Loading...
21-South Collegiate Drive projectCITY COUNCIL AGENDA ITEM BRIEFING SHEET Submittal Date: Originating Department: Presented By: Agenda Item No.: 06/01/09 City Council Shawn Napier, P.E. Directar of Council Date: Engineering, Planning & 21 06/08/09 Develo ment RECOMMENDED MOTION: Move to direct staff to proceed with the South Collegiate Drive project with the arterial option with funding to come from a bond election be held in November, and also directing staff to develop a list of additional projects to possibly include in a bond issue. POLICY ISSUE(S): Capitol planning BACKGROUND: The City Council requested that cost estimates for construction, engineering, and surveying be developed so a decision could be made as to how to proceed with the possible reconstruction and expansion of South Collegiate Drive. Hayter Engineering has put together a cost estimate for two types of roadways: (1) a 62-foot wide arterial from Loop 286 going north to Jefferson Road (FM 1507) for an estimated $2,405,500; (2) a 39-foot wide collector roadway, estimated at $1,910,200 (these two estimates are broken down on an enclosed exhibit). A third cost estimate was developed for the section of Collegiate in front of the Civic Center and Sports Complex (Jefferson Road north 1300-feet to the bridge) and estimated to cost $663,600. In conjunction with the South Collegiate project, staff has been working with the Texas Department of Transportation (TxDOT) to realign the Collegiate/Jefferson intersections and make South Collegiate the main north-south thoroughfare (see attachment). TxDOT has a letting deadline of August 2010 for a project to widen Jefferson Road to three lanes starting at the transition point from four lanes to two lanes just west of South Collegiate and going east through the two intersection and ending just east of the Paris High School property on Jefferson Road. In order to for TxDOT to make this happen they will need a resolution from City Council stating that: a) It is TxDOT's intention to widen Collegiate Drive and have it be the through roadway gaining a net increase in safety and mobility; [CONTINUED] BOARD/COMMISSION RECOMMENDATION: N/A EXHIBITS: Detailed cost estimates; aerial view of the proposed alignment ACTION: BUDGET INFO: ❑ Financial Report Z Minute Order Expense $ ❑ Department Report ❑ Resolution Budgeted Amt. $ ❑ Presentation ❑ Ordinance y'I'D Actual $ ❑ Public Hearing ❑ Other Acct. Name Acct. Number FISCAL NOTES: REVIEWED AND APPROVED BY: Z Administration Z City Clerk ❑ Community Development ❑ EMS/IT Z Finance ❑ Fire ❑ Municipal Court ❑ Legal ❑ Library ❑ Police Z Eng./Public Works ❑ Urilities City of Paris Revised 2/04/08 - 0 0 0 0 '?4": Project Cost Estimate Coileqiate Drive - Loop 286 to F.M. 1507 Prepared By Hayter Engineering Inc. May 15, 2009 Collector (39 FT) Arterial (62 FT) Construction Cost Estimate Street $922,000.00 $1,343,000.00 ($9.85/SF) ($9.03/SF) Stormdrain System $506,000.00 $506,000.00 Water & Sewer Extension $70,000.00 $70,000.00 Total Construction $1,498,000.00 $1,919,000.00 Contingencies (15% Construction) $224,700.00 $287,800.00 Professional Services Design Surveying By Others By Others Design $129,900.00 $129,900.00 SW3P $3,500.00 $3,500.00 Bid and Award $6,500.00 $6,500.00 Construction Testing By City By City Construction Review $47,000.00 $58,200.00 Warranty Review $600.00 $600.00 Total Professional Services $187,500.00 $198,700.00 Totai Estimated Cost $1,910,200.00 $2,405,500.00 Notes: 1. Estimate based on layout provided by City Engineer. 2. Estimate does not include relolcation of existing utilities. t~() (t)j o 7 -1 Project Cost Estimate Coileaiate Drive - North of F.M. 15071300 LF Prepared By Hayter Engineering Inc. May 15, 2009 Construction Cost Estimate $512,000.00 ($8.41/SF) Contingencies (15% Construction) $76,800.00 Professional Services Design Surveying By Others Design $41,300.00 SW3P $3,500.00 Bid and Award (If bid separate from south portion) $6,500.00 Construction Testing By City Construction Review $23,000.00 Warranty Review $500.00 Totai Professional Services $74,800.00 Total Estimated Cost $663,600.00 Notes: 1. Estimate based on layout provided by City Engineer. 2. Estimate does not include relolcation of existing utilities.