Loading...
24 - Development Fee Schedule UpdateItem No. 24 Memorandum TO: Mayor, Mayor Pro Tem and City Council Grayson Path, City Manager FROM: Duke McGee, MCP Building Official, Asst. Director Community Development Todd Mittge, City Engineer Michael Smith, Public Works Director SUBJECT: Review and Update of Development Fee Schedule DATE: April 22, 2024 BACKGROUND The City maintains a Fee Schedule in Appendix A for Development -related work the City performs in the Building, Public Works, Engineering and Fire Marshall Departments. The purpose of these fees is to offset public tax dollar expense directed towards development projects in town. The rationale is the development project itself, and not the tax payers, should cover expenses for zoning, platting, permitting, etc. While no fee schedule can ever truly account for the exact cost (above or below) for each unique project, the goal is to set a reasonable fee that covers as much of our cost as possible to help lessen the burden on the tax payers. STATUS With the above goals in mind, staff attempt to review our fees annually to determine if they are appropriate and whether they need to be decreased, increased, added or deleted. We also examine state legislation, such as HB 222 from this last year, to determine if changes need to be made (which is the case with some platting fees). After conducting this review, which included a combination of examination of state law changes, reviewing fees from some similar communities, and where needed performing our own internal calculations on what it truly costs us to perform certain tasks (particularly in platting), we have adjusted certain fees up and down to better reflect cost. In some situations, we have also re -categorized and moved some fees from one section to another. Some fees are being deleted while some new ones have been added. Again, the goal is to reasonably cover our cost to avoid raising taxes to do so. Significant changes include: • Increasing deposit on construction meters to actual cost of meter. • Reducing and capping Residential Remodel Permit Fee • Increasing the Vacant Building Registration Fee • Reducing Name Change ONLY CO Fee • Re -categorizing Plat Fees and adjusting to cover our cost • Insuring Engineering Fee align with State Law The departments with fee modification are: Building, Engineering and Public Works. Fire Marshall has no fee modification at this time. The proposed fee modifications have been attached to this memo. We have included "editor notes" in red ink to provide some additional comments behind the proposed edits. BUDGET The proposed fee schedules should better help cover certain expenses in the identified departments. OPTIONS 1. Approve an ordinance adjusting the development -related fee schedule as proposed. 2. Request edits to the proposed fee schedule. 3. Request additional information on any proposed fee edit, including requesting edits to fees that staff have not identified as being changed. 4. Reject the proposed fee schedule and keep the existing schedule intact. RECOMMENDATION 1. Approve an ordinance adjusting the development -related fee schedule as proposed. ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS, AMENDING APPENDIX A, "FEE SCHEDULE," SECTION A3.002, "DEVELOPMENT AND GENERAL CONSTRUCTION AND PLANNING PERMIT FEES," OF THE CODE OF ORDINANCES OF THE CITY OF PARIS; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; PROVIDING A REPEALER CLAUSE, A SEVERABILITY CLAUSE, AND A SAVINGS CLAUSE; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the Appendix A of the City of Paris Code of Ordinances provides a fee schedule for city permits and services, including those related to construction and development; and WHEREAS, the City Council amended the fee schedule relating to construction and development on December 12,2022; and WHEREAS, city staff has conducted its annual review of the fee schedule relating to planning, development, and construction fees and has proposed certain revisions thereto to better reflect current costs of operation so that the cost of development remains with developers rather than being passed on to the city's taxpayers at large; and WHEREAS, staff has proposed certain revisions to platting fees to bring those fees in line with recent legislative changes; and WHEREAS, the City Council finds it desirable to revise these fees as proposed by city staff, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS: Section 1. That the findings set out in the preamble to this ordinance are hereby in all things approved and are incorporated herein for all purposes. Section 2. That Appendix A, Article A3.002, "Development and general construction and planning permit fees," of the Code of Ordinances shall be and is hereby amended to read as set forth in Exhibit A, attached hereto and incorporated by reference as if fully set forth herein. Section 3. That all provisions of the ordinances of the City of Paris, Texas in conflict with the provisions of this ordinance are hereby repealed, and all other provisions of the ordinances of the City of Paris not in conflict with the provisions of this ordinance shall remain in full force and effect. Section 4. That the repeal of any ordinance or part of ordinances affected by the enactment of this ordinance shall not be construed as abandoning any action now pending under or by virtue of such ordinance or as discontinuing, abating, modifying, or altering any penalty accruing or to accrue, or as affecting any rights of the municipality under any section or provisions of any ordinance at the time of passage of this ordinance. Section 5. That it is the intention of the City Council of the City of Paris that this ordinance, and every provision hereof, shall be considered severable, and the invalidity or partial invalidity of any section, clause, or provisions of this ordinance shall not affect the validity of any other portion of this ordinance. Section 6. That this ordinance shall become effective from and after its passage. PASSED AND ADOPTED on this 22nd day of April, 2024. Reginald B. Hughes, Mayor ATTEST: Janice Ellis, City Clerk APPROVED AS TO FORM: Stephanie H. Harris, City Attorney EXHIBIT A NOTE: &Fikefiffea denotes deleted text. Underline denotes new text. If-Ztc,r are for informational purposes only and are not meant for publication. § A3.002 Development and general construction and planning permit fees. (a) Building department fees. (1) Residential. (A) New single-family home or duplex: $.50 sq. ft. 11,111 (B) Remodel, alteration or addition: $.-N.25 sq. ft. 5500.00 max (C) Residential reroof. $50.00. (D) Concrete/driveway: $50.00. (E) Accessory building - without NMP: $100.00. (F) Accessory building - with MEP: $150.00. (G) Repair HVAC: $50.00. (H) HVAC new: $50.00. (1) Meter repair: $50.00. (J) General electrical work: $50.00. (K) Rewire: $50.00. (L) Water heater: $50.00. (M) Gas test: $50.00. (N) Miscellaneous plumbing repair: $50.00. (0) Sewer relay: $50.00. (P) Water relay: $50.00. (Q) Irrigation: $50.00. (R) Swimming pool - above ground: $75.00. (S) Swimming pool - below ground: $200.00. (T) Swimming pool - repair/correction: $75.00. (U) Plan review: $25.00. (V) PV solar panels: $75.00. (W) Foundation repair: $50.00. (X) EV charging system: $50.00. (Y) Generator installation: $50.00. (2) Commercial. (A) Commercial new: Value based. (B) Commercial remodel: Value based. (C) Commercial reroof: Value based. (D) Commercial mechanical: Value based. (E) Commercial electrical: Value based. (F) Commercial plumbing: Value based. (G) Parking lot/paving: Value based. (H) Retaining wall over 4 32": $100.00. (TA u;E'r e. aiiiiw' OfnzHI r, lle�A (I) Fencing over T: $50.00. (J) Solar system: Value based. (K) Accessory building: Value based. (L) Irrigation: $100.00. (M) Swimming pool: Value based. (N) Plan review: 25% of permit fee. (3) Certificate o(oecy (A) Certificate of occupancy: $100.00 SCO—NAME CHANGE ONLY "2500�Ig it (0 option 1. $100.00 flat (43CC) Clean and show: $50.00. (Gj?) Temporary certificate of occupancy: $150.00. (4) Signs. (A) <50 sq. ft. (single sided or re -face): $50.00. (B) <50 sq. ft. (double sided): $75.00. (C) >50 sq. ft. (single sided or re -face): $100.00. (D) >50 sq. ft. (double sided): $150.00. (E) Monument sign: $200.00. (F) Flags & banners (temp signs): $75.00. (G) Billboards: $500.00. (H) Billboard annual registration: $100.00. (1) Sign recovery: $25.00. (5) Miscellaneous building departmentpermits. (A) Solar system: $50.00. (B) Moving (building): $100.00 per building. (C) Construction trailer: $100.00. (D) Demolition: $50.00. (E) Temp pole electric: $50.00. Engineering departmentfees. III o11,HT��� aa.��f110rii� &:,f t4.'d��u11w��KV Ili;✓`„, �✓w,,b�1� ;��'�, , a�l�Y 7 �w...... E4,�ormoF g.Yl�� ���� 4114, ���;M1]�✓ �,�VoIi�I ,E ✓, "�:(I�li C�f,4�a11 ti r U h",,s d Irv,,t'n✓[CnA U�✓I¢ a �."4➢60� GIC' rarr�a ��� ✓i,",'p�.��1�k.%0 0: u:a'i�6� II 0✓;U�Gr�ll,� (1) Site "clan review: $120.00 an hour. o (2) Site $100.00. (3) Eia uneea- Ti , TiRi ections: $120.00 an hour. Gi fad r,. p,., . A4! $290.00, (4) Grading ermit: $250,00, (5) Clearing .permit tree removal): $200.00. Ri& e€ -W 49 weAingrigh4e$-100.00 (6) Right-of-way_CRO�N/J.. - working in ri ro t -of -way. „"100.00. Third Partj' consultation, review or inspections: Actual Cost. �' C? .J I✓ x' Note1' ✓ UUAh"I" "i pj r 4 l r f"c'i r ✓!"I°�uY{Il„ Y6i ��4Y11ral4o�ICr��.'IC,,,r,�f ���✓<41Pt I✓✓,�1,`,, o, 8 P attire',. , �.r✓.�: 11 ,,:�, ��r , .., �.. �` ` �'� �� ". ll�i�l"GL �'1��1IIIll4L�! a✓(;frfJ✓ fir �,:(I�rlll.�,.+r"✓YJflg �✓I � ¢d� ��,✓flll,��,� bl� (I✓�1"ti� il� ✓ ,.I�� A Prelirninary Plat. Will be a adual increasin p scale as follows: (i) 1.... Lot: (ii). 2 - 4 Lots $30000er 121at Plus one dollar � 1-0QLer lot,., (iii). 5-10 Lots: $500.00 r jat plus ten dollars,$10.00 1_otm. (iv). 11-15 Lots: $750.00 iierPlat plus ten dollars 10.00` ;ger lot. (v). 16-20 Lots: $1000.00 per plat plus fifteen dollars (S 15.00) ger lot. (vi). 21-50 Lots: $1500.00 :ger 2lat Mus fifteen dollars$15.00' „pprjot. (vii). 51- Over Lots: $2000.00 per plat iAus twenty dollars $20.00) ger lot. tBi Final Plat. (i). 1 ITLot______..............................._..........._........:$300.00 $300.00.p.pr latm flus, one„_dollar 1.00 „"ger lot. (ii). 2 - 4 Lots: $300.00 per plat plus one dollar 'J 1.00 „ er lot. (iii). 5-10 Lots: $500.00 ,ger ;)lat plus ten dollars $10.00 er lot. (iv). 11-15 Lots: $750.00 er lat plus ten dollars L$10.00 :ger lot. (v). 16-20 Lots: • 1000.00 per plat plus fifteen dollars 615.00 :ier lot. (vi). 21-50 Lots: $1500.00 per plat plus fifteen dollars $15.00 ael r lot. (vii). 