2010-071 RES S. COLLEGIATE/RK HALL RECONRESOLUTION N0. 2010-071 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS, APPROVING THE BID AND AWARDING THE CONTRACT FOR THE SOUTH COLLEGIATE DRIVE RECONSTRUCTION - SOUTH LOOP 286 TO BIG SANDY CREEK TO R. K. HALL CONSTRUCTION COMPANY, LTD, THE LOWEST RESPONSIBLE BIDDER; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, advertise for bids for furnishing plant, labor, materials, and equipment, and for performing all work required for the "South Collegiate Drive Reconstruction - South Loop 286 to Big Sandy Creek Project" which bids were received until 3:00 o'clock p.m. Wednesday, the 2nd day of June, 2010; and, WHEREAS, the lowest responsible bid for all phases of the project in the amount of $1,465,740.40 was made by R. K. Hall Construction Company, Ltd, 1540 NW Loop 286, Paris, Texas 75460, and the contract should be awarded to R. K. Hall Construction Company, Ltd in accordance with the unit prices bid and the other terms and conditions set out in the bid documents attached hereto as Exhibit A; and, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS: Secrion 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the bid of $1,465,740.40 from R. K. Hall Construction Company, Ltd, 1540 NW Loop 286, Paris, Texas for the "South Collegiate Drive Reconstruction - South Loop 286 to Big Sandy Creek Project" is hereby accepted as the lowest responsible bid which provides the best value to the City and the contract for this project is hereby let conditioned upon said contractor meeting all of the terms and specifications included in the agreement and bid documents attached hereto as Exhibit A. Section 3. That the City Manager be and he is hereby authorized and directed to execute on behalf of the City of Paris an Agreement for the reconstruction and alignment of South Collegiate Drive walks with R. K. Hall Construction Company, Ltd, in the form attached hereto and incorporated herein as Exhibit A. Section 4. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this 28'' day e, 20 _ ,;EST: Will Biard, Mayor e Ellis, City Clerk APPROVED STO M: W. Kent lyar City ttorney J BID PR03ECT IDENTIFICATION: CONTRA.CT IDENTIFZCATION AND NUMBER: THIS BTD IS SUBMITTED TO South Coilegiate Drive Reconstruction HEI #180042 City of Paris 1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish atl Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in Accordance with the other ternis and conditions of the Contract Documents. 2. BIDDER accepts a11 of the terms and conditions of the Advertisemeat or Invitation to Bid and Instructions to Bidders, including, without limitation, those dealing with the disposition of Bid security. This Bid witl remain subject to acceptance for ninety (90) days after the day of Bid openino. BIDDER tivill sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER'S Notice of Award. In submitting this Bid, BIDDER represents, as more futly set farth in the Agreement, that: (a) BIDDER has examined copies of ail the Bidding Documents and of the following Addenda, receipt of all which is hereby acknowledged: Number Date -1?