Loading...
10-Hear and deliberate on presentation of wastewater treatment plant master planCITY COUNCIL AGENDA ITEM BRIEFING SHEET Submittal Date: Originating Department: Presented By: Agenda Item No.: 08/02/10 Doug Harris, Council Date: Utilities Director of Utilities 10. 08/09/ 10 RECOMMENDED MOTION: Not an action item - presentation only. POLICY ISSUE(S): Capital improvement BACKGROUND: On May 26, 2009, Council authorized Hayter Engineering to develop a master plan for the City of Paris Wastewater Treatment Plant. Mr. Mike Tibbits, P.E., with Hayter Engineering will present their engineering feasibility report and answer any questions. The report is in a separate binder accompanying the council meeting packet. BOARD/COMMISSION RECOMMENDATION: EXHIBITS: Engineering feasibility report from Hayter Engineering, Inc.; Hayter Engineering, Inc. Memorandum to Dou Harris, Director of Utilities ACTION: BUDGET INFO: ❑ Financial Report ❑ Minute Order Expense $59,785.00 ❑ Department Report ❑ Resolution gudgeted Amt. $59,785.00 ~ Presentation ❑ Ordinance y'j'D Actual $45,389.75 ❑ Public Hearing ❑ Other Acct. Name WWTP Master Plan Acct. Number 10-0901-86-98 FISCAL NOTES: REVIEWED AND APPROVED BY: Z Administration Z City Clerk ❑ Community Development ❑ EMS/IT ❑ Finance ❑ Fire ❑ Municipal Court ❑ Legal ❑ Library ❑ Police Z Eng./Public Works Z Utilities City of Paris ~1 2 Revised 2/04/08 / HAYTER ENGINEERING, INC. CONSULTANTS PLANNERS ENG1NEERS MEIVIORANDUM L~:..:,_ ..i o,.J: v ;I:.•...~ DATE: July 30, 2010 n;.~,,,__. ..'V 4445 S. E. LOOP 288 PARIS, TEXAS 75460 (903) 785-0303 FAX (903) 785-030$ 1aao4o-1o0 -3.- .c.. ....r.., . SUBJECT: Paris Wastewater Treatment Plant Engineering Feasibility Iteporti Per your request, I of£er the following summary of the engineering feasibility repore that I propose to present at the August 9`h council meeting: e The existinD plant was started in the ear(y 1940's, and has undergone a number of upgrades over the past 60-plus years. it has served its purpose well, but is reaIly showing its age. r~,_r,LL_...1_.'_ c.i _ r_ i•~t._ ..i . ii • .i.. . i , i _ ~ri....i. _ jili iuiSliii)it 'vi. iiiG ii~ iUii, iiiG ViitL-ai iU i.:' Ciii.al„i:ii ii7 maintain and aperate. • The average flow durisig the past five years is a little less than 4 MGD. There are a few i'ci:01'QS Oi -ic EriaiiL i G~'v' iiaCiiiilg tiiiv iilE U iYiii3 idiige, wiiii viic iili;iuciii ai, iii i:v"iu~T'i. iiiG rated capacity however is 7.25 MGD, but t}ie condition of the facilities prec;ludes it fra3n being operated at that rate for any significant Iength of time. _ , . • _ , A , , c , ~ x A .~r , ! . . . . , }ii;i~fiiii aii.itL iS iJ i i3 i c. ivi i.<.: iS'i'vil i1Lii . iiGi.iiiUiif.iiACiUii iS aCJlfu[IGu. operatianal staff has thus far been able to meet perinit most of tlle time despite the mechanical difficulties of doing so. ^ ,:.iic v~'aiQiivii "°v~~ l.L1LSi ia riai i;: :4i :c;it ~v ' -3iS-a iliiic "iO1:~iii "'i2d iGI :iZ iiL:ii f' r' i% a f~: j~~- 20 and a slight decline thereafter. It is nat anticipated that there wilJ be a large &qowth in the service area unless sorne large industry moves into the outskirts of town. - Ci_nxvl, 7000iiiie BO7i1, inritril.iiiivii ~)f Siiit% vev vsi~i~°,.iy iiu:i 'c'eiu~'~.-i. -^ri~,?~v vr i~ie v`r`vi,-,ll f30D total, but only 2.9% of the flow. Despite rumors that say Sara I.,ee is leawing, tlie recoilirnended 130D loading reaclling the plant was not changed from the average 214 / 217 ROr> :,nd TSc, p Months of conversations and e-mails with 'rCEQ about what they expect the future permit lilnits to 6e will depend on the locatioil of the iiew faci3ity. Pive locations wez•e studied-the existir3g, site; one southeast of towri in the Sulnhur River basin, and three to tlle east and south of'the existing p(ant site. A 7 I lS / 2 pecmit was anticipated for the existing site and two of tlle sites east of the plant. A 7/ 15 / 2 was anticipated for the site southeast of the plant, and a I~1 ! 