1997-002-RES WHEREAS, CITY COUNCIL DID RESOLUTION NO 96-138 ON DECEMBER 9, 1996
RESOLUTION NO. 97-002
WHEREAS, the City Council of the City of Paris did heretofore, in
Resolution No. 96-138, on December 9, 1996, approve the advertisement for bids for
furnishing plant, labor, materials, and equipment, and for performing all work
required for the "Cox Field - Paris Municipal Airport - Airfield Lighting
Improvements," being Phase I of TxDOT Project No. AP PARIS 4, TxDOT No.
CSJ 9601 Paris, which bids were received until 3:00 o'clock p.m., Tuesday, January
7, 1997; and,
WHEREAS, tl1e best bid for such construction was made by ~., & W Electrical
Contractors, Inc., of Floresville, Texas, and it should be awarded the bid for such
construction; and,
WHEREAS, the form of the contract for such construction project, attached
hereto as Exhibit A, should in all things be approved, and the Mayor should be
authorized to execute the same; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS,
that the bid of F & W Electrical Contractors, Inc.,for the construction project in the
amount of $46,000.00 be, and the same is hereby, accepted and let conditioned upon
said contractor meeting all of the terms and specifications included in the bid
documents; and,
BE IT FURTHER RESOLVED, that the Mayor of the City of Paris, Eric S.
C I i fford, be, and he is hereby, authorized and directed to execute, on behalf of the
City of Paris, the contract with F & W Electrical Contractors, Inc. for "Cox Field _
Paris Municipal Airport - Airfield Lighting Improvement\}, " being Phase I of
TxOOT Project No. AP PARIS 4, TxOOT No. CSJ 9601 Paris, upon the terms and
conditions and in the form shown in Exhibit A, attached hereto.
PASSED AND ADOPTED this 13th day of January, 1997.
ATTEST:
~~'"~4~
Mattie Cunningham, City Clerk
APPROVED A
~
AGREEMENT
THIS AGREEMENT is dated as of the 13th day of January in the year 19!2- by and
between City of Paris (hereinafter called OWNER) and
F & W Electrical Contractors, Inc. (hereinafter called CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree
as follows:
Article 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
Cox Field - Paris Municipal Airport
Airfield Lighting Improvements
TxDOT Project #CSJ 9601PARIS
The Project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
The whole project as described in the contract documents and as seen on the
contract drawings.
Article 2. ENGINEER
The Project has been designed by Hayter Engineering, Inc., Paris, Texas, who is hereinafter called
ENGINEER and who is to act as OWNER'S representative, assume all duties and responsibilities and
have the rights and authority assigned to ENGINEER in the Contract Documents in connection with
completion of the Work in accordance with the Contract Documents.
Article 3. COt,TRACT TIME
3.1. The Work will be substantially completed and ready for final payment within 75 days
from the date when the Contract Time commences to run, as provided in the General
Conditions.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence
of this Agreement and that OWNER will suffer financial loss if the Work is not completed
within the times specified above, plus any extensions thereof allowed in accordance with the
General Conditions. They also recognize the delays, expense and difficulties involved in
proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work
is not completed on time. Accordingly, instead of requiring any such proof, OWNER and
CONTRACTOR agree that as liquidated damages for delay (but not as a' penalty)
CONTRACTOR shall pay OWNER $ 235 for each day that expires after the time
specified.
19
EXHIBIT A
Article 4. CONTRACT PRICE
OWNER shall pay CONTRACTOR for completion of the work in accordance with the Contract
Documents in current funds as follows:
At the unit prices shown on the Unit Price Bid Schedule included in the Contract Documents.
Article 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with the General Conditions.
Applications for Payment will be processed by ENGINEER, as provided in the General Conditions.
The OWNER shall retain 10% of the amount of each payment until final completion and acceptance
of all work covered by the contract documents. When the work is substantially complete, the retained
amount may be reduced to 5%, at the OWNER1S discretion.
Article 6. INTEREST
If the contract amount of this contract is less than $400,000, no interest will be paid to the
CONTRACTOR on retained money. When the contract amount exceeds $400,000, no interest will
be paid unless required by law.
Article 7. CONTRACTOR'S REPRESENTATIONS
In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following
representations:
7.1 CONTRACTOR has familiarized himself with the nature and extent of the Contract
Documents, Work, site, locality, and all local conditions and Laws and Regulations that, in
any manner, may affect cost, progress, performance or furnishing of the Work.
