Loading...
2007-125-RES-Approving a Professional Services contract for groundwater monitoring and testing at the stillhouse road landfill between th eCity of Paris and Weaver Boos consultants LLC;RESOLUTION N0. 2007-125 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS, APPROVING A PROFESSIONAL SERVICES CONTRACT FOR GROUNDWATER MONITORING AND TESTING AT THE STILLHOUSE ROAD LANDFILL BETWEEN THE CITY OF PARIS AND WEAVER BOOS CONSULTANTS LLC; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City of Paris is in need of groundwater monitoring and testing services at the Stillhouse Road Landfill and Weaver Boos Consultants LLC has made a proposal for Groundwater Monitoring and Testing Services; and, WHEREAS, the proposal from Weaver Boos Consultants, LLC is deemed to be in the best interest of the City of Paris and its citizens and that such professional services contract in a form substantially similar to Exhibit A attached hereto and made a part hereof be approved; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the proposal of Weaver Boos Consultants, LLC for professional services for groundwater monitoring and testing at the Stillhouse Road Landfill described in Exhibit A attached hereto, be, and the same is hereby accepted. Section 3. That the Mayor of the City of Paris, be, and he is hereby authorized and directed to execute on behalf of the City of Paris the Professional Services Contract in a form substantially similar to the form of Exhibit A attached hereto. Section 4. That this resolution shall be effective from and after the date of passage. PASSED AND ADOPTED this 8th day ATTEST: of October, 2007. ,~ ~~, J sse Jame reelen, Mayor lce Ellis, City Clerk APPROVED AS TO FORM: W. Kent McIlyar, City Attorney ~~~~ ~~~~ ca7rrsv~.~c~''~c~ LLC B(D'C)'Y'I~Td~']EB'~' July 18, 2007 Mx. Shawn Napier, P.E. Director of Public V~rorks City of Paris I50 SE First Street Paris, Texas 754b0 6420 SOUTHWEST BLVD, SUITE 206 FORT WC11~TH, TF,XAS 76109 PHQNE; 817 735.9774 FAX; 817.735.9775 www.weaverboos.corn Re: Proposal for Landfill Consulting Services Stillhause Road Landfill, Paris, Texas Dear Mr. Napier: Chicago, IL Springfield, IL Naperville, IL Griffi~h,l'N South Be1a~', IN Denver, CO St. LOUiS, ~b14 Columbus, OH Fort Worth, TX V~eaver Boos Consultants, LLC-Southwest (WBC), is pleased to provide the City of Paris (City) with a proposal to assess potential groundwater contamination issues and plan a course of action at the above referenced landfill site. The following includes our project understanding, summaries of initial. and pote~itial additional services, a project schedule and estimated budget. This proposal supersedes our pxevious proposal dated December 2002. ~. Project Understanding Our proposal addresses TCEQ {Texas Commission on Environmental Quality) concerns stated in two landfill corrective action directive letters to the City (see Attachment 1 dated January 2l, 199$ and March 2, 2001) regarding the Stillhouse Road landfill. The City was directed by the TCEQ in January 1998 to complete the fallowing investigation activities: • Complete a methane gas survey. • Install proposed assessment piezometers P-13, P-14, and replacement piezameter P-10A. • Collect groundwater samples from all five monitoring wells and 14 piezometers, analyze the samples far volatile organic compounds {Vt3Cs) and ammonia. • Continue leachate pumping from well M'~V-~A. • ~.ventary facility monitoring wells and piezometers, and assess their condition. • Report on the investigation progress. During 1998, EMCON completed the first three items in the above directive list. No significant methane concentrations detected in an EMCON shallow bar hole probe assessment. Based on a driller's report, EMC~N correspondence and groundwater EXHIBIT, Mr. Shawn Napier, P.E. July 1 S, 2007 Page 2 sampling activities, assessment piezometers P-13, P-14 and replacement piezometer P- l0A were installed. Groundwater sampling and analyses were completed in June and December 1998. These analytical results (from about 8,5 years ago} 'indicated VOCs in groundwater at concentxations exceeding EPA. drinking water standards were present at the northern landfill boundary (in piezometers P-11; P-13 and P-14}, and had migrated off site beyond the southeast landfill boundary (in the vicinity of piezometers P-2 and' P-~}. Based on conversations with City personnel, no leachate has been pumped from the landfill since at least 1998. According to Mr. Arten Avachian of the TCEQ, no required project summary report summarizing these activitaes has been submitted to the TCEQ. Our review of TCEQ correspondence, the City's project files, and WBC's case files indicate WBC does not have a complete set of landfill case records. Rroposed Services This proposal's services axe based on available project information, and are designed to address the previously noted TCEQ.. iiivestigatioh zequireixients fai ~~.tlie `site and to .......determine if a persistent groundwater VOC~ contamination issues are` present, Xf groundwater contamination above-the EPA, drinking water standards is riot reported in the proposed sampling events, the project status report will present a plan to allow the site to exit the postclosure period, In the event persistent groundwater contamination is confirmed by the proposed groundwater analyses, the project status report will contain a Remediation Plan. Task 1- TGEQ Response Letter WBC will prepare an initial TCEQ response letter that briefly summarizes the project activities completed since 199$ and the City's future project plans described in this proposal's Tasks 3, 4, and 5. The purpose of this letter is to avoid a possible TCEQ NOV notice of violation) letter while the landfill is collecting additional groundwater data and preparing a course of action. Two draft copies of the initial response lettez will be prepared and submitted to the City for review. After incozporation of mutually-agreed City suggestions and changes, five final copies of the TCEQ response letter will be submitted to the City and TCEQ. Task ~ - TGEQ Record Search As noted in the project understanding, the available infarmation indicates WBC lacks previous investigation report information. To better plan project strategy and avoid duplicating previous investigation activities, WBC will