Laserfiche WebLink
CITY COUNCIL AGENDA ITEM BRIEFING SHEET <br />Submittal Date: Originating Department: Presented By: Agenda Item No.: <br />4-21-2008 Engineering 41 Shawn Napier, P.E. City Engineer 16 <br />Council Date: /Director of Public Works <br />4-28-2008 <br />RECOMMENDED MOTION: Two options for consideration: 1. Do nothing and let Paris <br />Independent School District (PISD) build the main entrances off the Loop and Jefferson <br />Rd. (F.M. 1507). 2. Have a bond election or sell certificates of obligation to build S. <br />Collegiate Drive and add in other projects for a total of at least three million dollars. <br />POLICY ISSUE(S~: <br />Issuance of Debt <br />BACKGROUND: <br />The City was approached by PISD about paying for or constructing S. Collegiate Dr. <br />between Jefferson Rd. and Loop 286. PISD is going to build the new high school on the <br />property east of S. Collegiate and between Jefferson Rd. and Loop 286. The existing <br />road is narrow gravel and asphalt surfaced roadway. The Major Thoroughfare Plan calls <br />for this section of roadway to be an arterial level which requires at least 80-feet ofRight- <br />of-Way (ROW) and 60-feet of pavement. Staff recommends building a 40-foot pavement <br />section that would include two 13-foot lanes and a 14-foot left turn lane. <br />The Commissioner Court and TxDOT have been approached as other possible funding <br />sources. TxDOT has pledged to assist monetarily with the reconstruction of two <br />intersections if we realign a section of S. Collegiate north of the proposed high school. <br />This would make S. Collegiate the main non-stop thoroughfare, Jefferson Rd. eastbound <br />traffic would stop at S. Collegiate in front of the Civic Center and would need to turn <br />right (south) to continue on Jefferson Rd., they would then turn left (east) to continue on <br />Jefferson Rd. The cost estimate for the arterial level roadway adjacent to the high school <br />is 1.6 million dollars. The cost for a collector level roadway (39-foot of pavement) is <br />estimated at 1.3 million dollars. The storm sewer cost that is included in both roadways <br />is estimated at $450,000.00 and the roadway will need to be built up at the north end near <br />Jefferson Road. A rough cost estimate for a collector level section of S. Collegiate north <br />of the high school section is $750,000.00. Ultimately a collector level roadway would <br />need to be extended north to connect to the five-lane section of pavement south of <br />Clarksville Street. <br />BOARD~COMMISSION RECOMMENDATION: <br />EXHIBITS: <br />Table reflecting effect of debt issue on tax rate and map with proposed roadway design <br />ACTION: BUDGET INFO: <br />^ Financial Report ®Minute Order Expense $ <br />^ Department Report ^ Resolution Budgeted Amt. $ <br />^ Presentation ^ Ordinance YTD Actual $ <br />^ Public Hearing ^ Other Acct. Name <br /> Acct. Number <br /> <br />City of Paris Revised 2/04/08 <br />U1.~ i <br />