Loading...
20-MOTION TO ACCEPT PROPOSAL FROM BOBBY SMALLWOOD CONSTRUCTION TO FIRE STATION NO 1CITY COUNCIL AGENDA ITEM BRIEFING SHEET Submittal Date: Originating Department: Presented By: Agenda Item No.: 11 /04/ 11 Council Date: Fire Department Ronnie Grooms, Fire Chief 20. 11/14/11 RECOMMENDED MOTION: Move to accept the proposal from Bobby Smallwood Construction Company to extend the upstairs hallway and construct an exit doorway and exterior stairway at Fire Station No. 1. This project needed to provide an additional means of egress (safety) for persons using the upstairs training area and so building complies with current Building and Fire Codes. POLICY ISSUE(S): Code Compliance and Safety Issue. BACKGROUND: When first constructed, Fire Station No. 1 did not meet all building and fire code requirements. A few years ago we began a systematic process of correcting those inadequacies. The completion of this exit hallway with exterior staircase is the last major component of that strategic plan. Since the FD is tasked with ensuring fire code compliancy within the City of Paris, we should comply ourselves. BOARD/COMMISSION RECOMMENDATION: N/A EXHIBITS: Proposals ACTION: BUDGET INFO: ❑ Financial Report El Minute Order Expense 30,692.21 ❑ Department Report ❑ Resolution Budgeted Amt. 35,000.00 ❑ Presentation ❑ Ordinance y'T'D Actual ❑ Public Hearing ❑ Other Acct. Name Capital Projects Fund Acct. Number 11-0901-32-98 FISCAL NOTES: REVIEWED AND APPROVED BY: Z Administration Z City Clerk ❑ Community Development ❑ EMS/IT Z Finance 0 Fire ❑ Municipal Court Z Legal ❑ Library ❑ Police ❑ Eng./Public Works ❑ Utilities City of Paris Revised 2/04/08 1 1 83 ~ r BOBBY SMALLWOOD CONSTRUCTION CO., INC. 1795 NE 17th STREET Paris, Texas 75460 Phone: 903-739-2350 Email: bgsmallwood@sbcglobal.net Fax: 903-739-2795 ESTIMATE 3-May-11 City of Paris 135 SE 1 st Street Paris, Texas 75460 Attention: Chief Ronnie Grooms Phone: 903-784-4670 E-mail rgrooms@paristexas.gov RE: Exit hall and stairs for Fire Station # 1 City of Paris will payfor building permit City of Paris will pay for Asbestos survey If Asbestos is found, The City of Paris will pay for abetment. Tear out (2) each 5' openings in (2) walls and demo 1 each 12'X12' room. $ 242.00 Frame 43' lineal ft of wall with openings for (2) 3'X7' doors. The hall will have a offset in it to miss the existing radio tower on the South end of building. $ 430.00 Install 31/2" insulation in the wall and 5/8" fire code drywall on both sides of new wall. $ 660.00 Cut wall and frame opening for exterior door in the South wall $ 120.00 Remove the brick from the door opening, salvage and reuse in setting welded door frame $ 650.00 Cut 20' ceiling grid in the center room, install wall angle and rework the existing grid and ceiling tile $ 110.00 Install ceiling grid, insulation and tile in 5'X23' hall $ 488.75 Labor and material to install fire/smoke alarms and connect to existing system $ 982.91 Labor and material to install electrical switches, receptacles, fixtures and (1) each exit light with emergency lighting. As required in thin wall conduit $ 880.00 Labor and material to connect to existing fire sprinkler system and install sprinkler heads as required by code $ 1,976.00 Labor and material to move and rebuild the chase for HVAC from the second floor to the first floor $ 365.00 Labor and materiat to tape, bed, texture and paint $ 1,457.00 Labor and material to build and install (1) sef of steel exterior stairs with concrete treads. The existing roof cover over the first floor door will be relocated under the stairs. $ 12,169.00 Labor and material pour a concrete pad under the door landing and 4'X10' conErete pad at the bottom of the stairs $ 660.00 (4) each 1 hour fire rated Timley door frames, (4) each 20 fire rated Red Oak doors, (4) each closers, (4) each Corbin Russwin lock sets and (12) each HD 41/2" hinges. $ 1,630.30 Labor to install (4) each door frames, doors, closers and hardware $ 400.00 (1) 3'X7' welded exterior door frame, (1) each 3'X7' hollow metal exterior door, (1) each view glass and frame, (1) each door closer $ 776.00 -11 84 Labor to install (1) each exterior door, cioser and hardware $ 235.00 Labor and material to install 12"X12" VCT floor to match existing in the 5'X23' hall, repair the floor were the walis will be taken out (will not be full tile) and install new base. The run # will be different, so the color may not match pertect. $ 709.50 Daily cfean up $ 125.00 Final dean up $ 75.00 Landfill and dumpster fees $ 224.00 Sub total $ 25,365.46 General conditions $ 2,536.55 Sub total $ 27,902.01 Contractor fee $ 2,790.20 Sub total $ 30,692.21 Sales tax (N/A) $ - Total $ 30,692.21 Thank you, Bobby Smallwood cc: Chief Ronnie Grooms p J (s4~F ~ ~ V" BOBBY SMALLWOOD CONSTRUCTION CO., INC. 1795 NE 17th STREET Paris, Texas 75460 Phone: 903-739-2350 Email: bgsmallwood@sbcglobal.net Fax: 903-739-2795 ESTIMATE 3-May-11 City of Paris 135 SE 1 st Street Paris, Texas 75460 Attention: Chief Ronnie Grooms Phone: 903-784-4670 E-maii rgrooms@paristexas.gov RE: Exit hall and stairs for Fire Station # 1 City of Paris will pay for building permit City of Paris will pay for Asbestos survey If Asbestos is found, The City of Paris will pay for abetment. Tear out (2) each 5' openings in (2) walls and demo 1 each 12'X12' room. $ 242.00 Frame 43' lineal ft of wall with openings for (2) 3'X7' doors. The hall will have a offset in it to miss the existing radio tower on the South end of building. $ 430.00 fnstall 