procure the services of a TCEQ file search firm to obtain all available case records in the TCEQ's Austin azchives. WBC will make a duplicate set of the TCEQ information obtained for the City's records. Q;ICITYOFPAR7SfPROPOSALICWARDAOS~lL07.07.DOC ~~~~~ ~~ ~~~a~ Mr. Shawn Napier, P.E. July 18, 2007 Page 3 , Task 3 -1=acility Well Inventory WBC will conduct an inventory of existing facility monitor wells and piezameters as required by the TCEQ. According to TCEQ files, there may be 26 facility wells on or adjacent to the landfill. Based an WBC's review of the case files, there maybe more wells at the site. For all located facility wells, each well's coordinates, depth, water level, well condition, and repair/plugging recommendations will be recorded. This task assumes the City will provide a surveyor with a GPS unit to accompany WBC's inventory technician for about two days and record well coordinates. The City's surveyor costs are not included in this proposal. Consistent with previous City proposal requests, the City's surveyor will invoice the City directly, Task 4 -Groundwater Sampling and Analyses Events Ta determine if groundwater contamination issues persist, two consecutive quarterly groundwater.sampling-events will~be-completed in the five landfill monitoring~~vells and 14 piezameters requested by the TCEQ in ,1898. WBC will provide an experienced sampler and all necessary sampling equipment to complete the field portion of this task., Immediately prior to purging and sampling, water levels and methane gas concentrations will be measured. in l 9 wells and piezometers at-the site. The piezometers will be purged and sampled in accordance with standard practices and consistent with recent events. Groundwater samples. wild be collected from monitoring wells MW-1, MW-2, MW-3, MW-~, MW-5, and piezozneters MW-4A, MW-SA, P-l, P-2, P-3, P-4, P-5, P-6, P-9, P- 10A, P-11, P-12, P-13, and P-l~. Samples collected each day will be shipped overnight to Test America (formerly Sevem Trent Laboratories in Austin and analyzed for the 47 VOCs listed by the TCEQ in Chapter 330 and ammonia (consistent with past events and the TCEQ directive). Test America will provide signed laboratory reports with associated laboratory QA/QC data and the required TCEQ report forms. The estimated labaxatary cost includes the quality control analyses of one field blank, one trip blank, and one duplicate sample. Field purging and sampling data will be recorded by WBG an individual well data sheets anal chain-of custody forms. WBC estimates about three days will be required to purge anal sample the 19 wells and piezameters, package and ship the samples, and complete the required documentation. Consistent with previous City proposal requests, Test America laboratory will contract directly with the City of Paris for service payment. This proposal includes the estimated City cost (at standard turnaround time without WBC subcontractor markup) for the proposed analytical services. Task 5 -Project Status Report After receiving the analytical data from the two WBC sampling events, WBC will prepare a project status report summarizing the project activities completed between January 1998 and early 2008. The report will include the WBC and EMCON-collected information Q~1G(TYOFPARlStPROPOSALICN'AROAOS~tLO1.01.pOC ~/,~~~~y ~"B~,(~~x~~~?~'~ Mr. Shawn Napier, P.E. July 18, 2007 Page 4 related to analytical results, the EMCUN bar hole pxobe methane gas survey, a landfill well/piezometer inventory, and details regarding EMCQN's 1998 piezometer installations. Based on the analytical results from the two WBC sampling events, the report will also contain either a Remediatian plan or a plan to allow the site to exit the postclosure period. Two draft copies of the praject status report will be prepared and submitted to the City far review. After incorporating mutually-agreed upon City suggestions anal changes, fve final copies of the xeport will submitted to the City and the TCEQ. Schedule WBC wiII begin work on this praject within 30 days of receiving City authorization to proceed, weather permitting. This proposal is valid for 120 days. Budget An estimated budget far 2007-2008 Stillhouse Road Landfill services is presented an the following page. Tie .estimated cast to perform the proposed services. is $45;020. WBC will invoice the City for project tinge and materials costs, consistent with the attached. Annual Fee Schedule. Q 7CJT1'OF PARISIPROPOSALIf~Y/PROPOSrlL 07.01.AOC ~j ~p ~J1i e"IJOfld~ T~pf7,Qtl.~rl'b~d~' Estimated Budget for Stillhouse Road Landfill Services Mr. Shawn Napier, P.E. July 18, 200'1 Page S Additional Considerations We have developed the preceding project approach based an our understanding of available information. The following is a list of additional considerations far the City's current and future consideration. • As per previous City requests, the drilling, analytic laboratory, and land survey contractors will contract directly with the City for service payment. The City will be responsible for disposal: of all soil and groundwater wastes generated by the investigation activities. In addition, this proposal assumes no WBC casts will be incurred in securing agreements ar accessing neighboring properties. Additional WBC and drilling contractor casts may be incurred due to poor access or impassible conditions. Included in Attachment 2 'are codes t3f a Proposal Acceptance ~ Sheet, WBC General .. ~ Terms and Conditions, and WBC annual fee schedule. ~ If this proposal is acceptable; .- _ ~ . please return one signed copy of the Ptaposal Acceptance Sheet to our office. We .appreciate the oppoxtunity to be ~of service to the City of Paris: Please contact us with any questions or concerns. . -Sincerely, _ . Weaver Boos Cousuitants, LLC-southwest ~' Robert S. Ferbend, P.G, Jeffrey P. Young, P.E. Senior Hydrogeolagist Principal Attachments: Attachment l : TCEQ Correspondence bated January 21,1998 TCEQ Correspondence Dated March 2, 2001 Attachment 2: Proposal Acceptance Sheet WBC General Terms and Conditions WBC Annual Fee Schedule 6~tClTY DFPRR1SiPROPDSALIGW PRDPDSAL 07-07.DDC ~~eu~r. ~'a~ 4~~n.