15 3 was anticipated for the site soLttheast of Par?s. TCEQ hedged on their prediction by saying that their calculations were based on flow from Campbell Soup wou(d be a large iilfluence on the pennits for the existiiig site and sites 1 thr«ugh 3. * t1 discussior_ was given regard.ing re.modelii.g the existir.g E,lant, ?itiilding a new plant adjacent to the existing plant, building a new plant somewhere else in Pine Creek basin, and building a new plaiit in another basin (the SulpliurRiver basin). . }1u;ld:i1g w I121v pi..1"it BdjaCeF2t tO tjl{: 2}:iSi11'.b p:c'3:ir kS tiZt- TeC03"i::;:C3lL2d 31ter??at3vC. Ti N~-aS recommended becatlse ofthe fo(lowing reasons- Service Since 1957 rePF F-000315 73 1. Rebuilding ttie old plajit would still leave us with ail old plant with afacelift. 2. Buiiding a new plant adjacent to the existing plant would allow tlie city to reuse the 3. would allow the city to reuse the existing outfall main, 4. woirlci allow the city ta reuse the eYisting master lift station and force main, ' - i _n--..i-- ...•n i... ..ii . _,.t-' -r.r _rrr.■n~ ~.^r~ . . . . . . . . . . . . . . . . . . . . . . . . . . ~ YTVUIV {.I.l[VYY lll~. Vll~' LV JLII( 11GY~.. UL1'-YY1✓411.lI~. Ul.Yf,~J i/l.l lli 1I Y1 l LI 1~ E>. would a11ow the city to minimize thc exteiisic>n o1'heavy 3-phase power to the site, 7, would reduee the threat of lawsuits for p(acing the site anywhere elsc., o ..,,,.,,t,a «,.,7.,,,~. .4.,. ...,,,.1f1 1,,. .L.,. r:,........ 4 ...ti~....,..._.._ discliarge point, 9. would still allow sorne of the existing plant's components to be reused ta reduce the nvvr,A7 nroinrf rnct 10. would require less buffer zone to be acquired since some of the existing site would be part of the bttffcr rone required ior the new site, i l, anrj thY f-xi-ztins> _aciiarPrit nrnnPrtv nwnPr ha-, alrPariv iiirliratPrl a vvillincrnPCC to cooperate with the city for sludge disposal. 4 12. Othei• sites would likely reqijire some coiidemnation and public f7earings that would undoubtedlv add vears to the proiect tirneline. • Six major stabilization processes were investi(yated in detlil: EiiY3co Carrousel racetraek, Fluidyne MuftiClaannel Keactor, Siemens VertiCell, AI3J `~,eniipnr_ino F3atr.h R_eactnr Ani_3a-Aerqhir,~ ~ern.nenr.irisr T{atch R.enctnr_ f'nnvr=ntinnn) aei ation All of these processes are variations of the activated sludge process. A side-by-side nr~trinaricnn r~at-t ~c ~rit:~~n a A present worth analysis of all of these alterrtatives was presented for 5.0 MGI.) and ] 0.0 MGD average daily flow. _ ~.,.:~._..i...~._., c.._._n,.~ :__......~:,_....,a. AT'AD treatment to Class A followed by spra_y disposal (no dewatering), Drying bed dewatering foliowed by landtill disposal, Geotextile bad dewatering followed by landCll .~t-.°--._i n.i..._....._. .s_...._._..~.._ r.n........ai...i.....~f'ii _i[:..........iv.t A present worth analysis of all four of' thesc; sludge disposal alternatives was presented_ Spray disposal was the recc>mmended solutian. . . . . Oi niliviliiL ui iaiiu iciIuiiCu iui aNiay ui~EiO>di Oi aiuugi5 ivdZ!, PcCiOiiircu ua5cii Oii metals aiialysis. It was found that only a very minor amount of lancl was required based on met.a.Is regulations. The controlling factor will likely be the allowable percolation rate of'the S01;. • f1 cost projeetion was put togetller based on $3.00 per gallon per day for the eonstruction cost of` the new plant. rldded to that nUinber was the constt•uction cost of other of'I=site ~i:ai :C~.. i~~ ......':b~.. t~ u~.,....,,....,~. ofiexisting facilities, ete. The total cost projection is $45M. a A life cycle cost analysis was given for the main stabilization processes. It was based an a _ _ ~ •_J~_'__ . . Q ConclLisions arid recotnmendations arc given at the end, along with a conccphial layout of the proposed recotnmended facility. ~ $ 5;: . M?~7T 74