11/16/2023 MinutesM INS , D`F ]EK,,S 0 F R E GU IL AR M E, E TIN
G
A,IRi,2R r ADVIs()RY BOACUD
107 E kST KAUFMAN STREET
PARIS,TQLAS
NOYIINI.�IER 16L20233j_5:10 P.M.
A-(.11%I'S-OrY, Board was uffled to order at 5.30 pm. by Airport Manager Paul Strahan.
Jackson and, Jeffrey Nhchols.
Cit,: Assistant ity Manager Robert Vine and Airport Manager Patti Strahan
I k1put,
�n�4,dle citizQn's i'brunl-
val d,�I NdinuU-Is
3, /�p�.)ro
Th, 17,'2( ,, niinuteart approval, motion made to approve the minutes by Scott
)1]'s
Lie i,so�,,io(J, by Jefficy Niebols,
4. fron'i the Airport NIanager,
C I .�, - a
") Upd,,te
Tlul-1 tea f. tfor UJ)gradc was placed into, the airport budget, after coordinating the upgrade it
tfi,,� FAA had misidentified IIRX AWOS, the AWOS did not need upgrading.
UJ , kifbrmalion, theprot was cancelled.
J ec
T
System
t
aiiports lhave ar�. aircraft tracking system to track all aircraft into
X , , " I -- 1 1 � � I'! Lo
(,, Ij,:I,,"',"nI,,s" �fiis 1nC()rnIaIiofI call, have as positive effect on the funding the airport receives.
....... - U
"" 11.d ti ii s
eriRA
dcc onto their NIP eligible iteins,This year TXDOT will pay- for 50%
". 11 �Is
of COM f'Oi, this; system, moving forward rXDO"l' is hoping to move the cost to a 90/10
^; t, 'or our tracking company, Since the airport is a first time
120(),Aero f
CLO" 011reeeived '3) months free Ibr this service with a remaining balance of $900
I I ""i :501X) of that Cost ($450) being covered by TXDOT. The equipment needed
to IW"; slCIIHI "I'VOrk was shipped by the conipany and installed by airport staff. The device
lAff'I C'(", "A", hoc)ked upi to the existing airport WiFi network.
—,('t "mas going Io "spend the bulk of this money to replace our aging fuel far]
sLartcJ coardinating this project which was slated to take place in FY
20"', fvqacst dcto the airport already having a fuel faun in spite of the age of
directions that the airport can check on but if the answer is a firm, no,
" ..GI Baa be .hilted clsvNvhcre.
Updaite
4,he placement of the large hangar (120'xSO') so not a lot of'
KS ,,"A crti.m,acd a renderino
g f the possible location of the hangars, this was
'I otal nUmber f,)fbores should be around 18-2 1, one per hangar,
OYL 17"( ""Ind nluhiple boreson the vehicle access road.
Ai J(,, tT ari(I I ochner had a meeting about the runway pro.ject, Lochner
SU,", the ovei-all pr(ject Nvould possible see an $800,000 price increase. There
E..ala rt can be, removed to rcduce the overall price. The pr(Iject cost is a x{1/10
k'�)1a.twr rai attentional $80,000. This, information ofa price increase was,
a)Vhen the ,.6rport went bel"ore, the council to approve initial dollar amount of
""uirheid si',mtge is ftom 2011, most of the panels that make up the signage
T[Ia""Y an,, i'n need of replaccinent. New panels will be ordered in December
1 �,J the ��inter finlc',, fi-ame.
/-"Ji,porlAdvl.,so'.,"� Board Meeting would Ire February 15, 2024.
2
3 ,s;(.1av 20 4,
Q
Paul Strahan, Airport Manager