~ucl~,~.in~a~ c ~~~ ~ Off' Barry ~, McBee, Chairman ~ ~~, w ~ R. B. "Ralph" Marquee, Comsa2issioner ~ ~ ~ /" John M. Raker, Commissianer Dan Pearson, ~'xecutiUe.Dtrectar TEAS ~1ATURAL RESOURCE CONSERVATION COMM~SS~aN Protecfing 1'~xas Gy Reducing and Freuenting Pollution 7anuary ~l, 1998 The Honorable Eric S. Cliffoxd, Mayer City ofParis . 'i ~',0, Box. 1037 Paris, Teas 75460 RE: Solid Waste -Lamar County City of Paris Stillhause Rd. Landfill - MSW Permit No. X44 Groundwater Investigation Report and Future Activities Dear Mayor Clifford: Wa have reviewed the repart entitled Groundwater Investigation, City of Paris Stillhouse Road Laru fill, .MSW Permit ~o. 14~, dated September 1997. The document vas submitted under a cover letter dated ~., actober 6,1997, signed by Mr. A. Richard Smith, Senior Hydrageolagist, EMCON, Fort Worth, Texas, ~~J Thank you far the repart. We are glad to read about improvements in final cover and drainage, and are interested in the passibility . that the volatile organic rampounds {'Vacs} detected may be related to landfill gas. Please implement the recommendations trade in the report far further activities at the site, with the following modificat~ans: + Ensure that tha tnethan~ gas survey adequately covers the entire site. In addition to concentrating an the southeast part of the szte, please also focus on the area around piezameter P-I 1, which has shown the highest overall concentrations of VoCs in groundwater samples taken during 1996. + Install replacement piezometer P-IOA, and the proposed new piezameters P-I3 and P-14 by the end of the first quarte;• of 1998. (Note: lrt Figure I8 of the repart, the proposed piezometets were designated .P-12 and P-I3; P-I2 already exists, therefore the new piezometers should be designated P-I3 and P-I~4.) + As soon as the replacement piezameter and new piezometers are ready, sample alt monitor wells (MW-l; Z, 3, 4, 5) and piezometers (P-I, Z, 3, 4, 5, 6, 9, IQ.A., I I, I2, 13}, and the leachate from MW-4A. Analyze samples for V4Cs and ammonia as proposed. • Continue semiannual monitoring of all ~~vells and piezometers in which VOCs are detected during the first event in 199&. After additional information is obtained and further recommendations are made, the monitoring schedule may be revised. • Continue leacha#e extraction from MW-4A. t...~ P.O. Box 13087 ~ Austin, Texas 78711-3087 0 512/239-i000 o Internet address: www.tnrcc,state.tx.us prinle3 an rtcyckrJ papec usit~ soy~bais:d ink M~.yor Eric S. Clifford, City of Paris, MSW Permit No.144 Groundwater lnvestigation Report and Future Activities January 21,1998 Page Z Conduct a complete inventory and provide documentation on the status of all existing and past monitor wells, including any that have been plugged and abandoned. As requested in Part B of ouz previous letter, dated 3anuaxy 29,1997, please inspect the condition of all e~cisting monitor wells and piezometers, both on and offthe site, and determine which should be plugged and abandoned. lxd'ormation in our files suggests that there maybe as many as 2b wells and piezometers (MW-1 through MW-5, MW~1A through 1vTW1 iA, P-1 through P-6, and P-9 through P-12}, ofwhich at least 12 are on neighboring property(ies}. Please document as completely as possible: (I}the present condition of each, well {includang concrete pads}; (2) construction details (including elevation afground surface, total well depth, elevation of top of filter pack and top of well screen, casing material, and type of seal); (3) current water level (elevation) in each well; and (~) any other significant information, Please implement the recommendations of the Groundwater Investigation, including the modifications outlined above, within 60 days from the date of this letter, Please also provide a written response to this letter within the GO days. All submittals, including tho cover letter should be in triplicate (one original and two photocopies). Please include the permit number for the site and the name~of the cotuxty an all documents, and our internal mail code in the mailing address (~`NIC 12~" appearing by itself on the first line} on all envelopes and correspondence, lfyou have any questions about this letter, please call Mr. Arten 1. Avalcian, Geologist, at (S 12} 239-4419. As our customer, your opinion is important to us in determining our strengths and weaknesses. Please take a few minutes to complete the enclosed TNRCC Customer Survey and return it to us. Sincerely, ~~~ Ada Lichee, Team Leader Groundwater Monitoring Team Municipal Solid Waste nivision AAL/A1A Enclosure cc: Mr. Mike Brashear, Waste Program Manager, TNRCC Region S Field Cfl~ce Mr. Earl E. Smith, P:1/., Paris City Engineer 11r1r. A, Richard South, Senior PTydrogeologist, EMCON, Ft. Worth Robert!, Huston, Chairman ~ . , R.B. "Ralph„ Marques, Cartrmissioner x I ~~John M. Baker, Commissioner ~ ~' Jeffrey A. Saitas, ~`xe>"tttive Director. TEXAS NATURAL RESOURCE CONSERVATl4N CaMMISSION Prateeti~g Texas bg Reducing and Preventing Poltufion March ~, 2001 The Honorable Michael J. Pester, Mayor City of Faris FA. l3ox 1037 Paris, Texas 75451-I037 Re: Solid`Waste -- ~,amar County City of I?aris 5tillhouse road Lax~df'ill -~ MSW Permmit No.144 Status of Groundwater Investigations and Corrective Action Dear Mayor.Ffiester; r,.... ,`,~`) The purpose of this letter is to inquire about the status of groundwater investigations and corrective action toaddress impacts to groundwater by volatile organic compounds and/or other constituents apparently'originating framthe xeferencedfacility. ~Ve spoke by telephone on February 2 1, 2041., . with Mr. Tezzy Townsend, Director of public Works for the City of Paris, to let him know in advance.. that we would be sending this letter. In our last communication, dated January 21,1998 (copy enclosed), we reviewed a report entitled Groundwater 1'nvastigation, City of Paris ~'ti~dhouse Road .iaandf li, M~I~ Permit No. 1 ~4, dated September 1997, and requested that the City implement recarnnaendations ii~the report,with some modifications. We did not receive a response to that letter nor afollow-up report. Please note that Title 30 Texas Adar~inistrative Gode, Chapter 330, Section 254 (Post-Closure Care Maintenance Requirements} establishes that the owner or operator of a closed municipal solid waste facility is responsible for miaintenance, and must correct problems such as leachatemigration and/or methane migration. Note also that this facility closed