Final Notice and Public Explanation of a Proposed Activity in a FFRMS Floodplain and WetlandFinal Notice and Public Explanation of a Proposed Activity in a FFRMS Floodplain and Wetland To: All interested Agencies, Groups and Individuals on 7/1/2025 : This is to give notice that the city has conducted an evaluation as required by Executive Order 11988 and Executive Order 11990, in accordance with HUD regulations at 24 CFR 55.20 Subpart C Procedures for Making Determinations on Floodplain Management and Wetlands Protection. The activity is funded under the Community Development Block Grant Program and administered by the Texas Department of Agriculture (TDA) ERR #(CDV23-0206). The City proposes to Replace approximately one thousand eight hundred sixty linear feet (1,860 LF) of ten -inch (10 in.) sewer line, including site clearing, boring, manhole replacement, related pavement repairs, and all associated appurtenances. The project will traverse one thousand eight hundred sixty linear feet (1,860 I.f.) cross country moving north beginning at Graham Street at approximately 120 LF east of 31 st Street SW, and end approximately 220 LF south of Shiloh Street on 28th Street NW, Paris, Lamar County, Texas. The purpose of the project is to replace deteriorated sewer lines. The extent of the FFRMS floodplain was determined using 0.2 percent flood approach. According to the Federal Flood Standard Support Tool (FFSST) CISA data is not available for the project area. However, the Federal Emergency Management Agency (FEMA) has defined the 0.2 -percent -annual -chance floodplain for the project area. According to FEMA, Flood Insurance Rate Map (FIRM) Panel No. 48277C0315C effective date 8/16/2011, approximately 0.04 acres of proposed project is located within the 1 %-annual-chance floodplain and 0.003 acres is located within the regulatory floodway. Therefore, approximately 0.043 acres of the proposed project is located within the Federal Flood Risk Management Standard (FFRMS) floodplain. As the proposed project does not involve an activity for which even a slight chance of flooding might be too great because such flooding might result in a loss of life, injury to persons, or damage to property, it is therefore not a critical action. According to the United States Fish and Wildlife Service (USFWS) National Wetlands Inventory (NWI), the proposed project is located within approximately 0.03 acres of designated wetland code R4SBC wetland. The natural and beneficial functions and values of the floodplain and wetland potentially affected by the proposed activity include floodwater storage and conveyance, groundwater recharge, erosion control, surface water quality maintenance, biological productivity, fish and wildlife habitats, harvest for wild & cultivated products, recreational, educational, scientific, historic, and cultural opportunities. The City of Paris has considered the following alternatives and mitigation measures to minimize adverse impacts and to restore and preserve natural and beneficial functions and intrinsic values of the existing floodplain and wetlands: locations outside and not affecting the FFRMS floodplain or wetlands, alternative methods to serve the identical project objective, and a determination not to approve any action proposing the occupancy or modification of a floodplain or wetland. The practicability of alternatives considered the natural, social, and economic values of each alternative. The alternatives considered were not chosen because they would fail to address the most deteriorated sewer lines in need of repair, would be economically prohibitive, and would allow health, safety, and environmental violations to persist. The City of Paris has reevaluated the alternatives and has determined that there is no practicable alternative to locating the proposed project in the FFRMS floodplain and wetlands. The proposed project must be located within the floodplain and wetland due to the necessity of aligning with existing infrastructure and to meet critical service requirements for the surrounding community. The best action is to proceed with the project as planned utilizing the following mitigation measures to minimize adverse impacts and to restore and preserve natural and beneficial functions and values of the FFRMS floodplain: • Sewer systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems • The project shall not lead to any significant increases in impermeable cover and shall have no negative impacts on the floodplain, as all lines will be subsurface, and the project area will be restored to pre - project conditions upon completion. • The project shall meet any applicable, additional local floodplain requirements set forth by the community's Floodplain Administrator prior to