Loading...
08 US 82 Deceleration Lane at Campbell Soup h I Texas Department of Transportation 1365 N. MAIN. PARIS, TEXAS 75460. (903) 737.9300 May 4, 2006 Mr. Gary Vest Executive Director Paris Economic Development Corporation 1125 Bonham Street Paris, Texas 75460 RE: US 82 Westbound Deceleration Lane at Campbell Soup Dear Gary: Sometime back, I was approached by officials from Campbell Soup Company with safety concerns related to their employees' driveway on westbound US 82. After looking at the existing situation, I determined that a combined paved shoulder/deceleration lane was needed between the railroad underpass and the driveway. This proposed improvement will provide a refuge for employees of Campbell's as they slow down to turn into the plant while avoiding the fast moving traffic, a significant number being trucks, traveling in the right hand lane of US 82. A paved shoulder is beneficial for numerous other reasons as well. An aerial view of this is attached. The estimated cost for construction is $160,000. In order to make this project a reality, a shared cost arrangement is being pursued between the Texas Department of Transportation and the Paris Economic Deveiopment Corporation. If the PEDe is willing to donate a fixed sum of $50,000 toward this project, I feel that the constnlction of this project can be accelerated into a Fall 2006 timeframe. Upon PEDe's concurrence of this request, I will forward an Agreement to ~t Donation for Highway Constmction Pro~ document to you for your execution. If you should have any questions about this project or require additional inforn1ation, please let me know. An Equal Opportunity Employer r' Thank you for your consideration and for your continued support of transportation improvements within the Paris area. SinCerelY. '.~. ' '.~. . . (i) ,1 /? '~/~/'/ I, DLJ// / 5~ ~.), Bobby G. Littlefield, Jr., P.E. District Engineer cc: Steve Ekstrom, P.E., Director, TP&D Reza Bazazzadeh, P.E., Area Engineer r"