A Use Study for
the City of Paris
Lamar County, Texas
on Lake Crook
General Information
1.1 Commissioning The Study
1.2 Goals and Objectives of the Study
1.3 Methodology
1.4 Public Participation
104.1 Public Hearings
104.2 Staff Participation
104.3 Comments and Interviews
1.4.4 Surveys
Government Restrictions
1.5. 1 General
1.5.2 Section 404 Permits
1.5.3 Flood Plain Management
1.504 Texas Department of Health
1.5.5 National Pollution Discharge Elimination System (NPDES)
Brief History of Lake Crook
2.0.1 Historical Need for the Lake
2.0.2 Water Quality
2.0.3 Lake Crook Data
2.0.4 Early Development Attempts
Current Usage of the Lake Crook Property
2.1.1 Improvements
2.1.2 Access
2.1.3 Adjacent Land Uses
2.104 City Utilities
2.1.5 Leases on the Land
2.1.6 Hunting and Fishing
2.1.7 Other Uses
Potential Uses of the Lake
3.1 Obstacles to Development
3.1.1 Water/Sewer Availability
3.1.2 Watershed Management
3.1.3 Legal Issues
3.1.4 Logistics to a Sale of Public Land
3.1.5 Campbell Soup
3.1.6 Water Clarity
3.2 Option 1- Low Density North Shore Development
3.2.1 Description of Option 1
3.2.2 Recommendations Concerning Option 1
Option 2 - Full Recreational Development Plan
3.3.1 Description of Option 2
3.3.2 What About Golf?
,
1.5
f :3 { 3 J / t 2 G - 3 I,
r 9/ ¿ðC? .
~
If '12 - t/-Ç".
2.1
3.3
, .
,,"--~~---'---"'-' -"---"'~-"""-" .--" "p
.'"
3.4
3.5
4.0
-
""--"."-"~'-"-"""':"'"
3.3.3 Recommendations Concerning Option 2
Option 3 - Dense Residential Development
3.4.1 Description of Option 3 .
3.4.2 Recommendations Concerning Option 3
Option 4 - Do Nothing Option
3.5.1 Description of Option
3.5.2 Discussion of the Option
Evaluation of Alternatives
4.0.1 Questions Unanswered
4.0.2 Economic Development
4.0.3 Risk
4.0.4 Lot Absorption
4.0.5 Referendum Now
4.0.6. Limitations of this Study
Recommendations
5.0.1. Summary Findings
5.0.2 Recommendations
Conclusion
6.0.1 General
5.0
6.0
0'.'
\ '
~ of Paris
Study of Lake Crook
March, 2001
1.
,
GENERAL INFORl\1A TION'
1.1
COMMISSIONING THE STUDY
In the fall of2000, the city council of the City of Paris commissioned the consultant to make a
study of Lake Crook. The council and staffhad, in the past, been approached by various groups
of very well intentioned individuals to use the lake and the surrounding city owned property for
boat races, archery trials, gun ranges, trails, public parks and even to sell the property for
development. The council wanted to better understand their options and the possible
consequences, both short and long term, of any action they might take with regards to Lake
Crook. While individually there were likely ideas and opinions in the minds of council members,
the council voiced no specific instruction to the consultant concerning a preferred outcome and,
in truth, left the consultant to develop the study without prejudice.
The consultant, Calvin T. (Terry) Brannon, is a registered professional engineer in Texas and four
other states, a registered professional land surveyor in Texas, and president ofa civil engineering
consulting firm in Tyler, Texas some eighty miles away from Paris. The consultant did not and
does not have any vested fmancial interest in the outcome of the study and employs no person
\vith any financial interest in the property surrounding Lake Crook.
..,
Mr. Brannon has, since 1977, been in private consulting practice. His fIrm specializes in the
development of communities both through the master planning of them and the design of public
works projects of all types. His personal experience in subdivision development includes the
design of Hollytree, Limited and Garden Valley Resort golf course subdivisions, the design of
lakes and subdivisions around lakes in Smith, Tarrant and Nacogdoches Counties with over
16,000 lots and parcels for residential and mixed use development; and serving as consulting
engineer during development of The Villages on Lake Palestine.
But, besides the private development, Brannon has been involved in the development of public..
recreational areas and walking trails in Livingston, Tyler, Longview and two dozen smaller cities;
has prepared over fifty successful applications for grant assistance to the Texas Parks and Wildlife
Department; has prepared applications for public and private concerns for 404 Wetlands Permits
from the Corps of Engineers. He has likewise prepared applications for sewer effluent discharges
for many cities and designed \vater and wastewater plants and pump stations all over Texas along
with their respective distribution and collection systems.
In his earlier life, Brannon was staff engineer for the city of Irving and assistant city engineer in"
Tyler. While in Tyler, Brannon was charged with monitoring and approving constnlction around
the city water supply at Lake Tyler and Lake Tyler East as well as approving subdivision plats
and construction documents.
Page 1 of 45
~"'" ~'f~
,.':~~,;,? )' ~.lt .
""'I',I:.~.'"".~,
, "'P ..
; '+ .
~ ~ 1l\ : f " , ' ~'?
, " :E ' I~ . :x ~ ....',...
--""'~---, ",; ~,.,~~\-~ ~~,' ':=-. c;'l::-".. ' ,t'
\- ,--- ,.:'~ ~ ~,:':'.:' ,f.", ,', ,-
- 'b.. .'0' ~ ~ d"" .-'. - . ' ' '
'-> '....,:;.~.J~, 0..""""".°1 ,'" ,.' ~ ~ '
~.' ",i/ ""'-" , .
2:~" ~ " ,'" .
.-."" -~" ,,.OJ,, ,-"~' -' ',' . to. .,_oo
..oo ", - .. 0, '::-'; :::.. '0 ."" .. ~ .i !..,-~ ' ,".'
I. .. I '..,,-.,¡ .,' - -'- '
, , ,-¡' ¡':~ '¡ .-:- ", ,:. ;'~"~.::~!!! -, " ,~\ :, ~ :~~, "',
., t ," ,..,~tl j""'\-' ".,'. ,,-., :..,.,
I ,"":, ,~', ,"", ~:'"r"-j::~i~~-:~~:""r:,:"'o:' ','">!. ;:'~U""'oo:'
~::.. "'III i""VI"'" 'i' '("t¡:o".~~.,....II.O-' ,I""'" ." z:.'..' ,"
" \' .,.".'I;,"'¡:'-"""fd.\',. "O~.,_.' " ,,'
" I t",r.;.°" ,,"t.'t," ~,.......'.'I....,.-t.:":::Af..,'" ,', "0'-,': ..', ..'
.' I ,¡ '-".':::/'t"J!~:..:;...'.\:I~.-t-"'í-:',~" .",,'1 :....... ' 0'
O' '-.. ,oi,.::L~;_L~l~~il../'~:'I.JI-,'4, ,;~;.-í!'-,' "';')¡,-:-'..;.~'~\.""..!;'-;:: . t., , .... ' t,
0 -,', -t..,-,;..._--~~'-\.-;' I' """::'~"'~"""'-:~I .I'~ ""., .,7"" ,-\\',,"'" ,
.. 'II.,...', ':".,...-..,"~-:-"'oo""',H;;,"".-{' ,'1 "-:D., 1---' ..t", -,"""'," I, ",; . , '
:,' , _f'r,~ - ;.]",r;:7.!,Ll,t\ ¡ -;li\j1 ¡,:o~,~~', r........ ~,-_!J "1,,,__,. . ,\ \ ~\;,'.\, . , .
-- 0--"1" ,'" .0( -.1" . - t. r."- -L..°1---¡ 1 t t I , , - I-' ,,' ' ,
õ, ' 0 -~.!" -¿',". .J:r~ll--¡",~ 1..1' "rn "r :pl\-~,.!,,~ _..,--~~.,,~.;"~ : 0.., -~i.4-~ ~, _J::;'> j.' ~ ,: ': ': "....'
, ,': ,~~~.L:. ~'\Ò.J~!-~_W_~ ,}~ ,+~"'-'!""r.',':~"':}o:J Tit:-:...,! ;;' :t;;-':., ' :~ . '\'
-':,.:..,\, ""'-:~I'.I..I JI...'_~t""..~~'--r-""r' ,.., ,"",\' -
:..-- .' . ,; ; " .i.1~--r"1,_r-I'-'-' ' ", " "", II \1 ¡i\i,lif' f.'~I.:,¿~.:-:-f"'~ '"
: _..~ ~. ~' ',..', - ~ -~;: I-~.:..:_:..: ;l:".~~!:f"'rii' r.__~,...}'!:;~tl'; ._,r'~'TtJ:::a':~q::þs:::,:..:t.'~l:'fill¡~::::I-O ',.: '. "". ',:, :,
. ",.,:,;"; :, ,..,::-'J);,~;"¡ -:;t::::.,' ".' ":':~'î -¡-1rt - i...rj,~_, ~-ri\\ .-::-~' ""',,\ í'-:-")I~,"'~-1\-- '~,' -=',-:\. i,"," ¡~,:. I .,- '~ji -" , ..
" . ~~'J" ""T- ,..'-- 0:-;.'"'1" \1"--' I";':'¡ 't.-u::-...~ ~"'-, ~,. .,.. '" . ,
;; .7..',::,--' "",-,,' " ),"l -1:L"'~:'-."""'--"r'o' \{ --"#Y'~"'::.C ,". ...,,' 1
""',,:, '!',. i,~."i~".1t..¿;~'J',:,'i]í\~~l~~~+',~~J..'..:::i:' ':"~lTlB~..1 ,\¡\i:'"n\ ':~". '.;~,/
:: '. --" I","':..,.ff ':.' , I' 'i. ,'-'~~~,.L,:..\..,._;3-:""i,..t"r 'i.:,':,:~. ,n¡{ ¡::. , """"
, ' ~-, ,""'" 4,-. ""'1-'- --'-"",,-'--I'õ'----H...,"':-';"""""".' ;',;0.,." .1;.1'1:.':'" "
.. ii' 'Ir:-.-,""",'r'~' ,- ;'6'.""
, ' -,'" Ii' ,to,. '1""_"'~1':-;Tì"\1.-t"""t¡t ,:"'..:,',
, ,,- '¡';'" :':'" ,.~ :'r;~~ ,':..~'r~~' ,_~..,I" ~:_,¿~~\,.:;;;;, _.oJ,~~~,~' 5~:'" " ,.." ";'.
.I' ,:,..";" .\,,~~..' . !"""" :.,,1_,.;', ........ r,;,.¡-:--
:,;'j""',~":,,, .'. ~:. .,' ;,'~;:~~:t:,,~¡,~~,:-i.'.;.-;~:,": '~.: ' ,,- ':-.w", 'Y . ~'.....
~,/ .. ~ ' -:""" -"..:1-.. ~..l,....
/ ~ .. .. ...~
., ¡ 0 ,-:;--' .,>,"---':':
I ,;' ';-~':r ~ \f~,
, ,'"
------...,
~ '"
..
,- .
-: '--'-,
,
\
., -------.,-
','- . - - ,
. 0,' ' , .
\
\
I
I
I
1
I
"
'-...
"
\ --:
'__'0'-':---'- -¡ ~
".
"
. ,
'. ..
r'
i,
':I
,..,\ ,
.. ,-
, ..
-:;.:"-----:~' ,~._..,
, ,~ ,,~..'
0<\
(...."
--
, toe
.-
I,
l
»;
WAfER 1J<æAfME
'-'-,
'I'
," ;i:.;- -
,
II
s;
"
~.
, '::-'
, ...
"
.,'1. ""
'.. '-
":
~"
.
"- <".
". .
~.
",
-.11-" "
...,
,
"
,oo
"fI'.' ,
.,#-: '
"
,
, ,.,
;:.,i"
'", oJ- ,
, ,-,oo
., .....:-,-' WA5reW^re'~ 11æAfl&Nr P\..NJ' '~r \
, , \
, .. 1'("
.r"'~, ",'
.l '
, .. 1--
-"",-:-,:~"-"-"-':'- ;;;
, " I
I ' ,
,¡
.
.
,
~
~'~
~~
§~
~~
~,~
x~
~~
SL~
.~,Z
:-~..
,
\
, ~\
""
r'
" ,-
I
" ~:
, .
,
.'
'r-
, \ p
,i
..
,.' "
, ,:,-:;. , . -.. '~'.,:,
.
,
.
\-
.-- -,.o~\ ,"
. .
,
'\
~\
I()()()Ó., ..
. "
. :..,,\
!? 000 '
'P\..,A,"J'(
I,
SCALE, '
I,.
~, '
GRAPHIC
,
, ',"~ ';'.. ,
',.
.. ,0 , r
IN FEET
"'-' ,
.j
..
.. .
0
,
..
;,
~'
'.-
..
"
.' .
.
,"
, ,
oJ i
'...
'. I' ::
0' ,
~,
I'
't
r' 0,
,
",
.
I,.
~. '
...---
,to
..'
, \
.,..'
, ~
~ of Paris
Stud~ of Lake Crook
March, 2001
,
,
1.2
GOALS AND OBJECTIVES OF THE STUDY
The goals and objectives of the study are fairly straightforward:
0
0
0
Gather data on the Lake Crook asset
Evaluate the needs of the public
Recommend a highest and best use or uses of the lake and property based on
environmental, economic, and engineering factors.
If successful, this study will provide information to government officials to enable them to
embark on a reasonable course of development of an important asset. It will provide the public
fmality to a question looming over the city for years. . . what to do with Lake Crook. It will
provide the sportsmen and sportswomen (hunters, fishers, archers, shooters, bicyclists and
hikers) with information their respective organizations need to go forward, whether here at Lake
Crook or somewhere else, And finally, it will provide the building community with ans\vers on
whether to embark on their own subdivision developments or wait a while longer for property in
and around Lake Crook.
..,
One thing that is NOT an objective ofthis study is to serve as a substitute for potential developers
and builders doing their own due diligence. Potential beneficiaries must conduct their own studies
with how developing Lake Crook would impact their own business investments, The plans
shown later in the study are "'broad-brushed" potential plans of development. There are many,
many other options available \vhich could not be held in this one volume.
1.3
METHODOLOGY
The methodology, like the goals and objectives, are very straightforward. . . COLLECT,
ANAL YZE, RECOMMEND. While it sounds easy, the process is much like herding cats. The
problem is not a lack of information but rather a wealth of it.
Gathering data is important because the city has been approached by what seemingly are
incompatible potentia! users of the land and water. The city has accumulated a mass ofhistorica1
documents concerning Lake Crook lake from the day when it was conceived all the way to the
present. This study will endeavor to boil down the information, separate fact fi"om folklore, and
present fairly the condition ofthe lake and what might or might not be done to improve the lake.
Before evaluating the needs of tire public, it is essential to find out what the public wants.
Unfortunately, in the case of Lake Crook, the public itselfis not of one mind. Opinions expressed
in open meeting range trom "Leave it alone" to "Sell it and make money" and every conceivable
position in between. Through the use of surveys and public comment, the study should present
the case of most parties for council consideration.
Recommendations and subsequent actions by the city should be based on sound evidence and
Page 3 of 45
~ of Paris
Stud~ of Lake Crook
March, 2001-
certainly not on emotion. There are 'certain to be some persons not pleased with the
recommendations herein but these recommendations will be based on what the consultant
considers to be sound principles of development.
1.4
PUBLIC PARTICIPATION
1.4.1 Pub Ii e Hearings. Certainly the pub lie has been kept we 11 informed on this subject. If they
are not so infonned then they have failed to listen to the radio, read the newspaper, open their
water bills, or attend one of the two public meetings set aside for citizen input. Approximately
two hundred persons attended the first public hearing held in November, 2000 and over three
hundred attended the second hearing held in February, 2001. Every citizen wanting the
opportunity was given the chance to step to the microphone and voice his or her sentiments
concerning Lake Crook. Individuals were represented. Hunting, shooting, and wildlife groups
were present. And economic development supporters, builders and developers were also present.