construction. • All state, local, and NFIP floodplain protection procedures will be followed. Including manhole elevation/floodproofing as necessary. • The consulting engineer shall take into consideration additional specifications to minimize damage to and/or restore the native plant species • The project shall be implemented using best management practices designed to protect improvements from flood damage. • The proposed improvements that intersect the floodway will be installed underneath the floodway using directional drilling • The implementation of erosion and sediment control measures will be used wherever possible, such as the installation of silt fences, sediment barriers, or erosion control blankets, using sediment basins to capture runoff before it enters wetlands, or stabilizing exposed soils immediately after construction with vegetation or mulch. • The implementation of pollution prevention measures will be taken when possible, such as having spill prevention and control plans with spill kits on-site, storing and handling hazardous materials away from the wetlands, inspecting construction equipment for leaks and malfunctions before project work commences, and using biodegradable hydraulic fluids in equipment when working near wetlands is possible. • Preventative construction techniques, such as ensuring that heavy machinery is inspected regularly for potential oil leaks, malfunctioning parts, or other mechanical issues, will be used to reduce the availability of construction-related pollutants that might contaminate runoff. • Staging and operating heavy machinery within the wetland or riparian area will be avoided. • Restrict the use of heavy machinery during certain times of the year when wetlands are most vulnerable (e.g., during the rainy season or breeding seasons for wildlife). Conduct heavy construction activities during dry periods to minimize soil disturbance and water contamination. • Establish specific access routes and designated areas for heavy machinery to minimize the disturbance of sensitive wetland areas. These routes should avoid high-conservation or particularly fragile zones, and should be demarcated with physical barriers like fences or signs to prevent unauthorized entry. • The Responsible Entity (RE) and consulting engineer are working with USACE to determine what permits, if any, are necessary. All necessary permits will be acquired prior to construction. • All state and local wetland protection procedures will be followed. • If a USACE permit is required, the project will remain in compliance with all the General / Regional Conditions of the applicable permit. Environmental files that document compliance with steps 3 through 6 of Executive Order 11988 and Executive Order 11990 are available for public inspection, review, and copying upon request during regular business hours at the City Hall. There are three primary purposes for this notice: (1) People who may be affected by activities in floodplains and those who have an interest in the protection of the natural environment should be given an opportunity to express their concerns and provide information about these areas; (2) An adequate public notice program can be an important public educational tool. The dissemination of information and request for public comment about floodplains can facilitate and enhance Federal efforts to reduce the risks and impacts associated with the occupancy and modification of these special areas; and (3) As a matter of fairness, when the Federal government determines it will participate in actions taking place in floodplains, it must inform those who may be put at greater or continued risk. Written comments must be received on or before 7/8/2025 by the City of Paris at 135 SE 1st Street or PO Box 9037, Paris, TX 75461, (903) 784-9202. Attention: Mihir Pankaj, Mayor. A full description of the project may also be reviewed during regular business hours at the same address. Comments may also be submitted via email to rvine@paristexas.gov CC: jacqueline.six@grantworks.net. Aviso final y explicacion publica de una actividad propuesta en una Ilanura aluvial y humedal de FFRMS Para: Todas las Agencias, Grupos e Individuos interesados el 7/1/2025 : Esto es para notificar que la ciudad ha realizado una evaluacion segun Io requerido por la Orden Ejecutiva 11988 y la Orden Ejecutiva 11990, de acuerdo con las regulaciones de HUD en 24 CFR 55.20 Subparte C Procedimientos para tomar determinaciones sobre el manejo de Ilanuras aluviales y la proteccion de humedales. La actividad esta financiada bajo el Programa de Subvenciones en Bloque para el Desarrollo Comunitario y administrada por el Departamento de Agricultura de Texas (TDA) ERR #(CDV23-0206). La Ciudad propone reemplazar aproximadamente