-- < IZ f20i0 (b) BIDDER has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work. ~r _ (c) BIDDER has obtained and carefully studied (or assumes responsibility for obtaining and carefully studying) all such examinations, investigations, explorations, tests and studies which pertain to the subsurface or physical 11 10 ExHiBIT -L ~ conditions at the site or otherwise may affect the cost, progress, performance or furnishing of the Work as BIDDER considers necessary for the perfarmance or furnishing the Work at the Contrac# Price, within the Contract Time and in ~ accordance with the other terms and conditions of the Contract Documents, and no additional examinations, investigations, explorations, tests, reports or simila.r information or data are or will be required by BIDDER for such purposes. (d) BIDDER has reviewed and checked all information and data shown or indicated on the Contract Documents with respect to existing Underground Facilitzes at or contiguous to the site and assumes responsibility for the accurate location of any and all Underground Facilities. No additional examinations, investigations, explorations, tests, reports or similar information or data in respect of said Underground Facilities are or will be required by BIDDER in order to perforrii and furnish the Work at the Contract Price, within the Contract Time and iiz accordance with the other terms and conditions of the Contract Documents, including specif cally the provisions of Paragraph 4.04 of the General Canditions. (e) BIDDER has correlated the results of all such observations, exazninations, investigations, ekplorations, tests, reports and stud'zes with the terms and conditions of the Contract Documents. (fl BIDDER has given ENGTNEER tivritten notice of all conflicts, errQrs or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER. (g) This Bid is genuine and not made in the interest of or on hehalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly ar indirectly induced or solicited any other Bidder to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by coltusion to obtain for itself any advantage over any other Bidder or over OWNER. a ~ 12 J - I +.v uv,v...ia i.aJ - .b - - 4. BIDDER will complete the Work for the following price(s): UNTT PRICE SCHEDY7LE ESTIMATED N0. DESCRIPTION pUANTITY 1. Mobilization. I LS 2_ 60" HDPE stortn sewer_ 1,255 LF 3. 48" HDPE storm sewer. 12 LF 4. 36" HDPF, storn7 sewer. 12 LF 5. 30" HDPE storni sewer. 698 LF 6. 24" HDPE storm seiver, 192 LF 7. 18" HDPE storm setiver. 397 LF S. 66" RCP stozza sewer. 8 LF 9. 4' x 2' RCP bos culvert. 139 LF 10. 24" RCP storm sewer. 30 LF 11. 21° RCP storm sewer. 36 LF 12. 10` Recessed inlet, 11 EA 13. SETP-PD HeadwaIl(for 66"). 1 EA 14. SETP-PD Headwall (for 24"). 2 EA 15. SETP-PD Headwall (for 21 2 EA 16. In1et dowmstream of detention pond. 1 EA 17. 36" CH-FW-O Headwall. 1 EA 18. 48" CH-FW-O Headwall. I EA 19. 4' x 4"rype H inlet with grate_ 2 EA 20. Headwall and concrete channel removal downstream of detention pond. I LS 1--- UNIT TOTAL PItICE PRICE S 03 000 s /03, o00 ~/Y-6 $Iqs~7 YO~ ~ S 1390 $ d3=- $ y5~ ~ $ V Gb ov $ /~i ` ` $ -7S $ 77.s G. ° pb ~ z75 ao ~ Z, zov O~ $ /"Ip7p~ ~ y3 0' ~ ~ 2 90 _ $ 39 6° 60 s Z7oa ~ $ Zg, 7cle) oa $JI~O-' $ Z 7 sv ~ vv $ P $ vo s 6/ ov - $ 3S00 ~G $ ~SpO ~J ~ $ Z-76V'--o $ S oa ~ -yoo ~o $ ~9~~ ~ $ S a~ $ SODc~ee $ glDOd 13 7-Id5 G: 1 U UJ: U0cf f1G1~LC1' CCtslIICCI llls 111c+ - ~ - r u- ..+c.r- r r. - 21. Lime material. 542 TN S p $ 1y? oa s 9J Oz~ - 22. 8" Lime stabilized subbase (8%). 21;515 SY s~ $'3 91 7Z7 - 23. S" Asphalt (Type B) base. 16,915 SY S-2Z G- $ Y7, F30 `i- I 90 24. 2" Asphalt (Type D) wearing surface. 15,664 SY s~~- s-__`~~ 25. 10" Concrete paving. 4,178 SY u~ 3 5_2 u~ S Z/ '0-S6 ~ 26. Curb and gutter. 3,510 LF $ 13 $ Y 630 ~ 27. Pavement markings. 1 LS s 12~J~Oo ' s/~LSo 28. Relocation existing fire hydrant. 1 EA 0 $ S~__°-G _ 29. 10" x 6" Tappino, sEeeve and valve. 1 EA ~o $ 2 yY " oc ~/r1-'~' 30. 10" :c S° Tapping sleeve aild valve. 1 EA S 79,Y6 ~ $ 2, X96 31. 