Loading...
10/09/2025 MinutesMINUTES OF THE REGULAR MEETING FOR TAX INCREMENT REINVESTMENT ZONE (TIRZ) BOARD PARIS, TEXAS CITY COUNCIL CHAMBER, 107 E. KAUFMAN ST, PARIS TEXAS THURSDAY, OCTOBER 9, 2025 4:00 O'CLOCK P.M. Members present: Cody Head, Chairman; Miles Mathieu, Vice -Chairman; Reeves Hayter and Pam Norwood Members absent: Maureen Hammond, Dillon Cecil, and Brad Archer City Staff. Rose Beverly, City Manager; Emily Secrest, Government Analyst; Stephanie Harris, City Attorney; Skylar Unger, Deputy City Clerk, and Cheri Bedford, Main Street Coordinator 1, Call meeting to order. Chairman Head called the meeting to order at 4:00 P.M. 2. Citizens' input. No one came forward during citizens' input. 3. Approve minutes from the Meeting on September 11, 2025. A Motion to approve the Minutes was made by Vice -Chairman Mathieu and seconded by Mr. Hayter. Motion carried, 4 ayes — 0 nays. 4. Receive update regarding the I st Street Renovation Project. City Manager Rose Beverly reported that Richard Drake Construction was awarded the project bid and is scheduled to begin construction soon, with completion expected in December. 5. Receive update regarding the Toole Plan and Chris Lambka and Associates. Main Street Coordinator Cheri Bedford reviewed the draft Scope of Services submitted by Chris Lambka and Associates. The proposal includes the following five tasks: 1. Project Management 2. Existing Plan Review, Existing Conditions Review, and Data Collection 3. TxDOT Coordination 4. Vision Paris Guide, which encompasses: o Two -Way Restoration o Paris Town Square o Parking o Market Square o Streetscape Elements Page I of 2 5. Phasing and Implementation Ms. Bedford stated that the estimated fees total approximately $48,520.00. The complete Scope of Services is attached and referenced as "Exhibit A". 6. Discuss and possibly act on a Resolution recommending that City Council pass an Ordinance removing Sub -Zone 4 from the boundaries of the TIRZ Zone. City Attorney Stephanie Harris stated that a public hearing would be required to remove sub -zone 4, and that it could go to City Council at the November meeting. Following further discussion, a Motion to recommend City Council pass an Ordinance removing Sub -Zone 4 from the boundaries of the TIRZ Zone was made by Vice -Chairman Mathieu and seconded by Ms. Norwood. Motion carried, 4 ayes — 0 nays. 7. Receive update regarding the Financial Projection Tool and matters relating to updating the tool. Vice -Chairman Mathieu thanked Ms. Harris for her assistance and reported that Joe from Forked Pine Consultants had provided an updated version of the Projection Tool, which now includes the 2024 data. Mr. Mathieu reviewed the differences in the updated document and asked Ms. Beverly whether the balance reflected both the collection of 2024 revenue and the $ 100,000.00 payment to the 1st Street Renovation Project. Ms. Beverly stated that she would consult with the Finance Department to confirm. Mr. Mathieu also inquired about the possibility of increasing the current percentage rate of 3.85%. Chairman Head thanked Mr. Mathieu and Mr. Hayter for their efforts on this item. 8. Request future agenda items. • Discussion about utilizing a more accurate growth percentage • Discuss canceling the December TIRZ meeting • Update on the removal of sub -zone 4 • Update from City Manager on current and future projects • Status of Chris Lambka proposal 9. Adjournment. There being no further business, a Motion to adjourn was made by Mr. Hayter and seconded by Mr. Mathieu. Motion carried, 4 ayes — 0 nays. Chairman Head adjourned the meeting at 5:00 P.M. Page 2 of "EXHIBIT A" 1"ARIS SCOF,1,E OF SERMES - DRA%FT as S, 9nd I - ct m led Market Square, to include the civic properties of Market Square Farmers Market, The Paris Public Library, and Bywaters Park as shown in Toole Designs Plan. 0 Note: This does not include a redesign of Bywaters Park, only connectivity to the park. S � n' as til. aY s – Standards and guidelines for this project include City of Paris Planning, Zoning, and Engineering Standards, Texas Department of Transportation (TXDOT) standards, North Central Texas Council of Governments (NCTCOG) standards, Manual on Uniform Traffic Control Devices (MUTCD), American Association of State Highway and Transportation Officials (AASHTO), Americans with Disabilities Act (ADA) accessibility guidelines, Public Right -of -Way Accessibility Guidelines (PROWAG), Federal Highway Administration (FHWA), and other guidelines, standards, and specifications as appropriate. S C 1"', E 0 F S E R\/ l� CE"[) F?