mil ochocientos sesenta pies Iineales (1,860 LF) de linea de alcantarillado de diez pulgadas (10 pulgadas), incluida la Iimpieza del sitio, la perforacion, el reemplazo de alcantarillas, las reparaciones relacionadas con el pavimento y todos los accesorios asociados. EI proyecto atravesara mil ochocientos sesenta pies Iineales (1,860 pies Iineales) a campo traviesa hacia el norte, comenzando en Graham Street aproximadamente a 120 LF al este de 31 st Street SW, y terminara aproximadamente a 220 LF al sur de Shiloh Street en 28th Street NW, Paris, Lamar County, Texas. EI objetivo del proyecto es reemplazar las Tineas de alcantarillado deterioradas. La extension de la Ilanura aluvial FFRMS se determine utilizando un enfoque de inundacion del 0.2 por ciento. De acuerdo con la Herramienta Federal de Apoyo al Estandar de Inundaciones (FFSST), los datos de CISA no estan disponibles para el area del proyecto. Sin embargo, la Agencia Federal para el Manejo de Emergencias (FEMA, por sus siglas en ingles) ha definido la Ilanura de inundacion con una probabilidad anual del 0.2 por ciento para el area del proyecto. De acuerdo con FEMA, Mapa de Tarifas de Seguro contra Inundaciones (FIRM) Panel No. 48277C0315C fecha de vigencia 8/16/2011, aproximadamente 0.04 acres del proyecto propuesto se encuentra dentro de la Ilanura aluvial de probabilidad anual del 1 % y 0.003 acres se encuentra dentro del cauce de inundacion reglamentario. Por Io tanto, aproximadamente 0.043 acres del proyecto propuesto se encuentran dentro de la Ilanura aluvial del Estandar Federal de Gestion de Riesgos de Inundacion (FFRMS). Dado que el proyecto propuesto no implica una actividad para la cual incluso una minima posibilidad de inundacion podria ser demasiado grande porque dicha inundacion podria resultar en una perdida de vidas, Iesiones a personas o danos a la propiedad, por Io tanto, no es una accion critica. De acuerdo con el Inventario Nacional de Humedales (NWI) del Servicio de Pesca y Vida Silvestre de los Estados Unidos (USFWS), el proyecto propuesto se encuentra dentro de aproximadamente 0.03 acres del humedal designado con codigo de humedal R4SBC. Las funciones y valores naturales y beneficiosos de la Ilanura aluvial y el humedal potencialmente afectados por la actividad propuesta incluyen el almacenamiento y la conduccion de agua de inundacion, la recarga de aguas subterraneas, el control de la erosion, el mantenimiento de la calidad del agua superficial, la productividad biologica, los habitats de peces y vida silvestre, la recoleccion de productos silvestres y cultivados, las oportunidades recreativas, educativas, cientificas, historicas y culturaless. La ciudad de Paris ha considerado las siguientes alternativas y medidas de mitigacion para minimizar los impactos adversos y restaurar y preservar las funciones naturales y beneficiosas y los valores intrinsecos de la Ilanura aluvial y los humedales existentes: ubicaciones fuera de la Ilanura aluvial o los humedales de FFRMS y que no los afecten, metodos alternativos para servir al mismo objetivo del proyecto, y la determinacion de no aprobar ninguna accion que proponga la ocupacion o modificacion de una Ilanura aluvial o humedal. La viabilidad de las alternativas considerando los valores naturales, sociales y economicos de cada alternativa. Las alternativas consideradas no se eligieron porque no abordarian las Tineas de alcantarillado mas deterioradas que necesitan reparacion, serian economicamente prohibitivas y permitirian que persistieran las violaciones de la salud, la seguridad y el medio ambiente. La ciudad de Paris ha reevaluado las alternativas y ha determinado que no hay otra alternativa viable que ubicar el proyecto propuesto en la Ilanura aluvial y los humedales de FFRMS. EI proyecto propuesto debe ubicarse dentro de la Ilanura aluvial y el humedal debido a la necesidad de alinearse con la infraestructura existente y cumplir con los requisitos de servicio criticos para la comunidad circundante. La mejor accion es continuar con el proyecto segun Io planeado, utilizando las siguientes medidas de mitigacion para minimizar los impactos adversos y restaurar y preservar las funciones y valores naturales y beneficiosos de la Ilanura aluvial FFRMS: • Los sistemas de alcantarillado deben estar disenados para minimizar o eliminar la infiltracion de aguas de inundacion en los sistemas y las descargas de los sistemas • EI proyecto no dara lugar a ningun aumento significativo de la cubierta impermeable y no tendra impactos negativos en la Ilanura aluvial, ya que todas las lineas seran subterraneas y el area del proyecto se restaurara a las condiciones anteriores al proyecto una vez finalizado. • EI proyecto debera cumplir con los requisitos adicionales aplicables de Ilanuras