1998-179-RES WHEREAS, IT HAS BEEN BROUGHT TO THE ATTENTION OF CITY COUNCIL
RESOLUTION NO. 98-179
WHEREAS, it has been brought to the attention of the City Council of the City of Paris
that there is a need for water service in an area of Paris, and that such need could be best served
by a pro rata water main extension beginning at U.S. Highway 82 East and continuing south along
47th Street S.E. to Old Clarksville Road, thence west a distance of approximately 1,500 feet,
thence north and northwest to the intersection of an existing 6" water main located on 42nd Street
S.E., said extension to serve adjacent properties along the route and the Paradise Estates
Subdivision; and,
WHEREAS, it is deemed necessary for the protection of the health and welfare of the
above-described area for the City of Paris to extend the above-described line and act in the
capacity of sponsor under the terms of Section IX of Subdivision Ordinance No. 1315 of the City
of Paris, with any refunds due under the pro rata charges being paid to the City of Paris water and
sewer fu~d; and,
WHEREAS, preliminary plans, specifications, and an estimate of the total cost of the
project were prepared by the City Engineer and delivered to the City Manager and considered at
the regular Council Meeting on the 12th day of November, 1998, and public hearings concerning
the same were held on the 10th and 14th days of December, 1998; and,
WHEREAS, after hearing the matters presented at the public hearings, the City Council
is of the opinion that it is in the best interests of the citizens of Paris, and particularly the citizens
in the vicinity of the proposed project, that the City of Paris act as sponsor for said project, which
is necessary for the protection of health and welfare in this area; and,
WHEREAS, such project should be known as the "Paradise Estates Pro Rata Water Main
Extension Project," which has a total estimated cost of $152,697.75; and,
WHEREAS, the front foot method would be equitable and is the method described on
Exhibit A attached hereto; NOW, THEREl"ORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the
pro rata water main extension beginning at U.S. Highway 82 East and continuing south along 47th
Street S.B. to Old Clarksville Road, thence west a distance of approximately 1,500 feet, thence
north and northwest to the intersection of an existing 6" water main located on 42nd Street S.E.,
said extension to serve adjacent properties along the route and the Paradise Estates Subdivision,
containing approximately 10,660 linear feet of P.V.C. water main line, be, and the same is
hereby, approved and shall be known as "Paradise Estates Pro Rata Water Main Extension
Project"; and,
BE IT FURTHER RESOLVED, that the City of Paris act as sponsor of said pro rata
water main extension; and,
BE IT FURTHER RESOLVED, that the front foot rule method described in Exhibit A,
attached hereto, less the cost of over-sizing, is found to be equitable and is hereby adopted as the
method to be used for refunding said cost of the water main extension to the water and sewer fund
of the City of Paris; and,
BE IT FURTHER RESOLVED, that the City Manager, Michael E. Malone, be, and he
is hereby, authorized and directed to proceed with said project, and that, upon completion of the
project, the actual costs of said project shall be fixed and the price per foot established in
accordance with the plan described in Exhibit A, attached hereto, which shall be used for the
purpose of the charging of the pro rata charges to the property owners benefitting from the same
and the amounts to be collected in the event of connection to the line so constructed and paid to
the water and sewer fund of the City of Paris.
PASSED AND ADOPTED this 14th day of December, 1998.
ATTEST:
APPROVED AS TO ~'ORM:
Scott P. Foster, City Attorney
ENGINEER'S COST ESTIMATE
CITY OF PARIS "...,"'\\\\\\\,
.:?~ '\ tOr r ~J';,
150 SE 1ST .:- '\ ~ .........;....... 1:.1 ~J\
P 0 BOlt 9037 "Of rJ'\'" ~~ ". 10 rf,:
. . ,.,' ''/' ").JI"..~" ..~ "'
.!,.,' * .' ..~,'..l", I, ",::
." ~ , ....,'~ ~ ", "',- ~}
."'. ,I, ,. <II'..
PARIS, TEXAS 75461-9037 [1 ~'r t' v' \1'( ':1,
(903) 785-7511 f{.......~i~~rt..s~~wI~.~.....f~
(903\ 784-1798 (FAX) ::i.......:........".:.:..;,:.~.:........"..r..""',:.;
J ,/ 0\1 . ~,J.( .,:~~. " ~ ':,
~.,(/ '-;'1 -. /) 'li,.o.l.....""... "): j:~ ..;
'~f '(;"''','/''{', "_,,,,'~/~J\/..~':;
CZ~ ~~;~~~~~}~/
BY:
DATE:
SEPT 18. 1998
REVISED 9-25-98
EARL SMITH, CITY ENGINEER
PROJECT DESCRIPTION: PARADISE ESTATES PRO-RATA WATER LINE
QUANTITY UNIT ITEM UNIT PRICE TOTAL
7185 LF 611 PVC A'MNA C-900, DR18 WATER MAIN $10.00 $71 850.00
3475 LF 811 PVC A'MNA C-900, DR18, WATER MAIN $12.50 $43,437.50
6 EACH FIRE HYDRANT ASSEMBLY $1,750.00 $10,500.00
1 EACH 611x611x611 TAPPING SLEEVE & VALVE $1,100.00 $1,100.00
1 EACH 611 VALVE wI BOX $550.00 $550.00
1 EACH 811 VALVE w/ BOX $650.00 $650.00
8 EACH 611 FITTINGS (various bends, retainer alands etc.) $450.00 $3,600.00
5 EACH 8" FITTINGS (various bends,retainer alands etc.) $500.00 $2,500.00
14 EACH LONG SIDE CUSTOMER SERVICE $600.00 $8,400.00
17 EACH SHORT SIDE CUSTOMER SERVICE $200.00 $3,400.00
342 LF GRAVEL STREET/DRIVE REPAIR $5.00 $1,710.00
238 LF ASPHALT STREET/DRIVE REPAIR $10.00 $2,380.00
223 LF CONCRETE STREET/DRIVE REPAIR $11.75 $2,620.25
SUB-TOTAL $152,697.75
INELIGIBLE FOR PRCJ..RA TA PORTION OF PROJECT
.3475 LF COST DIFFERENCE BETWEEN 811 & 611 PVC $2.50 ($34.750.00)
-5 EACH COST DIFFERENCE BETWEEN 811 & 611 FITTINGS $50.00 ($250.00)
-435 LF 611 PVC A'MNA C-900, DR18, WATER MAIN $10.00 ($4,350.00)
-60 LF ASPHALT STREET/DRIVE REPAIR $10.00 ($600.00)
-1 EACH 611x611x611 TAPPING SLEEVE & VALVE $1,100.00 ($1,100.00)
TOTAL (41,050.00)
.