% A, The following scope of work is to be performed by Lambka Associates. Task �k Fln",Jc�,;t Lambka Associates will conduct ongoing coordination with the City ofrPoris and other appropriate city leadershi throughout the duration of the project, including an initial project kiolk6ff meeting, progress meetings with City Staff, and drafting meeting summaries. Lambka Associates will Oroporp monthly,ptbgress reports and invoices, including task accomplishments and status of deliverables. • Kickoff meeting with city staff and other appy0priate city leadership to',r0*w scope, schedule, budget, and project expectations (to be in-person ;klwt e as the existir—oonditions in-person review). • Monthly progress meeting (virtual). • Monthly progress reports and invoices. Note: Public participation is not anticipated for the Vision ftris,,Gulde; however, it can be provided on request 2� Review, Exfsfing Rew%fiew, and, Existing plans, policies, and regulations th6thave bearing on theproject study area will be reviewed and J summarized in the Vision Pads:Guide,'Speoilflc'611y W64111' ,,,.'Oalu ate and break down the recommendations made by Toole Design in the Downtown PairltNisioning Workshop. Additional details will be added where necessary to continue to cast the vision for downtown and advance recommendations forward, The City of , Pods will'provide, any existing GIS, survey, and traffic data Within the project study area, which Lambka Associates will reVlew,4nd analyze:tambka Associates will develop base drawings, for Task 4 elements, with1her.available data, which'isshticipatedt6 be in GIS format and include property boundaries, street centerfm6s, aerial photography,,,,Ond other relevant data. If the city has an existing survey of any portion of the study area, Lambka Associates wiff" incorporate said survey information into the base drawings. A new survey will not be conducW for this effort. , Mar base drawings are created, Lambka Associates will perform a site visit to assess existing,'66irtditions, measure roadway widths, and photo document street corridors and project locations. As part of data collection, Lambka Associates will collect and evaluate existing turning movement counts from city staff (if available), TxDOT AADT traffic counts, and ask TxDOT for current level of services for the four intersections around the Town Square and Culbertson Fountain. New traffic counts, turning movement counts, and level of service will not be acquired or performed for this effort; however, they can be provided as additional services. • Existing Plan Review summary to be included in the Vision Paris Guide. ■ Base drawing utilizing GIS, aerial photography, and other relevant data. ■ One (1) site visit to assess existing conditions. Understanding that TxDOT is a major stakeholder in the success of Downtown Paris, it isImportant to engage them throughout the lifecycle of the project. Following the existing plan review and data collection in Task 2, Lambka Associates will provide an overview of Vision Paris with the TxDOT Paris Area Engineer, This overview meeting will allow Paris and Lambka Associates an opportunity to reengage TxDOTstaff, garner feedback, and receive direction on necessary planning, design, funding, and education stra4ies to implement the Project. Throughout the development of Task 4, Lambka Associates will facilitate additional meetings to review typical sections and concept designs with TxDOT on TxDOT controlled streets. ■ One (1) in-person TxDOT kick off meeting to review the Toole Design. ■ Up to two (2) additional meetings with TxDOT to review D Anticipate one (1) virtual and one (1)-in7person. 'faslk, 4,: Visior� Pa6s The purpose of the Vision Paris Guide is to summarize tW Downtown Paris Visioning Charrette bndaoVance the visii All work completed during the PhArOtte and,,current plannit guide that will be provided to the City of Paris for review a comments on the draft document, Lambka Associates will Paris guide in electronic"formtvt, The doqu(n4,nt1W '13a ' vist layout and an enjoyable reading iexpertnoe. Vision developed by brnpleted by Toole Design in 2019 during the new planning and concept development work. -ss will be memorialized in a draft Vision Paris ment. Following receipt of one unified list of iecessary revisions and issue the Final Vision i, with ample graphics to provide a user-friendly The result will be a Downtown Master, Plan that the city, stakeholders, TxDOT, and others will have collaborated on and shaped the oUlcorhes. The ownership, energy, and support of the results will help propel the project through its next steps towaids'Implernebtafton and serve as a proactive "roadmap," giving Paris the confidence to make informed choices regaittnotheir dow6t6wn's future. 