1.4.2 S ta ff parti ci pa ti 0 D. City 0 f Paris staff were instrumental in pro viding the consultant with
backgro und data. The City Atto mey' S office provided deeds and histo rical info rma tio n on Lake
Crook. The engineering department furIÚshed water and sewer data and aerial photographs. The
police chief furnished infonnation on police efforts to monitor the existing park land and relevant
historical data on criminal activity in the vicinity. Public works provided maintenance and
development data pertaining to the ongoing efforts to improve the public park on the south
shores. And finally, the city manager's office sent out surveys to 9900 citizens and the city
manager's secretary tabulated the results.
1.4.3
Comments and Interviews. The consultant was able to conduct brief but beneficial
interviews in person, via e-mail or on the telephone with several parties including the
Dallas Off Road Bicycling Association, the Wild Turkey Federation; representatives of
Archers for Christ, Paris Gun Club and Maxey Rifle and Black powder Club; several
local Paris home builders and developers; Realtors; and neighbors of Lake Crook.
1.4.4 Surveys. A survey was developed and mailed to 9900 residential water customers seeking
their comments on the use of Lake Crook and 1,473 responded for a response rate of 14.91%,
c usto mary £0 r this type 0 f survey. None 0 £ tho se surveyed lived in apartments since they are not
directly billed for water. Some of the questions came ITom the consultant and others ITom
members ofthe staff. The survey, although it contained fairly straight forward language, became
an opportunity for many people to vent on everything from Lake Crook to trash collection in the
city. The following summarizes each of the questions in the survey:
Qllestion: Given tile clloice behVeen tile two following options do YOll favor
development of the property for picnicking, camping, hiking and similar recreational
purposes OR do favor pres ervati on oft he land as a n at ural park in a 1/10 re II n distil rbed
condition?
1,381 persons responded to this question with 80.3% favoring development of the
land for recreational use over preservation as a natural park. Some side-bar
Page 4 of .45
'.~
.
~ of Paris
Stud~ of Lake Crook
Marcb,2001
....
,
comments correctly pointed out that the property is big enough for both uses,
, Question: Given the choice between the two following options do you favor
. development of the property for picnicking, camping, hiking and similar outdoor
recreational purposes OR do favor development of at least part of tlle land as an
athletic col1lplex containing possibly ballfields and play fields?
The intent in a properly worded survey is to limit the choices to just a fe\v. In this
q uestio n, 69.1 % of tho se respo nding favo red picnicking, etc. over a roo re formal ball
complex.
Question: If development into recreational uses were to take place, what types of
facilities do you favor?
The respondents were given a list oftwenty five options and given an opportunity to
"write in" their preference if it did not appear in the list. The following is the list in
descending order of preference and the percentage of all 10,584 selections made by
respondents according to the survey:
Picnicking
Fresh\vater fishing piers
Playgrounds/s\vings
\Valking/jogging trails
Boat ramps
Hiking (unimproved trail)
Tent camping pads
Beac hi swimming
Bicycling (improved trail)
Recreational vehicle camping
Baseball fields
Softball fields
10.30/0
9.20/0
8.3%
8.30/0
7,0%
6.90/0
5.9%
5.80/0
5.40/0
5.00/0
3,20/0
3.1%
. Horseback riding trails
Amphitheater
Basketball courts
Skateboard park
Tennis courts
Golf course
Archery
Soccer fields
Clay/trap shooting ranges
Other
Ro Her hockey rinks
'~Frisbee" golf course
All of the above
3 .00/0
2,7%
2,3%
2.1 %
2.0%
1.90/0
1.80/0
1.70/0
1.70/0
0.80/0
0.70/0
0,7%
0.070/0
Question: Should the users of recreational facilities be requirel[ to pay user fees?
A resounding 64% of 1,356 respondents felt users offacilities should pay fees.
Qllestion: Given a choice between Mo of the following options, do YOll favor
dl!l'elop1/lent of the property for outdoor camping, hiking and similar outdoor
recreational purposes OR do you favor the city entering into some public/private
partnerships to sell the surrounding real estate (bllt not the lake itse1j)?
Of 1,375 respondents to this question, 84.9% favored the development of the
property for outdoor camping, biking, etc. Some commented the property was big
enough for both and the two choices are not mutually exclusive.
Page 5 of 45
"
.
SV of Paris
Studt of Lake Crook
March, 2001
....
.
Question: Would you be willing to pay higher water and wastewater bills to pay for the
extension of water and wastewater utility lines to this area if developed for resi dentinl
h . ?
; ouslng.
Overwhelming opposition arose not only in the 89.4% out of 1,433 respondents but
the item drew much written commentary. General co nsensus 0 f those surveyed is that
developers should pay the expenses for development. Admittedly the statement,
"would you be willing to pay. . . " always evokes such comments.
Question: Should the city authorize creation of a "non-profit housing development
partnership" to create "affordable" or "subsidized" housing around Lake Crook?
9 3 .2 % 0 fthe 1,429 respondents felt strongly that the city should not create a special
housing partnership nor should they build "affordable" or "subsidized" housing
around Lake Crook,
Question: Should the city divest itself of surplus lands around the lake to the
highest bidder?
Tills question one would think would be more evenly divided based on the comments
received orally. However, those surveyed said the city should NOT divest itself of
property to the highest bidder by a five to one margin.
Question: Should the city continue leasing Lake Crook properly to Archers for Christ,
the Ma:o::ey black powder Rifle Club, and Paris Skeet and Trap Club, Inc.?
Over two thirds of those surveyed said the city should continue leasing to these
entities.
Question: What are you r concerns about members of your family using any potential
park iltzprovelnents at Lake Crook?
This turned out to be a discussion question and provided pages and pages of comment
by those surveyed. The following is a tabulation of the reasons given. Respondents
could circle more than one reply.
Page 6 of 45
\ '
"
. ~ of Paris
Stud~ of Lake Crook
March, 2001
Table 1. Public Concerns on Usin the Lake
~-, '
~'~'"
Cleanliness 909 17.3%
Lack of restroom facilities 897 17.0%
Lack of adequate policing 876 16.7%
Lighting (absence thereof) 828 15.8%
Vandalism 644 12.3%
Inadequate access by foot or bicycle 163 3.1 0%
Adjacent users 157 3.0%
Tragically, 49 respondents said they would never let a member of their fanùly go to
Lake Crook.
....
Qllestion:- If YOll lire not using facilities at Lake Crook now, why Itot?
This question is the stuff of \vhich novels are made. The general range of \vritten
responses covered such reasons (in no particular order) as:
.
.
.
.
.
.
.
.
.
Nothing to do out there.
Crime and vandalism; safety
Insufficient roadway access
Did not know what ,vas there or how to get there
Water is dirty
Horror stories; rumors of activity including devil \vorship
Better facilities available at Lake Pat Mayse
The grounds are 'unkept'. Run down.
Many respondents said they were simply too old to go out there
Question: Shoulcl we continue to allow special events such as boat races at the lake?
An overwhehning 90.3% said the city should continue to allow special events,
1.5
GOVERNMENT RESTRICTIONS
1.5.1 G en eral. More factors than public 0 p inio n enter into the development of a long range plan
for Lake Crook. Federal and state statutes co ntro 1 many 0 f the functions of co nstructio n, repair,
or land development.
Page 7 of 45
" .
, ,O
~ of Pa~is
~~~~, ,~~~ ~~~~= St.~.'!Y...~,~a~~ Çrook
March, 2001
1.5.2 Section 404 Permits. The móst noteworthy restriction in recent years is the U.S.
Environmental Protection Agency's enforcement of the 1972 Clean Water Act, particularly
Section 404, Under this regulation the government originally controlled and permitted the
dredging and depositing of dredge materials into 'navigable' water or 'waters of the U.S.' After
numerous court tests led by the Sierra Club, the Conservation Fund, and National Wildlife
Federation, the Corps \vas forced into more stringent permitting requirements restricting the use
of heavy machinery in wetlands because such activity fouled the water. Subsequently, other
organizations like the National Association of Home Builders have sued because the Corps went
too far, in their opinion, to regulate
? activity in wetlands. The Corps has
been caught between the factions by
being forced to write enforceable
rules and then seeing the rules
overturned by the courts,
....
The wetlands identified in this study
were based on the consultant's
familiarity \vith the requirements of
the Corps of Engineers but the
maps do not purport to have any
official status. Certainly before any
development from a pier to a
subdivision takes place anywhere in
the city o\vned pro perty
surrounding Lake Crook, the Corps will have to be consulted and a 404 Permit requested.,
Certain 'nationwide permits' already exist which extend the authority for installation of pipe lines
tor example or limited roadway crossings, Ifa 'nationwide pennit' is claimed, a notification in
writing to the Corps of Engineers ot1ìce is still recommended. Contact:
Figure 1. \Vetland upstream of Caviness Road
David A. Manning
Planning. Environmental, and Regulatory Division
1645 S. 101st East Ave., Tulsa, OK 74128-4609
Phone: (918) 669-7400
Fax: (918) 669-4306
There are at least a dozen other federal laws governing what can and cannot be done in a wetland
regulated by the U.S. Environmental Protection Agency, the U.S. Fish and Wildlife Service, and
the U.S. Department of Agriculture.
1.5.3 Flood Plain Management. Another significant law on the books is the National Flood
Prevention Act of 1968 which created federal standards for locating and protecting flood plains.
This law regulates the elevations to which surrounding structures must be built to protect them
from flooding but also prevents the depositing ofm\ materials into a flood plain in such a way as
to exacerbate flooding either upstream or dovmstream. A significant area, perhaps several
hundred acres ofland, is lost to development due to flood plains in the upper reaches of the lake
near Caviness Road and F,M. 79
Page 8 of 45
, .
,"
~ of Paris
Stud~ of Lake Crook
March, 2001
,
,
In developing land plans for this study, the
consultant assumed no encroachment
would be made into the flood plains or
}vetlands su"ounding Lake Crook.
1.5.4 Texas Department of Health. The Texas Department of Health regulates on-site sewage
disposal in Texas. These would include septic and aerobic systems under 10,000 gallons per day
with either absorption fields, spray surface irrigation, or evapotranspiration fields. The state
regulations require that homes built within 300 feet of a public sewerage system must connect to
that system. If septic or aerobic systems are to be used for on-site disposal, the lots on which
these homes are built must usually be at least Y2-acre in size. However, special orders by the
Texas Water Quality Board (now the Texas Natural Resource Conservation Commission) dating
back to 1971 dictates that within the Lake Crook watershed, minimum lot sizes within a
subdivision must be I-acre or more to use anyon-site disposal system. Ifless than I-acre lots are
platted, a community sewer system must be installed.
1.5.5 National Pollution Discharge Elimination System (NPDES). The prevention of storm
\vater runoff laden with silt and sediments into the nations streams and waterways is a priority of
the Environmental Protection Agency. The disturbance ofas little as Y2-acre requires preparation
of a Storm Water Pollution Prevention Plan (SW3P) to prevent soil runoff and filing of a Notice
of Intent (NO I) to begin construction. The creation of a subdivision or the construction of a
soccer field equally fall under the umbrella of this law, Obviously, with the turbidity of Lake
Crook as high as it is, compliance with this law will be a major local enforcement issue as well
as federal as the city attempts to keep the lake from being further muddied.
Page 9 of 45
-"
- - ;.. '=- - - ,-.
;11'1' .t!
',-,'
,-
\,'
, ,'"
C 10~~_~~,
'1
I
\1:1
. .
, ~.;. : '" ,"
-,' .
, , ..-
" , -
"f:', '
. !
""
, .."
Il'
'~ - - I
0 ~ '
.
~I
, -I
, .
.....
0
In
.z'
.~,
"
. -
. ,
". ~ i
" -!
0'
I
,
. 1
!' 0 ",' t
WAllO T~"'" I
0 I
~I' "
, ~I". ~
'~~,
~t
to' '
I
I
-' ->-,
'"
"
/:
11....../,,'
"", '
, .
, !
...
';t
'.
.
". ;
,I
.
-\ r--.t
I
I
I
,
,
I
t
I
, fJI
~
, ,
,.
r'
"
I
I
:1
,I"'.)U~
,
I
¡I'
1 "
I
. ,
, ,t
! I
"
.., , ,
I I
"l,,".
-,-,-'~_J'-'-----'r-~'
, ...,..-,' i I~"b."!
! ' ,."J."';" .' 'i
, "'J~¡¿' .1'",
'-""-"/:'" ~~.-.
, ,..~, "";.t"i!'. \
I I!' ,,!'..."" . J
",-{':"""f' ' ,
,J.:::;~)J::;;.~ : I
-.,' ï t,ade<
" .II" ,-
y~,
, ,
"
',;
I'
,..
u,
\1'
, , ,
",
,
r--i '~:-
, , : .J
" 1
;
I
!
"J
"',,':..
. ,~::- J
\-,'
~.
- \ 'II
.~ tC
...
...
-I;: ;'
"'---
:,' I
-:;, ,
",¡Rae
, : 'ÌIIIIF
.' .)~
" ,
, '. '
.
, ;' \
: II ,j" ~i
.~: I" '
r' ,.
J..-:,\ ~,'
, '"
~II
, "tlJ!
.:'" ,," ,&,..
,....~:;.....- ..
. '..~, '11", :".
.:,.,:'~. ".
... ,I ... ..
,:' ~ '-'
WI
STATUTORY
WETLANDS
Sl'^1UfORY \\tf1\...AN?5 MAY NOr f'e FLL.fl?
OR []Iæt:1œt:1 'M1HO\j( A Pe~ F~OM -n-e
U.s. N?MY COl<PS Of fNlAIt-ef~, 111IS NtH'
~ ~0PeR1Y QM..f:t:1 f'Y -n-e CtfY Of
PARIS W11CH IN x.L. L.1KfL.1Hl7OI? IS
a.A55IFIet:1 16 \\tf1\...ANt', Qt.I.. Y -n-e
COI<PS Of eNlAIt-ef5 MAY eS""~I5H
FI~ ~ARlfS F~ v.Æ:'I'1...ANt:15, NO
a.fARINlÃ, FLt..INlÃ, I'Iæt:1CiINlÃ, t:1t.WPtNlA
OR 0f}1:~ C0N511a.1::11ON X:l1V111fS
~t:1 æ A1"œMP1'l'!t:1 IN -n-e5e NæI6
'M111O\..If FI~l' CONflCl1Nlà ~ C0I<P5,
i ,
I <
-~-
,
, ,
I
I
I
, \,-
I
\
r,
'0
~.
GRAPHIC SCALE
0 .00 1000 2000 !tOOO ..000
. .
- I
,
, , ~'
;""
I ,I
. ,.' "
,,', ,
,
ca
CII
-- CII
-~
...--
'.
II
~
f'l'f'{?Y, " Y,",','
~*ij;t?:n
Ÿ.,J~¡'r-«'¡'"
7~?//.'/~<J,"':';' .
~,/ ',,' ,'"
~",,;~"'I.';:
~M~~;~":~"~
~~;k:'J',~'; :),
}(j:l.Ù¿.~,:f:' ,;~'
~ÿ,y';:;~':d"<
~,..7";' "J' ".~ "
~ftj;¿< ~~,: :)~.,~
~";:-:,:,.,.",,
~iJ:)'::,:'..,'
?"'~;,,.,::,~: ',',
~7'i,"" ',',
?~'~':'¡,'" .
?;þ,:.,{.; -
~?~"'J"".",f/'
'(j;h;"';';~ '. ~":"
?$;J'.~'~¡';" :'; ':~
~,',";";'-,',~;:¡"',,;
~h\o'/f.".; í"-:"/:;
i//J/h/1/, f
>~
ø:
0
...