8" x S" Tapping sleeve and valve. 1 EA s Z U~- ~ Z od'= 32. Ductile iran fittings. 0.14 TN s 3/2-0 r $ `/3 6 2 33. 8" C-900 DR 18 PVC water main. 293 LF ~ s~ f ~oa ~ 7 r 34. Standard 4' diarneter manhole (0'-6')_ 2 EA ~c s Z/"° 106 $ 20- 35. Additional manhole depth (over 6'). 4,5 VF w $/sb - ~ $ 70Z' 36. SDR 35 PVC gravity sewer. 325 LF s -7" $ Z3-7 Z 37. 0'-5' Trenchina, backfill, and cleanup. 212 LF 3r $ 60 5~ 7 38. 5'-8' Trenching, backfill, and cleanup. 53 LF 39. Trench protection. 2,317 LF s o~ J~ 40. 12" Road bore. 60 LF s 41. 12" Steel encasement - road bore. 110 LF va S~ $~~Z 42. 14" Road bore. 60 LF Gn $ ~v ,d ~ y S~ 43. 14" Steel encasement-road bore. 110 LF $ $ c :4 1"ld`J' G! ill Uzi:U;Z)Gl ~7C~VCI' GfIS11(CCt 1116 11- 44. 12" 5teel encasement - open cut. 45. 14" Steel encasement - open cut. 46. Subgrade mitigation. 47. Erosion protection. 48. Storrnwater poliution prevention plan. 49. Traffic control plan. 50. Unclassifed e::cavation. 51. Emhankment material. TOTAL BID: dW /yliaioN ye Jlun~t~o %~v2 k,,A,-YtW i*SE W ADDI7'IY E ALTERNATE: A I. 60" RCP storm sewer. A2. 43" RCP storm sewer_ A3. 36" RCP storm sewer. A4. 30" RCP storm se-vver. AS. 24" FCP storm sewer. A6. 18" RCP storni sewer. TOTAL ADDITIP'E AL7'ERN ;~LTE: r- - I 73 LF 73 LF $ s 10 CY s l`~o 4,040 LF $ yy yY o0 1 LS $ ~O° ~ ~ ~O o 1 LS ~ $ Z ooo'- - $,7~, ooa 5,660 CY 2,578 CY r~ ~60 ~,~i~' y-°- EZDS) ;e ~ -~ry Crf/v)-, IG S) 1,255 LF s /S"o 12 LF $ ~ ys.-- 7 D`-~` 12LF s $ 698 LF $ $ 192 LF 397 LF ((ISE IYORDS) 17EDUCTIVE ALTFR11rATE.• D1. 60" HDPE storm sewer. 1,255 LF D2_ 48" F-IDPE storm sewer. 12 LF D3. 36" HDPE storm sewer. 12 LF D4. 30" HDPE storm sewer. 698 LF 2 (F1~ ~o $ ~s~' $ / ~S 7~7U $ 12" $ 7•__~_ r ~'C ~ 15 11 a`1j C! LU U.7: Uv-7d I'lO„", l, C(" L116 111CC1 111S t It - .av.~ I . r• - . 0.0 D5. 24" HDPE storm sewez. 192 LF s'"6 i- i- D6. 18" HDPE stornl sewer. 397 LF ~7-> ~ 7'OTALDEDUCTIb''EALTER ATE: it,v,~lv,~l~o oNh 14'w 0sA*A,) ,~a~ ~5_ (USE WORDS) (FIGURES) 5. BIDDER agrees that the Work will be substantially completed and ready fax final payment within 240 calendar days after the date when the Contract Time cammences to run, as pravided in the General Conditions. B£DDER accepts the pzovisions of the Agreement as to S500 per calendar clay liquidateci damages in the event of failure to cornplete the Work an time. 6. The foilowing doeuments are attached to and made a condition of this BID: (a) Required Bid Security in the farm of (3 t Q_&"yi) 7. Comniunications concerning this Bid shall be addressed to the address of BIDDER indicated below. The terms in tlus Bid, which are deined in the General Conditions of the Canstruction Contract, included as part of the Contract Documents have the meanings assigned to them in the Genezal Conditions. r--- SUBMITTED on j c/N 20 1 % Of the above total - Base Bid, $ y'D~ ~OJ is for materials actualIy incorporated in th.e Work; and $ is fox atl other costs. /7 r ✓'!J ` V r, ~ yb~ ~ 7I O •.-P-- 15a IF BIDDER IS: An Individual: By (Individual's Printed Name and Signature) doing business as, Business Address: Phone Number: A Partnership: I3y R, 14g RCL aNST~~lG~~ e~ cr-r (Seal) / (Name of Firm) (GeneraI Partner's Printed Name nd Signature) Business Address: /SL/o N.v~/. Gda Zk4 '7 SYbo Phone Number: (Q03~ -7,8 q - b'8g0 T~ A Corporation: Name of Corporation: , State of Incorporation: By (Printed Name of Person Authorized to Sign and Signature) Attest: (Title) (Printed Name and Signature of Secretary) a 0 Business Address: Phone Number: *~:***~~****~***~~~****x~****~~***~~************~*****~~~********~*~~~~**~***~x~* A Jaint Venture: By Address: (Printed Name and Signature) Phone: By (Printed Name and Signature) Address: Phone: (Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the rnanner indicated above.) 