2004-168-RES AUTHORIZING EXECUTION OF A RECONCILIATION CHANGE ORDER TO THE CONTRACT FOR THE CONSTRUCTION OF THE 24" RCCP WATER TRANSMISSION LINES FOR CONSTRUCTION OF THE NEW ELEVATED WATER STORAGE TANK - BONHAM STREET RESOLUTION NO. 2004-168 A RESOLUTION OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING AND AUTHORIZING THE EXECUTION OF A RECONCILIATION CHANGE ORDER TO THE CONTRACT FOR THE CONSTRUCTION OF THE 24" RCCP WATER TRANSMISSION LINES ASSOCIATED WITH THE CONSTRUCTION OF THE NEW ELEVATED WATER STORAGE TANK - BONHAM STREET; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the 13th day of January, 2004, in Resolution No. 2004-021, award the contract for that project described as "24" RCCP Water Transmission Lines associated with the construction of a new elevated water storage tank - Bonham Street," to Buster Paving, a division of APAC - Texas, Inc., of Sulphur Springs, Texas; and, WHEREAS, Bucher, Willis & Ratliff Corporation, acting as project engineer, recommends the amendment of the contract for said project in accordance with the Reconciliation Change Order attached hereto as Exhibit A, and providing for a net increase of $34.050.94 in the contract price, for a total contract price of $1,869,477.44; and, WHEREAS, the form of Reconciliation Change Order, attached hereto as Exhibit A, should in all things be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the form of the Reconciliation Change Order to the Contract for that project described as "24" RCCP Water Transmission Lines associated with the construction of a new elevated water storage tank - Bonham Street", attached hereto as Exhibit A, for the changes described in said Reconciliation Change Order, and providing for a net increase of $34,959.84 in the contract price, for a total contract price of $1,869,477.44, be, and the same is hereby, approved. Section 3. That the Mayor be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, said Reconciliation Change Order, upon the terms and conditions and in the form shown in Exhibit A, attached hereto. Section 4. That this resolution shall be effective from and after the date of passage. PASSED AND APPROVED this 22nd day of September, 2004. ATTEST: , xJ~~ Sherian Dixon, Assistant City Clerk CITY OF PARIS, TEXAS MONTHLY ESTIMATE Date: 10-Sep-2004 I Estimate No.: 15 & FINAL Project: 24" RCCP WATER TRANSMISSION LINE BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. Contractor: P.O. BOX 278, BRASHEAR, TEXAS 75420 Contract Date: 9-Jan-2003 Contract Time (CD) 376 Start Date: 24-Mar-2003 Time Charge to Date: 376 Submitted By: BB Percent Time Charged 100% Checked Bv: CGW Percent Project Complete 100% Prepared By: BFD Invoice For Period Through: 8-Jul-2004 ORIGINAL FINAL Contract Cost (Base Bid + Bid Alternate #1 ) $1,834,517.60 $1,743,873.27 Total Change Order Amounts $0.00 $107,303.58 Adjusted