~~ j Z~
~°ø..~Z
ø..g 5
ra,.uø::""u
of:! ~ ~l
g:s ~ j
t
~!!
A;
<
ø..
-
- -
.~-~
--
1
I
I
I
!
, .
,~
~f Paris
Study of Lake Crook
March, 2001
2.0
.
BRIEF HISTORY OF LAKE' CROOK
2.0.1.~istorical need for the lake. The history of public water supply in Paris dates back to the
fire of 1877 which destroyed a large portion of 'downtown' Paris north of the railroad to the
county square and stirred the interest of a number of private promoters including the Paris Water
Works and Artificial Ice Company formed in 1878. However, it \vas IÚne years later in 1887 that
the first pipes were actually installed in the ground for the purposes of a public water system.
After flirting with the use of water wells, sometimes with more success than at other times, the
city decided near the turn of the century that surface water from a lake \vas more reliable. By
1899 Lake Gibbons was built but it was not until 1904 the pump station and pipeline \vere 'on
line' furnishing the city's water needs. By 1911, expanded use of the lake and a severe drought
proved that the small lake could not sustain Paris and the lake was expanded. Worries about the
dam bursting during periods of heavy rain prevailed when people were not worried about
drought. The following was taken from the internet site provided by the Texas State Historical
Agency (http//"www.tsha.utexas,edulhandbook):
....
Lamar County has suffered several major disasters since its establishment. In August
1877 a fire destroyed nearly three -fourths (ten acres) of the downtown business
district of Paris. Recovery u'as rapid, and stronger building ordinances induced
residents to construct many of the new buildings of brick. On March 21, 1916, much
of the town was destroyed by the "Great Fire, " which began in the southwest section
of town and, assisted by \vinds estimated at forty miles an hour, burned from 5:30
P.M. to 3:30 A.M and devastated 260 acres. More than 1,400 structures were
destroyed, including most of the downtown business district. The total monetary loss
exceeded 511 million. lvliraculously, only four lives were lost.
These two fIfes kept the need for an adequate fife fighting water supply foremost in the minds of
city officials for decades. Finally in 1920, the city council, citing a need for a dependable water
supply for future growth, called a bond election and $1.0 million was subsequently voted in
September, 1920 to create a new lake on Pine Creek northwest of Paris. Engineers were hired
to prepare plans and bids were taken for construction of what was in 1922 to be named Lake
Crook in honor of then retiring mayor J.M. Crook who was instrumental in starting the project
in the flfst place during his tenure and was responsible for purchasing the land on which the lake
sits. [By the way, he was authorized by the city council to offer all the way up to $22.00 per acre
for the lake site.]
In June, 1923 just about one year after construction actually had begun, the lake was dedicated.
A water rights appropriation authorizing withdrawal of up to 12,000 acre-feet per year (or the
equivalent of 1 0.7 rnillio n gallons per day)was granted to Pads by the State ofT exas. S inee that
date, although repairs have been necessary to the concrete spillway occasionally, the only
significant construction on Lake Crook has been the expansion of the water treatment plant in
1943, 1966, and 1985. The plant was enlarged to 36 million gallons per day capacity in 1995
with the co mp letio n 0 f Lake Pat Mayse by the U. S. Army Corps 0 fEngineers. The city now can
receive about 28 million gallons per day ttom Lake Pat Mayse in addition to approximately 8
million gallons diverted to create electrical power. The city ftequently drafts 4 to 8 million
gallons per day from Lake Crook.
Page 11 of 45
-". -.,
. . '
.0
.~
~ of Paris
Studr of Lake Crook
March, 2001
According to the Texas Natural Resource Conservation Conunission inspection reports, the dam
and spillway are in good shape needing only minor repairs to stay in compliance with dam safety
regulations. .
2.0.2 Water Quality. \Vater quality in Lake Crook is not nearly as good as it is in Pat Mayse.
Clarity 0 f water is 0 ften measured in NTU' s or turbidity units where the lower the turbidity units,
the clearer the \vater, Lake Crook has a turbidity usually between 80 and 100 whereas Pat Mayse
has turbidity in the 5 to 6 range. Turbidity manifests itself in water treatment by adding to the
chemical cost and shortening the filter cycle rates. More frequent backwashing is required and
more water wasted in doing so,
,'. ,~">'I'
, .r;...
"';'-- ".;;.;;..f"":~""~'-'" """','.~---"'.'.'..;'--". "",-,-,.----,".-"'-r--=:: -(8:s
~
....
,. .
-..;
Figure 2 Lake Crook looking west down the south shore
2.0.3 Lake Crook Data. Lake Crook has the following statistics:
A wa t e r surface area 0 f so me 1,226 acres 0 fland (Red River Aut ho rity ofT exas)
A storage capacity (originally) of some 11,000 acre-feet (3.6 billion gallons)
A storage capacity (presently) of some 8,530 acre-feet (2.8 billion gallons)
Water shed drainage area of 48 square miles
Total area of city-o\vned land and lake about 2,700 acres
Height of the dam approximately 42 feet
Length of the dam approximately 3,200 feet
Crest width about 16 feet
Construction: Clay core .. earth fill dam with concrete armor plate on water side;
Spillway: 300 foot wide concrete Ogee weir
Siltation rate: 50/0 per 13 years
Page 12 of 45
"
,"
~ of Paris
'Study of Lake Crook
-
March, 2001
,
2.0.4 Early Development Attempts. The city has occasionally pursued development of Lake
. Crook. In May of 1956, the city council appointed a committee to investigate dedication or lease
to th~ Texas State Park Board for creation of a state park on Lake Crook. The committee
unanimously recommended against the proposal in their report to the council stating that the city
would have to give up control of the watershed as well as other key and immovable obstacles to
such a dedication, In their written report the three-man committee also stated:
"Also, your committee was of the unanimous consensus that Lake Crook and its
surrounding properties are a valuable asset of the City of Paris, something of which all
of us can be justly proud, and is an area in which the City Council should in the future
give a great deal of attention to expending [expanding?] and improving the arealor
park purposes. II
They go on to say:
...
H. . . your committee respectfully recommends to the Council that a definite and
accelerated program of the improvement of the water shed area adaptable for park
purposes be initiated at once, including improvement of the access road to the park
area. Your committee feels that the City of Paris can do a great deal toward improving
the recreation areas of the Lake Crook property in such a manner as to make them
more usable by Ollr local citizens and at a cost which is within our means. ~Ve would
like to see increased expenditures and activities in this behalf in the immediate future. II
The report was signed by Robert McWhirter, Clark Estes, Jr., and J.M. Gladden in June, 1956.
In 1972, the city council passed a resolution authorizing city engineers to cooperate in a feasibility
study by the Soil Conservation Service of the U. S. Department of Agriculture for use of Lake
Crook as a flood control lake. The USDA reported in 1977 that, in order to be effective for flood
control, the lake would have to be lowered by 2-1/2 feet \vhich \vould benefit the property by
exposing 178 acres. The city agreed in principle to lowering the lake even though it would mean
a loss of some 2,582 acre-feet of water. The cost reported for channelization upstream, Lake
Crook modifications, access, fish and wildlife improvements and floodwater retarding structures
would be about $2.8 million in 1976 dollars with the federal goverrunent paying most of these
costs. Ho\vever, the city would be required to obtain additional land rights at an estimated cost
of$760,000. For whatever reason, this plan was never implemented and there appears to be no
further discussion. in the public record or news media.
Again in 1972, the city passed resolutions allowing hunting in specific zones around the lake and
goose and duck hunting upon Lake Crook itself. Prior to tlùs time much ofthe land had been
listed as a state game preserve until the state lifted that designation sometime around 1970.
Some areas around Lake Crook are now or have been under lease particularly the Archers for
Christ, Maxey Black Powder Rifle Club and the Paris Gun Club. Each ofthese clubs have made
improvements such as the installation of target ranges and shelters on their respective leases.
Page 13 of 45
",. . ' , ,.
"
..
~P~ris ,
Study of Lake Crook
March, 2001
-
-. ~,~ "
The city closed NW 19th Street in
the late 1980's as an access at the
poiQt where the electrical
transmission lines cross the road
south of the developed city park on
the southeast shores of the lake, . .i<c'
~."
The city had experienced a rash of ~t> ;t
illegal activities in the park and \...:. ' .t:' .
voted to close the street to facilitate ~ . .: ~l~::
locking the park at night and better
controlling the criminal elements
which had laid claim to the park.
,
':":';~(;7.;:
. ,,',.'"
....
2.1
CURRENT USAGE OF THE LAKE CROOK PROPERTY
2.1.1 Improvements. The city has installed two boat
ramps on the south shoreline near the water treatment plant
and has a small fishing pier bet\veen the two ramps. A metal
. building picnic pavilion approximately 80 feet by 120 feet on
i a concrete slab foundation has been added in recent years.
Also in recent years, the city has embarked on a steel post
and rod barrier system to keep users' vehicles on the
designated roadways and not allow vehicles up into picnic
areas or open spaces. Roads have recently been plowed and
re-graveled and leveled \vithin this park. City forces have
also thinned and underbrushed several acres 0 f parkland.
~.~-_.",. -=-:-~
-- .. . ..:~_..... - - ,
'. ';..~. .. ., -- .,:, ~ The gun and archer clubs have made limited improvements
~..~.." ,..~~~ t hro ugh the co nstruc t io n 0 f targ et ranges and target trails
2.1.2 Access. Access to Lake Crook is severely limited,
Two roads, one designated County Road 32900 and one a
Figure 4 Park road city road designated Lake Crook Road (formerly C.R.
31700) provide the only access into the city park on the
south shore. The Lake Crook Road is very narrow and in poor condition. It was never designed
to carry sigrúficant amounts of traffic and must be upgraded lithe south shoreline of Lake Crook
is to serve as a quality recreational area. Many of those surveyed in the mail-out indicated they
did not know how to access the park or were afraid to access the park on the only available
Page 14 of 45
,e
~ of Paris
StudLof Lake Cro~k
March, 2001
, = _a ..sL
-_..~
. '
routes, County Road 32900 is a windmg narrow country lane designed to serve the fe\v local
residences along that road. It, like Lake Crook Road, \vas never designed to carry high vehicle
coun~s which \vould or could develop if the south shoreline is improved substantially. The
consultant estimates nearly three quarters of a million dollars will be necessary just to widen the
roadways and resurface them.
As mentioned earlier in this report, N\V 19th Street has been closed for over a decade now
ostensibly to prevent any criminal element úom having a second escape route in the event they
are approached by police patrols, NW 19th Street úom Loop 286/US 82 north\vard to the closure
is nearly 7,600 feet in length and passes through a lo\v to moderate income neighborhood of low
density population. If reopened it would provide limited access to the south shoreline.
The north shoreline is available OIùY on foot or horseback under most conditions and via all-
terrain vehicle or four wheel drive vehicles under the best of conditions. The city property
actually úonts 2000 feet on F.M. 1499, a recently rebuilt farm-to-market highway but it is about
2,500 feet úom the fann-to-market to the closest shoreline, Other access is afforded only
through locked gates via four \vheel drive vehicles from Caviness Road (C.R, 32500).
..,
Caviness Road actually crosses the upper (\vest) end of the lake and limited, portable boat access
to the \vater is afforded at either ofhVO small bridges. The Archers for Christ club and the Maxey
Black Po\vder Rifle Club access their facilities inm1ediately off Caviness Road whereas the Paris
Gun Club actually enters otfofF.M. 79.
2.1.3 Adjacent Land Uses. A significant portion of the south shoreline property o\vned by the
city is itselfbordered by Campbell Soup company property used as a spray irrigation disposal field
between NW 19th Street and Lake Crook Road. This spray disposal system creates a serious odor
problem according to reports from
the neighborhood, especially in the
heat of the summer when the wind
is ITom the south.
Other than immediately adjacent to
NW 19th Street where sparsely
populated residential ~
neighborhoods are built, land south -. "". :,' 1 :.')"': ' ."" ,'~",.. -: '
of the lake is largely unusable ~'.":'c'" ,:" ,},~~ il~t.4;"""~"':" . ~- "
-' . .... ' , ~'.. IW~:.~;, ,..,'" ~~...
I d d fl d 1. b ~.,.' . ,~ ""'o1~-i° ':""';'~'~~~:o.: ~~~..:...,.;t.~..
wet an an 00 p am etween . .." 0' .i~!-~~;;;'-" ~.':i;"r-rš.,~ :':::r~.;D::~;t, w...lIi~~~"'t.~~,~.~'-~
. .o;.Ç. .~;,. ~~~;-: . . .,' '~~""""~~" -~.
th . ""'~- . 'e ' ...:::.:....~:'¡"'-~,- .0".' .::,:":,,,,~~~,"~'~,~
NW 19 Street and Cavmess Road. ..:,=~~;;š:", ~.~.... .. ,~"1f.'-:.. . ,¡..~;o ,-:;:.:'-:.>. :. :.:;:"""~ ~/'~.~'-:';:~~!r~'
.. - ~.~. '"......~ . '...~..," .~ ~ ....." ."';::". ....' ,--.,.:,\~ .r-:.
The gun and archery clubs occupy.' ~fì'~~~i'!l~j-'¿»f:\;~',:~:;~%{~ì8::{'f'~:f~
about the only 'develop-able' land ~~.-:~~..........~c-f".:_'" ."-~' . . ".""'. """"'-~ !'... . .-' .' - !":~~'~~~
th t d f th I k Figure 5 Northwest comer city property at Cavmess Road
on ewes em en 0 e a e
along Caviness Road. Proceeding
north of these clubs on Caviness one quickly runs into heavy wetlands on either side of the road
all the way to the city's north boundary line where it crosses Caviness Road, There are no
occupied dwellings anywhere along Caviness Road acrosS the city land.
Page 15 of 45
..
if
~ of Paris
Stud~ of Lake Crook
March, 2001
,
The city land on the north shore is heavily wooded with underbrush. Further nort~ above the city
property, are scattered farm and ranch land and sparsely developed subdivisions with scattered
dwellings.
The east side of Lake Crook is where the dam and spillway are located and a large portion of the .
land between the dam and U.S. Highway 271 is flood plain and undevelopable.
With the exception of the city's property west of Caviness Road, all the city property surrounding
Lake Crook is annexed into the City of Paris.
2.1.3 City Utilities. At the south end of the dam is situated the City of Paris 36.0 MOD Water
Treatment Plant \vruch pumps water through three large diameter water mains all the way into
ground storage tanks in the northwest side of Paris. From these storage tanks, booster pumps
lift the water into towers for general distribution. To use water from the plant would require
construction of ground storage and booster facilities and possibly even a new elevated storage
tank since the lines between the plant and the ground storage tanks are not pressurized at all
times.
....
To the northeast of Lake Crook, about Y2 mile east across U.S, 271 and north about two miles
from Pine Creek is the City of Paris Wastewater Treatment Plant. Any sewerage systems on Lake
Crook would have to flow east with Pine Creek until it intercepted se\vage trunk mains running
roughly parallel to V.S, 271.
Because of the confluence of several small drainage sub-basins into the north shoreline of Lake
Crook, any sewer system development along the north shore would likely have to be "lifted" by
a pump station east to a point where the sewer could gravity flow to the east. As many as five
lift stations could be required to serve the entire north shore, These lift stations would not serve
great areas ofland beyond the city owned property because there is a significant drainage divide
between Lake Crook and F.M. 1499.
2.1.4 Leases on the Land. As ment io Red earlier there are principally three 0 rganizatio ns using
land around Lake Crook,
Page 16 of 45
..
.
~ of Paris
&
_n.- -, ~tudt~!~ake Crook.~ rp~
_._--,-~~.
l\larch,2001
~ I
F' 7 P 'G Cl b 1 F M 79 Figure 8 Archers for Christ lease on Caviness
Igure ans un u ease on ,. Rd
The Archers for Christ organization has had a
lease in the past but rene\val of that lease has been placed in limbo pending completion and action
by the city on this study, The Archers for Christ actually occupy small target ranges on both sides
of Caviness Road and frequently utilize other, non-leased land for hunting and special
competitions or '.shoots" during the year.
