Loading...
18-Deliberate and act on a resolution approving and accepting a proposal for architural services from Denney Architects for the Bywaters ParkCITY COUNCIL AGENDA ITEM BRIEFING SHEET Submittal Date: Originating Department: Presented By: Agenda Item No.: 04/07/10 Engineering, Planning & Council Date: Development Shawn Napier, P.E. 18. 04/12/10 RECOMMENDED MOTION: Move to approve a resolution authorizing an agreement for professional services with Denney Architects for architectural services related to the restoration of the Bywaters Park Peristyle and authorizing the City Manager to negotiate and execute all necessary documents. POLICY ISSUE(S): Professional services; Historic preservation BACKGROUND: The architectural services are for the repair of the Peristyle in Bywaters Park. Denney Architects proposal for services is $29,800, which is a not to exceed amount and includes the structural engineering services for the foundation. The estimated total project cost for the restoration of the Peristyle is $262,100. This includes the complete removal of the stone structure, demolition of the existing foundation, construction of a new foundation in the same location; the complete restoration and reassembly of the existing limestone Peristyle superstructure; and installation of a new electrical system, and lights. The project is estimated to take four to five months to complete. Denney Architects is proposing that we use the next two months to take detailed measurements of the structure and prepare plans and specification. This timeline would have construction starting around the first part of July. The leadership in Lamar County Class is currently raising funds for the project. They are trying to raise $66,000 toward the cost of the project. The City of Paris has an encumbered historic preservation fund of $138,000 that comes from 5% of the hotel motel tax that is designated to be used for historic preservation. An application for a Meadows Foundation grant for a major portion of the project cost will be made next week. There are also some modifications to the scope of work as well as possible phasing to bring down the estimated total cost. BOARD/COMMISSION RECOMMENDATION: EXHIBITS: Resolution, contract ACTION: BUDGET INFO: ❑ Financial Report ❑ Minute Order Expense $ ❑ Department Report Z Resolution Budgeted Amt. $0.00 F-1 Presentation ❑ Ordinance y'I'D Actual $ ❑ Public Hearing ❑ Other Acct. Name Acct. Number FISCAL NOTES: REVIEWED AND APPROVED BY: Z Administration Z City Clerk ❑ Community Development ❑ EMS/IT Z Eng. ❑ Finance ❑ Fire ❑ Municipal Court ❑ Legal ❑ Library ❑ Police ❑ Public Works ❑ Urilities City of Paris Revised 2/04/08 C1001,15 DRAFT attorney\rework\current\Architect Serv - Bywaters Park Peristyle Impr Res 2010 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS, APPROVING AND ACCEPTING A PROPOSAL FOR ARCHITECTURAL SERVICES FROM DEIVIVEY ARCHITECTS FOR BYWATERS PARK PERISTYLE IMPROVEMENTS; MAKIIVG OTHER FINDINGS A1VD PROVISIOIVS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the historical Peristyle located in Bywaters Park is in need of repairs and restoration and the City of Paris has requested proposals for architectural services for making necessary repairs to this historical structure; and WHEREAS, the City of Paris has received a proposal for such services from Denney Architects in the form attached hereto as Exhibit A; and, WHEREAS, the City Engineer has determined that the proposal from Denney Architects is the most qualified for this Project. 