Contract Cost $1,834,517.60 $1,851,176.85 Total Work Completed to Date $1,851,176.85 Material (Not Installed - Invoiced) $18,300.59 Total Work Plus Material $1,869,477.44 Less 50k Retainage $0.00 Less Liquidated Damages $0.00 Total Payment Due to Date $1,869,477.44 Less Previous Payments $1,754,803.68 "AIViOUNTBAYABLE,THIS ESTIMATE?"): ~ '["jFt: $114,673~76' ., :",:-::)>; ITime vs Work comPletel 1 RECOMMENDED FOR PAYMENT: o 0.2 0.4 0.6 0.8 Percent Complete . Time Used II Work Complete 1 By: B. Frank Davis, Jr., P.E., R.P.L.S. Project Manager Bucher, Willis & Ratlif Corporation EXHIBIT A.. PAGE 1 OF 2 CITY OF PARIS, TEXAS MONTHLY ESTIMATE Date: 10-Sep-2004 I I Estimate No.: 15 & FINAL Project: 24" RCCP WATER TRANSMISSION LINE BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. Contractor: P.O. BOX 278, BRASHEAR, TEXAS 75420 Estimate Total Payment Payment Due to Date This Estimate Estimate #1 $20,660.56 $20,660.56 Estimate #2 $187,024.31 $166,363.75 Estimate #3 $627,260.84 $440,236.53 Estimate #4 $779,060.58 $1 51 ,799.74 Estimate #5 $903,980.37 $124,91 9.79 Estimate #6 $1 ,01 0,499.42 $1 06,51 9.05 CO#1 Pymt $1 ,034,389.42 $23,890.00 Estimate #7 $1 ,1 14,729.68 $80,340.26 Estimate #7A $1 ,131 ,424.00 $16,694.32 Estimate #8 $1 ,207,1 1 1 .65 $75,687.65 Estimate #9 $1 ,275,949.69 $68,838.04 Estimate #1 0 $1 ,422,046.90 $146,097.21 Estimate #1 1 $1 ,471 ,508.75 $49,461 .85 Estimate #12 $1 ,545,1 91 .04 $73,682.29 Estimate #12A $1 ,622,526.27 $77,335.23 Estimate #1 3 $1 ,739,321 .62 $1 1 6,795.35 Estimate #14 $1 ,754,803.68 $1 5,482.06 Est #16 & Final $1 ,869,477.44 $1 14,673.76 PAGE 2 OF 2 RECONCiliATION CHANGE ORDER PROJECT NAME: CONTRACTOR: ADDRESS: PHONE NO.: 24" RCCP WATER TRANSMISSION LINE BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. P.O. BOX 278, BRASHEAR, TEXAS 75420 903-885-0006 DATE: PROJECT: 13-Jul-2004 PARIS 8249 BWR 2002140 24" RCCP WATER TRANSMISSION LINE ITEM ITEM UNIT OF CONTRACT COMPLETE OVERRUN! UNIT INCREASE! NO. DESCRIPTION MEASURE QUANTITY TO DATE UNDERRUN PRICE (DECREASE) 500 Proiect Mobilization LS 1.00 1,00 0.00 $30,000.00 $0.00 Barricades, Signs 502 And Traffic Handlina MO 10.00 13.00 3.00 $800.00 $2.400.00 Allowance for CO #1, #2 & #3 800 Unknown Conditions LS 0.36 0.00 (0.36) $100,000.00 ($35,806.72) 700 Remove & Salvage Fire Hydrant EA 4.00 3.00 (1.0m $220.00 ($220.00) 701 Plug Existing Water Line EA 3.00 3.00 0.00 $165.00 $0.00 Cut & Remove Existing 24" RCCP 702-A (Pump Station Location) LF 20.00 20.00 0.00 $22.00 $0.00 Cut & Remove Existing 24" RCCP 702-B (Clements Road Location LF 60.00 60.00 0.00 $22.00 $0.00 2005-A Concrete Encasement CY 130.00 414.50 284.50 $77.00 $21,906.50 I 2005-B Crushed Stone for Trench Stab. CY 500.00 1,078.43 578.43 $22.00 $12,725.46 2010-A 6" PVC Water Line LF 160.00 168.00 8.00 $14.30 $114.40 2010-B 8" PVC Water Line LF 250.00 260.00 10.00 $16.50 $165.00 2010-C 12" PVC Water Line LF 100.00 100.00 0.00 $23.65 $0.00 2010-D 14" PVC Water Line LF 420.00 420.00 0.00 $25.30 $0.00 CHANGE ORDER #1 CO#1 2010-E 18" PVC Water Line LF 120.00 160.00 40.00 $46.20 $1,848.00 2012 Ductile Iron Pipe Fittings LBS 14,500.00 14,500.00 0.00 $2.15 $0.00 2014-A 24" RCCP Water Line (Open Cut) LF 11,630.00 11,630.00 0.00 $69.15 $0.00 24" RCCP Water Line 2014-B I (Open CutHClements Road) LF 60.00 60.00 0.00 $363.00 $0.00 2014-C 24" RCCP Water Line (Bv Bore) LF 280.00 280.00 0.00 $47.30 $0.00 20" RCCP Water Line 2014-D I (Open Cut)(Clements Road) LF 15.00 15.00 0.00 $161.70 $0.00 2020-A 6" Gate Valve & Box EA 11.00 11.00 0.00 $656.70 $0.00 2020-B 8" Gate Valve & Box EA 5.00 4.00 (1.0m $715.00 ($715.00) 2020-C 12" Gate Valve & Box EA 2.00 2.00 0.00 $1,155.00 $0.00 2022-A 6"x6" Tapping Sleeve & Valve EA 3.00 2.00 (1.0m $1,155.00 ($1,155.00) 2022-B 8"x8" Tapping Sleeve & Valve EA 1.00 1.00 0.00 $1,265.00 $0.00 2022-C 12"x12" Tappina Sleeve & Valve EA 2.00 2.00 0.00 $3,960.00 $0.00 2022-D 14"x14" Tapping Sleeve & Valve EA 1.00 1.00 0.00 $9,644.00 $0.00 PAGE 1 OF6 711412004 RECONCILIATION CHANGE ORDER PROJECT NAME: CONTRACTOR: ADDRESS: PHONE NO.: 24" RCCP WATER TRANSMISSION LINE BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. P.O. BOX 278, BRASHEAR, TEXAS 75420 903-885-0006 DATE: PROJECT: 13-Jul-2004 PARIS 82-49 BWR 2002140 ITEM ITEM UNIT OF CONTRACT COMPLETE OVERRUNI UNIT INCREASEI NO. DESCRIPTION MEASURE QUANTITY TO DATE IcUNDERRUN PRICE (DECREASE) 2022-E 18"x18" Tappina Sleeve & Valve EA 1.00 1.00 0.00 $12,320.00 $0.00 CHANGE ORDER #1 CO#1 2022-F 18" Cut-in Valve (24" RCCP) EA 0.00 0.00 $19,789.00 $0.00 2024-A 14" Butterfly Valve EA 1.00 1.00 0.00 $1,705.00 $0.00 2024-B 20" Butterfly Valve EA 1.00 1.00 0.00 $1,639.00 $0.00 2024-C 24" Butterfly Valve EA 13.00 13.00 0.00 $4,290.00 $0.00 2024-0 Cut-In 24" B.F. Valve (24" RCCP) EA 3.00 3.00 0.00 $9,907.70 $0.00 2026-A AirNacuum Release Valves EA 4.00 4.00 0.00 $770.00 $0.00 2030 Fire Hydrant EA 9.00 8.00 (1.0m $1,265.00 ($1,265.00) 2060 Manhole for Air Release Assemblv EA 4.GO 4.00 0.00 $1,100.00 $0.00 2080-A 36" Bore LF 280.00 280.00 0.00 $170.50 $0.00 2080-B 36" Steel Encasement Pipe LF 280.00 280.00 0.00 $55.00 $0.00 2100 Trench Safety System LF 12,500.00 12,480.00 (20.00) $1.10 ($22.00) WATER & SANITARY SEWER CONSTRUCTION 104-0 Remove Existina Manhole LS 1.00 1.00 0.00 $825.00 $0.00 700 Remove & Salvaae Fire Hydrant EA 2.00 2.00 0.00 $330.00 $0.00 701 Plua Existina Water Line EA 4.00 4.00 0.00 $165.00 $0.00 2005-A Concrete Encasement CY 20.00 51.00 31.00 $82.50 $2,557.50 2005-B Crushed Stone - Trench Stab. CY 100.00 179.50 79.50 $44.00 $3,498.00 2010-A 6" PVC Water Line LF 2,280.00 2,355.00 75.00 $14.30 $1,072.50 2012 Ductile Iron Pipe Fittinas LBS 600.00 600.00 0.00 $1.10 $0.00 2020-A 6" Gate Valve & Box EA 4.00 4.00 0.00 $605.00 $0.00 2022-A 6"x6" Tappina Sleeve & Valve EA 1.00 1.00 0.00 $1,320.00 $0.00 2022-B 8"x6" Tappina Sleeve & Valve EA 1.00 1.00 0.00 $1,375.00 $0.00 2030 Fire Hydrant EA 3.00 3.00 0.00 $1,375.00 $0.00 2040 5/8" Water Services EA 47.00 47.00 0.00 $357.50 $0.00 2042 3/4" Copper Tubing LF 810.00 820.00 10.00 $4.13 $41.30 PAGE 2 OF 6 7/14/2004 RECONCILIATION CHANGE ORDER PROJECT NAME: CONTRACTOR: ADDRESS: PHONE NO.: 24" RCCP WATER TRANSMISSION LINE BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. P.O. BOX 278, BRASHEAR, TEXAS 75420 903-885-0006 DATE: PROJECT: 13-Jul-2004 PARIS 82-49 BWR 2002140 ITEM ITEM UNIT OF CONTRACT COMPLETE OVERRUN! UNIT INCREASE! NO. DESCRIPTION MEASURE QUANTITY TO DATE (UNDERRUN' PRICE (DECREASE) 2050 6" PVC Sanitarv Sewer Line LF 1.300.00 1,300.00 0.00 $12.65 $0.00 2056 4" PVC Sanitary Sewer Line LF 600.00 600.00 0.00 $4.95 $0.00 2056 Sanitary Sewer Service EA 30.00 30.00 0.00 $330.00 $0.00 2060-A Standard Manhole EA 1.00 1.00 0.00 $1,375.00 $0.00 2060-B Drop Manhole EA 1.00 1.00 0.00 $1,375.00 $0.00 2060-C Extra Deoth for Manhole VF 6.00 6.00 0.00 $110.00 $0.00 2060-0 Standard Clean out EA 2.00 1.00 (1.0m $220.00 ($220.00) 2100 Trench Safety System LF 3,600,00 3,600.00 0.00 $1.10 $0.00 16TH N.W. STREET CONSTRUCTION 100 Preoare Riaht-of-Wav STA 12.90 12.90 0.00 $700.00 $0.00 104-A Remove exist concrete drivewav SY 200.00 200.00 0.00 $6.50 $0,00 104-B Remove exist cone. Curb & outter LF 500.00 500.00 0.00 $5.00 $0.00 1 04-C Remove exist asohalt drivewav SY 100.00 100.00 0.00 $4.00 $0.00 110 Roadway Excavation CY 1,895.00 1,912.50 17.50 $7.65 $133.88 132 Embankment (Select Fill) CY 90.00 (90.0m $16.50 ($1,485.00) 160 Top Soil CY 200.00 192.00 (8.00\ $11.50 ($92.00 162 Block Sod SY 1,400.00 1,440.00 40.00 $2.55 $102.00 166 Fertilizer (15-5-10) LBS 30.00 30.00 0.00 $0.25 $0.00 BID ALTERNATE #1 BID AL T 260 Lime Treated Subarade (8") SY 1,400.00 $2.50 BID ALTERNATE #1 BID AL T 264 Lime, Tvoe "A" TN 93.00 $110.00 340-A 2" HMAC Surface (Type "0") TON 390.00 372.00 (18.0m $43.65 ($785.70\ 340-B 4" HMAC Base (Type "B") TON 780.00 744.01 (35.99) $41.25 ($1,484.59) 464-A 15" RCP (Class III) LF 135.00 110.00 (25,00) $28.00 ($700.00) 464-B 18" RCP (Class III) LF 280.00 280.00 0.00 $30.00 $0.00 464-C 24" RCP (Class III) LF 80.00 52.00 (28.00> $41.00 ($1,148.00) 465-A 15' Combination Inlet EA 2.00 2.00 0.00 $4,200.00 $0.00 PAGE 3 OF 6 7/14/2004 RECONCILIATION CHANGE ORDER PROJECT NAME: 24" RCCP WATER TRANSMISSION LINE CONTRACTOR: BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. ADDRESS: P.O. BOX 278, BRASHEAR, TEXAS 75420 PHONE NO.: 903-885-0006 DATE: PROJECT: 13-Jul-2004 PARIS 82-49 BWR 2002140 ITEM ITEM UNIT OF CONTRACT COMPLETE OVERRUNI UNIT INCREASEI NO. DESCRIPTION MEASURE QUANTITY TO DATE UNDERRUN PRICE (DECREASE) 465-B 6' x 5' Junction Box LS 1.00 1.00 0.00 $4,100.00 $0.00 466 2-24" CH-11-A