2.1.5 Hunting and Fishing. Hunting is allo\\'ed on certain areas of city O\\l1ed Lake Crook
property by ordinances passed in the 1970's and subsequently an1ended. Duck and goose hunting
\vith shot guns (and not rifles) is pennitted on the open waters of the lake. Only bow hunting is
allowed on the north shore and on the upper \vest shore \vest of Caviness Road and above the
Archers for Christ lease. Shot gun hunting is allowed in the large flood plain area south of the
lake down to F.~1. 79 and up along the south shore to \vhere the park road is closed.
Hunting is not permitted in the public park on the south shore nor around the water treatment
plant and below the dan1.
Fishing is allowed on the lake in accordance \vith state fishing laws. There are currently no
restrictions on boat size or horsepower on Lake Crook
2.1.6 Other Users. The lake has been used in the past for water skiing and ski jumping training
or competitions. In 1975, the ski jump ramp \vas removed with the concurrence of the Paris
Water Skiing Club.
The lake has also been host to Touchstone Energy Longhorn National Drag Boat Racing
competition, the most recent being in July, 2000. There are no publicized plans for additional
racing on the lake at the present time,
Page 17 of 45
~~ :
. . -'
, .-
I
"".,
,,'
.....
i'
" ,,'
','
'. ~ .-.' ,
"". I
i
\.
"
Ih1Ø ...;'
'".
¡,¡u
. . ,
':'-'
- "-
" ':--
"'='
.~
FARM
AND
RANCH
LAND
CI
.
,'"
~
o¡,
. ,t ' .. ,,' ;..-
.' ""',
t:¡.
I
~:I
FARM
AND
RANCH
LAND
VI
(.100~&~.
"
" .,
_--,-"
. ;, I
I
. I
i
""--1
",....' I '" ,',
I :, ',\
I '..,
! '. ,
,
í
- -~':"-';';.- -'-'
,'i"I' .11
. "-"
;.. -'.'
. ':'
, '
..
", I" ..
;
,
, , ~
, 'I
, . "s
I
,
i
I
,
;p;1
:;!
~:
~t
, :r:1
"
w~ -~. .., ,~
%?Mdt.
'-./',~'~.:' r~t
. '~;;:,;;;.ý~
::'Y?y.j ,
=-,.,' ,:,.~"::1z;,t
':7Î~:;ij:~;.:T;~::::~i {It
' """';"<"
. <,ii~.\ ~
, ~;:,:' { ,
:~~~, ,
. , ./,.,CAMP!f.,E;LL/~,..~.,;.,.../"...,... :~/"":'X': '.)u
.. ";"',: :/t-:;:-:-'.SOU' P,.,//;'~'?,f;{~t/,'%;;:¿;:-:'/":,:,;," :':,/;:~./:~:
,$/",.. """'. '/""/.~?:/."<""/.-""""""',"""'/':'/;--""
. ',/,', {C.;;'~(!-%;{'{{{*,t<é,":':~~?:~;:,
'" , ..",
~, ."'" --t?)~'J.II~r~l\~i};:¡i: '
~ ""', ,/",.:~"t.../":,,,,/;:. "<'~"i?"/:"'J
,.. \~~,_.-;J~~~fUg{~J"¡;r ~
..'
.
.,. '
I
,. ,
'w.... hnk~ I
, , I
?'
FARME'"
AND ~~
RANcii
T' A ND ~
, >,'::;i(:',~,,;,
::<':!;:":, ~',:;:';:':",,' ",'..,
- ,.-i-
!
,
,,'
"'"
'~
.'
'"
~
,,:
,
~
.~
...
I - '
~,
~\
...
,,' ;
'R
::'. rC
~i( ,
,...:.:-
p" ,
dib'
. ,,~111~
,~, )1
" ~ .
.. '\
,
",
i,
, '
'SI
';.--.""~
I :~:
f...1
,e-;,.-, ' ~::¡
....~":" *,'~" '
~. '"
'....,' '.1:"
LEGEND
. 1'Iæ1/lOUS~" ~ MOt!I1S fCß.
CK'Isr. N:, H!D'Øtf I'.HoICZS, 00'e~ ma
~NlQ.f ~, HIf) ØQN tUomNG
II CItY Of' ,,- _Ir næAf'I\.-£NI'rIJ'HI'.
Mia sna.cruræ HIf) '(1NA
. CII'Y Of' ".MIS 1Mf'II!OIIt'(1 "H:7. LHIf).
~. C/'INr ~S. f~ f'elr. ø<N\f
D I'IæVlOUS L~-Q.'(1 ~ "-""!IS ~ a.1.Ø.
ma :\HOOfING ON. V, ~f / trtN
. I'IæVlOlß LEI\SeHOL'(1 rlV ~V I/I'LE HD
"....00. f'0NI7U(. c:uI Q.ID. IlHJlZ ~
ON.Y
"
GRAPHIC SCALE
0 ~OO 1000 2OCX) ~ ..000
I J
~
N
~
.ON CO.f>
~ :..c
'" 0
1r~: .~E
., ~
~ol ~O
r
s
-.... CII
_1ft CII
- ~
IfAI: .-
.
,
:
,
n
;
¥
Q
~
a
Ii
i
.
.
...
¡;;
CD
...
.
(/
~
{a
VII-
taJ
VI
:11 Z ~
::::..: '"' ~
<0 ~ 0 Z
o..OCloZ::::'
. ~ <0
ÔU~..JU
>-I&:e-CO:
¡...:':VlZ<
-;S<-~
u ~f-o::S
~
><
taJ(/
¡¡:
«
g.
~
IIOIt II[.-s
.~..c.,;,'":i
8CØ1III.
2
I
1
I
I
!
..
t-
~ of Paris
Study of Lake Crook
March, 2001
I
3.0
,
POTENTIAL USES OF THE'LAKE
3.1
OBSTACLES TO DEVELOPMENT
3.1.1 Water and Sewer Availability. As discussed in paragraph 2.1.3 Public Utilities, in the
section on existing improvements, there are currently no public sewer or \vater utilities anywhere
on the lake except at the water treatment plant itself. Since water is pumped into town only when
ground storage tanks in Paris dictate it, pumping is intermittent. A pumping station utilizing
either variable speed pumps and ground storage facilities or conventional pumps and elevated
storage would be required to distribute water to the south, west and north shores of the lake. A
large development involving a thousand lots or so would dictate the need for elevated storage for
maintaining pressure,
..,
Sanitary sewer is available only through the use of several lift stations scattered along the shore
lines, Because there are at least five sub-drainage areas actually entering the lake on the north
shore, it would be necessary to install approximately five separate lift stations to lift se\vage east
to the dam where the sewer could gravity flo\v eastward across U.S. 271 to the existing sewer
trunk lines. An alternative solution would be to install a pressure system in which each home
\vould have a small lift station of its own to lift into a small diameter pressurized main. This
would obviate the necessity for manholes or gravity lines throughout the housing development
but would require more long term maintenance in monitoring and replacing individual home lift
stations, Current TNRCC regulations require the city (or other utility company) to monitor and
maintain the individual home lift station units even though they are installed on private property.
An imperative in the use of the larger lift stations and gravity mains would be a provision for
generators at each lift station to provide alternative power supplies in the event of loss of
commercial power. Another concern would be the use of secondary containment around lift
stations to contain any sewer overflow before it could reach the lake,
Earlier in this report we discussed the special water quality regulations for Lake Crook that
dictate I-acre minimum size lots for anyon-site disposal system. The consultant further
recommends that no septic fields, lines, or tanks be permitted within three hundred feet of the lake
or a stream leading to the lake,
The installation of a water distribution network for any residential or commercial development
of the shoreline properties should only be allowed with large diameter pipe (6-inch minimum
diameter) designed to carry fire flows into the neighborhood. Fire hydrants and valves should
also be required in keeping with the city subdivisio~ regulations.
3.1.2 Watershed Management. Lake Crook has largely been replaced by Lake Pat Mayse as
a water supply for the city. However, the city does occasionally draw several nùllion gallons of
water per day and is permitted up to the equivalent of 10 million gallons per day per year. That
fact and the use of the lake as a contact recreation and fishing lake make it imperative that the city
impose strict development regulations concerning uses along the shores of the lake. A suggested
list of regulations occurs on page 35 of this study.
Page 19 of 45
..
~ of Paris
Stud~ of Lake Crook
March,2001
,
There should be severe limitations on the 'use of insecticides, herbicides, and fertilizers on lawns,
gardens and landscapes. Almost all insecticides for home use carry warning labels conveying a
stem. threat of potential environmental damage to fish and birds if the product is misused.
Although monitored by the city's treatment plant staff and laboratory, nonnal filtratioI} methods
at the city's water treatment plant are no t designed to remove these types of po isons from water.
The city should restrict potential silt damage to the lake during the construction of utilities,
roadways and buildings. Erosion control plans must be developed and adhered to by each of the
parties involved in building subdivisions or homes,
The clearing of trees and vegetation should be closely regulated to prevent potential erosion
damage to the shoreline.
3.1.3 Legal Issues. The consultant is a\vare of Section 253.001(b) \vhich requires that land held
by a city as a park may not be sold unless the issue is submitted to the qualified voters of the
municipality and approved by a majority of the votes cast. Section 1508.006 of the Texas
Government Code further requires an election if the property is sold or encumbered for more than
$5,000. Case la\v has extended these provisions to even cover long term leases of property.
..,
Chapter 272 of the Texas Local Government Code contains provisions requiring a published
notice and a sealed bid to sell or exchange land. Once again, this la\v has been ~xtended by case
law to cover long term leases as being comparable to an actual sale.
The consultant is not qualified to practice law. We do not knO\V \vhether the use of the property
for hunting, hiking or similar uses renders it as "park" land and therefore subject to an election
or not. Certainly, however, this is an obstacle to overcome if the city council does decide the sale
of land is in its best interest. We point out that one citizen could effectively shut down the
process of selling land until a ruling could be issued in court months or years down the line.
3.1.4 Logistics to a Sale of Public Land. Hand in hand with the previous discussion section,
the actual transfer of land to a developer may prove to be extremely complicated. For example,
no developer will want to bid on the property without conducting his own feasibility and due
diligence study to decide what the land might be worth to him or her. Most developers, faced
with a competitive bid situation, may not be inclined to invest the money to conduct such a study
on the off chance they may 'win' the bid. Further, the potential bidder may be reluctant to accept
the city's own study as being sufficiently thorough enough on which to base a bid for possibly
millions of dollars. Given these difficulties in preparing a bid, potential bidders will be reluctant
and competition will be scarce. As a result the bid prices the city receives may be artificially low.
3.1.5 Campbell Soup. The nuisance odors created by the surface disposaf of irrigated waste
water on Campbell Soup property is apparently well known in Paris circles. We encountered
dozens of individuals who stated the odor is so strong that it can make one ill to the stomach at
the very worst and keep citizens indoors at the very least. Campbell Soup does not appear to be
altering their disposal process and have millions of dollars invested in their land disposal system.
A developer considering Lake Crook will not take this problem lightly. It may be a substantial
Page 20 of 45
~
~ of Paris
Stud1. of Lake Crook
March, 2001
.
enough problem by itself to inhibit the såle of property around Lake Crook.
3.1.6. Water Clarity. While it can generally be ackno\vledged that Lake Crook is an asset to
the City of Paris, can it be likewise acknowledged that Lake Crook is a muddy, turbid body of
water, a fact \vhich detracts from its potential beauty? Lake Crook is not th~ same as the Villages
of Lake Palestine, Holly Lake Ranch, Hide Away Lake, Lake Cypress Springs, Lake Ouachita
at Hot Springs, Arkansas or any of the more famous regional lake developments. These lakes
have clear, sometimes spring fed water.
During public participation meetings, several individuals brought up the subject of dredging Lake
Crook. Cleaning an 80-year old lake of siltation is an expensive task. There are essentially two
methods which can be used. One is to drain the lake down and allow the bottom to harden to the
point where standard earth moving equipment like scrapers, back hoes or drag lines can remove
the silt. This may take years given that you must have a dry period for the lake bottom to firm
and for silt to be de-watered before it can be hauled off. Further, there is no way of lo\vering
Lake Crook without constructing some alternative pipe spillway, building a siphon, pumping, or
breaching the dam. All of these are costly and breaching may be unpredictable. \Ve do not
recommend any consideration be given to breaching the dam.
..,
The second method is to use shallow \vater barge mounted dredges. \Vhiterock Lake is the most
recent success story. This urban Dallas Lake is almost exactly the size of Lake Crook and has
nearly the identical square miles of watershed. It also was built in the 1920's. Whiterock was
dredged in 1995-1996 at a cost of nearly $14.0 million which included a 17 mile force main for
the dredgings to be pumped to an abandoned gravel pit near Duncanville. A similar project was
completed two years later on a larger lake for the City of San Angelo. Their dredging project
cost a mere $9.5 million but land \vas available adjacent to the lake on \vhich to pump silt. Based
on these and other dredging
projects with \vhich \ve are
familiar, we estimate a dredging
project for Lake Crook would
cost between $5.0 and $6.5
million dollars. A permit is
required from the Army Corps of
Engineers and from the TNRCC
before dredging can be done.
The chief ad vantage to dredging
over lowering of the water level is
that use of the lake is continuous. .'.
even \vhile dredging is taking ~ ~:.;'
place. , . even for fishing.
Figure 9 Effects of erosion seen on south shore
Page 21 of 45
..
~
. .
~ of Paris
Study of Lake Crook
-
l\'Iarch, 2001
3.2
,
OPTION 1 - LOW DENSITY' NORTH SHORE DEVELOPMENT
3.2.1.Description of Option 1. This option proposes a modest, large lot development with lots
averaging one to hvo acres along the north shore which \ve will describe in this report as the
North Shore addition. Such a development with a large, stone wall and landscaped entry off of .
F .M. 1499 could be done in a rural style with split rail fences along the roadways and county road
section streets with very shallow "borrow" ditches. The paving surface would be asphalt under
this proposal, winding through the lush tree cover all along the shores of the lake. A minimum
of 222 lots could be platted in our estimation even allowing for several acres of green belt and
natural areas to remain unimproved or slightly improved with picnic tables. Even so, estimated
cost for a north shoreline subdivision with large lots is approximately $6,0 million
An additional unit described herein as the ~Vest Shore development would likewise be large lots
and conform to the description given for the North Shore development. This unit cannot feasibly
be developed independent of the north shore ifa central sanitary sewer system is required. West
Shore simply does not have enough lots to support an expensive off-site sewer system, The west
shore infTastructure development would cost approximately $1.98 million for construction under
a rural style set of improvements \vith on-site sewage disposal.
....
Under this Option 1 scenario, large areas of\vetland and flood plain are avoided and left in natural
state to be set aside as bird sanctuary and wildlife habitat. Hiking/mountain biking trails can be
built inexpensively through these habitat areas to connect the subdivision \vith the present so.uth
shore city park.
This option leaves the south shore for the development by the city into a community or regional
park. The south shoreline would largely be unaftècted by any development on the north shore
or \vest shore due to lack of access roads connecting the park and these ne\v subdivisions.
This option presupposes several things. One, the property lies wholly within the city limits of
Paris and therefore is subject to the city's ordinances governing subdivision development. City
subdivision regulations call for concrete streets with integral curb in subdivisions such as shown
in Option I, Cost estimates have been prepared and are sho\vn later in this section comparing the
cost of compliance with this part of the ordinance. Further, city ordinances would require
centralized sewer systems as opposed to on-site septic or aerobic systems. The city planning and
zoning officials and the city council may be unwilling to \vaive these sewer system requirements
even for large lots. Ifvariances are not granted, the cost of constructing the infrastructure for the
north shore balloons to $8.9 million and, for the west shore, costs escalate to $3.3 million. In
discussion of Option 3, a denser single family residential development, a table has been created
to compare the "per lot cost" for each of these different scenarios.