prior to implementation of the current municipal solid wasterules, andtherefore corrective actionmaybepursuedundertheTexasltisl~Reductionl?ragram (see htt„~~llwww.tnxcc state tx.us/permitting/tma.htm on the TNRCC Internet site for information}. Please review the situatiaa and respond within 45 days from the date of this letter with a preliminary plan and schedule to. complete the necessary, activities, Note that all submittals, including saver letters, should be provided to the MSW Permits Section in duplicate (one original and one copy}, ,.. ,. Please include the permit number for the site and the name of the county an. all documents, and our ~~ internal mail code (MC 124} in the mailing address. A copy should also be sent directly to.the TNRCC Region 5 field office, to the attention of Mr. Mike Brashear, V+laste Section Manager, PA. Box 13087 ~ Austin,'fexas 78711-3087 • 5121239-1000 ~ Internet address: w4vw.fnrcc.state.t<c.us printed on reryded paper using so;~~6ased ink Mayor Michael J. Pester, City of Paris, MSW Permit No.144 . Status of Crroundwater Jnvestigatians and Corrective Action. March 2, 2QOI Page 2 . 2916 Teague Drive, Tyler, Texas 75701-3756. ~ you have any questions aba~zt this letter, please call Mr. Amen J, Avakian, Gealagist, at X512} 239.4419. Sincerely, . ~~. ~~~ Ada Lichaa, Team Leader . MSW Permits Section . Waste Pemtits Division Texas Natural Resauxce Conservation Commission AALlaja ce: Mr. Terry Townsend, P.E., Director of Public Works, City of Paris Enclosure $~ ~' h.. .' ~ i ~ 7 1 L 1 1 1 1 1 1 1 1 1 1 1 1 WEAVER BOOS CONSULTANTS, LLC-SOUTHWEST 6420 Southwest Blvd., Suite 206 Fort Worth, Texas 76109 (817)735-9770 PROPOSAL ACCEPTANCE SHEET Description of Services: Landfill Consulting Services Project Name: Stillhouse Road Landfill Project Address: Stillhouse Road, Paris, Texas Weaver Boos Project No.: Date: 07-18-07 Client Contract No.: F21102 For approval and payment of charges, invoices will be charged to the account of: Firm: City of Paris, Texas Attention: Mr. Shawn Napier, P.E. Street Address: 150 SE First Street Telephone: (903) 784-9292 CitylState: Paris, Texas Zip Code: 75460 This AGREEMENT acknowledges acceptance of the Standard Terms and Conditions (attached) and is subject to the following special provisions/payment schedule: Per attached proposal This AGREEMENT is accepted by: By (Signature) By (TypelPrint) Accepted: 19 Weaver Boos Consultants, LLC-Southwest (Sign ture) Jeffrey P. Young, P.E. By (Type/Print) Principal Accepted: Julx 18, 2007 P:1GroundwaterlParislProposal accept sheet07.rtf WEAVER BOOS CONSULTANTS, LLC General Terms and Conditions Version 2006-A1 Page 1 of 3 These General Terms and Conditions are incorporated by reference into the foregoing Proposal and shall along with the Proposal constitute the Agreement under which services are to be performed by Weaver Boos Consultants, LLC (WBC) for Client. The Proposal shall remain valid for 90 days unless otherwise stated in the Proposal. SECTION I: SCOPE OF SERVICES a. It is understood that the scope of services and time schedule defined in the Proposal are based on the information provided by Client and certain assumptions. If this information is incomplete or inaccurate, or if unexpected site conditions are discovered, the scope of services may change, even as the work is in progress. b. The scope of services shall include all services provided by WBC in its discretion, which are reasonably necessary and appropriate for the effective and prompt fulfillment of WBC'S obligations under the Agreement and all services shall be subject to the provisions of the Agreement, including these General Terms and Conditions and any Supplemental Terms or Conditions incorporated herein. All such services provided shall be invoiced and paid for in accordance with Section 3 below. c. All additional or subsequent work performed for client, shall be subject to these General Terms and Conditions, unless otherwise superseded or modified by mutual agreement of WBC and Client. SECTION 2: CLIENT DISCLOSURES a. It shall be the duty of the Client before and during the project to promptly notify WBC of any known or suspected hazardous substances which are or may be related to the services to be provided. Such hazardous substances shall include but not be limited to any substance which posed or may pose a present or potential hazard to human .health or the environment, whether contained in product, material, by-product, waste or sample and whether it exists in a solid, liquid, semisolid or gaseous form. Provided, however, WBC acknowledges that the services they are providing pursuant to this Agreement are to be performed at a Class I Landfill and WBC acknowledges that they are aware of the typical hazards and risks associated with working at a landfill and drilling monitor wells pursuant to TCEQ requirements. b. Following any disclosure as set forth in the preceding paragraph, or if any hazardous substances are discovered or reasonably suspected by WBC after its services are undertaken, and which substantially change the costs and risks of the project, then WBC may, at its discretion, discontinue its services. Client shall notify WBC of potential health hazards or nuisances which might arise out of the work by WBC and its contractors andlor subcontractors (hereinafter referred to as subcontractors), and thereafter WBC shall take necessary and reasonable measures to protect its employees against such possible health hazards or nuisances. The reasonable direct costs of such measures shall be borne by the Client. d. The Client shall notify WBC of any other conditions, of which Client is or should reasonably be aware of, which might significantly affect the efficiency or safety of work of WBC. SECTION 3: BILLING AND PAYMENTS a. Unless otherwise specifically provided in the Agreement, billings will be based on the fee schedule referenced in the proposal. WBC shall submit invoices monthly for services performed and expenses incurred and not previously billed on any previous invoice. Payment is due upon receipt. For all amounts unpaid after thirty (30) days of the invoice date Client agrees to pay to WBC a finance charge of one and one-half percent (1 112%) per month, eighteen percent (18%) annually, or the legal maximum rate if it is less. The billing