Headwall EA 1.00 1.00 0.00 $3,600.00 $0.00 467 15" S.E.T., 3:1 EA 2.00 2.00 0.00 $565.00 $0.00 479-A Adiust Manhole EA 2.00 7.00 5.00 $400.00 $2,000.00 479-B Adiust Cleanout EA 1.00 5.00 4.00 $200.00 $800.00 479-C Adiust Water Valve EA 5.00 9.00 4.00 $200.00 $800.00 529-A Std. 6" Concrete Driveway SY 280.00 381.52 101.52 $36.00 $3,654.72 529-B Std. Concrete Curb & Gutter LF 1,725.00 1,915.00 190.00 $16.00 $3,040.00 532 Concrete Flume SY 25.00 222.80 197.80 $65.00 $12,857.00 SITE AND STREET REPAIRS 164 Seedina for Erosion Control AC 10.86 10.86 0.00 $412.50 $0.00 166 Fertilizer (15-5-10) LBS 1,095.00 1,095.00 0.00 $0.22 $0.00 247 -A Flexible Base (12") - Trench SY 2,550.00 5,960.00 3,410.00 $12.65 $43,136.50 247-B Crushed Gravel (6") - Temp Drwv SY 850.00 (850.00' $7.30 ($6,205.00) 247-C Crushed Gravel (6") - Park Drive SY 960.00 1,100.00 140.00 $7.30 $1,022.00 340-A 2" HMAC Surface (Type "D") TON 790.00 782.64 (7.36 $43.65 ($321.26 340-B 4" HMAC Base (Type "B") TON 660.00 391.32 (268.68) $42.00 ($11,284.56) 464 18" ADS Pipe (Temp Drivewav) LF 560.00 (560.00) $33.73 ($18,888.80\ 479-C Adiust Water Valve EA 10.00 27.00 17.00 $200.00 $3,400.00 529-A Std. 6" Concrete Driveway SY 170.00 282.00 112.00 $36.00 $4,032.00 529-B Std. Concrete Curb & Gutter LF 785.00 943.00 158.00 $16.00 $2,528.00 529-C Concrete Curb & Gutter (Var) LF 300.00 (300.00) $16.00 ($4,800.00) 5005 Rock Filter Dams (Install & Remv) LF 400.00 (400.00) $32.78 ($13,112.00) 5249 Silt Fence - Install & Maintain LF 4,000.00 (4,000.00' $2.97 ($11,880.00) 5249 Silt Fence - Remove LF 4,000.00 (4,000.00) $0.50 ($2,000.00) 550-A 4-FT Chain Link Fence LF 50.00 50.00 0.00 $4.40 $0.00 PAGE 4 OF 6 7/14/2004 RECONCILIATION CHANGE ORDER PROJECT NAME: 24" RCCP WATER TRANSMISSION LINE CONTRACTOR: BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. ADDRESS: P.O. BOX 278, BRASHEAR, TEXAS 75420 PHONE NO.: 903-885-0006 DATE: PROJECT: 13-Jul-2004 PARIS 82-49 BWR 2002140 ITEM ITEM UNIT OF CONTRACT COMPLETE OVERRUNI UNIT INCREASEI NO. DESCRIPTION MEASURE QUANTITY TO DATE 'UNDERRUN PRICE (DECREASE) 550-8 6-FT Wood Privacv Fence LF 50.00 (50.00) $5.50 ($275.00) 2005-A Select Material - 24" RCCP CY 4,225.00 3,939.20 (285.80) $6.05 ($1,729.09) 2005-B Select Material - 6" Wtr & 6" Swr CY 825.00 860.00 35.00 $6.05 $211.75 2005-C Select Material - 6" Water CY 270.00 367.02 97.02 $6.05 $586.97 BID ALTERNATE NO.1 2,550.00 3,300.00 750.00 $7.30 $5,475.00 Flexible Base (8" - 16th Street TOTAL CONTRACT INCREASE I (DECREASE) - CONTRACT $14,513.75 CHANGE ORDER NO.1 ADDITIONS 5001A Hanson Concrete Products, Inc. LS 1.00 1.00 0.00 $3,600.00 $0.00 Professional Services of 5001B TOW Services, Inc. (Basic) LS 1.00 1.00 0.00 $9,802.48 $0.00 Professional Services of 5001C TOW Services, Inc. (Emeraency) LS 1.00 1.00 0.00 $44,301.00 $0.00 Contractor Labor & Equipment 50010 for Emeraency Services