The Option I plan shows a 59 acre commercial parcel where Paris Ovn Club leases now. While
eventually this could be a valuable comer for local retail, restaurant/fast food, convenience store
and gasoline filling station, traffic counts may not be high enough yet to entice a commercial
builder to this site.
Page 22 of 45
~ of Paris
Study of Lake Crook
March, 2001
.
.
Table of Advantages versus Disadvantages
Option 1
I. Low impact development with ability to largely
preserve the trees and habitat.
2. Connects FM 1499 with Caviness Road with a
winding, scenic lake shore road.
3. Fewer lots means a faster absorption rate in the
Paris housing market and less impact on other
subdivisions than would a ten year or twenty year
build-out.
4. If aerobic systems were permitted, the sewer
system development costs are significantly lower
than other options.
5. If county road sections in lieu of concrete
pavement are permitted, the paving development
costs are significantly lower than with other options.
6. There would be a significant increase in the tax
base by some $44.9 million and tax revenues to all
entities would climb by as much as $1.2 million.
7. Sales tax revenue annually trom new resident
spending would bring to all entities about $300K
each year.
8. The water revenues would be expanded by the
addition of333 new customers.
I. Low density will render fewer lots for sale on
which to distribute the costs of development.
2. The development of commercial land along FM
79 is probably at least a decade away.
3. Residential development along a lake shore
brings with it the problem of fertilizer and
insecticide contamination of the water supply.
4. The lower dependability of on-site disposal
systems threatens the water supply.
5. County road sections, while cheaper to build,
cost more to maintain due to ditches and culverts.
6. Hunting should be curtailed on all city property
if this option is selected due to the proximity of
homes.
7. Leases to archers and shooters should not be
renewed because of noise and threat of flying
projectiles near homes.
8. The water system would be greatly expanded and
require a new pwnping station and higher
maintenance.
9. The sale of public land is difficult. If the city
acts as developer it puts the city in unreasonable
competition with private enterprise.
10. It could overtax public safety services such as
lice and fire at resent staffin levels.
Page 23 of 45
,... -. - - .,.
II II 8 I
Ii Ii I.
I i I. ¡
-.. .- '....
-
f f",~¡¡fk ~¡~~:~{ ti, i \( ~,;!; R1~ii~'¡I; ~~~';~J
~~~~,~~":{:~:~~:~;"~~:'¿'~'i'\.~~~~.'~:':-~'\'§r~£.~~~,~ ~
~~~_a~
S"tX3J. AJ.NaO:) HYKV1 SUIYd
J.N3f{d01:iA3G 3110H5 .LS3A\ "i Hl1l0N
I NOI.LdO
NYId lI:USYI'( >1001(:) 3)(YI
SHlV.1 .:10 A.I.IJ
~.
-- - --
I11IS8JM
'~~ t §~ ~
~~ es §Q ~9
1~ kI §n
I ~ ~
~~ i~~ §i~~ ~~ r.:¡
~ Rt1~t: -oqlt: .
! - ~~ ~ ~i ~ en II
.. ~ ~
n ~~ ..:I!~ ~i~' !::~ ~~ ~~: ~~
~~ "'~5 ~ "'~ ~!~~
§N" ~ ~ ~ ø..,
~C) Q~ ~~n"'.
8t~ It'" ~~~ ~>~~ !>~~ ~§ f
i¡ II Ii §~ ~1! ~t~1!
~~ ~~~ "~9~ "~9, t.-'- IiIr:
..tI .. ",\I ~
~õ(~ ~i~¡~ i~~~~
. II 5v 0
~æg e @
~~
-¡, , ....- ,
. i ' ,,}
.:r',.. -- ~;:>..
I - -'..-....¡.-- '
,---'-,._- '\
, , .----
\ ' " ,,' ' Ñih¡¿'ioN" , _. ~:~ -'~!Ñiñ;'9~-
, I ,ó!
, 1 '.
I
.0 "" . A:!~' , ..',
~~'- ,---1- ,,7 ~:z;;.' "
, "':l~: '. '. -' ".',' """;';
::,~
, -_...~-, ,0, '
;¡.{".i' ::- "
""'() ;' 'I
, :/' "'F(
"" ,: ,
/lI:l '
- ';1Ii./' ,""
- ..,' "
,;-, .
,,~
, . . ;) ,..
;~ ~ ,,1;, to..'
,-~-:.. '" ----._-~.3o..,,: -;:;
, '," , , . '- ' a'=;:~--"'~,-
, .-- ,-' 'L.' """"'...
.-""'-- I, ',.o-} ' ,
i '\',~~.f,'\.J¡.:.,"r~
, ~ 't:,,~.¡"Þ'i..¡¡~í;/
I!, :::¡;,t~~¡o:~
,i".",tj; .
I .. ,
.I
.
,
.
~
,.." ,,---
,- .. '
. ,
It'
..
. '-
.. ""
!
, .-'
",
¡
;,," ,
- ¡--' -. -. --. ---'-"'"
--' , .. ..
",', '
',I ,'-:,',
,~'. '..J-.~-,-.-
,,'
"I
, . ~
"', --:
--'"
I
,0'
l"
,"
',: :,',
;,¡ .-'
"
',-, '.'
,I
11(' '"
,"
- ,.,
,
;, "
, ",'
ï
,
, -.-"
,
, .
! .'-,_.-
.., ".,,'
'¡ ,,-,--'~'""'- '
~
..
..
I
. .:. ...". .
""
..:'
".
.
..
.. - -
"Ó
...
)1&,
0'
't "
u'
T ¡
"
,,-'
'j
~
( ,
. ,
::
..
"
..
,.'
~
, 7
"
.
~
:,.--'
., ,"-
,
I '
"
a
. I.-
,'/, .
~
3
"'-.
,:" ,I ','
'"...,-
4
" ~'"
. C'
'-
:...
,
,
PRELIMINARY OPINIONS OF COST" . , ".,' " , . "" "... " :
F,OROPTION I ~ NORTH AND WEST SHORE DEVELOPMENT. ' " . " i
LAKE CROOK STUDY' '. .,' ,'. , ' " ' ,,12 JUNE 2001 . ¡
he following information is intended to show the relative costs of development under this scheme versus other options and
s based on the consultanfs experience. Actual costs may be higher or lower than these preliminary estimates. Estimates
re not based on substantial engineering surveys and data which may later reveal obstacles or possible savings in cost
em Description
Concrete Paved Streets and Sewer System
NORTH SHORE:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6- - 12- size; fire hydrants, valves
5 Off.site 12- water line from plant to new ground storage
6 0.5 mgal ground storage; pressure pumping station
7 On-site sanitary sewer lines; 6"-8- size; manholes; cleanouts
8 Submersible pump liftstations; force mains; wetwells
9 Off.site 12- gravity sanitary sewer to existing trunk
10 Dry bore and casing; U.S. 271
11 Monolithic concrete curb
12 Reinforced concrete pavement
13 Entry way signage; lighting; street signs; traffic signs
14 Landscaping entrances and common areas; irrigation
....
WEST SHORE:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6- - 12- size; fire hydrants, valves
5 Off-site 12- water line
7 On.site sanitary sewer lines; S-.8- size; manholes; cleanouts
8 Submersible pump liftstations; force mains; wetwells
9 Off-site ë force main to North Shore
11 Monolithic concrete curb
12 Reinforced concrete pavement.
13 Entry way signage; lighting; street signs; traffic signs
1 ~ Landscaping entrances and common areas
Subtotal Construction
Surveying, platting, staking
Engineering
Contingency (10%)
Estimated Units
Quantity
45.1 acres
25 ea
330 sta.
33000 IJ .
6000 IJ .
1 LS
30000 IJ .
5 ea.
11000 IJ.
200 IJ.
66000 IJ .
121000 s.y.
1 LS
1 LS
Unit
Price
Total
$8,000
12,500
2,500
22
32
350,000
25
85 , 000
34
160
6
25
40000
80000
$360,800
312,500
825,000
726,000
192,000
350,000
750,000
425,000
374,000
32,000
396,000
3,025,000
40,000
80,000
$7,888,300
18.9 acres $8,000 $151,200
12 ea 12,500 150,000
14 sta. 1,500 21,000
1 4000 IJ. 22 308,000
3000 IJ. 32 96 , 000
14000 IJ. 25 350,000
1 ea. 85 ,000 85 , 000
3000 .f. 20 60 , 000
28000 IJ. 6 168,000
51400 s.y. 25 1,285,000
1 LS 20000 20000
1 LS 40000 40000
$2,734,200
$ 10,622,500
133,200
333,000
1,062,250
$ 12150950
Total Cost: Construction a tion I
.
.
, ' ",' , . . ,I
, " FOR OPTI?N I-, NORTH ANDWEST SHORE DEVELOPMENT,' ' ,:', ' ¡
, ,"'.',' , ' , " I
m Description Estimated Units
Quantity
Asphalt county road section and on-site sewage disposal systems
NORTH SHORE:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6. - 12" size; fire hydrants, valves
5 Off-site 12. water line from plant to new ground storage
6 0.5 mgal ground storage; pressure pumping station
7 Flexible road base on compacted subgrade
8 Hot mix asphaltic concrete pavement
9 Entry way signage; lighting; street signs; traffic signs
10 Landscaping entrances and common areas; irrigation
....
WEST SHORE:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6. - 12" size; fire hydrants, valves
5 Off-site 12. water line
6 Flexible road base on compacted subgrade
7 Hot mix asphaltic concrete pavement
8 Entry way signage; lighting; street signs; traffic signs
9 Landscaping entrances and common areas
Subtotal Construction
Surveying, platting, staking
Engineering
Contingency (10%)
Total Cost: Construction Option I
45.1 acres
25 ea
330 s13.
33000 I.f .
6000 I.f .
1 LS
88000 s.y.
84000 s.y.
1 LS
1 LS
18.9 acres
12 ea
14 s13.
14000 IJ.
3000 IJ.
37000 s.y.
34000 s.y.
1 LS
1 LS
Unit
Price
$8,000
12,500
2,500
22
32
350 , 000
12
12
40000
80000
$8,000
12,500
1,500
22
32
12
12
2 0000
40000
Total
$360,800
312,500
825,000
726,000
192,000
350,000
1,056,000
1,008,000
40 , 000
80 , 000
$4,950,300
$151,200
150,000
21,000
308 ,000
96,000
444 , 000
408,000
2 0000
40000
$
$1,638,200
6,588,500
133,200
351,365
658,850
$
7,731,915
Notes:
This cost analysis does not include the cost of advertising and marketing; sales and legal expenses; promotions;
maintenance during sales; lot preparation for building; or amenities.
The installation of gas, electric, telephone and television facilities is assumed to be sufficiently cost effective due
to the density of development that there will be no cost to the developer for installation.
.'
~
March, 2001
I
£!!,v of Paris
Study of Lake Crook
3.2.2 Recommendations Concerning Öption 1. The consultant, recognizing that the plan has
significant environmental attraction to it by preserving vast amounts of ground for wildlife habitat;
cannot support Option 1 as configured now. The cost per lot is too high to make it a viable
projeèt. We could support t~e project more if the West Shore part of this option \vere not
included due to the poor access along the county road. Soil conditions and high water table make
it difficult to maintain a high quality, heavy trafficked road along the wetlands on both sides of
Caviness Road. Since it is not in the city limits, but borders the city limits, it is unlikely the
county will expend vast amounts of money to upgrade this road.
We further could support Option 1 if the development of the commercial tract \vould be deleted
ftom consideration and left in a natural state for several years to come. Without the West Shore
development, the commercial tract development would be seriously impeded.
Whereas private roads on the north shore could reduce initial costs of construction and defer city
maintenance ofpaving and drainage for years to come, \ve believe the citizens are not best served
by prohibiting ftee and uninterrupted use of a road along the shoreline. A north shore
development should be designed to later extend streets and utilities north into other lands when
these other tracts are developed.
Finally, if the \vest shore and the commercial tract were not developed, \ve can support the
concept ofrenewing leases to the gun and archery clubs feeling they \vould no longer be a hazard
to any nearby homes.
3.3
OPTION 2 - FULL RECREATIONAL DEVELOPMENT PLAN
3.3.1 Description of Option 2. This option
provides for the immediate development of certain
tracts of land, especially the south shore park, as
formal park improvements \vith improved fishing
piers, campgrounds, playgrounds, group picnic
shelters, family picnic shelters and tables. Other
areas would be left undeveloped and promoted as
váldlife habitat and hunting property, The archery
and gun clubs could retain their leases and ranges
under this option with some re~trictions, Longer
leases (twenty or more years) would encourage
these clubs to make more meaningful investments
into the property in time and money. Short term
leases (year to year) will discourage this investment
entirely.
Expansion of a hiking/biking trail along the north
shore is shown in this option, looping all the way
around the dam and spillway and tying back into
the developed south shore park. These trails would
Page 26 of 45
, i
" "I
,
Thi.1 Par\: will bto. Iccktd during the boars or .~)
IO:<JO p.Jl'l, Ib G;C)4) I.M. '
T!rt "~I1I31üi! I.J un ~ pl1k herOIc r~ÙI' is ßt r:estJ."
Aayoae Io<Ud i. I~ park din J>:CO p.=. Þ1)' CCClt.ad:':
tJu~ W2ttf Tratz::t:( Pb:IC a( ';$-4-%41)4 or .
t~ Puis Polit, Dep&..tllud It iSt.&1!ð3. ,:?
~, ,:tIlIft~ t!óI ~:. Ia! jIIOjIdIlt tt.I W. r,. M u,¡,:~
Ikmal" Am tli ~ J1\w1TI4 ~ ,...1i2I* "no rvle ud .~~;
.fONI:øz_~~~ :tlSS-õ5IJ ElL zs¡) , . '\""",~.'
. ,.:t~
'. . '::::~¡
, . ""~'
.'
,.
£!tv of Paris
Study of Lake Crook
l\'larcb,2001
I
,
be cleared, unpaved paths through the woods with underbrush pulled back away from the trail
for safety sake. In some unusually steep creek crossings areas foot-style bridges would be needed
and c~lverts would be installed in major drainage paths. Signage along the trail would identify
location, mile marker, and hazards. Nature identification signs could be placed to point out flora
and fauna encountered along the trail. Maintenance of the trail will be inexpensive but still
required. Signs from time to time must be re-set and brush continually cut back from the trail,
In the past decade, the Archers for Christ have leased much of this property for bow hunting and
for trail type target shooting. Under option 2, Archers for Christ could occasionally use the north
shore for the same activity but with time constraints. Special events could be staged but when
the events are over the park reverts back to full public use. Areas used by the archers west of
Caviness Road would remain unimproved and available for hunting and target shooting by the
Archers with fe\ver restrictions, There need be no 'time sharing' of this portion of the Lake
Crook habitat,
The Wild Turkey Federation has expressed an interest in re-populating the north and western
shores of Lake Crook with turkey ifthere are no residences built under the approved development
plan.
....
In the public opinion surveys, several individuals suggested the need for \vilderness camping areas
for scouts and other groups to use. Our opinion is that the peninsula of land jutting between the
two fmgers of Lake Crook would be ideal for such a camp. Access to proposed restrooms and
parking lots can be controlled at Caviness Road to reduce unauthorized use, The \vildemess
camp could have minimal improvements such as earth paths and nature trails which are not
expensive to construct.