rates described in this Agreement may be modified on a periodic basis (typically annually). These modifications will be incorporated into long term projects, unless otherwise addressed in the Proposal. b. The Client shall provide WBC with a clear written statement within twenty (20) days after receipt of the invoice of any objections to the invoice or any portion or element thereof. Failure to provide such a written statement shall constitute acceptance of the invoice as submitted. Only the disputed sums may be withheld from payment. Further, WBC and Client agree to promptly address and resolve invoice disputes. c. The Client's obligation to pay for the services performed under this Agreement is in no way contingent upon other events; including but not limited to Client's ability to obtain financing, zoning, approval of governmental or regulatory agencies, final adjudication of a lawsuit in which WBC is not involved, complete a transaction or successfully complete the project. No deduction shall be made from any invoice on account of penalty, liquidated damages or other sums withheld from payment to WBC. d. If timely payments are not received, then WBC may commence collection activities. It is agreed that all expenses incurred by WBC in obtaining liens, obtaining judgments or collecting any amounts due under the Agreement including the time of WBC employees, at full billing rates, all associated costs, and reasonable attorney's fees shall be recoverable from the Client. SECTION 4: RIGHT OF ACCESS a. If services to be provided under this Agreement require the agents, employees, or subcontractors of WBC to enter onto the Project site, Client shall provide timely right of access to the site to WBC, its employees, agents and subcontractors, to conduct the planned field observations and services. WBC shall take reasonable precaution to reduce damage to the site due to its operations, but is not responsible for the cost of restoration for any damage resulting from its operations, unless otherwise provided for in the Proposal. SECTION 5: SAMPLING OR TEST LOCATION a. If the scope of services includes performance of soil borings, or other subsurface excavations by WBC, it is understood that the Client will furnish WBC with a diagram indicating the location and boundaries of the site, and all subsurface structures and utilities. WBC reserves the right to deviate a reasonable distance from the proposed boring location(s). Client recognizes that drilling equipment is large and heavy and understands the risk of site damage. At Client's request and cost, WBC will restore the site to the conditions existing prior to WBC operations if practicable. WBC shall not be liable for damage or injury to or resulting from damage to subterranean structures (pipes, tanks, cables, wires or other utilities and subsurface structures, etc,) which are not called to WBC's attention in writing and correctly shown on the diagram(s) furnished or correctly marked at the site. b. Unless otherwise stated, the fees in this proposal do not include costs associated with surveying of the site for the accurate s: I citydatalattorneylcontracts120071 weaver boos contract-landfill consulting services final oct 2007.docx WEAVER BOOS CONSULTANTS, LLC General Terms and Conditions Version 2006-A1 Page 2 of 3 horizontal and vertical locations of tests. Field tests or boring locations described in our report or shown on sketches are based upon information furnished by others andlor estimates made in the field by our representatives. Such dimensions and elevations should be considered as approximations unless otherwise stated. c. This agreement may be terminated if site conditions prevent soil borings or other subsurface excavations by WBC at or near the designated locations, because of either obstructions or safety considerations, and these conditions were not revealed to us prior to acceptance of this Agreement. If, in order to complete borings, or other subsurface excavation, to their designated depths, additional work is necessitated by encountering impenetrable subsurface objects, this and all additional work will be charged for at the appropriate rates in the fee schedule. d. Any equipment lost or damaged due to site surface or subsurface conditions, and not the negligence of WBC or its subcontractors, will be invoiced at cost plus 15 percent. SECTION 6: SAMPLES a. All materials and samples will be discarded immediately after testing unless the Client advises WBC in writing to the contrary, In such case, the samples will be delivered, shipping charges collected, or stored at owner's expense. Client shall have the sole responsibility to dispose of any hazardous substance or regulated contaminant whether the result of or a by-product of sampling or not, in accordance with applicable law. Client shall bear all costs and liabilities associated therewith. c. Client agrees to indemnify, defend and hold harmless WBC from any claims made or asserted against WBC arising out of or related to collection, storage or disposition of samples or materials alleging a failure to comply with any Federal, State or local environmental law, regulation or ordinance. SECTION 7: REPORTS AND OWNERSHIP OF DOCUMENTS a. With the exception of WBC reports to Client, all documents, including field data, field notes, laboratory test data, calculations and estimates are and remain the property of WBC. Client agrees that all reports and other work furnished to the Client but not paid for in full will be returned to WBC upon demand and will not be used for design, construction, permits, licensing, or any other purpose. b. Documents, including but not limited to, technical reports, field data, field notes, laboratory test data, calculations, and estimates furnished to the Client or its agency pursuant to this agreement are not intended or represented to be suitable for use by third parties or reuse by the Client or to the extensions of the Project or on any other project. Any use or reuse without WBC's written consent will be at Client's sole risk and without liability or legal exposure to WBC or to WBC's subcontractor(s). Client shall indemnify and hold harmless WBC and WBC's subcontractor(s) from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. SECTION 8: INDEMNITY PROVISIONS a. WBC agrees to