4.1 Two-Wav Restoration Two-way restoration of the existingone-way pairs will have the single greatest impact on the walkability and vibrancy of downtown. Basedon the information garnered from Task 2 and 3, Lambka Associates will develop up to three (3) altemetNe street cross sections for evaluation. Alternatives will be based on existing conditions, city staff desire, and national best practices. The alternative cross sections will be presented to city staff and other appropriate officials virtually. At the conclusion of the meeting, city staff will select one cross section as the preferred typical section to move forward. It is anticipated that the two-way restoration of Main Street, 1st Street, Lamar Avenue, and Clarksville Street will all have one typical section for the downtown core transect and one for the urban transact. Following the selection of typical cross sections, Lambka Associates will develop a conceptual two-way restoration master plan of the existing one-way pairs to approximately a 5% design level. The concept design will be developed in AutoCAD over GIS and aerial imagery — not with the use of a survey, unless provided — at a scale of no more than 1" = 100'. This process helps solidify design intent, ensure geometric design is proper and feasible, verify vehicle turning movements and radii, provides accurate quantity take -offs, and allows real conversation with TxDOT on the proposed corridor improvements. Concept design will include a general layout and arrangement of streetscape elements and focus on providing visual cues for motorists to slow down as they enter the downtown core. Two-way restoration extents will be from Pine Bluff Street to Sherman,$treet and 7", Street to 121^ Street. Lambka Associates will present the concept plan to city staff, TxDOT, ajd�,,Other appropriate city officials for review and comment. One round of revisions will be made to the conce and a final working concept plan will be included in the Vision Paris Guide, Notes: It may be beneficial to coordinate with a local traffic engineering firm to as a Ludy and a trT TxDO T coordination once the concept plan is developed. 4.2 Paris Town Square Town Square is the heart of Paris and central gathering space fo(','Ji , Mt festivals andatlivities downtown. Paris has already implemented portions of the Town Square design by t k&,Pesign'1*1,11�11the reallocation of space to wider sidewalks, parallel parking, brick patio with caf6 seating, and c6i6j�6 mp outs. An immediate impact on vibrancy and pedestrian safety was realized and garnered excitement16"Ifflo community. Lambka Associates will advance Toole Design's concept for the Town $J Wre to include building ,,facato building face to an approximate 5% design level. The concept design i 4p -pd in AutoCAD GIS and aerial imagery — not with the use of a survey, unless provided — at a 6#41e of iib "'p"'tha56 it process will allow a orl V deeper dive into design, further discussion of sidewalK, es an 'p, develop hardscape selections, I � and provide accurate quantity take -offs. Research will iandd bf boti'fpean Squares and national squares to ensure the result comple"M,,", Culbertso n, architectural building fagades around the square, and tells Paris' story. Con' t deet06,*ill include neral layout and arrangement of all Town Square and streetscape elements, ce*,14d around `a street d i in as desired by the Paris Visioning Charette, to create a vibrant central gath0,Mg space in tlV*`,beart of dow Lambka Associates will present the concept plan to city staff and oth6ropriate J' mment. One round of revisions will be made ,app AW, to the concept plan, and a q4ja,,N, rkin eluded in the Vision Paris Guide. 4.3 Parking Downtown/,parking requires°a de$A"",'#'t,,,With the realities of w. oark"dv will be memoria date irk with the city to partnersnip,�sites, to develop maximize yiek,,'�Ir? parking lot and set 1, walkable downtown fioWue ai�`*`aoh that blends an understanding of customer and business owner rig downtown to be an extremely walkable environment. Toole Design's initial 400in the Vision Paris Guide. Lambka Associates will build on the work done to eloot up to four (4) surface parking lots, either city owned or potential public private incept designs. The designs will provide ideas on how to reconfigure parking lots to i0lity, and create landscape enhancements for visual appearance within the :)ng the street corridor. Solutions for parking will be crafted to achieve a highly welcoming cars and demonstrating sensitivity to business owner concerns. 4.4 Market Square Market Square Farmers Market, The Paris Public Library, and Bywaters, Park are all located adjacent to one another and sit just 2.5 blocks away from Town Square, A vibrant streetscape from Town Square to these important civic uses will encourage walking between them. Toole Design created two distinct concepts for Market Square that provide a strong and flexible connection linking all three facilities into a cohesive design. Lambka Associates will work with city staff to select one of the two concepts developed by Toole Design to move forward to an approximate 5% level of design. The concept design will be developed in AutoCAD over GIS and aerial imagery — not with the use of a survey, unless provided — at a scale of no more than I" = 50'. Lambka Associates will present the concept plan to city staff and other appropriate city officials for review and comment. One round of revisions will be made to the concept plan, and a final working concept plan will be included In the Vision Paris Guide. Notes: To assist with Task 5 Opinion of Probable Construction Cost development for the, proposed vertical structures, Lambka Associates will work with a local Architect. 