The north shore between the dam and F.M. 1499 is proposed in Option 2 in the long term as
another large, \vell improved public park perhaps several years after the south shore development
is completed. There is adequate room, behveen 100 and 200 acres, abutting F.M, 1499 to
construct numerous group picnic shelters and looping park roads. A north shore boat ramp and
fishing pier will eventually be needed and an excellent site for an amphitheater exists already. A
large rustic playground structure \vould be a \velcome addition to this park as the population of
Paris expands northward.
We have included in Option 2 an RV campground currently shown in the south shore park but
conceivably this R V campground could be placed on the north shore instead where access to U.S.
271 is much easier and where there would be little interference with other day users as there
would be in the south shore park. Our experience \vith these type campgrounds shows that with
very little advertising such a campground can attract overflow from state and federal parks. We
recommend controlled access and preferably a full-time lake/campground caretaker, perhaps even
certified as a peace officer or warden. The caretaker should reside at the park or near the dam
and oversee payment of camping fees, maintenance of improvements, and watch out for illegal
or ill advised activities on the land or in the water. A similar development on Lake Hawkins in
Wood County catches overflow from Tyler State Park and nets the county some $60,000 per
Page 27 of 45
.
.
..
Sv of Paris
Stud~ of Lake Crook
March, 2001
I
.
year. Unattended campgrounds, ho\vever, are not recommended.
A w~ll-built RV campground will also requITe bath house and restrooms on-site. In fact all of the
south'shore park needs restroom facilities which are light and clean. Controlling access to the
park, careful selection ofbuilding materials, and a full-time lake caretaker will minimize vandalism
to these structures. Package aerobic waste\vater treatment systems with subsurface disposal
fields are recommended for use with bath houses and restrooms.
Table of Advantages versus Disadvantages
for 0 tion 2
.;;i~\:::::(.-i.r.~:i;'~~:~:~;<f<~~t:;:;:!:~';::,~;,,:.,;.;~:::cc~'~(~i¿~~:t-;..¡t';';!;.'f:.:¡':~:,;¡:~~:!i~(þ.'i.' ~.:t.~~;~,. :f:~;;~.~j;V'¡f';~~~tt:~~~~:,,:.:'.::-~.~:~¡r~~y.:~,~~,\,:..i}~:- ..'
""".~..""'- ;"""""",."""""""..",~"..r.,,~:¡.--. """"""7~.~'.".~,'.' "~."""'."',""".",~','1f,<, "-,'"',r., .". rl,' .,,"",.,..,~.,' "".".', ,,~..1t.~.'WW~'ë'¡;'f;","'.. -,.,.')-!-,.r.¡;"'~..r,').~'c"~'~"-.,"',~f~,"".i'.".'
;Þ'.':¡j ~'f-'nïn;~i¥4.:t1 i~ f~ ~ i"'i( fr-, rfj"'~).;~'¡\¡;,~;)~J{.'¥;:i':'!:;(~~}!~ ~fi:;~" ~) J ,,(:iJi rr~îí1' ¡rt'i"7~"", . ~' t "tfí ri'I.i~i1 .
'"~:-.)::~';,,~.i\'-~.~.-='~ ~-:.~ :""".",'.. ~~-'!"~'\-! ,':í:\'~~':;~-;-';>::~';,~: ;:;"':L'1':.\,~'~';.?~'... . .;::-,~." ;-j-.,: ,:,,~~~~;';'.:.~l~':i;.~:~~~~",~, -'~ ,.~!~~~~!t;.~.~;.. ,
1. Preservation of the land for future
generations
1. Loss of the revenues from the sale of
land.
2. Development costs can be shared
through grants from various agencies
3, Lessees get to keep their leases for
archery and gun shooting
2 . Loss of tax revenues from developed
lots.
3. Costs of development with little revenue
to offset the costs
,..
4. Recreational benefits afforded the whole
city and not just a few developers and
residents
4. Loss of\vater/sewer revenues from a
developed subdivision
5. Tourist dra\v for campgrounds and
special events.
5. Cost of developing and maintaining
adequate access routes into the park.
6. Maintenance costs exceed city's present
ability to maintain high level parks;
additional staffing needed.
6. Opens the property up to traffic and
reduces criminal activity and vandalism.
If the city is to adequately open the south shore to formal park development replete with
campgrounds and picnic facilities for hundreds ofpersons at one time, the access roads to the site
must be improved. We have included in this section the cost ofimproving the park as well as the
cost of improving each of three access routes. At least one million dollars will be necessary if
all three routes are widened and resurfaced.
With respect to priority, the improvement to Lake Crook Road is the highest priority and CR
32900 and NW 19th Street tie for second priority.
The access to NW 19th Street should be opened up even ifit must be gated for night time security.
Daytime traffic from NW 19th Street and Lake Crook Road will be essential to deter crime and
illegal dumping in the area.
Improvements to existing boat ramps and fishing piers is recommended. An additional fishing
pier is recommended on the north shore when that park is eventually developed. Several
Page 28 of 45
.
,
..
~ of Paris
Study of Lake Crook
March, 2001
I
.
re~pondents to the survey mentioned conStructing an indoor fishing pier hut on Lake Crook. We
favor the idea only if the city hires a full-time caretaker for the property.
.3.3.2 What about golf? Several participants mentioned golf as a possible use of Lake Crook
lands. While economic development grants and Texas Parks and Wildlife grants could be used
to partially fund golf courses, such courses after they are built must be self supporting, A golf
course with modest club house costs between $3.0 million and $4.0 million. Industry pundits say
36,000 rounds of golf per year are necessary to support such a course. If the city were to elect
to build a course there is certainly enough land on which to do it. Only about 200 acres or so is
needed for a quality golf course, the terrain is excellent and there is certainly abundant supply of .
\vater. An 18-hole golf course needs about 1 million gallons of water per day during grown-in
and about half that much during the growing season upon reaching maturity.
Alternatively, if a public course is not built, most developer-experts agree that 1,000 acres ofwell
planned subdivision will usually support a golf course through the homeowners' dues, trail use
fees, guest fees and enhanced lot sales prices. It is commonly considered the best of all \vorlds
to intert\vine the golf course routing plan with the subdivision plan to take advantage of fairway
lots, green lots and tee box lots as \vell as lake&ont and lakeview lots. In the present north shore
property, to install a golf course would largely destroy the potential for home building and vice
versa. The shape of the property with its numerous corners and narrows, would result in an
inefficiency for high lot counts, Therefore, in order to get 1,000 acres on the north shore, an
enterprising developer \vould have to acquire some of the adjacent, privately owned land.
It is beyond the scope of this study to analyze the development of private golf courses. In these
days of privatization, \ve are seeing more courses being taken out of the public domain than are
being built into it. There are companies that specialize in nothing but golf course feasibility
studies. While there may be some study out there, we have yet to see a study done where the golf
course was not proven 'feasible'. \Ve choose to believe, however, golf course ownership is not
a business the City of Paris should get into.
Page 29 of 45
"
II II II I
Ii . I.
I i I. 3
-........... ....
aoq
IUJS8JA
, ~~ a¡
~I. "~¡ ~~
i~~ ~>~ ;-; ~
,~~ ~I~ ~'IIJ
~Ru ~ ~ :: ~~~
~~~ ~.:I ¥)~~~
~~~ ~~~ ~e~a
>- ,~~ ~~~ ~~~~
~ ~~~ Lf::~ ~Q1ii8
- t~~ ~e': ~~~~
~~~ ~~~ ~~~~
~~e ~~~ ~L~~
@,~ Q
. . ""'.
:1 ,
I
'Il~
I "
:HI
. ',7:.' .
.'1 '
1 :. .' -,-
'
.' .
"Ó '
.. .
,)£,
o.
0 '
~ -
,u',
.., ,)
I I
, '
; /'
~
-. .
-
I
I .
t\~;':I£~~ij~}Ì;;,~ [ZfE:~.:~~)K;l;; ~~t¡~¡
~'i'~R<~rn.","t.~~~~.«:~....;,-..: ~>':;-;O ,~";"":~"~::"'" :~- ~.-'.,~.....
[;'~~~~~:-C;:~' <~.. ~~~~:~~'.l:':$.~';-;'.~:..~;;,.~~~~~'~~~~-ì.-1.~~~
..., :{".~~ ',~,s.~:¡.~ ~~,:~~:$.~'-~~;;,:<..,,~,~ ~~
~~.., "~ ;\.~~.:,,~'\.'\.~,
c(
~J.
.'\,-
¡§ ~ ¡ ~~ ~ ~
.~ Dl ~ ~~ ~ ~
~iq ~ ~~ ¡ ~
~a¡~ ~ ~ ii§ ~~ ~
~~~ ~ . ~ ~~~ ~g
~~~ ~~ ~ ~2~ ~~ ~.
~~Iii ~~ ~, ~~~ ~~ ~~
~U n n IU U ~~
~ GQ@ @E)
. .ú..'l~ -".-'.
,..!.~ ",: , ~;'~'-;L~..\"':¡,1~~::"",".,.;:
, '..
,
..
.
'. ....-
"ii ' '~ I r,. '-
-i:..,.._-' ;::~:r ,,' .; .. ,
1 ----i " '
1., ,- ih.----._._-~----_._---
\ '1--. ."'\ Nl/illUtION- --.- ~
t. .( ~
I ".:" .' ~
, :,: '"~' '~
,~"~";"'"~-:" .:.~ .-
,."" -- " ,~
::":',,', ~
~
~~
.~.
~"
"~ ,¡,',
'L
',', .\.
.'~,
~
~o
O~
v.
" , -
~'
. .' ~
, ~
, !.'"'
. .
I :a
-\
! I
- '."
I'!' ._",_.-.~.",
..ò-' ." ,- "r" I ,,' "~:.
, ,t.,; .~V",
; ",_)",:I.,.,..)"~' /~..'
SYX3.L 'uNfiO:> HYJ'(VJ SUIYd
NYId J.N3WdO13A3Q 1YNOLLYJHJ3H
ë; NOI~dO
fo¡"Y1d 33.LSVJ'( "003:> 3)fYI
SJUVd ...0 ur:>
II
J
-----
., -~ ~ ~ ~ 9
~ ~. III ~ ~ ~d ~
~~~ ~J J~ ~ ~~ ~ ~~ ~
¡;¡ lit ~ U! ~ Ii j j~ j
~~~ ~~~~ cl~~ ~ ~~ ~~ ~~ ~
~~~ ~I!~ I u~~ ~ ~~ ~~ ~~ ~~
~~~ . ~~~& ~ ~~~~ ~ ~~ ~~ ~i ~~
~~~~ ~~~~ ~ ~~j~ ~ ~ä ¡~ ~~ ¡~
~;:S~~ ~~~\J ~ ~Bžlll~ Bž ~~ ...I~ ...I~ ...IL
@ 0 0~ ~@ ~@<W
-- ~ - !í.fi~:;-"
:1':-"'J, ,I. &
'I .
" ',," or(
/;"',: ,
, " /11:""
I',--"'~_.,..'
;' ". "'.
I" ,,:.:'l
! ì, 4 , ,,- '~' :.
,a . -. 'ì;
--.;..--,-------- ' ' '~, .,.§ 'I ~t
NOJ.!Ntf14l(f( I .-----.'-----"..-- -----,----~,/I-_.'; ':'!~
I ' ' , , , , '-' ,\=;::.:--..~
'-~ -' - --' :...- . ,.. -, ..,. !...'~'~~~',' ...
-¡ .' I ~J~,~~,'~t.J'
, , , i1i.:-;M:, :.it..:.
, ,~' ""':':.}.r..",,'1
~ . -. -«.: 1~,:. '1.
"" . Ii.l
. "",
.1
.
I
.
\ "-1
~- ~. '.~~...~..o~'-~~
8 --'¡'"
~~~ ~CI¡
~ ~'r ~
: ~~n~
~
.... ..',..;..
., -' .. - . ,--_.
. "\
,I
~
g~
C/)
"~l
=x::
~§
e,:,-
~
, ,.0
a
0
"'~
@\
\ ~
'J'~' -"
...,-' "', '-,1@'
,~" .
, /
:: I'@':\"
@ ~"".
~þ -"
'-. ~.;.
~
@
Q
"
.
..
..
.
t=;o.è!"
'6/.."
@"
. -,. : - ' ,
-'
i. /,:
...
.
'-
¡Q..
. /:
I
I 8'
:/, .
. '
,.', ..' ,.',' ;,; '; : '.. '
",'
~.
!:
. ." .-
:. .'
..,
PRELIMINARY OPINIONS OF COST. ' .' :
FOR OPTION 2 - WilDLIFE AND PARK DEVELOPMENT OPTION I
LAKE CROOK STUDY' .' - 12 JUNE 2001 I
he following information is intended to show the relative costs of development under this scheme versus other options and
s based on the consultant's experience. Actual costs may be higher or lower than these preliminary estimates. Estimates
re not based on substantial engineering surveys and data which may later reveal obstacles or possible savings in cost.
Item
Description
Estimated Units Unit Total
Quantity Price
2 LS 90000 $ 180,000
2 LS 40000 80,000
1 LS 400000 400 , 000
1 LS 1 00000 100.000
17500 U. 48 840,000
7.75 miles 7500 58.125
12700 U. 80 1,016,000
7500 s.y. 30 225,000
1 LS 60000 60 , 000
2 ea. 60000 120,000
4 ea. 50000 200,000
1 ea. 200000 200,000
1 lS 40000 40 . 000
1 LS 1 00000 100.000
1 LS 80000 80,000
$ 3,699,125
110,974
369913
$ 4,180,011
1 New boat ramps with trailer parking and fishing piers
2 Renovate existing boat ramps adding piers and parking
3 Construct new RV campgrounds w/concrete pads;
utility pedestals; paved roadways; bath house
4 Construct new primitive camp area; restrooms
5 Pave existing gravel South Shore Park roads
6 Clear hike/bike/equestrian trails; bridges and culverts
signage; leveling.
7 Construct new park roads 22' wide; asphalt surfaced
signage; drainage and clearing
8 Clear and pave asphalt parking areas for trail heads
9 Cabling; barriers; posts and gates
10 Rustic playground structures and surfacing
11 Group picnic shelters on concrete pads; tables and
cook tops; site prep and clearing; paved walkways
12 Rustic amphitheater and stage
13 Park signage, lighting and landscaping for entry
14 Initial clearing and brush management, allowance
15 Turkey re-population; wildlife management startup;
duck boxes; signage; and related activities; allowance
Subtotal Option 2 construction costs:
Surveying. engineering, layout
Contingency
Total Improvements Option 2
Minimal Off-site Road Improvements:
CR 32900; widen and re-surface
lake Crook Road; widen and re-surface
NW 19th Street. widen and re-surface
1.3 miles
1.9 miles
1.7 miles
200000 $
2 50000 $
200000 $
260,000
475,000
340,000
Road improvements do not include acquisition of ROW;
assume shoulder widening and overlay of full width.
No curb and gutter; minimal repairs to existing pavement;
Use drainage structures already in place;
- .
."
~ of Paris
Study of Lake Crook
-
March, 2001
I
,
3.3.3 Recommendations Concerning Option 2. While certairùy the least expensive 'first cost'
of the three development options, Option 2 is not without its long term costs, The loss of nearly
$4.0 ,million in revenue nom land sales is nothing to be taken lightly. The significance of
estimated taxes to all taxing entities nom Option 1 ($1.1 million annually) and Option 3 ($4.2
million annually) cannot be overlooked by even the most zealous conservationist.
The development of the south shore for public
park use is an essential element of all three
developnzent options. It is the nature of north
shore and west shore developments that renlain in
question.
...