1VOW, THEREFORE, BE IT RESOLVED BY THE CITY COUIVCIL OF THE CITY OF PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the proposal of Denney Architects for architectural services for the repair and restoration of the historical Bywaters Park Peristyle in an amount not to exceed $29,800.00 is hereby accepted conditioned upon said services meeting all of the terms and conditions included in the proposal attached hereto as Exhibit A. Section 3. That the City Manager of the City of Paris be, and he is hereby authorized and directed to prepare and execute on behalf of the City of Paris any and all documents necessary to carry out this project as provided herein. Section 4. That this resolution shall be effective from and after the date of passage. PASSED AND APPROVED this 12th day of April, 2010. ATTEST: Jesse James Freelen, Mayor Janice Ellis, City Clerk APPROVED AS TO FORM: W. Kent McIlyar, City Attorney ~~~~1 11 t"~ XMC9 PROPOSAL FOR ARCHITECTURAL SERVICES February 8, 2010 ATo: City of Paris, Texas ATTN; Mr. Kevin Carruth Mr. Shawn Napier Project: Bywaters Park Peristyle Improvements Paris, Texas We offer the foliowing proposal to provide architectural/engineering services for the project based on meetings with Mr. Kevin Carruth & Mr. Shawn Napier: Project Scope: In generai, the project includes the following: A. Complete dismantling, restoration & reassembly of the existing limestone peristyle superstructure. B. Complete demolition of the existing floor structure & construction of a new floor structure in the same location. C. Construction of a new electrical system, including power distribution 8 lighting. Services Included: This proposal includes the following architecturaVengineering services: A. Research & Preparation, including: 1. Basic field research & investigation of existing conditions. 2. Detailed field measurements. 3. Limited topographic surveying. 4. Preparation of existing conditions drawings. 5. Building code research & analysis. NOT INCLUDED: Geotechnical investigation & recommendations. Subsurface utilities investigation. B. Design & Documentation services, including: 1. Site work design & documentation, including: a. Site Demolition. b. Earthwork & Grading. c. Site Drainage. d. Site Utilities. e. Paving & Flatwork. NOT INCLUDED: Planting & Irrigation. 2. Architectural design & documentation, including: a. Modifications to Existing Building Enclosure. (Selective Building Demolition) b. Roofs. c. Stairs 8 Ramps. Proposal for ArchiteCtural Services - Page 1 of 3 EXHIBITg d. Handrails 8 Guardrails. e. Doors, Frames & Hardware. f. Finishes. g. Fixtures & Specialties. 3. Furnishings & Appointments design & documentation [NOT INCLUDED]: 4. Structural design & documentation (Kassaw-Dietz Engineering), including: a. General Structural Requirements. b. Structural Foundations. c. Structural Framing. d. Structural Walls. 5. Mechanical design & documentation [NOT INCLUDED]: 6. Electrical design & documentation, inciuding: a. Generai Electrical Requirements. b. Site Electrical. c. Electrical Power Distribution Systems. d. Electrical Lighting. e, Communications & Alarm Systems. C. BiddinglNegotiation Phase services, including: 1. Document Publishing 8 Distribution. (10 sets of final construction documents) 2. Final Drawings in Electronic Medium. (1 copy) 3. Accessibility Review. 4. Energy Code Review. 5. Pre-Bid Meetings. 6. Bid Opening & Review. NOT INCLUDED: Construction Contract Agreement Preparation. D. Construction Phase services, including: 1. Shop Drawing & Submittal Review. 2. Construction Observation. 3. General Construction Phase Administration. 4. Final Punch l.ist & Contract Closeout. NOT INCLUDED: Color & Finish Selections. E. Post-construction Phase services, [NOT INCLUDED]: Final TAS Inspection. Final Energy Code Inspection. Preparation of "As-builY" Drawings. On-site Warranty Follow-up Inspections. We propose to perform the above described architectural & engineering services for an hourly rate not to exceed the sum of Twentv-nine Thousand Eiqht Hundred Dollars IS29.800.001. Fee Breakdown: Proposal for Architecturel Sarvices - Page 2 of 3 Architectural Services: $23,300.00 Structural Engineering Services: $6,500.00 Total: $29,800.00 Additionai Services: Architectural services listed above as "not included," or which are not specifically defined in this proposal, are considered to be additional services and are not included in the fee quoted above. 