51- Over Lots: $2000.00 eri)lat plus twenty dollars t20AJ )er lot,. (Cj Replats. 1 Lot: $300.00 per .lat alus one dollarl OOt, aek r lot.„ (ii). 2 - 4 Lots: $300.00 per olat Mus one dollar ',$1.00tier lot. (iii). 5-1 O.Lots: .........$500.00 �- r Plat Plus ten dollars t 10.00, er lot. (iv). 11-15 Lots: $750.00 ger plat plus ten dollars "10.00tier lot. (v). 16-20 Lots: $1000.00 _ er _flat plus fifteen dollars '$15.00` Ler lot. (vi). 21-50 Lots: '$1500.00 ,i)er olat ,alus fifteen dollars $15.00 per lot. (vii). 51- Over Lots:.. S2000.00 per plat plus twent dollars 9 20.00 er lot. D Master Plats. When submitted with a )reliminwy plat the fee shall be an additional ten dollars $10.00ner lot. When submitted separately the fees will be as follows: 1 Lot: wj300 00er Plat plus one dollar `.;1.00 er lot. (ii). 2 - 4 Lots: $300.00 ger plat plus one dollar $1.00per lot. (iii). 5-10 Lots: $500.00 ner3alat Phar ten dollars x$10.00) e r lot. (iv). 11-15 Lots: $750.00 , er tilat Mus ten dollars ($lQ,0Q,LVqr lot. (v). 16-20 Lots: _$1000.00 ger .plat plus fifteen dollars ,1515,00_leer lots (vi). 21-50 Lots: 1500.00 ger plat :plus fifteen dollars 15.00e�r lo_t. (vii). 51- Over Lots: 2000.00 ger lat . lus twent dollars x'20.00 aer lot. (E) Minor Plats. Three hundred dollars ($300.00) per minor Mat. In addition to these fees, an additional thiriv nine dollar check or current filing, fee) shall be submitted with all final plats, Lejslats and minor plats for County filing expense. The check shall be made to the Lamar Count Clerk for filing, fees. (c) Public work fees — water and sewer taps. (1) Water. (A) Standard 1" -in pavement: $1,790.00. (B) Standard I" - in soil (same side): $890.00. (C) Standard 2" - in pavement: $2,610.00. (D) Standard 2" - soil (same side): $1,900.00. (E) Split service - in pavement: $2,610.00. (F) Split service - soil (same side): $1,100.00. (G) 5 & 5 program: See policy. (H) Dc posit for Construction Water Meter, '2500,OQ Ed,�� r,i p e S d (1) Construction Water Meter rate: See A10.003 for Commercial Water Rates vvifl] (2) Sewer. (A) Standard 4" - in pavement: $2,260.00. (B) Standard 4" - in soil (same side): $800.00. (C) Standard 6" - in pavement: $2,500.00. (D) Standard 6" - soil (same side): $1,000.00. (E) Split Service - in pavement: $2,210.00. (F) Split service - soil (same side): $1,000.00. (G) 5 & 5 program: See policy. (d) Fire department and fire marshal fees. (1) Fire construction permit. (A) Underground fire main: $200.00. (B) Above-ground fire sprinkler system: $1.00 per fire sprinkler head, $200.00 min - $1,200.00 max. (C) Fire alarm system: $1.00 per fire alarm device, $200.00 min - $1,200.00 max. (D) Fixed fire extinguishing system: $150.00 per system. (E) Flammable and combustible liquids tanks: $100.00 per tank. (F) LP-gas: $50.00. (G) Spraying or dipping: $150.00. (H) Standpipe system: $150.00. (n Electronic access doors and gates: $150.00. (2) Fire operational permit. (A) Explosives: $500.00. (B) Fire works and pyrotechnics: $100.00. (C) Fire hydrants and valves: $50.00. (D) Hot work operations: $25.00. (E) Open burn - standard (residential): $50.00. (F) Open burn - standard (commercial): $250.00. (G) Open burn - recreational: $50.00. (H) Open burn - agriculture (annual): $50.00. (1) Temporary fuel dispensing and storage: $50.00 per tank. (3) Fire annual inspection. (A) Nursing home: $75.00. (B) Daycare (adult or child): $35.00. (C) Group homes: $35.00. (D) Hospital: $175.00. (E) Commercial building: $50.00. (4) Miscellaneous fire department fees. (A) Application fee: $50.00. (B) Flow test: $50.00 per test. (C) False alarm fee - commercial 4 to 6 alarms: $50.00 per alarm in a 12 month period. (D) False alarm fee - commercial 7 and more alarms: $75.00 per alarm in a 12 month period. (E) Hotel or motel: $25.00 plus $5.00 a room. (F) Failed inspections over 3: Permit cost. (G) Licensed foster or adoption home < 7 children (biannual): $0.00. (H) Licensed foster home > 7 children (annual): $100.00. (1) Requested general commercial fire inspections: $50.00 plus $0.10 a square foot. (J) Industrial or buildings over 50,00 sq. ft.: $200.00. (K) Miscellaneous fire inspection fee: $50.00 per hour. (e) Planning department fees. (1) P1 ff"di[t,�"Ji- k,") Pr-el4m4Nffy or- final pla4.- $300.00 plus $5.00 per- let. (B) Replat. $3 00.00 plus $5.00 pff let, (G) Nfifter- pIR4 (>4 lots with-:-R-A- utility &E4.). $150.04.- (1-2) Planning and zoning. (A) Zoning verification letter: $50.00. (B) Variance - board of adjustment: $300.00. (C) Zoning change: $400.00. (D) Minor com plan amendment: $400.00. (E) Specific use permit: $400.00. (F) Vacation of easement or alley: $200.00. (G) Annexations - disannexation: $350.00. (H) Planned development: $500.00. (1) Pre-Dev Meetings s J) Initial meeting and an' Ljdditional city, reguested meeting s- No char, e (ii) Additional meetinsp(s) reLiuestedb'v developer: S200.00 permeetin-. kflrzAd,,3.ing f,,,e c y, (f) Registration fees. (1) Contractor. (A) Sign contractor: $50.00. (B) Sign contractor renewal: $35.00. (C) House movers: $25.0950.00. 6 y (2) Other. (A) Historic districts vacant building - commercial: $500.00 (1st year + $500.00 increase each year thereafter). r"(") (B) Historic districts vacant building - residential: $250.00 (1st year + $25.00 increase each year thereafter). (g) Miscellaneous fees. (1) Inspection fee. (A) After hours: $100.00 hour (minimum 2 hours). (B) Reinspection: $50.00. (C) Historic District Rental property re -inspection: $25.00. 0D A,(Jcl' ""T"i e a,,," (JIr'lat (D) Stormwater: $50.00 a day. (E) Miscellaneous inspection fee: $50.00 per hour. (2) Other fees. (//",w) Appeal to building bear -El- $200.00. (IEIddl ,,uNbA11)ele,t, I Tassfe buildieg buildifigs and staffdffds- [sie]-. � .. ........ "fl,��,,,,,,,t,e,f,'r"",(",,( (AE) Special event: $200.00250.00. (BB -P) Work without permit: $50.00 per day plus double applicablepermit fee, iv'i �"fia �"Ja a It ,,�6d (CR)Home occupation: $75.00. Q)F)Processing fee: $25.00. LEG)Miscellaneous permit: $50.00. (FH)Third-party consultation, review or inspections: Actual cost. Q4) Deconstruction permit: $25.00. (h) Commercial building valuation table. Total Valuation Fee $1.00 to $500.00 $35.00 $501.00 to $35.00 for the first $500.00 plus $3.05 for each additional $100.00, or fraction $2000.00 thereof, to and including $2,000.00 $2001 to $80.75 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction $25,000.00 thereof, to and including the $25,000.00 $25,001.00 to $402.75 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or $50,000.00 fraction thereof, to and including $50,000.00 $50,001.00 to $655.25 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction $100,000.00 thereof, to and including $100,000.00 $100,001.00 to $1,005.25 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or $500,000.00 fraction thereof, to and including $500,000.00 $500,001.00 to $3,245.25 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or $1,000,000.00 fraction thereof, to and including $1,000,000.00 $1,000,001.00 and $5,620.25 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or UP fraction thereof