3 1/2" insulation in the wall and 5/8" fire code drywalt on both sides of new wall. $ 660.00 Cut wall and frame opening for exterior door in the South wall $ 120.00 Remove the brick from the door opening, salvage and reuse in setting welded door frame $ 650.00 Cut 20' ceiling grid in the center room, install wall angle and rework the existing grid and ceiling tile $ 110.00 Install ceiling grid, insu(ation and tile in 5'X23' hall $ 488.75 Labor and material to install firelsmoke alarms and connect to existing system $ 982.91 Labor and material to install electrical switches, receptacles, fixtures and (1) each exit light with emergency lighting. As required in thin wall conduit $ 880.00 Labor and material to connect to existing fire sprinkler system and install sprinkler heads as required by code $ 1,976.00 Labor and material to move and rebuild the chase for HVAC from the second floor to the first floor $ 365.00 Labor and material to tape, bed, texture and paint $ 1,457.00 Labor and material to bui(d and install (1) set of steel exterior stairs with concrete treads. The existing roof cover over the first floor door will be relocated under the stairs. $ 12,169.00 Labor and material pour a concrete pad under the door landing and 4'X10' concrete pad at the bottom of the stairs $ 660.00 (a) each 1 hour fire rated Timley door frames, (4) each 20 fire rated Red Oak doors, (4) each cfosers, (4) each Corbin Russwin lock sefs and (12) each HD 41/2" hinges_ $ 1,630.30 Labor to install (4) each door frames, doors, closers and hardware $ 400.00 (1) 3'X7' welded exterior door frame, (1) each 3'X7' hollow metal exterior door, (1) each view glass and frame, (1) each door closer $ 776.00 _ , 86 Labor to install (1) each exterior door, closer and hardware Labor and material to install 12"X12" VCT floor to match existing in the 5'X23' hall, repair the floor were the walls will be taken out (will not be full tile) and install new base. The run # w+ll be different, so the color may not match perFect. Daily clean up Final clean up Landfill and dumpster fees Sub total General conditions Sub total Contractor fee Sub total Sales tax (N/A) Total Thank you, Bobby Smallwood cc: Chief Ronnie Grooms $ 235.00 $ 709.50 $ 125.00 $ 75.00 $ 224.00 $ 25,365.46 $ 2,536.55 $ 27,902.01 $ 2,790.20 $ 30,692.21 $ - 692.21 $ 0, . 87 ~ ° 4 November 2011 Fire Chief Ronnie Grooms City of Paris Fire Department 1444 N. Main St Paris, Texas 75460 Reference: Fire Station 1 2"d Floor Corridor expansion Fire Chief Grooms, Thank you for the opportunity to present you with this proposal. Our pricing is based on the following scope of work: Includes Materials, Labor and Supervision to perform the following: • 2nd Floor Demo to accommodate new construction o Demo existing walls at Conference room approx 5' o Acoustical ceiling grid and tile approx 5' into Conference Room o Existing storage room at South end next to exterior wall o Demo existing air duct chase in main storage area • New wall construction o Frame and drywall approx 44' o New air duct chase o(1) 3-0 x 6-8 hollow core door to Conference room with passage lock o(1) 3-0 x 6-8 insulated residential steel insulated door to storage area with passage lock • South 2"d Floor Egress o Remove brick from exterior of building at new door location and install sill flashing and brick steel lintel o new 3 x 7 holtow metal door frame and door unit with door hardware, closer, and weather stripping • Exterior stairs 0 11'2" elevation. 0 4' x 4'6" platform with toe kick 0 2 rail handrail at 2 sides of platform, one side of stair o Wall rail at existing building down one side of stair o Serrated grating at platform o Serrated tread for stair (17 ea) o Four (4) 4x4 steel columns for platform o Anchor bolts for columns o Bolts for treads and bottom of stringers o Materials primed and painted o Sidewalk for stair landing approx 14' long x 47" wide o Pour footing approx 4' x 4'-7" Sprinkler system o relocate one to hallway from Conference room o two new sprinkler heads in new area of hallway . ~ 8 • Acoustical Ceiling o Armstrong Prelude Fire rated grid system o Armstrong Fine Fissured Fire rated 2 x 4 ceiling tiles • Electrical o Move (2) 2x4 lay in fluorescent fixtures from the Conference room o Remainder of 2x4 lay in corridor lighting to be new fixtures o Exit light at the end of corridor o Re-work any light switch issues due to moving room entry points • HVAC o Relocate duct in chase approx 4' over from existing chase o Relocate 4 supply and or / return grills for remodel • Flooring o Install VCT floor tile at new corridor area o Patch VCT at wall demo area o Install 4" rubber base on new wall • Paint o Tape /bed /texture /paint new walls o Paint new interior and exterior doors • Other o General liability and workers compensation insurance o Construction site area cleaned o Dumpster for construction debris o Daily construction safety program Exclusions • Not responsible for detection or removal of asbestos or other hazardous materials • Sales Tax • Permits Clarifications: • Finishes (flooring and paint) will not match exactly due to the age of the existing, product samples will be supplied for Owner selections. Quote: $ 31,560.00 We appreciate the opportunity to look at this project. Please call if you have any questions or have any other projects you like for us to review. Respectfully submitted, We Build, Inc. Building Systems Departmenf Rhonda Welch Project Manager 903-785-1653 Keith Saufferer Project Superintendent 8 Iq 2