Loading...
1998-063-RES WHEREAS, CITY COUNCIL DID HERETOFORE ON THE 9TH DAY RESOLUTION NO. 98-063 WHEREAS, the City Council of the City of Paris did heretofore, on the 9th day of December, 1996, in Resolution No. 96-139, award the contract for "Wastewater Treatment Plant Clarifier and Sludge Processing Facilities," Project No. 92- WSRBO 1-96, to Gracon Construction, Inc.; and, WHEREAS, the City Engineer, Earl Smith, acting as project engineer, recommends the amendment of the contract for said project as follows: (I) select fill under the clarifier; (2) oil coolers for the spray field pumps; (3) level sensors for the sludge holding tanks; (4) ball check valves in the wetwells; (5) plug valve in 4" line to the AT AD building; (6) Pre-AT AD holding tank level indicator; (7) larger conduit at the wetwells; (8) thermal overloads for the 6 Flygt pumps; and (9) networking cable for the two AT AD controllers; which provides for a net increase of $23,097.18 in the contract price, for a total contract price of $3,821,097.18 and a net increase of contract time of 155 days, for a total contract time of 485 days; and, WHEREAS, the form of Change Order No. One (I), attached hereto as Exhibit A, should, in all things, be approved, and the Mayor, Charles H. Neeley, should be authorized to execute the same; NOW, THERE~'ORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the form of Change Order No. One (l) to the Contract for the "Wastewater Treatment Plant Clarifier and Sludge Processing Facilities," Project No. 92-WSRBO 1-96, attached hereto as Exhibit A, which amends the contract as follows: (l) select fill under the clarifier; (2) oil coolers for the spray field pumps; (3) level sensors for the sludge holding tanks; (4) ball check valves in the wetwells; (5) plug valve in 4" line to the AT AD building; (6) Pre-AT AD holding tank level indicator; (7) larger conduit at the wetwells; (8) thermal overloads for the 6 Flygt pumps; and (9) networking cable for the two ATAD controllers; which provides for a net increase of $23,097.18 in the contract price, for a total contract price of $3,821 ,097.18 and a net increase of contract time of 155 days, for a total contract time of 485 days, be, and the same is hereby, approved; and, BE IT FURTHER RESOLVED, that the Mayor, Charles H. Neeley, be, and he is hereby authorized and directed to execute, on behalf of the City of Paris, said Change Order No. One (1), upon the terms and conditions and in the form shown in Exhibit A, attached hereto. PASSED AND ADOPTED this 11th day of May, 1998. Charles H. Neeley, Mayor ATTEST: Mattie Cunningham, City Cler APPROVED AS TO FORM: Scott P. Foster, City Attorney lJilll'lul!. UJtJJ.t.H Exhibit "A"' No. -O.ne (1) (Instructions on reverse side) .. .', . ....... , PROJECT: Wastewater Treatment Plant Improvements - Clarifier & Sludge b~~rr~ing Facilities DATE OF ISSUANCE: Apr,~l 14, 1998" ., , , (Namc. City of Paris Addres~ PO Box 9037 Paris, TX 75461-9037 CONTRACTOR: Gracon Construction Co. Inc. PO Box 360039" Dallas, TX 75336-0039 OWNER's Project No, -9.LYSRlL01~-9.6.. CONTRACT FOR: Wastewater Treatment Plant Improvements ENGINEER: Hayter Engineering 4445 SE Loppe 286 Paris, TX 75460 ENGINEER's Project No. 180013-28 )'ou are directed to make the foUowing changes in the Contract Documents. . , Description: Change ~'f contract time Change in contract amount . . Purpose of Change Order: , ~ ~! Attachments: (List documents supporting changc) Hayter Engineering document CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: , , Original Contract Price Original Contract Time ,! . S 3,798,000.00 330 days claYI or dale Previous Change Orders No. None to No. Net changc from previous Change Ordcrs t'..,',:, I $ 0.00 o dlYI " Contract Price prior to this Change Ordcr Contract Time Prior to this Change Ordcr $.