4.5 Streetscape Elements Streets make up the largest portion of the public realm that is availal* for creating a.sense place. Streets are a billboard advertising your community values. The visual quality of downtown is paramount to a successful downtown. This goes beyond storefronts and building facades to include a comprehensive analysis of public realm and urban design conditions. Lambka Associates will inventory thepul5licrealm and urban design elements of Downtown Paris. Specific attention will be placed on understanding the current relationship between the built environment and the pedestrian and vehicular zones'llo determine overall indicet for walkability, accessibility, comfort, and attractiveness downtown. Making the proceeding streetscape element selections early will Sidi. In OW development of accurate planning level opinion of probable construction costs. While the generAl direction:61! matortals Will be selected during this task, the city can update or change material as budgets are estWished, projects move forward and are constructed. Lambka Associates will present strafksoapo olements, to 64,,itoff and other appropriate agency officials for final y selection. Furnishings contribute to the inviting expedonce of DowptQwn Paris for both residents and visitors. Seating helps define space and provides p1ppes for nost,'Oftrind, and conversation. Cafe seating can define a block and activate the sidewalk with vibrant, advily. Bike racks encourage active living within the community by providing safe locations -to g—e� bicycles as p#ople explore, shop, or dine downtown. Kiosks help guide visitors around downtown,and provlderavdents witn,"netai , community events, and entertainment publications and announcements. While Parts currently uses 'a,Victory Stanley backless bench and trash receptacle, Lambka Associates will evaluate the needfor a new dity standard bench, trash/recycle refuse, kiosk, and a bike rack, and design guidelines will be explored for private business owners to have furnishings that match their individual style while complementing the city standard. Lighting will be broken into twoscales—pedestrianand vehicular. Currently, downtown features one style of light trying to perform both teeks1which may not fit the vernacular of downtown. An existing inventory of light fixtures within downtown will be documented to aid in the selection of fixtures moving forward. Color, lumens, luminaries, globe style, and the ability to don artwork, banners, and hanging baskets will be addressed in the selection and guidance. Location and number of lights will be based on street typology. Maintenance, replacement cost, and the ability to partner with your utility provider for lighting needs will also be considered. T�e�aouVom�eoan Our focus will be, "creating a landscape where utility, practicality, and beauty are united" and expanding the flora throughout downtown. The landscape palette will h*visually appealing, utilizing mass drifts n(perennial flowers, shrubbery, and stately shade trees. Each plant selection will be identified with a picture, plant name, characteristics, and seasonal interests. Species will be carefully selected for their ease of maintenance; multiple varieties will be selected to ensure resilience and longevity, and we will educate city staff on prciper maintenance ofall selected varieties. � costs.Hardscape material, hue, texture, pattern, and orientation play a big role in the aesthetics of downtown. Brick, stone, and concrete elements will be explored along with their respective maintenance and implementation Primary hardscape materials will be identified for implementation throughoutthe,streetscape and sideiwalk network downtown within the project study area. Development of two-way restoration street cross sectlor�s �> One (1) virtual review meeting with city staff and otha� appropriate ofty leadership. Development of one (1) two-way restoration concept plan. >) One (1) in-person review meeting with city staff, TxDOT� and other appropriate city leadership. >) One (1) round of revisions to deliver final working two-way restdration concept plan. Development of one (1) Town Square concept plod. One (1) virtual review meeting with ol ty, staff and,othef appropriate 4co leadership. 