indemnify, hold harmless, and defend Client from and against any loss, damage, injury, claim, and liability arising and caused by the negligent acts or omissions of WBC, its agents and subcontractors, but subject to the limitations of liability set forth in Section 11 of this Agreement. Further, Client agrees to indemnify, hold harmless, and defend WBC against any loss, damage, injury, claim or liability not caused by or arising from the acts or omissions of WBC. SECTION 9: STANDARD OF CARE a. WBC represents that the services performed under this Agreement will be performed with the care and skill ordinarily exercised by reputable members of the profession practicing under similar conditions at the same time in the same or similar locality. b. Client recognizes that subsurface conditions may vary from those encountered at the locations where the borings, surveys, or explorations are made by WBC and that the data interpretations and recommendations of WBC's personnel are based solely on the information available to them. WBC will be responsible . for those data, interpretations, and recommendations, but shall not be responsible for the interpretation by others of the information developed. c. NO OTHER WARRANTY, EXPRESSED OR IMPLIED, IS MADE OR INTENDED BY RENDITION OF CONSULTING SERVICES OR BY FURNISHING ORAL OR WRITTEN REPORTS OF THE FINDINGS MADE. SECTION 10: INSURANCE AND INDEMNIFICATION a. That Contractor must, at all times during the term of this Agreement, keep: and maintain in full force and effect a policy or policies of insurance, providing at least $250,000.00 per person and $500,000.00 for any single occurrence for bodily injury or death and $100,000.00 for any single occurrence for injury or destruction of property, indemnifying all persons for any and all damages, personal injuries, or property damages sustained as the result of the negligence of: Contractor, its agents, servants, or employees, and shall pay all premiums due thereon when due. It is expressly provided that such insurance policy or policies shall and must be written and issued by a reputable and financially sound insurance company or companies, with the City, its elected officials, officers and employees named as additional insureds. Contractor or its insurance carrier..or carriers shall deliver a copy of any such policies to the City Clerk of the City of Paris, 150 1~` Street S.E., Paris, Texas, 75460, or furnish to said City Clerk a current letter or certificate from such company or companies, evidencing the fact that such insurance is in full force and effect at all times during this Agreement, and any extensions hereof, and specifically noting thereon that City, its elected officials, officers and employees as an additional insured. All such policies shall be written so that the City will be notified of cancellation or of any restrictive amendment of the policies at least thirty (30~ days prior to the effective date of such cancellation or amendment. Notice shall be by certified mail, return receipt requested, addressed to the City at the following address: City Clerk, City of Paris, P. 0. Box 9037, Paris, Texas 75461-9037. b. The Contractor and his sureties shall indemnify, defend and hold the City, its elected officials, officers and employees harmless from all suits, actions or claims of any character, name and description brought for or on account of any injuries or damages received or sustained by any person, persons or property on account of the operations of the Contractor, his agents, employees or subcontractors; or on account of any negligent act or fault of the Contractor, his agents, employees or subcontractors in the execution of said contract; or on account of the failure of the Contractor to provide the necessary s: Icirydatalattorneylcontracts120071weaver boos contract-landfill consulting servtces final oct 2007.docx WEAVER BOOS CONSULTANTS, LLC General Terms and Conditions Version 2006-A1 Page 3 of 3 barricades, warning lights or signs; and shall be required to pay any judgment, with cost, which may be obtained against the City growing out of such injury or damage. The Contractor likewise covenants and agrees to, and does hereby, indemnify and hold harmless the City from and against any and all injuries, loss or damages to property of the City during the performance of any of the terms and conditions of this Contract, whether arising out of or in connection with or resulting from, in whole or in part, any and all alleged acts or omissions of officers, agents, servants, employees, contractors, subcontractors, licenses or invitees of the City. c. The Client further agrees to notify any contractors or subcontractors who may perform work in connection with any design, report or study prepared by WBC of such limitation of liability for breach of contract, errors, omissions or negligence and require as a condition precedent to their performing their work a like limitation of liability on their part as against WBC. d. The Client and WBC agree that neither will be liable to the other for consequential damages incurred due to the fault of the other. Said damages include, but are not limited to, loss of use and lost profits. e. With the exception of actions pertaining to materialmen or mechanic's liens, and if lawful, causes of action between the parties to this Agreement pertaining to acts or failures to act shall be deemed to have accrued and the applicable statutes of limitations shall commence to run on the date the alleged actor failure to act occurred. f Not withstanding the above, all claims, whether based upon contract, tort, breach of warranty, professional negligence (including errors, omissions or other professional acts), or otherwise, shall be deemed waived unless made by WBC or Client in writing and received by WBC or Client within one (1) year after WBC or Client reasonably knew or should have known of its existence, but in no event, shall such claim be asserted by WBC or Client later than two (2) years after WBCs completion of services with respect to which the claim is made. SECTION Il: TERMINATION a. This Agreement may be terminated by either party upon at least seven (7) days written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. Such termination shall not be effective if the substantial failure has been