aluviales locales establecidos por el Administrador de Ilanuras aluviales de la comunidad antes de la construccion. • Se seguiran todos los procedimientos estatales, locales y de proteccion de Ilanuras aluviales del NFIP. Incluyendo elevacion de pozos de inspeccion/impermeabilizacion segun sea necesario. • EI ingeniero consultor debera tener en cuenta especificaciones adicionales para minimizar el dano y/o restaurar las especies de plantas nativas • EI proyecto se implementara utilizando las mejores practicas de gestion disenadas para proteger las mejoras de los danos causados por las inundaciones. • Las mejoras propuestas que intersectan el cauce de inundacion se instalaran debajo del cauce de inundacion mediante perforacion direccional • Siempre que sea posible, se utilizaran medidas de control de la erosion y los sedimentos, como la instalacion de cercas de limo, barreras de sedimentos o mantas de control de la erosion, el use de cuencas de sedimentos para capturar la escorrentia antes de que ingrese a los humedales, o la estabilizacion de los suelos expuestos inmediatamente despues de la construccion con vegetacion o mantillo. • Se implementaran medidas de prevencion de la contaminacion cuando sea posible, como tener planes de prevencion y control de derrames con kits de derrames en el sitio, almacenar y manipular materiales peligrosos Iejos de los humedales, inspeccionar el equipo de construccion para detectar fugas y mal funcionamiento antes de que comience el trabajo del proyecto, y usar fluidos hidraulicos biodegradables en el equipo cuando se trabaje cerca de los humedales. • Se utilizaran tecnicas de construccion preventivas, como garantizar que la maquinaria pesada se inspeccione regularmente para detectar posibles fugas de aceite, piezas que funcionen mal u otros problemas mecanicos, para reducir la disponibilidad de contaminantes relacionados con la construccion que podrian contaminar la escorrentia. • Se evitara el estacionamiento y operacion de maquinaria pesada dentro del humedal o area riberena. • Restrinja el use de maquinaria pesada durante ciertas epocas del ano en que los humedales son mas vulnerables (por ejemplo, durante la temporada de Iluvias o las temporadas de reproduccion de la vida silvestre). Realice actividades de construccion pesada durante los periodos secos para minimizar la alteracion del suelo y la contaminacion del agua. • Establecer rutas de acceso especificas y areas designadas para maquinaria pesada a fin de reducir al minimo la perturbacion de las zonas sensibles de los humedales. Estas rutas deben evitar las zonas de alta conservacion o particularmente fragiles, y deben estar demarcadas con barreras fisicas como cercas o Ietreros para evitar la entrada no autorizada. • La Entidad Responsable (RE, por sus siglas en ingles) y el ingeniero consultor estan trabajando con USACE para determinar que permisos, si los hay, son necesarios. Todos los permisos necesarios se obtendran antes de la construccion. • Se seguiran todos los procedimientos estatales y locales de proteccion de humedales. • Si se requiere un permiso de USACE, el proyecto seguira cumpliendo con todas las Condiciones Generales / Regionales del permiso aplicable. Los archivos ambientales que documentan el cumplimiento de los pasos 3 a 6 de la Orden Ejecutiva 11988 y la Orden Ejecutiva 11990 estan disponibles para inspeccion publica, revision y copia a pedido durante el horario comercial regular en el Ayuntamiento. Hay tres propositos principales para este aviso: (1) Las personas que pueden verse afectadas por actividades en Ilanuras aluviales y aquellas que tienen interes en la proteccion del medio ambiente natural deben tener la oportunidad de expresar sus preocupaciones y proporcionar informacion sobre estas areas; (2) Un programa adecuado de aviso publico puede ser una importante herramienta educativa publica. La difusion de informacion y la solicitud de comentarios publicos sobre las Ilanuras aluviales pueden facilitar y mejorar los esfuerzos federales para reducir los riesgos e impactos asociados con la ocupacion y modificacion de estas areas especiales; y (3) Como una cuestion de justicia, cuando el gobierno federal determine que participara en acciones que se Ileven a cabo en Ilanuras aluviales, debe informar a aquellos que puedan estar en riesgo mayor o continuo. Los comentarios por escrito deben ser recibidos antes del 7/8/2025 por la Ciudad de Paris en 135 SE 1st Street o PO Box 9037, Paris, TX 75461, (903) 784-9202. Atencion: Mihir Pankaj, Alcalde. Tambien se puede revisar una descripcion completa del proyecto durante el horario comercial habitual en la misma direccion. Los comentarios tambien pueden enviarse por correo electronico a rvine@paristexas.gov CC: jacqueline.six@grantworks.net.