7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface
conditions and drawings of physical conditions, if any, which are contained or identified in the
Contract Documents, and accepts the determination set forth in the Contract Documents of
the extent of the technical data contained in such reports and drawings upon which
CONTRACTOR is entitled to rely.
7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining
and carefully studying) all such examinations, investigations, explorations, tests, reports and
studies in addition to, or to supplement, those referred to above, which pertain to the
subsurface or physical conditions at or contiguous to the site, or otherwise may affect the
cost, progress, performance or furnishing of the Work as CONTRACTOR considers
necessary for the performance or furnishing of the Work at the Contract Price, within the
Contract Time and in accordance with the other terms and conditions of the Contract
Documents, and no additional examinations, investigations, explorations, tests,' reports,
studies or similar information or data are, or will be, required by CONTRACTOR for such
purposes.
20
7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on
the Contract Documents with respect to existing Underground Facilities at or contiguous to
the site and assumes responsibility for the accurate location of all Underground Facilities,
whether indicated in the Contract Documents, or not. No additional examinations,
investigations, explorations, tests, reports, studies or similar information or data in respect of
said Underground Facilities are, or will be, required by CONTRACTOR in order to perform
and furnish the Work at the Contract Price, within the Contract Time and in accordance with
the other terms and conditions of the Contract Documents.
7.5 CONTRACTOR has correlated the results of all such observations, exanunatlOns,
investigations, explorations, tests, reports and studies with the terms and conditions of the
Contract Documents.
7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies
that he has discovered in the Contract Documents and the written resolution thereof by
ENGINEER is acceptable to CONTRACTOR.
7.7 CONTRACTOR has reviewed and fully agrees to the limitation ofliability provisions included
in the Supplementary Conditions.
Article 8. CONTRACT DOCUMENTS
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1 This Agreement
8.2 Bid and Bid Schedule, Advertisement, and Information or Instructions to Bidders.
8.3 Performance and Payment Bonds
8.4 Notice of Award and Notice to Proceed
8.5 General Conditions and modifications thereto, if any, such are included.
8.6 Supplementary Conditions
PSA Engineering in
7 hni at S ill . d' db association with d d
8. Tec c pec cations prepare orlssue y Hayter Engineerinl} ate 10/22/96
8.8 Drawings, consisting of sheets numbered E1 through ~ inclusive with each sheet.
bearing the following general title: Cox Field - Paris Municipal Airport
Airfield Lighting Improvements TxDOT Project #CSJ 9601PARIS
8.9 Addenda numbers 1 to 1 ,inclusive.
8.10 Documentation submitted by CONTRACTOR prior to Notice of Award, identified as
5% Bid Bond
21
8.11 The following ,ch may be delivered or issued after the L..J.ective Date of the Ag ~eement and
are not attached hereto:
All Written Amendments, change orders, and other documents amending, modifying, or
supplementing the Contract Documents pursuant to the General Conditions.
There are no Contract Documents other than those listed above in this Article 8. The Contract
Documents may only be amended, modified or supplemented, as provided in the General Conditions. . ,
Article 9. MISCELLANEOUS
9.1 Terms used in this Agreement which are defined in Article 1 ofthe General Conditions will
have the meanings indicated in the General Conditions.
9.2 No assignment by a party hereto of any rightS' under or interests in the Contract Documents
will be binding on another party hereto without the written consent of the party sought to be
bound; and specifically, but without limitation, monies that may become due and monies that
are due, may not be assigned without such consent (except to the extent that the effect of this
restriction may be limited by law), ane! unless specifically stated to the contrary in any written
consent to an assignment, no aSsignment wiII release or discharge the assignor from any duty
or responsibility under the Contract Documents.
9.3 OWNER and CONTRACTOR each binds hi~self. its partners, successors, aS,signs, and legal
representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect of all covenants, agreements and obligations contained in the
Contract Documents.
Article 10. OTHER PROVISIONS
None.
IN WITNESS WHEREOF, OWNER and CO~TRACTOR have signed this Agreement in multiple
copies. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER.
All portions of the Contract Documents have been signed or identified by OWNER and
CONTRACTOR or by pNGINEER on their behalf. (1195)
This, Agreement will be eITcctive on January 13 · 19 J2..
\
OWNER: City of Paris CONTRACTOR: F & W Electrical Contractors
By: Eric S. Clifford, Mayor
By:
(Corporate Seal)
(Corporate Seal) '.
Attest:
Mattie Cunningham, City Clerk
Attest:
22
,!
Address for giving notices:
P. O. Box 9037
Paris. Texas 75461-9037
Approved As To Form:
'LK. Haynes
City Attorney