We do not believe that under Option 2 the city should allow control of so much of the public land
to rest \vith one entity, that is, Archers for Christ. As much as \ve may agree with their charter
and purpose, to withhold five to seven hundred acres of land nom the public does not seem to
be good public policy. Under Option 2, each of the gun or archery clubs would have fixed, hard
boundary leases covering what they need for target ranges and clear zones as well as
improvements to the land such as parking lots, storehouses and meeting rooms, For the balance
of the property, we favor a shared use \vhere Archers for Christ and shotgun hunters can use the
property outside their fixed boundary leases during specific competitions or hunts but not to the
exclusion of the public the rest of the year. Proper installation of gates and signs along the
hikelbike trail and around the perimeter of other property can signal the public that there are
special events being held and to refrain from using the trail that day.
The development of a formal south shore park and eventually a north shore park will require the
expansion of park maintenance staff \vithin the city and the purchase of more vehicles and
equipment for their use. For this reason, we have not recommended the full formal development
of Lake Crook as a public park like Whiterock Lake is to Dallas or Town Lake is to Austin. As
attractive as paved jogging trails and wide, open, closely cropped grassy fields may be, the Paris
city staff\vould simply be overwhelmed by the manpower and money needed to maintain such
a park. A large natural habitat
park requiring very little
maintenance is ideal for most of
the property under this Option 2.
Option 2 is, in our opinion, a
better short term plan for the next
five to ten years, Parts of Options
1 and 3 where residential' .
development is contemplated may -
be desirable permanent elements in ,
the future. We do n?t see some of 1 '. .._."A:~~ J ."'¿"'.
the elements of OptIons 1 through F .... .; .' .
3 as being mutually exclusive. '.' .
There is a lot of land out there!
'..
, ".
. - :."; ,
Figure 11 Group picnic shelter at Lake Crook
Page 31 of 45
.'
~ of Paris
Study of Lake Crook
March, 2001
I
3.4
.
OPTION 3 - DENSE RESIDENTIAL DEVELOPMENT
3.4.1; Description of Option 3. In Option 3, the consultant investigated the development ofaIl
suitable lands on the north and west shores into small lots (approximately 1/4 acre). Suitable
lands for the purposes of this study were all those lands not in a wet land or floodplain. We did,
however, exempt the south shore line as being unsuitable for residential development due to the
proximity of Campbell Soup disposal fields, the water treatment plant and the limited access
available for a large permanent population,
Because the lots were much smaller than in Option 1, the possibility of county road section paving
and on-site sewage disposal was ruled out completely. This option presumes the installation of
public concrete streets with concrete curbs to city specifications. In addition, Option 3 assumes
that all lots will be served with public sewer system lines, As in the case of Option 1, if sewer
lines are required, the development of the west shore (I, II, and III) are dependent on the
development of the north shore. The \vest shore development will simply not support the
extraordinary costs for extending \vater and sewer lines unless it is coupled with the north shore
development.
...
Another variation from Option 1 to be found in Option 3 is the set-aside tract between the north
end of the dam and F.M, 1499. In Option 3, this 100 to 150 acres of land is proposed as
retirement community land hosting everything from full care nursing facilities to assisted living
units to unassisted retirement living residences. During the public hearings there \vere a number
of speakers \vho addressed the aging of the population and the need for retirement housing in
Paris, Additionally, a proposed community recreation facility open to all of the city is sho\vn on
a hill overlooking the lake. This community center could house 'meals-on-wheels', senior
services such as temporary health screenings, small banquets, bridge and domino parlor rooms,
and other meeting areas \\"ith a beautiful vista looking south over the lake.
Adjacent to this community center a north shore boat ramp and fishing pier is depicted.
Throughout the rest of the north shore development, small areas of greenbelt park are shown to
break up the expanse of housing. Even so, Option 3 shows approximately 1,180 lots total in four
separate units of development. The north shore development alone could produce a minimum
of 544 high quality lots, Some lots in the concept plan are waterfront lot and many others are
waterview lots, both of \vhich \vill command a higher retail price than any other lots in Paris.
3.4.2 Recommendations Concerning Option 3. Option 3 is clearly the more difficult of the
options to implement. Several local developers expressed skepticism that anyone locally would
be in the position financially to take on the development of the north and west shores under this
option. For one thing, the cost of the infrastructure totaling as much as $20,000,000 over a
twenty year period is a substantial risk. And while the developer(s) is risking his finances in hope
of a huge financial gain, the city will have given up control of the land. The ~downside' , at which
every good business entrepreneur must look, is the very real potential for failure. If the land
development venture fails, then the land falls into the hand of some financial institution with the
responsibility of conveying the land to a third party who mayor may not have the city's best
Page 32 of 45
t'
March, 2001 -
-
~ of Paris
Study of Lake Crook
,
interests at heart no matter how well thé city might choose a developer in the first place. Any
lender, fmancing the development of streets and sewers, is going to require the land be
coll~teralized and even if the city inserts reversionary clauses in the contract of sale, is the city
prepared to pick up the debt to complete the work in the event of an unfortunate foreclosure? Not
very likely.
Table of Advantages versus Disadvantages for
Option 3 - Higher Density Development
~~~]f~rì~4t;~&t~~~ifi~{~ .,,'.~ ~.'. :~:.' , ,t~;J~}~w'~ m~¡Jf(titn~~1~~J.;i~~~~%~~~~fIJì~~1
1. Revenue to the city from the sale of the
land bet\veen $1.8 million and $3,6 million
2. Increased tax base of perhaps $159
million.
3. Increased sales tax from population
gro\Vth of perhaps $1.0 million per year
...
4, Development of a retirement community
5. Preservation of park land on the south
and west shores.
6. Concrete streets minimjze future
maintenance costs to the city
7, More revenues &001 water and sewer
8. Lowest develo ment cost er lot
1. Loss of an asset for future generations
2, Hunting, archery and gun ranges would
not be permitted under this option,
3. Can a development survive the often
intolerable odors arising from Campbell
Soup disposal fields to the south?
4, Risk to the city if a developer fails.
5. Potential for pollution from fertilizers
and insecticides.
6, Requires stretching police and fire
protection to the north shore area.
7. More maintenance required for 6 miles
0 f new \vater and se\ver line and perhaps
1,100 customers.
Page 33 of 45
. ,p'
C tO~~f,d
......
-, -. ---_:::"" -:.;, - - ,-, r--¡"':;-"
, ;1", ... ,:', '
. "-' 1 ',í'~
,
I
I
I
,- '" - -t.
.,--' ,','\
-::'i'::-:-:::»'-'::'" / "~'~"J
,-' ",;:,:L";:,-:- !
'f
I
,
I
I
.
~,
It: 1
~I
~¡
'.'
.,
,
I
11>t
@)
,- , -. ','
.
i....
-- .
.. ,
"'!. '.'
"','
oJl
,,-, I
..
, ,I
- ,
,I
.,~
S."
,.,
..' ..,
...
IIi.,. ...
, ".
"
,
I ?,
,
I I
,(' ,'-, t
WAllO T,"~' I
, I
~I' ,
~"...:
, ~t
;:¡.
~l
101
I
.
, I
-~ ~- -'I
I
1
I
,
.
r
I
I
I
'.
.
...
, fI' ,
,-
I'i.~
! '
- .
I
I
'~, ;/
! , ",}U...
,
,
51'
I "
,.
I
,I
,
I
",
, .: .W"" ..
' , ," ""-', - ,
... , ..{; " . -",
-- - .-- (11i..b.1I
'-"-'-"-:,.,.--,~ ,j),:
-' - ".' .°" -
...J' ~ , .
' "'¥--:;'f..' tL._-
!. t;Ü11.~". .
~ , , f7f!rø,{ ,~ }
" "'~;!..'ii,\j".. , ,
..'t.¡;,'!!<.~', .' ""i'" ,
""~"'l ~, 11ø~", - 8,.~,
' . l"k......,-
.. I
, 'r:
I'
I
I.
ø
".
,,'
""
,
,..: .--'
r.
l
,
I
, R
.!'. tC
'.. U',
i
,I,
",-'
.":1
,iRac
... ~IF
.' );
" ",
, .
, .. l
,;. .
- . ~ : H,,; I,
., .. :~t.'
~!.;. 'it.... '¿'Q
....~...,-' '.,
'..0;: *,..t.....
~, . '... ;
,~..: "
..
.
/
.aæ!!t-ftL1S,I'I.OOI:'f'U\N. \Ne11JN'S,
NoD ~vel-OPl!P PHS. LNoD.
ø I'Ll.L CNæ "'-RSIN/:õ 1'1CI.11Y. ~~~5,
Iß\ ~p LIVNI:< 1læ1lfæ ~Nf' VLLJa, ...2
~ IOeS
I() ~~ ~~ CI11ZeIð aNl"tR
~ HD PHlS... B~ ,ACIlæS
@ ~O!>e" I'~ Plfllt.
(É) 1'f'Op~" ~ ~ tKJAf 'ftIWIIO.
te\ ~02P NOfm1!t1O1ë1! 5Na..1! f~Y
U I'I!\II!LOPMI!NI'. ~I .ACJæS INCL~
!I1OI<'fLU PHlS.. LJ'JoD, "..... LorS Of'
\'.HCH ð9 Næ W^ffJ!1'~, 7,9 MUS or
I'IW STlœl!fS
I?:\ PIItOPO!>fP weSf'!t1OIëI! SNeL!! I' M\L Y
\.::::J t1f.VELOPIÆNf - H!f.^ I.
~ ..oæs.
^VE~ Lorscze 1~,OOO5J',
-19.. LorS Of It'.ot-tCH 19 ~ W^19I'R'GNr
l-OfS. 6,26 MLe~Of' ~W5œe1S
ICi\ f'flOf>O!>e P we ~ !t1OIëI! 5INa.I! .,. ~ V
I(J 1?I>~IÆNf' IftA N,
2O.2..aæS. 0.6 ML!! Of NeW ~et
-I2LOrS^\II!~Ijo,OOOS.I'./Lor
! ,
(j'\ PIItOPO!>fP we'>f'!t1OIëI! SNa.e fM\LV
\.:.J ~\II!LOPMeNf' Næ^ III,
-t9 .ACJæS. 1,2 ML!!S Of' NeW S11iiUf
IOOLOf'S^\II!~ !!io,OOO S.I'. /LOf'
(j\ f'flOf>O!>eP WLOL..e WØI1"Af Jæ~1M!! HD
\::::!.) L'W SONCtWIN', NO 1t.N11N/:i. 7(»
IQæS
tÇ\ tXðf1NCA HD I'IItOPO!.tP I?I>Vt:LQPf:E'
~ PNlJ.L.HD, 26-1 .AC~S
I
I
I
forle.: 1180 5INa..I! I'M'oLYLOfS
(eXCLID1Nt:i Jæf1læMeNf v&.LJa) ON
7~..oæS. ð'I.700LJ', Oft 16 ML!!S
Of ~W ~eß,
-{.
THIS f'LH,f ~O!>fS ~ Ie.L ~ NOr 1"Iæ~Nn.,' N
PNflS ~ N \Nef1,JoH::>S Oft !'LOOP I'\.J\II'ð P'0IIt
ræ5lCJl!NfW,. I'I!YeLOf'MeNf. 1.I!~5 fO NiOt!rt N-O aN
Cl,.IÞS yoJ"P NOr øe !!~Cl.lreP N-O H.N1'IN/:4 ~" eoe
I'~p PI.£ fO I'IeOXIMifY Of HOMeS.
, ,- . .
GRAPHIC SCALE
0 !tOO 1000
7000
~
I
I
~ -.. CII
1-- C8
-- CII
~- ~
:scu_-
.
.:I
a
~
".
.:I
~
~~
:z f-4
:s 2:
ø. ~
ClJQ: ;:1;>-
;:: '"I M "-!G
~tï.".9:;)
-~-~o
ea.::=! 0>(.)
o~ t ~~
r:oo~::§
üe ~:3
t-o
~ 2:
:s ~!!!
-II::
(I)~
~ø..
Ø::
'1000
--
- -
,~_"\'¡
HIt.
3
I
I
I
1
"
. '
PRELIMINARY OPINIONS OF' COST, . , ' , " , ' ", , . . :
FOR OPTION 3 - NORTH AND WEST SHORE DENSITY DEVELOPMENT'
LAKE CROOK STUDY. . ' .,' ." ' " '12 JÙNE 2001
he following information is intended to show the relative costs of development under this scheme versus other options and
s based on the consultant's experience. Actual costs may be higher or lower than these preliminary estimates. Estimates
re not based on substantial engineering surveys and data which may later reveal obstacles or possible savings in cost.
Item
Description
NORTH SHORE:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6" - 1 Z' size; fire hydrants, valves
5 Off-site 1 Z' water line from plant to new ground storage
6 0.5 mgal ground storage; pressure pumping station
7 On-site sanitary sewer lines; 6"-8" size; manholes; cleanouts
8 Submersible pump liftstations; force mains; wetwells
9 Off-site 12" gravity sanitary sewer to existing trunk
10 Dry bore and casing; U.S. 271
11 Reinforced concrete pavement
12 Entry way signage; lighting; street signs; traffic signs
12 Landscaping entrances and common areas; irrigation
14 Monolithic concrete curb
....
Subtotal for North Shore:
WEST SHORE UNIT I:
1 Clearing and grubbing of right's of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines: 6" - 1 Z' size; fire hydrants, valves
5 Off-site 1 Z' '",ater line
7 On-site sanitary sewer lines; 6"-8" size; manholes; cleanouts
8 Submersible pump liftstations; force mains; wetwells
9 Off-site 6" force main to North Shore
11 Reinforced concrete pavement
12 Monolithic concrete curb
13 Entry way signage; lighting; street signs; traffic signs
14 Landscaping entrances and common areas
Estimated Units Unit Total
Quantity Price
58 acres $8,000 $ 454 , 000
40 ea 12,500 500 . 000
420 sta. 1,500 630 , 000
42000 l.f. 22 924,000
6000 I.f. 32 192,000
1 LS 350 , 000 350 , 000
4 OCOO I.f. 25 1 ,000,000
5 ea. 85 ,000 425,000
11000 I.f. 34 374,000
200 l.f. 160 32,000
154000 s.y. 25 3,850,000
1 LS 40000 40 , 000
1 LS 80000 80,000
84000 I.f. 6 504 ,000
$ 9,365,000
45.5 acres
30 ea
330 sta.
33000 I.f.
3000 I.f .
35000 I.f .
1 ea.
3000 I.f .
121000 s.y.
66000 I.f.
1 LS
1 LS
$8,000
12,500
1,500
22
32
25
85,000
20
25
6
20000
40000
$364,000
375,000
495,000
726,000
96 , 000
875,000
85 , 000
60 , 000
3,025,000
396,000
20000
40000
Subtotal for Unit I
56,557 000
t'
WEST SHORE UNIT II:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6" - 1 Z' size; fire hydrants, valves
5 Off-site 1Z' water line
7 On-site sanitary sewer lines; 6"-8" size; manholes; cleanouts
8 Submersible pump liftstations; force mains; wetwells
9 Off-site 6" force main to North Shore
11 Reinforced concrete pavement
12 Monolithic concrete curb
13 Entry way signage; lighting; street signs; traffic signs
14 Landscaping entrances and common areas
15 Concrete curb and gutter
Subtotal for Unit II
WEST SHORE UNIT III:
1 Clearing and grubbing of rights of way
2 Drainage structures; culverts and inlets; headwalls
3 Roadway shaping, excavating, filling, and compacting
4 On-site water lines; 6" - 1 Z' size; fire hydrants. valves
5 Off-site 1 Z' water line
7 On-site sanitary sewer lines; f) -8" size; manholes; cleanouts
8 Submersible pump liftstations; force mains; wetwells
9 Off-site 6" force main to North Shore
11 Reinforced concrete pavement
12 Monolithic concrete curb
13 Entry way signage; lighting; street signs; traffic signs
14 Landscaping entrances and common areas
15 Concrete curb and gutter
Subtotal for Unit III
Subtotal Construction
Surveying, platting, staking
Engineering
Contingency (10%)
Total Cost: Construction Option 3
4.4 acres
4 ea
3.2 sta.