16 Seal) (Corporate Seai) Bid Bond SURETX DEPARTMENT Conforms with the American Institute of Architects, A.I.A Documents No. A-310 KNOW ALL MEN BY THESB PRESENTS, That we, R. K. Halt Construction Ltd. as Principal hereinafter called the Principat, and Travelers Casualtv and Surety,Companv of America a corporation created and existin- under the laws of the State of Connecticut whose principal office is in Hartford as Surety, hereinafter called the Surety, are heid and firmly bound unto Citv of Paris as Obiigee, hereinafter called the Obligee, in the sum of Pive Percent af the Greatest Amount Bid Dollars ($5°/a GAB) for the payment of which sum, well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, admiristrators, successors and assigns, jointly and severally, ftrntly by these presents VVhereas, the Principal has submitted a bid for Reconstruction of 3,229 !f of S. Collegiate Drive NOW, `I,I-iEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give snch bond or bonds as may be specified in the bidding or contract documents with good and sufficient surety for the faithful performanee of such coniract and for the prompt payment of labor and material furnished in the prasecution thereof, or in the event of the faiIure of the Principal to enter such contract and give such bond or bonds, if the Principal shafl pay to the Obligee the differenca not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perfarm the work coverzd by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect Signed and sealed this 2nd day of Jiine, 2010 R. K. Aall Construction. Ltd. (Principal By Travefers Casu It and Suret Com an of America Surety) c gy (SEAL) chard . aiker Attorney-in-fact WARNWG: THIS POWER QF ATTOANEY IS I 432h, 1'RAVELERS J POWER OF ATTORNEY Farmington Casualty Compan}' Fidelity and Guaranty Insurance Company Fidelity and Guaranty Insurance Undertivriters, Inc. Seaboard Surety Company Sf. Paul Fire and Ntarine Insurance Company Aitornev-In Fact No. 220749 80RDER St Paul Guardian Insurance Company St. Paul Mercury Insurance Company Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America United States Fidelity and Guaranty Company Certificate No. 093046246 KNOW ALL LNIEN BY THESE PRESENTS: Tha[ Seaboard Surety Company is a corporation dui}, organized under thz 1aws of Lhe State of:\ew Yark, rhat St. Puiil Fire and Marine Insurancce Company, St. Paul Gourdian Insurance Company and St. Paul ivlercury Insivance Company are corporacions duly organized under ,he Inw~ of th: State of Minnesoca, tha[ Farmingtan Casualty Campany. Travelers Ca,ualty and Surety Compan}, and Travelers Casualty and Surery Company of America are corpuratioas duly organized under the laws of the State of Connecticut, that United Stutes Ffdelity and Guaranty Company is a corporation duly organized under thr laws of the State of Maryland, that Fidclity and Guaranty Insurance Company is a corporation duly organized under tlie laws of the Smce of towa, and that Fidelicv and Guaranty Insurance Underwriters, Ine. is a corporation duly organized undar the laws of the State of Wiseonsin (herein collectively called the "Compan;es-), and thai th,° Companits do hereby ntake, consiituta and appoin[ Rschard W. Daiker, Tony Fierro, Johnny Moss, and Jay Jordan ot'thz Ciry o€ RoektiWa[,) Stute of T";X,As•tfieir true aud IawFul Attorr;ey~s)-in-PUcL. eeach in their szparate capacity if n-vorc than one is named ahove, to sign, execute, seal and acknowledge any aod ali bonds, recognizances, conditiooal undcrt.