remedied before expiration of the period specified in written notice, b. The heading or title of a section is provided for convenience and information and shall not serve to alter or affect the provisions included herein. c. All obligations arising prior to the termination of this Agreement and all provisions of this Agreement allocating responsibility or liability between the Client and WBC shall survive the completion of services and the termination of the Agreement, d. Unless otherwise provided, the substantial law of the State of Texas will govern the validity of this agreement, its interpretation and performance, and remedies for contract breach or any other claims related to this agreement. As this contract is to be performed in Lamar County, Texas, exclusive venue shall be in Lamar County, Texas. e. WBC shall apply professional judgment in determining the. extent to which WBC shall comply with any given standard identified in WBC's documents. Unless otherwise indicated, such compliance, referred to as "General Compliance" specifically excludes consideration of any standard listed as a reference in the text of those standards cited by WBC. f. Unless specifically stated in WBC's Proposal, it is understood the costs for implementation of the work are based on privately owned projects utilizing merit (non-union) wages and employees. Government funded or publicly owned projects that require prevailing wages will have specific fees identified in the Proposal. Any job action, strike, or other requirement to use union represented employees will require renegotiation of the costs for performing the work. g. In the event that WBC borrows or uses equipment or machinery, including but not limited to stationary, mobile and non-road mobile equipment, from the Client, it is agreed that the equipment is being rented for the sum of $1.00 and other considerations unless a specific rental agreement is executed by the parties. h. This Agreement may be assigned by WBC to an affiliate company, in whole or in part. WBC may also retain persons or entities not in WBC's employ without Client's prior specific consent when such retention is appropriate and customary, including, but not necessarily being limited to, surveyors, drilling subcontractors, testing laboratories, remediation contractors, and specialized consultants. Client shall not assign its duties and obligations hereunder without the prior written consent of WBC. b. WBC may terminate this Agreement if the Client suspends WBC's services for more than sixty (60) consecutive days through no fault of WBC's. c. This Agreement may be terminated without cause by either party upon at least sixty (60) days' written notice. d. If this Agreement is terminated, WBC shall be paid for services performed prior to the termination date set forth in the notice plus termination expenses. Termination expenses shall include costs attributable to personnel and equipment rescheduling and re-assignment and all other costs incurred directly attributable to termination. SECTION 12: MISCELLANEOUS a. In the event that any provision herein shall be deemed invalid or unenforceable, the other provisions hereto shall remain in full force and effect, and binding upon the parties hereto, s:lcitydatalattorneylcontracts120071weaver boos contract-landfill consulting services final oct 2007.docx WEAVER BOOS CONSULTANTS, LLC- SOUTHWEST -1 ANNUAL FEE SCHEDULE -PROFESSIONAL SERVICES (Revised November 2006) I. PROFESSIONAL STAFF U.S. $ a) Principal /Corporate Consultant ......................................................... ............................... Hr 165.00 b) Project Director ......:.......................................................................... ............................... Hr 140.00 c) Senior Project Manager ..................................................................... ............................... Hr 125.00 d) Senior Project Engineer/Scientist ...................................................... ............................... Hr 110.00 e) Project Manager ................................................................................. ............................... Hr 100.00 fl Project Engineer/Scientist/Environmental Specialist .......................... ............................ Hr 90.00 g) Staff Engineer/Scientist/Environmental Speclalist ............................. ............................... Hr 80.00 h) Engineer/Scientist/Environmental Specialist ..................................... ............................... Hr 75.00 II. TECHNICAL STAFF U.S. $ a) Construction Superintendent .............................................................. ............................... Hr 80.00 b) Construction Manager ...................:.................................................... ............................... Hr 70.00 c) System Specialist ............................................................................... ............................... Hr 65.00 d) System Technician ............................................................................. .... ........................... Hr 60.00 e) Certified Technician .......................................................................... ............................... Hr 55.00 fl Senior Engineering Technician .......................................................... ............................... Hr 50.00 g) Engineering Technician II ................................................................. ............................... Hr 45.00 h) Engineerning Technician l ................................................................. ............................... Hr 40.00 III. SUPPORT STAFF U.S. $ a) CAD Designer III ............................................................................... ............................... Hr 75.00 b) CAD Designer II ................................................................................ ............................... Hr 65.00 c) CAD Designer I ................................................................................. ............................. Hr 50.00 c) Technical Assistant ............................................................................ ............................... Hr 45.00 ~ d) Clerical/Word Processing .................................................................. ............................... Hr 40.00 IV. GENERAL EXPENSES a) Automobile Transportation .................................................................................. Mi. $0.55 b) Subcontract Service or Rental ........................................................................................... Cost + 15% c) Report Preparation (outside services) ............................................................................... Cost + 15% d) Outside Services (e.g. photographer, film processing, overnight delivery, etc,) .......................................... Cost + 15% e Per Diem food and lod in ....................................................................... $1401day ( g g) ..................... f) Per Diem (no lodging) ...................................................................................................... $301day ° °-~- g) Transportation by Commercial Carrier or Rental Car ....................................................... Cost 15 /° h) Travel Expenses ................................................................................................................ Cost+15% UNIT PRICE NOTES: 1. All professional, technical, and support staff time and expenses spent in furtherance of the client's work will be billed. This includes, but is not limited to, proposal, field, travel, research, technical review and reporting, project management, client meeting, and project-specific administrative time and expenses. 2. An overtime rate of 1.3 times the regular rate is billed for technical and support staff services for work m excess of 40 hours per week, work between 7:00 p.m. to 5:00 a.m., and work on Saturdays. This overtime.rate is increased to 2.0 times the regular rate for work on Sundays and holidays. 3. Unless otherwise agreed to in writing, a monthly interest charge of 18% per annum, will be charged accruing from the date of invoice, on all invoices not paid within 30 days. 4. The unit rates are subject to periodic modification (typically annually). These rate modifications wdl be incorporated into long-term projects, unless otherwise addressed in the project contract. 5. Deposition and testimony services are charged at 1.5 times the regular billing rate. GENERAL EXPENSE NOTES: I . Rates quoted are for expenses only, equipment purchased on the client's behalf is marked up 25% 2. Personnel rates are billed separately from general expenses. 3. Standard non-disposable protective outer-wear or equipment damaged or contaminated by site conditions are billed at replacement cost plus 15%. 4. General expense mark-ups may be negotiated based upon contract size and payment terms. 5. The per diem rates set forth above are the standard rates we typically use for our technical staff on projects. We reserve the right to modify these rates in high cost areas. Any modifeation to this fee schedule requires the written approval of Weaver Boos Consultants, LLC P: IGrmarchvalerlGxnrdPrairieVProp~osals,2006 GW Proposcd12007 WBC Fee Schechrle.doc WEAVER BOOS CONSULTANTS, LLC-SOUTHWEST ANNUAL FEE SCHEDULE -PROFESSIONAL SERVICES (Revised November 2006) V. EQUIPMENT RENTAL FEES A) pH, Specific Conductance and Temperature Meter .................................... Day 30,00 B) Grundfos Purge Pump;and Controller ......................................................... Day 150.00 C) Honda Electric Generator ....................................................................... Day 50.00 D} Disposable Poly Bailer ................................................................................ Ea 8.00 E) Disposable Gloves ...................................................................................... Pair 0.50 F) Water Level Indicator ................................................................................. Day 30.00 ) G p p ...................................... .................. .. Filter and Hose for um Ea 25.00 H) Modified Level °D" (Tyveks, Boots, Gloves)lper person/per chg of clothing Ea 50.00 I) Photoionization Detector (PID) .................................................................. Day 100.00 J) ..:............................................................................ Nuclear Density Gauge Day 60.00 K) Air Sampling Equipment, per pump ........................................................... Day 50.00 L) Hand Operated Field Probe Equipment ...................................................... Day 110.00 M) Explosimeter ............................................................................................... Day 35.00 N) GA90lGEM S00 Gas Analyzer ................................................................... Day 100.00 0) Flame Ionization Detector ........................................................................... Day 110.00 P) Interface Probe ............................................................................................ Day 50.00 Q) ATV ............................................................................................................ Day 25.00 R) Company Truck .......................................................................................... Day... 75.00 TESTING AND RENTAL NOTES: 1. Rates for testing and equipment not listed above are available on request. 2. Testing and equipment rental costs are negotiable for specific projects and for on-site laboratory programs. r, 3. Laboratory unit prices cover equipment and labor costs to perform standard test procedures and laboratory reports with normal turn-around times. Non-standard testing requirements, supervisory and project management costs, data evaluation costs, and environmental sample disposal costs are not included in the testing unit prices and are billed separately. 4. Equipment rental rates are for equipment costs only. Transportation, calibration and personnel costs are billed separately. 5. Daily and weekly rates cover a maximum of 10 and 50 hours respectively. 6. SAMPLES WILL NOT BE RETAINED beyond classification and testing unless other arrangements are agreed to in writing. Environmental samples remain the property of the client. M Any modif cation to this fee schedule requires the written approval of Weaver Boos Consultants, LLC P: IGromrchvaleriGrnndPrairielProposnls12006 GW Proposah?007 VVBC Fee Schedrde.doc