-1.798.000.00 ---130 daYl or dlle Net Increase R)eX~XXi of this Change Order NctIncreascX~WaQ of this Change Order S 23,097.18 (0.6% of original contract amount) Contract Price with all approved Change Orders 155 days daYI Contract Timc with all approvcd Change Orders , ' S~21, OQ7.18 485 cI.qy~ - RECOMMENDED: APPROVED: CITY OF PARIS, PARIS, TX APPROVED: oh OWI'U.' Mayor by CCln!mlQr APPROVED AS TO FORM by ^TTEST: En.ineer by '" ~ City Clerk r. PlAIBIT A City Attorney ',. . , . : ~.1 ' I : :i I' jilii:, ; '~I~. rl',. !I".t !.~~ . " ~ I' :,.!; ~' I ; i :;: :lJ; ",.j, P';\; : ;:1 ~ \ 1::!1 I: 'I' .1-:. ,. ;:1:'1 ":\1:1' .j'il j:) .; 'tl!:, .,,1 HAYTER ENGINEERING, INC. 4445 S.E. LOOP 286 PARIS, TEXAS 75460 (903) 785-0303 ~AX (903) 785-0308 CONSULTANTS PLANNERS ENGINEERS ATTACHMENT TO CHANGE ORDER ONE 1. Select fill under the c1arifier--$7,500.00 2. Oil coolers for the spray field pumps--$3,338.00 3. Level sensors for the sludge holding tanks--$3,360.00 4. Ball check valves in the wetwells--$3,6I2.I5 5. Plug valve in 4" line to the ATAD building--$2,106.80 6. Pre-ATAD holding tank level indicator--$1,229.35 7. Larger conduit at the wetwells--$443.38 8. Thermal overloads for the 6 Flygt pumps for $517.50 9. Networking cable for the two AT AD controllers--$990.00 ,', " ~ . ' Ii . Ul r ,r itl 010 IIIJ~.....,.", //1 1',-' I ',ii " ' ~\:, Ii' ,', Ft." I . ' ...........E'-t '-t I.' ,.~.'..~ fill zt:..A, ...;f~ '. :1:" f: ~ \.*~ i. ::.'. ' Mic'HAEl'N:'!riBBtfs~ ::' fi'''-65484:~7iJ i," fA "'~"~f" ~t.l" I ~~a 1f .,~~.~lst(o';~"~~'f ;' '~:IOHACt.!4f'P ;. \\'1ll,ttk."IIo."tt="'" i. : i:: l 1;,11 i'I.:' ""\' CHANGE ORDER TOTAL $23,097.18 ORIGINAL CONTRACT AMOUNT $3,798,000.00 NEW CONTRACT AMOUNT $3,821,097.18 i ! ~ " , i I ; !'IM . l~ ,. ~ J i ';:1\'\,' Ii'" I':' ; ;':(;' '1,1 II ;(i , i:: An increase in contract time of 155 days will take the original contract completion date of November 26, 1997 to May 1, 1998. This is justified by the unusual weather experienced by the contractor that hampered construction during this time period, the time required to install the above change order items, and delays brought on by the necessity of working with the staff of the plant to keep operations on-going during construction (e.g.- testing the new spray field pumps could not begin until the sludge disposal site was dry enough to dispose of sludge, the clarifiers could not be taken out of service until the flow equalization facility had reached an acceptable level, excavation for the new clarifier could not begin until TV Electric moved their poles and lines, etc.). ! ,':+ ,"I'. ;;:C,i I'; , I;" ] l; :~ i :L" .Ii : I , ' . . > ,(:\ ; ~ , I !1' .',,:/1 Ii'" ,: II: 'J i :.~ I " il :;: , I' I; I, ,!, ORIGINAL CONTRACT COMPLETION DATE November 26,1997 CHANGE ORDER TIME INCREASE 155 Days i ~ ; i /; \ ",(\'" 1:li , q 1 I'll il" ,:r. I,. , .I"i ,\\; i,I,:, /',1 t\:, :', NEW CONTRACT COMPLETION DATE May 1, 1998