~kinos and odier writings ob(igatory in the ttsture [hereof on beh;ilf of thc Companies ir: their business of oua.*anteeing the fidclity of persons, guarantezine tl7i perfonnancc ot conirac[, und e,recuum~ ar nuaranteeing bonds and undertakings requ:red or permitted in any ac[ions or proceedin,s allowed by law. IN WiTtiESS WHEREOF, the Companies have caused this ins[rument to 6e sioned and [heir corpurate seals to be Itere[o affxed, this ~~:,y ~,t June 2009 ~ Fzrmington Casualty Company Fidelity and Gaaraniy Insurance Company Fidelity und Guaranty Insurance Underwriters, lnc. Seaboard Surety Company St. Paul Fire and nIarine Insurance Company 3rd St. Paul Guardian insurance Comgany St. Paul Niercury lnsurance Campanv Travelers Casualty and Surety Company Travelers Casualty and Surety Company of America Gnited States Fidelity and Guaranty Company ASU . ~JUf~r VE1RE 6 ` M ~MS j tN44q nl~.iHO 5Y1 f~}tY.~//~~ t♦ r ~ O .9 JP ...........9 ` r L Q t e°'°°`y. t o * ~ }E @'~ • . ( o;~ • .1'• ~ O t'oR00q f~ ~ ~ '9 ~ 1962~0 0 ~ ' w~llm 1~27 ~ ~~~m ~Wr~OaTORAJ~iP~ a ~ ~taacntm M,~RlFORD. + ~t4lRti0F4 ~ i896 x ~`~r'~ ` ~1977~ 195f s 1~'. ~o CONN. o ys GaW. @ in ~,.58RLi'n W r q9~ 4 ' ~.N > ~K~ ~i'cFhfW~ °1~w`,.^•"M• ~,,~~MAN,~✓", ~r•...,.:*~a ~1 *a+a { ~ ,t+•+ ~✓/1 AhY~ Scate of Connecticut C'ity of H.inford sti. B y: Gcorg6 Thompson, t-r 'ica Presidzn[ Un thi; tlle 31'd dsy of JU(12 , 2009 , before me personally uppeared Georae W. Thompsoit, wha acknowled,cd himself to be the Seniur Vice President of Farmington Cusualcy Cmnpany. Fidelity and Guaranty Insurance Company, Fidelity and Guaranty Insurancr UndzrwrikTs [nc., Seaboard Surety Cnmpanv, St. Paul Fire and Marine Insurancz Companq, S[. Paul Guatdian Insuranee Company, St. Paul Mercury Insurxnce Company, Travelen Crsualtt and Surery Compan}•, Travelers Casualry and Surety Company of America, and United States Fideliry and Guaranty Compnny, and that he_ as sucn. being authonzrJ so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corpora[ions by himself as a duly authonzed off cer. eg In ~Vitness ~i'hereoP, I hereunto set m~~ h:inJ and oFficial seal. l~ly Commission expires Ihe 30th day oI ]une. 2Q11. Nluric C. Tetrzault. Notary Public 58440-5-07 Printed in U.S.A. WARNING: THIS POWER QF AT70RNEY IS INVAUD WfTHOUT THE RED BORDER Bid abulation City of Paris South Collegiate Drive Reconstruction South Loop 286 to Big Sandy Creek HEI #180042 J~~iqu &v ew 3:00 p.m. R.K. Hall Construction, LTD Richar Constructi d Drake on Co., LP l T Unit Totat Item Descri tion Estimated Quanti Unit Price ota Price 00 000 103 Price 00 856 152 Price 856.00 152 1 Mobilization 1 LS 103,000.00 . , 00 780 195 . , 132 90 , 789.50 166 2 60" HDPE storm sewer 1,255 LF 156.00 . , 00 160 2 . 00 116 , 392.00 1 3 48" HDPE storm sewer 12 LF 180.00 . , 00 380 1 . 40 63 , 760.80 4 36" HDPE storm sewer 12 LF 115.00 . , 974 00 3 . 80 39 780.40 27 5 30" HDPE storm sewer 698 LF 63.00 . 4 , 432 00 1 . 27 50 , 280.00 5 6 24" HDPE storm sewer 192 LF 96.00 . 8, 00 775 29 . 14 58 , 788.26 5 7 18" HDPE storm sewer 397 LF 75.00 . , 00 200 2 . 349 00 , 792.00 2 8 66" RCP storm sewer 8 LF 275.00 . , 00 070 18 . 00 183 , 437.00 25 9 4' x 2' RCP box culvert 139 LF 130.00 . , 00 290 1 . 40 51 , 542.00 1 10 24" RCP storm sewer 30 LF 43.00 . , 60 425 1 . 42 80 , 540.80 1 11 21" RCP storm sewer 36 LF 39.60 . , 00 700 29 . 