GRAND TOTAL 111,647.75
t VI nr,"'I;':" ~
. \ ,"''',:' l;~.'~ j { ,~.4
'''., .A / I l,,,, ,i t,
PRO-RATA WA TERMAIN EXTENSION
PARADISE ESTATES
Based on the front rule, in accordance with City of Paris Ordinance No. 1315, Section IX, the estimated costs
for the project are as follows:.
Total Pro-Rata project cost to be applied = $111,647.75
LOT BLOCK PROPERTY OWNER FOOTAGE PRO-RATA SHARE
v Stephens 1213 $6,701.83
. Glass/Bray 1039 $5,740.48
J Lyons 500 $2,762.50
" Dzenowski 160 $884.00
> Hankins 563 $3,110.58
v Wunsch 1898 $10,486.45
1 A v Wood 150 $828.75
2 A ' Grot john 450 $2,486.25
3 A . Grotiohn 150 $828.75
4 A ' McDowra 151 $834.28
5 A v McDowra 380.5 $2,102.26
6 A .; McDowra 175 $966.88
1 B { Holmes 425 $2,348.13
2 B . Holmes 150 $828.75
3 B J Hunter 150 $828.75
4 B ,I Jones 425 $2,348.13
5 B " Dupree 107.5 $593.94
6 B , Dupree 347 $1,917.18
7 B . Dupree 458 $2,530.45
8 B Dupree 123 $679.58
9 B , Dupree 164 $906.10
10 B Dupree 142 $784.55
1 C >' Pickens 421 $2,326.03
2 C " Hudson 170 $939.25
3 C ,; Smith 706.5 $3,903.41
4 C " Hudson 625 $3453.13
1 D ' Hudson 376 $2,077.40
2 D ' Hudson 447 $2,469.68
3 D v Cae 155 $856.38
4&5 D v Bell 267 $1,475.18
6 D , Bell 121.5 $671.29
7 D y Gentry 561 $3,099.53
8 D v Vaughn 459 $2,535.98
9 D " Cunningham 97 $535.93
10 D " CunninQham 168 $928.20
11 D v Chaney 126 $696.15
12 D J Noland 273 $1,508.33
13 D v Fleming 578 . $3,193.45
1 E -/ Hammerstein 150 $828.75
2 E v Barham 150 $828.75
3 E Ii Taylor 150 $828.75
4 E v' Bass 121 $668.53
1
5 E . Steed 126 $696.15
6 E ' Babb 383 $2,116.08
7 E . Flenniken 582 $3,215.55
6 A " McMillian 400 $2,210.00
.; Hill 195 $1,077.38
Lester 304 $1 679.60
I' Brav 1206 $6,663.15
1 F , DeSantis 125 $690.63
2 F , DeSantis 125 $690.63
3 F v Edenhoeffer 125 $690.63
4 F J Edenhoeffer 116 $640.90
5 F , Hurst 145..5 $803.89
6 F , Dupree 144.5 $798.36
7 F " Dupree 618.5 $3,417.21
8 F ' Burns 168 $928.20
20206.5
$111,640.91
Total Assessable Front Feet = 20206.5
,.,.",,-\\\\\\~! ,
."'.... 0 I" 'lv
.;}' .\, ~ r r t. '~'.
,..... v C ,~ /"
4.,J .~~ ,4........' "i d ~,'i
.::: ...'\ ~ t~~..ol ~ ft....;(, ~'i~
"" c .f,. 'fl'."
,.., 'j,' <:ii:t\I~? ',' ,',
,;.' "l'~. c"~;~i;\ t. .:~ ~':
:J ,:, ;' V:":' '., * ';~
.~.J ~.\.. ~ .~........................:......'f.,
,;.......,~,,~! ~!;l r i~t'I~.'ns ~
~: ~:mH. ~~~ ~(~'!hu ~
:~i; H ....~..~~.. t ..,,~ )fit.....,.... He U .\I..(o.:,n....f!~
1 . "'1' t";." . ~
~Ii_ "'0 '. ~j ''t~~iP ,II .Q:' /F
,I. ',) ". II '" ".. ~ /;J ... /1,1 ",'
f,l C) '. I " . c' V " V ~';'
~. '0 '.(.:0,/01'1:" ,t ,~ it"
1 I/.., I,.. J \ "'....1 !"\" ..~"
1",,'0\" ..~". a'\.~I),.....
~" ' ,"l~ ~L \ w'o
'I" VI', l' '
\, ' .......
~\ ,,'"
~ ~ 2-1 '-7~
then : $111,647.75
20206.5 = $5.525/ft
2