Loading...
09-A Streetscape Change Order No. 3 & Final DRAFT f:attomeylreswork\current\ Streetscape Change Order NO.3 & Final Res 2006 June 22, 2006 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING CHANGE ORDER NO. THREE AND FINAL TO CONTRACT FOR THE CONSTRUCTION OF DOWNTOWN STREETSCAPE PROJECT-PHASE II, FEDERAL PROJECT STP 2000 (615) TE, CSJ-0901-29-017, CONCURRENT WITH THE APPROVAL OF THE TEXAS DEPARTMENT OF TRANSPORTATION; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the 8th day of December, 2003, in Resolution No. 2300-187, award the contract for the "Downtown Streetscape Project, Federal Project STP 2000 (615) TE, CSJ #0901-29-107," to Encino Landscape, Inc.; and, WHEREAS, Hayter Engineering, Inc., acting as project engineer, recommends the amendment of the contract for said project to provide for an adjustment of the estimated quantities for Phase II to as-built quantities, and providing for a net decrease of$I,904.40 in the contract price; and, WHEREAS, the Change Order No. Three and Final Summary, attached hereto as Exhibit A, should in all things be approved, and the Mayor should be authorized to execute said Change Order No. Three and Final concurrent with the approval of the Texas Department of Transportation; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the Change Order No. Three and Final Summary to the Contract for the "Downtown Streetscape Project, Federal Project STP 2000 (615) TE, CSJ #0901-29-107,", attached hereto as Exhibit A, to provide for adjustment of estimated quantities for Phase II to as-built quantities, and providing for a net decrease of$1,904.40 in the contract price, be, and the same is hereby, approved. Section 3. That the Mayor be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, Change Order No. Three and Final, upon the terms and conditions and in conformance with the Summary shown in Exhibit A attached hereto, roo concurrent with the approval ofthe Texas Department of Transportation. Section 4. That this resolution shall be effective from and after the date of passage. PASSED AND APPROVED this 26th day of June, 2006. Richard Manning, Mayor ATTEST: Janice Ellis, City Clerk APPROVED AS TO FORM: John D. Lestock, Assistant City Attorney r" CHANGE ORDER Order No. Three & Final Date: May 24. 2006 Agreement Date: January 1. 2004 NAME OF PROJECT: Downtown Streetscape Federal # STP 2000 (615) TE and CSJ # 0901-29-107 OWNER: City of Paris CONTRACTOR: Encino Landscape. Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: See attached Change Order # 3 Summary. Justification: Adjustment of estimated quantities for Phase 2 to as-built quantities. Change to CONTRACT PRICE: Original CONTRACT PRICE: $ 601.340.11 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 743.197.19 The CONTRACT PRICE due to this CHANGE ORDER will be decreased by: $ 1.904.40 The new CONTRACT PRICE including this CHANGE ORDER will be $ 741.292.79 Change to CONTRACT TIME: The CONTRACT TIME will be increased by o calendar days. The date for completion of all work will be April 30. 2005 . Approvals Required: To be effective this Order must be approved by the Federal agency if it changes the scope or objective of the PROJECT, or as may otherwise be required by ~tl1e."\;~ttPP~NT AL GENERAL CONDITIONS. ,~ "'\ t 0 F .,. .t.~~L 4:' "', l../-......... "fA( -~3'T 8 ~ ..... <P it: Owner: . *"~' City of Paris RECEIVED ~-31-DC EXHIBIT A. IUN r J 21)1]6 r'o Change Order # 3 Summary Sidewalk Extensions on N.E., S.E., and S.W. Corners City of Paris Downtown Streetscape Project Federal #STP 2000 (615) TE and CSJ #0901-29-107 May 24, 2006 L Estimated As-Bullt Change Order Unit Final Total C.O. Item Description Quantity Quantity · Quantity Price Price Price 1 Mobilization (6% of change order work) 1 LS 1 LS o LS 8,300.00 8,300.00 0.00 2 Remove concrete curb 1,069 LF 1,098 LF 29 LF 5.00 5,490.00 145.00 3a Remove and dispose of concrete sidewalk, signs, etc. 9,035 SF 9,325 SF 290 SF 1.10 10,257.50 319.00 3b Remove by hand and dispose of concrete at buildings o SF o SF o SF 1.75 0.00 0.00 4 Replacement sidewalk 9,320 SF 9,610 SF 290 SF 5.44 52,278.40 1,5n.60 5 Asphalt street repair 1,069 SF 1,349 SF 279.6 SF 5.00 6,743.00 1,398.00 6 Textured asphalt crosswalks o SF o SF o SF 9.00 0.00 0.00 7 Type "A" concrete curb ramp OEA o EA o EA 500.00 0.00 0.00 8 Type "B" concrete curb ramp OEA o EA OEA 500.00 0.00 0.00 9 Type "C" concrete curb ramp OEA o EA OEA 500.00 0.00 0.00 10 Type "0" concrete curb ramp OEA OEA OEA 500.00 0.00 0.00 11 Concrete curb ramp (non-standard size) 1 EA OEA -1 EA 1,000.00 0.00 (1,000.00) 12 Detectable wamer pavers in curb ramps 25 SF o SF -25 SF 8.00 0.00 (200.00) 13 Elevated sidewalk with handrails 129 EA OEA -129 EA 16.00 0.00 (2,064.00) 14 Elevated sidewalk over basement area 120 EA 16 EA -104 EA 20.00 320.00 (2,080.00) 15 Remove and dispose of indoor/outdoor carpet (Area 1) 650 SF 650 SF o SF 2.00 1,300.00 0.00 16 Sandblasting existing sidewalk prior to resurfacino 650 SF 650 SF o SF 4.00 2,600.00 0.00 17a Resurfacing existing sidewalk (Area 1) 1084 SF 1084 SF o SF 5.00 5,420.00 0.00 17b Resurfacing existing sidewalk (Area 2) o SF o SF o SF 5.00 0.00 0.00 18 Resurfacing existing sidewalk at buildinos o SF o SF o SF 10.00 0.00 0.00 19 Shallow trench drain o LF o LF o LF 30.00 0.00 0.00 20 General purpose trench drain 190 LF 190 LF o LF 40.00 7,600.00 0.00 21 Glass paver replacement o SF o SF o SF 150.00 0.00 0.00 22 Electrical (12 lights). 1 LS 1 LS o LS 44,600.00 44,600.00 0.00 23 Signage o LS o LS o LS 15,000.00 0.00 0.00 24 Traffic handling o LS o LS o LS 3,000.00 0.00 0.00 TOTAL 0 $144,908.90 ($1,904.40)