LS 1.00 1.00 0.00 $20,290.00 $0.00 Furnish 2022-F 18" Cut-in Valve (24" RCCP) EA 2.00 2.00 0.00 $5,472.30 $0.00 CHANGE ORDER NO.2 ADDITIONS Furnish & Install 5002A Storm Sewer Cleanout EA 2.00 2.00 0.00 $330.00 $0.00 Furnish & Install 12" SOR-35 5002B PVC Storm Pioe and Connections LF 498.00 442.00 (56.00) $5.00 ($280.00\ 5002C Furnish & Install Grate Inlets EA 3.00 2.00 (1.00) $700.00 ($700.00\ 50020 Flowable Fill CY 60.00 102.50 42.50 $77.00 $3,272.50 CHANGE ORDER NO.3 ADDITIONS 5003A Cement Ton 25.00 27.03 2.03 $100.00 $203.00 50038 Cement Treat Existing Material SY 2,200.00 2,000.00 (200.00) $1.75 ($350.00) I TOTAL CONTRACT INCREASE I (DECREASE) - CHANGE ORDERS $2,145.50 PAGE50F6 7/14/2004 RECONCILIATION CHANGE ORDER PROJECT NAME: 24" RCCP WATER TRANSMISSION LINE CONTRACTOR: BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. ADDRESS: P.O. BOX 278, BRASHEAR, TEXAS 75420 PHONE NO.: 903-885-0006 DATE: PROJECT: 13-Jul-2004 PARIS 82-49 BWR 2002140 Original Contract Total Amount of Approved Change Orders Adjusted Contract Amount Increase/Decrease Amount in Original Contract Quantities Increase/Decrease Amount of Approved Change Orders Materials on Hand TOTAL AMOUNT THIS CHANGE ORDER $1,834,517.60 $0.00 $1,834,517.60 $14,513.75 $2,145.50 $18,300.59 $34,959.84 FINAL CONTRACT TOTAL $1,869,477 .44 This Document will become a SUPPleJl~. t t e contract and all provisions will apply hereto. RECOMMENDED a FOR APPROVAL: . !..... if City Engineer #v QIt3/o1 Date Contractor tf -Z?'vJ V Date " ACCEPTED: ACCEPTED: ~~ C City Manager f~z: 7- 2<<?Y Date PAGE60F6 7/14/2004 Shawn Napier From: Sent: To: Subject: Frank Davis [BDavis@bwrcorp.com] Wednesday, July 14, 20042:22 PM 's_napier@ci.paris.tx.us' Water Line . 'ARIS - WTR UNE - FINALS 13JU... Shawn, I am attaching an excel spreadsheet which contains the sheets for Estimate No. 15 and then the Estimate 16 & Final. Estimate 15 needs to be processed, I will be sending a signed copy to you this week. The Estimate 16 & Final and the Reconciliation Change Order are for final acceptance by the Council. The final cost is $34,959.84 over the contract price. This includes materials on hand that will remain with the city. The overrun is due mostly to additional asphalt pavement, flexible base, and concrete encasements used in the trench repairs. These were needed to repair the remaining portions of the streets and for the larger areas needed to work, and to provide additional blocking. Frank <<PARIS - WTR LINE - FINALS 13JUL04.xls>> B. Frank Davis, Jr., P.E., R.P.L.S. Project Manager Bucher, Willis & Ratliff Corporation 601 Shelley Drive, Suite 202 Tyler, Texas 75701-9439 Phone: 903-581-7844 Fax: 903-581-0178 e-mail: bdavis@bwrcorp.com<mailto:bdavis@bwrcorp.com> Notice: E-Mail Disclaimer: http://www.bwrcorp.com/edisclaim.htm Bucher, Willis & Ratliff Corporation http://www.bwrcorp.com 1