0 One (1) round of revisions to deliver finall,working Town kupre concept plan. Development of up to (4) surface parking lot concept dqsJ§11s. D One (1) virtual review meeting with city slaffepdother appropriate city leadership. Development of one (1) Market Square concept design. One (1) virtual4eview meeting With city�staff and other appropriate city leadership. One (1) round of revisions todoliver final working Market Square concept plan. One (1) streetscape element review meeting with city staff and other appropriate city leadership. Streetsca0e elements to , bs-!hcJUda�.1hfft0,V1,sIon Paris Guide a Draft Vision Paris Guidle Ih,.P,0F electronic format. )) One (1) round of revisions. a Final'Vision Paris Guide in POOelectronlc format, Implementation of a downtown master plan without a clear path forward can feel like a daunting task. Lambka Associates will Work with city staff'to develop a phasing plan that establishes a clear path forward, breaking up projects into manageable and achievable projects. Planning level opinion of probable construction costs will be developed for the Two-way Restoration of the one-way pairs, Town Square, and Market Square, These will be order -of -m agn Rude estimates made for budget purposes only, based on recent local bid tabs, historical bid tabs, and estimator judgement. Construction phases will be established for each project based on logical start and stop locations, i.e. per block, park versus streetscape.etc. An implementation matrix will be developed whelp prioritize projects for construction. Matrix categories will include, but not belimited to; opinion ofprobable construction cost, pama*ad economic value, perceived, community value, perceived impact onbusiness owners, etimated duration of construction, available budget per fiscal year, etc. Categories will be discussed and finalized with staff prior mmatrix development. raaxu ooxw'amo�weam/g^ ^ Development n/phasing and implementation plan. » Tourincluded inVision Paris Guide. ° Development of one (1) opinion of probable construction cost for Two-way Restoration, Town Square, and Market Square. " Development ofone (1)prioritization matrix. ^ ^ SCHEHIKIE After receipt of a notice to proceed, a 6 -month planning and guide development'sChedule was ariti.pipated for scoping purposes. This schedule does not include City of Paris and TOOT review and approvbiltimia, only allowed planning time. It is anticipated that the project schedule will be dispOssiad and agreed upon -during the kickoff meeting. The following lump sum costs are presented by task and are inclusive of le'bor, overhead, and profit. Vision Parils� Guide Fee Task Fee Task 1 Project Management Task u Existing Plan Rmv Task Coordination Task Vision Paris Task 1 Phasing andl;molem . and Data Collection -04=o�uu ��40.00 $3,360,00 $3s.R^O.00 $4,480.00 Total Lump Sum Cost $48,520.00 Direct Expenses: Cost Plus 10%: )) Printing and color presentation materials A Travel (transportaWn, lodging) A Meals Mileage: $0.701mile �,Ourrent Federal Rate) Lambka Associatel(s whl provide backup data for all direct expenses submitted. " The project will be billed onepercent complete basis once per month for the duration ofthe project. Any additional services requested, o,changes oothe approved plan/design after contract document production has begun will be considered an additional service and fee and require written authorization and approval by both parties. N A cl dAfl, c,�, ir�, a S c',,, r v i c s The following services are not included in the scope of work, but can be provided as additional services if authorized by the Client inwriting. Compensation for additional services will ueagreed upon prior to their performance. " Design services maddition mwhat isincluded inthe scope mservices. • Coordination meetings inaddition mwhat ioincluded inthe scope o[services. " Public engagement, meeting, u,graphic renderings |naddition oowhat |oinclude the scope o[services. ~ Data analysis. = Flood Plane andlo Wetland delineation. • Environmental investigation and permitting. • Traffic analysis and counts. ~ Traffic control. • Geotechnical investigation and analysis. " Civil, umity, electrical, trans pouation/tranc, lighting, slgnal�'lhydraulic, and stn�btural design and • Landscape Architectural design and irrigation design. • Franchise utility design and coordination. " vvapmn/nesignage and design. ° Survey v,subsurface investigation, right-of-way, 6ftments, and acquistlort., • Plat revision services. ~ ,=nn/tt.ng services ~ Construction administration, mvprpioo and ~ Bidding and advertisement ^ 'xuv' coordination ma • Printing services. • /uLuAccess upa • Additional submis ons/reviews/revWions/rende rings required throughout the planning/design process other than those desdhbed. ° Any services not o mmx. rxonx you for the opportunity to paftor with the City vfParis. |fyou have any questions orwould like tndiscuss further, pleasebontact me directlycn, my"ceUphone m064.580.1178mvia email mt chris.lambka mall.com. 262 East Autumn kidge Road 1, Moore, SC 29368 8