Utility Engineering (Optional) N/A *Note: for planning purposes, 14 calendar days are assumed for a complete City response to a data request or comments related to a Draft submittal. 10 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 EXHIBIT B (FEE SUMMARY) The table below presents a summary of the fee amounts and fee types for this Agreement. WORK DESCRIPTION FEE AMOUNT FEE TYPE Task I - Service Line Inventor Assistance $20,346 LUMP SUM Task II - Water Quality, Assessment $15,262 LUMP SUM Task III - Sampling Plan and Protocol Develo Ment $17,968 LUMP SUM Task IV - Lead Service Line Replacement Plan 12,188 LUMP SUM Develo ament ................ Task- Bud etin, for LCRR and LCRI Costs $12,620 RATE SCHEDULE .V Task VIFundin_Assistance RATE SCHEDULE .........._...... TaskWVll -Review of Communication Materi-a-ls ITITITIT mITITIT$25,038 mmmm_ $9,956 RATE SCHEDULE Task VIII - Subsurface Utility En ineerin Unit Pnce $4,780 RATE SCHEDULE TOTAL FEE $118,158.00 The lump sum amount to be paid under this Agreement is $65,764.00. For informational purposes, a breakdown of Garver's estimated costs is included in this Exhibit B with approximate current hourly rates for each employee classification. Any unused portion of the fee, due to delays beyond Garver's control, will be increased six percent (6%) annually with the first increase effective on or about November 1, 2024. The Owner will pay Garver for Service rendered at the agreed upon rates for each classification of Garver's personnel (may include contract staff classified at Garver's discretion) plus reimbursable expenses including but not limited to printing, courier service, reproduction, and travel. The total amount paid to Garver under this Agreement is estimated to be $52,394.00. The actual total fee may exceed this estimate. For informational purposes, a breakdown of Garver's estimated cost is included in this Exhibit B with approximate current hourly rates for each employee classification. The agreed upon rates will be increased annually with the first increase effective on or about June 1, 2024. 11 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035 Garver Hourly Rate Schedule: July 2023 - June 2024 Classification Rates ngmeers I MAltects $ 157.00 E-1 $ 130.00 E-2 $ 144.00 E-3 $ 174.00 E-4 $ 203.00 E-5 $ 247.00 E-6 $ 304.00 E-7 $ 422.00 fanners $ 58.00 P-1 $ 157.00 P-2 $ 196.00 P-3 $ 244.00 P-4 $ 273.00 P-5 $ 308.00 Designers $ 58.00 D-1 $ 118.00 D-2 $ 135.00 D-3 $ 161.00 D-4 $ 193.00 Technicians T-1 $ 95.00 T-2 $ 114.00 T-3 $ 139.00 T4 $ 180.00 Surveyors S-1 $ 58.00 S-2 $ 77.00 S-3 $ 103.00 S-4 $ 148.00 S-5 $ 187.00 S-6 $ 218.00 2 -Man Crew (Survey) $ 225.00 3 -Man Crew (Survey) $ 282.00 2 -Man Crew (GPS Survey) $ 245.00 3 -Man Crew (GPS Survey) $ 302.00 Construct on , servation Rates C-1 $ 112.00 C-2 $ 140.00 C-3 $ 171.00 C-4 $ 221.00 C-5 $ 259.00 Paris Lead and Copper Rule Assistance Classification Rates Resource pec a' is $ 104.00 RS -1 $ 104,00 RS -2 $ 137.00 RS -3 $ 194.00 RS4 $ 268.00 RS -5 $ 335.00 RS -6 $ 411.00 RS -7 $ 460.00 TMI'ronmental specialists $ 75.00 ES -1 $ 104.00 ES -2 $ 131.00 ES -3 $ 168.00 ES -4 $ 198.00 ES -5 $ 248.00 ES -6 $ 318.00 ES -7 $ 398.00 ES -8 $ 450.00 Project Controls $ 75.00 PC -1 $ 106.00 PC -2 $ 140.00 PC -3 $ 178.00 PC4 $ 229.00 PC -5 $ 280.00 PC -6 $ 361.00 PC -7 $ 454.00 Administra ion anagement AM -1 $ 75.00 AM -2 $ 96.00 AM -3 $ 134.00 AM -4 $ 171.00 AM -5 $ 209.00 AM -6 $ 272.00 AM -7 $ 320.00 M-1 $ 510.00 12 Version 1 Garver Project No. 2302035 Exhibit B City of Paris Lead and Copper Rule Assistance All Tasks S.Moai-B..i.S—i—S..ti.. 1e sa wo nx e oF '-, , /^,i, , 56tQ, ;p 77,, Exhibit B City of Paris Lead and Copper Rule Assistance All Tasks EXHIBIT C (INSURANCE) Pursuant to Section 7.1 of the Agreement, Garver shall maintain the following schedule of insurance until completion of the Services: Worker's Compensation Statutory Limit Automobile Liability Combined Single Limit (Bodily Injury and Property $500,000 Damage) General Liability Per Occurrence $1,000,000 Aggregate $2,000,000 Professional Liability Per Claim $1,000,000 Annual Aggregate $2,000,000 Excess of Umbrella Liability Per Occurrence $1,000,000 General Aggregate $1,000,000 15 Version 1 Paris Lead and Copper Rule Assistance Garver Project No. 2302035