00 580 3 , 380.00 39 12 10' Recessed inlet 11 EA 2,700.00 . , 00 750 7 . , 00 140 2 , 140.00 2 13 SETP-PD Headwall (for 66") 1 EA 7,750.00 . , 00 1 800 . , 00 680 , 360.00 1 14 SETP-PD Headwall (for 24") 2 EA 900.00 , . 00 1 600 . 00 690 , 380.00 1 15 SETP-PD Headwall for 21" 2 EA 800.00 , . 00 500 3 . 00 800 2 , 800.00 2 16 Inlet downstream of detention pond 1 EA 3,500.00 . , 00 700 2 . , 00 240 5 , 240.00 5 17 36" CH-FW-O Headwall 1 EA 2,700.00 . , 00 400 5 . , 00 940 8 , 940.00 8 48" CH-FW-O Headwall 1 EA 5,400.00 . , 00 800 5 . , 00 580 5 , 160.00 11 P 4' x 4' T e H inlet with rate 2 EA 2,900.00 . , . , , 20 Headwall and concrete channel removal douvnstream of detention pond 1 LS 8,000.00 8,000.00 00 81 029 1,960.00 152 10 1,960.00 438.20 82 21 Lime material 542 TN 149.50 . , 727 00 38 . 35 2 , 560.25 50 22 8" Lime stabilized subbase 8%) 21,515 SY 1.80 . , 00 130 372 . 45 25 , 486.75 430 23 8" As halt T e B base 16,915 SY 22.00 . , 80 116 97 . 75 6 , 732.00 105 24 2" As halt T e D wearin surface 15,664 SY 6.20 . , 00 217 256 . 90 56 , 728.20 237 25 10" Concrete avin 4,178 SY 52.00 , . 00 630 5 . 48 18 , 80 864 64 26 Curb and utter 3,510 LF 13.00 . 4 , 500 00 12 . 00 13 200 , . 200.00 13 27 Pavement markin s 1 LS 12,500.00 . , 144 00 1 . , 185 00 1 , 00 1 185 28 Relocation existin fre h drant 1 EA 1,144.00 . , 444 00 2 . , 00 155 2 , . 155.00 2 29 10" x 6" Ta in s sleeve and valve 1 EA 2,444.00 . , 00 886 2 . , 00 720 2 , 00 720 2 30 10" x 8" Ta in sleeve and valve 1 EA 2,886.00 . , 00 808 2 . , 00 645 2 . , 645.00 2 31 8" x 8" Ta in sleeve and valve 1 EA 2,808.00 . , 80 436 . , 00 900 5 , 826.00 32 Ductile iron fittin s 0.14 TN 3,120.00 . 00 567 5 . , 45 26 749.85 7 33 8" C-900 DR 18 PVC water main 293 LF 19.00 . , 00 720 5 . 840 00 4 , 680.00 9 34 Standard 4' diameter manhole 0-6 2 EA 2,860.00 . , 00 702 . , 00 336 , 00 512 1 35 Additional manhole de th over 6') - 4.5 VF 325 LF 156.00 7.30 . 2,372.50 . 19.60 . , 6,370.00 . n o131) nn HAYTER ENGINEERING, INC. CONSULTANTS PLANNERS ENGINEERS June 17, 2010 Mr. Kevin Carruth, City Manager City of Paris 135 SE lst Street Paris, TX 75460 4445 S.E. LOOP 286 PARIS, TEXAS 75460 (903) 785-0303 FAX (903) 785-0308 REFERENCE: South Collegiate Drive Reconstruction - South Loop 286 to Big Sandy Creek HEI # 180042-280 Dear Mr. Carruth: On June 2, 2010, the City of Paris received bids for the above referenced project. Two bids were received, with the lowest being that of R.K. Hall Construction Co., LTD in the base bid amount of $1,484,412.40, additive alternate of $272,829.00, and deductive alternate of $291,501.00. A bid tabulation is attached for your review. We have verified the mathematical accuracy and completeness of both bids, and have verified that the bonding company is licensed in Texas. The low bid appears to conform to the contract document requirements. Based upon the Statement of Bidder's Qualifications, we believe the low bidder to be responsive and responsible. We therefore recommend award of this project to R.K. Hall Construction Co., LTD in the base bid amount of $1,484,412.40,plus additive alternate of $272,829.00, and less deductive alternate of $291,501.00, for a total award of $1,465,740.40. If the City concurs with this recommendation, please sign the attached three original Notice of Award forms. Upon signing, please return all three originals to this office for further execution. Sincere y, OF ~ HAYTER ENGINEERING, INC. i~ Michael J. qfiffinan, P.E. s~NNAN Project Manager ~,17 `@. 14~; . • ` ~g Enclosures ~`~g ~''"•N•».•``'' C~ ' A YE~ ~►"•S` cc: Shawn Napier, P.E., City Engineer Service Since 1957 TBPE F-000315