7hese additional services will only be performed upon receiving a written authorization and will be invoiced at the following haurly rates: Principal Architect: $130.00/hour Drafting: $60.00/hour Clerical: $60.00/hour Note: l'hese rates are subject to change and wili only be in effect for six months from the date of this proposal. Consuiting engineering rates are shown in the attached proposals from the respecfrve engineering firms. Reimbursable Expenses: In addition to the quoted fee, reimbursable expenses for the project will be invoiced with no mark-up and are estimated as follows: Accessibility Plan Review Fees: (Final Inspection Fees Not Included) $0.00 IECC Code Review Fees: (Final Inspection Fees Not Included) $0.00 Estimated Printing Cost: $0.00 Estimated Postage/Shippinq Costs: $0.00 Total Estimated Reimbursables: $0.00 Invoices based on percentage of work campleted will be submitted monthly and are due within thirty days of billing. We appreciate this opportunity. If you have any questions, please let us know. Very truly yours, DENNEY ARCHITECTS, INC. ~ David C. Den ey Attachments: Kassaw-Dietz Enginee ' Proposal, dated January 25, 2010. Accepted: City of Paris, Texas By Date Proposal for Architectural Services - Page 3 of 3 r nn103 a, KASSAW and DIETZ, Inc. Consulting Engineers ~ 5620 Ofd Bullard Road, Suite 130 I~ Tyler, Texas 75703 sTxucTuRAt. OHice (903) 581-2551 Fax (903) 581-2552 ' • ' ' ' • ' www kdiengineers.com t:KGINEF.Ri\'C PROPOSAL TO: Mr. Paul K. Denney Denney Architects 740 Twenty-fourth Street Southeast Paris, Texas 75460 DATE: 01/25/2010 FROM: Donna Dietz, P.E. PROJECT: Structural Services Repairs to Peristyle Foundarion Bywaters Park Paris, Texas Thank you for the opporiunity to participate in the referenced project. We propose to prepare structural plans and specifications for the construction of the new foundation system. Project Scope: Based upon the recommendations provided in the Geotechnical Evaluation, Peristyle Pavilion Renovation, Paris, Texas, prepared by Apex geoscience inc., Apex #109-179, dated January 19, 2010, two options were presented, as described below. Please note that Options 1 and 2 would require that the peristyle pavilion and abutting brick building be dismantled, archived and reassembleci. Option 3 would attempt to a11ow the existing structure to remain in place. 1. Shallow Foundation System: Excavation of the exisring surficial five feet of soil underlying the foundation area, and backfilled with moisture and density controlled select fill material. New shallow footings, grade beams and slabs would be constructed. 2. Straight, drilled concrete shafts or Auger Cast in Place Piles and structurally suspended floor system. 3. Stabilization of existing soils with chemical injections and support of existing pavilion by helical piles and corbelled, eccentric plinths. Structural Engineering Proposal Sheet 2 of 2 _ TO: Mr. Paul K. Denney DATE: 01/25/2010 Denney Architects FROM: Donna Dietz, P.E. Construction Document Services: We do not recommend thai Option 3 be used, due to the lack of connectivity of the existing limestone elements and the displacementlmovement that has occuxred. We do not feel that the structure is sufficiently stable to perform construction while it remains erected. Option 2 is our preferred system of support. With the expense of the dismantlement, archival, restoration and reassembly, the most positive approach is always to provide a deep foundation system and suspended foundation. 1. Kassaw and Dietz, Inc., proposes to perform the above described structura] engineering work for Oprion 2 on an hourly basis with a not to exceed amount of Six Thousand and Five Hundred Dollars (6,500). Our hourly rate is listed below. Construction Phase Services Provided: 1. Kassaw and Dietz, Inc., will observe the foundation work as authorized by you, on an hourly basis as needed. (See attached rate schedule). Invoices will be submitted monthly and are due within sixty days of billing. Principal $140.00/Hr Proj ect Engineer $115.00/Hr. Graduate Engineer $ 85.00/Hr. Draftsman $ 65.00/Hr. Clerical $ 40.00/Hr. Please let us know if this proposal meets your requirements. At that time, we will prepare a Contract for your signature. cc: File 000141