3200 I.f.
500 I.f .
3200 I.f.
1 ea.
500 I.f .
12000 s.y.
6400 I.f.
1 LS
1 LS
6400 IJ .
8.8 acres
6 ea
6.4 sta.
6400 IJ .
500 IJ .
6400 IJ .
1 ea.
3000 l.t.
23500 s.y.
12800 IJ.
1 LS
1 LS
12800 IJ.
$8,000
12,500
1,500
22
32
25
85 , 000
20
25
6
20000
40000
10
$8,000
12,500
1,500
22
32
25
85 , 000
20
25
6
20000
40000
10
$35,200
50 , COO
4,800
70,400
16,000
80,000
85 , 000
10,000
300 , 000
38 , 400
20 , 000
40,000
64 , 000
$813,800
$70,400
75,000
9,600
140,800
16,000
160,000
85 , 000
60.000
587,500
76,800
20.000
40.000
128,000
$1,469,100
$
18,204,900
182,049
606,769
1,820,490
$
20,814,208
Notes:
This cost analysis does not include the cost of advertising and marketing; sales and legal expenses; promotions;
maintenance during sales; lot preparation for building; or amenities.
The installation of gas, electric, telephone and television facilities is assumed to be sufficiently cost effective due
to the density of development that there will be no cost to the developer for installation.
.'
~ of Paris
Study of Lake Crook
March, 2001
....
.
.
.
.
.
PROPOSED DEVELOPMENT RESTRICTIONS
LAKE CROOK
PARIS, TEXAS
CENTRAL WATER/WASTEWATER SYSTEMS ONLY
150' SET BACK FROM WATER LINE FOR ANY OCCUPIED
STRUCTURE
CITY BUILDING CODE COMPLIANCE
INDIVIDUAL SITE PLAN APPROVAL
TREE REMOVAL PERMITS
.
LIMIT NO. OF OCCUPANTS OR FAMILIES
.
PROHIBIT BURNING
.
LIMIT OR PROHIBIT COMMERCIAL USES
.
LIMIT OR RESTRICT ABANDONED VEHICLES
.
CONTROL NUISANCE WEEDS/BRUSH
.
RESTRICT FENCING; PROHIBIT BARBED WIRE; SET BACK
CERTAIN FENCES FROM ROADS;
.
RESTRICT ANIMAL HUSBANDRY, KENNELS, ETC.
.
CREATE LARGE SET BACKS ON ALL LOTS
.
RESTRICT USE OF FERTILIZERS AND INSECTICIDES ON
WATERFRONT
.
LIMIT SIZES OF BOAT HOUSES AND PIERS
.
LIMIT SIZES OF "SEA WALLS"
.
LIMIT DREDGING AND FILLING
.
RESTRICT TAKING OF WATER
.
PROHIBIT MARKER BUOYS FOR PRIVATE SWIMMING
Page 35 of 45
, '
)
SUMMARY OF DEVELOPMENT COSTS FOR
OPTIONS 1 AND 3
31 March 2001
':'>.';\C:""'o"(a)""';'" ','" ":(b)""';,""";:""(c)";~: ',~' ¡ (d)';',':'~">::';l";,"~"::',(e')',r,'t;'~;~:;,Co ::"1':~'(f)"';"'."".;~¡"'",-~:'.;(g' ):'/',: ""","."!.(h')..'~,'r,.',<".' ,I:'; (I)'Y-":":' ;';.' ":,'.'-""(J)',;:,,:"".~1;,';
~':".:~' ','."..'" "',' "',, ','-' ..'.'~-;,';"'" :"",:.,;;",.',~\'" ~;,ì: "..,:..:'~': ,:":':-,'~'.',:~: "'~'.."" ".....-,,;. ,':.'. ',,':' ,.' :-', ,),~;,,-.~,
'~': De's'rlption": ~ Lots:',:" \(~èreage., Dens#ÿ':',,':':;,'~Estimátèd, ",,::i~stlmated ::Estlmated:' Estimáte'd "j~stln1~tëd; ',; Estl'rriatec('::
:,', 'of area' " ' """.', lots/ac:, ,'consti'Úëtlon' "må'r~etlng ',', land;" 'land' 'development develorjmerit
, ., . cost, .' . & sales' value/acre' ' costs, "cost. 'cost/lot','
costs (2 '
Option I - Lower Density Single Family (concrete pavement and sewers)
North Shore 222 471 0.47 $ 8,900,000 888,000 2,500 1,177,500 10,968,000 $49,405
est Shore 111 266 0.42 $ 3,300,000 444,000 2,500 665,000 4.411,500 $39,743
Totals: 333 737 0.45 $ 12,200,000 1,332,000 2,500 1,842,500 15,377,000 $46,177
Option I - Lower Density Single Family (asphaltroad section/septic systems)
North Shore 222 471 0.47 $ 5,750,000 888,000 2,500 1,177,500 7,818,000 $35,216
est Shore 111 266 0.42 $ 1,982,000 444,000 2,500 665,000 3,093,500 $27,869
Totals: 333 737 0.45 $ 7,732,000 1,332,000 2,500 1 ,842,500 10,909,000 $32,760
Option 3 - Higher Density Single Family Development (1)
North Shore 544 361 1.51 $ 11,250,000 2,176,000 2,500 902,500 14,331,000 $26,344
494 300 1.65 $ 6,354,000 1,976,000 2,500 750,000 9,082,500 $18,386
est Shore II 42 20 2.10 $ 1,200,000 168,000 2,500 50,000 1,420,500 $33,821
est Shore III 100 49 2.04 $ 2,010,000 400,000 2,500 122,500 2,535,000 $25,350
Totals: 1180 730 1.62 $ 20,814,000 4,720,000 2,500 1,825,000 27,361,500 $23,188
(1) These costs do not include the onsite development of assisted living and full care nursing facilities shown on the Option 3 plan.
Likewise, the costs for a seniors recreation center and associated park improvements are not included in the cost of development.
.
,
~
Estimated Tax Impact of Residential Development
Lake Crook Feasibility Study
12 JUNE 2001
)y¡¡m~¡¡Hn¡1mmmm~ ¡1~mmmC?' j~~¡~~¡T:¡:T~¡)::::,~TT:¡~]:¡'::::::/>:=:'/::: ¡:/::T::)(:::: ::UC?:/u ':'¡CY?=} ¡¡¡T¡HTY?W¡ \T¡¡¡¡¡THHY¡:¡
loJortti:Sbore-:-:-:.:.:-:.:. -:.:.:.:-:.:-:222. .:-:.:-:.:.;.:-:.;.200 $:-:.;.;.;.;.;.>.29,970,000 »:.;.;.>105.914 ;.;.;-:182,817.;.;-:459(140 -:.;.;.;.:.:49(061. $:.;.;.797)392.:
~¡¡~~]',¡,i,\¡"i!I!' "!il','llil,I~~i I,\,II"I!I!II'!I'II ~I,I,I,lllli,IIIII~~!~~~!il. ,lili!:I~iI1~~~~t I,I,III~~~¡~~ il,I',!li~ I,:'¡.'\I\~~I ~\"ij:~I'.
I
D~v~lonm~nt Onn(J
¡;~~mm~i~¡¡mml¡I¡I¡¡ 1¡¡¡I¡¡¡1¡¡mD~~: ¡¡¡j1¡¡¡¡¡¡¡¡¡¡¡~¡¡~~~: ~¡¡:¡n~~¡~u¡nH~~¡~~mff~H ¡/¡¡¡:¡¡~n~1~~~ :¡¡¡Hû~~¡~M nn¡wm~'¡~r¡~ ~¡¡¡¡¡¡¡¡¡M~~1¡ mW~¡~TI~¡~~~¡j
NØlit:Sho"~.I::::::::::::: ::::::::::::;:494: ::;;;::::::;:::::;:445 $:::::;:::::;:;::66;690;000>:::.:.::235;816.;:;.=406;809 .<:1.023.025 ::::::::;l09¡172 $':;:1¡114¡821:;
n¡~n¡¡jm¡Hm¡n¡¡mmm~¡ ~j1j¡¡~¡j¡¡¡¡¡¡¡¡H \¡1¡1¡¡¡¡¡H¡¡¡¡¡:¡¡¡:¡H: \:::¡::¡¡H¡¡;:~:¡:¡~:::¡:¡~:¡;¡~;¡:~¡: :~::¡~:;:¡:~:/¡;;:~:H :¡:~¡:~¡¡~\::¡¡¡::¡¡ ~:::¡:;:¡H<¡~:;H ¡¡¡1\¡¡¡¡1¡¡¡~:~nnn Hj¡\1¡YH~:¡;¡H¡1
N~8t.Shore:D:-:.:.;.;.:.; :.:.:.:-:.;.:-;.'12: ;.;.;.:.;.;.;.;.;.;.;36$.;.;.;.;.;.;.;.:.;.5.610,000. .; : : : .:-:20.049 .:.;.:-:-:34;&81 .;.;.;.;.66.978 :.;.:.;.;.;.;9."282 $;.;.:.;150,896;.
i~,~I~~;,;¡;I¡;", ,;,l¡¡",¡I~¡~~! 1,1,1,1"",I,ll~l[~ t,I"",I",I,',~~~i~ii¡ ¡,,¡llli,1111 ,¡,I",~ijij¡ij~ ¡¡¡¡]III;.;!l.¡I~~1 ~,'~Œ~~{¡~!
$
12,500
Development 0
tlll",!li!,'I'llil ",I,!,:,I,:,I. ,'llli,IIIII,llllllli: '1111,llllilililllilllii~~!~\\ .llllllilillllllllllllllllil!¡!1 iliiliillllll,¡1111
.." '.:. ""';;:::::::::::::::::;;:;:;:;:;; ""'(=::;::::;::;;;;;::;' . 'J:.::;;,:;::::-:".;:;;;;: .. .. p.:.:;:;::::;:- . : . 'T:;::::.: .,. '1:;::,;:: . .. 'I':':;::;;~' .'."".
Qtih.$hOtß:.:.:.:.:.:-:.; :~::::;~::::::544 ;:::::;:;~;:;::::::~99. .;:::;:;:;;:;:;;:::::;:;;~8~¡599; :;::::;:;::;)~,300 ::::;;::::30,600 :::::.:::.76,500 ;:~.;.:.;:SO4.900
. .
~ of Paris
Study of Lake Crook
March, 2001
I
3.5
OPTION 4 - DO NOTHING' OPTION
3.5.1 Description of Option. This option takes very little explanation but every feasibility study
must contain the "do nothing" option. The obvious lowest 'first cost' option available to the city
is to take no action now and maintain the present course. Believe it or not, there were several
surveys received that conveyed this exact sentiment. . . leave the property the way it is now.
3.5.2 Discussion of the Option. Certain advantages are clear.
./
./
./
./
The city would expend no more for maintenance that it does now,
The lack of any development \vould protect the water supply
Wildlife habitat, if anything, \vould be enhanced
The lack of development will reduce the need for police protection except around
existing park facilities.
Low risk of failure
./
....
Ho\vever, the perceived lack of cost is deceptive. The loss of $1.8 to $ 3.0 million in revenue
from the sale of the land has to be considered. On the flip side, however, the argument can be
made that the land is likely to be \vorth more in the future as land north and west of Paris
develops and appreciates.
The value ofhventy or more years of taxes is like\vise important. Under Option 3, the estimated
ad valorem tax revenues for just the City of Paris would be nearly $1.0 million. The present
vallie, that is, the amount of money \ve \vould need to sock away no\v to equate to $1.0 million
each year for 20 years at 5 per cent interest compounded, is over $12.5 million. The present
value of$166,000 in estimated sales taxes to just Paris from Option 3 is over $2.0 million dollars
on the same basis. Present value is one clear way of expressing the value of future tax revenues.
Summing up then, the cumulative cost of doing nothing, expressed in present value terms for the
next 20 years, could be as high as:
$1.8 million from sale of land
$ 12.5 million from ad valorem taxes
$ 2,0 million from sales taxes
$ 2,6 million in water/sewer/revenues
Add to this the buying power and economic impact of3,000 new Parisians and you are beginning
to talk about real money!
In fairness, you must deduct from this gaudy sum the cost increases to the cityfor city services
since water, sewer, streets, drainage, parks, police and fire protection, and support services must
be provided for these 3,000 new citizens. Based on the 2000-2001 budget, the expenditure per
citizen in Paris for these and other city services is about $1,100 per person annually.
Page 36 of 45
.'
2!r of Paris
Study of Lake Crook
March, 2001
I
4.0.
EVALUATION OF ALTERNATIVES
4.0.1, Questions Unans\vered. For all its risk, land development is a very big and lucrative
business in this country. Thousands of successful real estate investors have turned land just like
that surrounding Lake Crook into gemstones, A questions remains:
What is tlte City of Paris' role
in the development of land
around Lake Crook?
It would appear the City could take one or more of the following approaches to development of
Lake Crook land for residential or multi-purpose land use other than parkland:
0
The city can be a seller of land, taking bids and awarding the land in one or more
parcels to the highest bidder. This could require the city to have a referendum for
the voters to decide \vhether the city should divest itself of the land. The city
could still withhold reasonable controls over the sub-dividers through terms of
sale and deed restrictions.
....
0
The city can be an investor partner in real estate development by putting up the
land and assisting \vith the cost of infrastructure. This assistance might be in the
form of off-site utility construction, for example. The city could sell off land in
small units as they are developed thereby reducing the exposure to the developer
or the city.
0
The city with the assistance of Lamar County could be the driving force behind
creation of a county development district such as used in Denton County and
Kaufman County, The following summary of the enabling legislation is from a
website by Glocal Vantage, Inc., authored by Donna Prestwood and Paul
Schumann, J r. (\V\VW. glocalvantage. com/CDDReQ.Q!11llinlt
With the passage of the County Development District Act (CDD) ,
Subchapter D ofSB 345, enacted September 1995, the Texas Legislature
has given small to medium sized counties a powerful new economic
development tool. Counties of less than 400,000 population may create
districts that can adopt and levy a sales and use ta", receive the proceeds
of a hotel occupancy tax, issue bonds, and exercise the power of eminent
domain as long as the purpose of the district is to attract visitors and
tourists.
Denton County in particular has expanded this use to encourage development of
residential subdivisions, shopping districts and golf courses but not without
criticism of the public and a few court challenges.
0
The city could be a developer literally by constructing roads and utility
inftastructure and then selling off lots on finished streets through a bid process.
The city could even employ a "construction manager" or other development
Page 37 of 45
.,.' ..;' ....",'~>..- ., ,
. '
.>
~ of Paris
Study of Lake Crook
March,.2001
I
professional on staff. The city would certainly obtain a higher price for its land
than simply \vholesaling the property en masse to the highest bidder but would be
assuming all the risk normally carried by private entrepreneurs. Then, too, there
would be substantial backlash as to why the city would compete with private
enterprise in the first place. This concept bears mention only because it is an
option available to the city. But it deserves only mention, . .
0
The city could form a non-profit development company, staff it with a
director/manager/developer, and deed the land over to it. This \vould not be so
much different than industrial economic districts statewide \vhere land is sold at
cost to attract industriaVmanufacturing concerns to create jobs. The difference
is that this land is being sold so that houses can be built and the job creation is
only temporary. Local developers will likely oppose any attempt to create a
subsidized, competing, residential neighborhood to compete \vith housing
developments citywide.
4.0.2. Economic Development. Several other suggestions have been offered by interviewees
during this study. One suggestion \vas that the city give the land away as some kind of economic
development incentive to attract a developer and thereby benefit the city through the growth in
the tax base. Others suggested the city should help \vith the developn1ent by paying for off-site
water and sewer extensions to ready the property for service.
Truthfully, we do not see how the city
could give tlte land away since public
law clearly provides that landfor sale or
exchange, other than to another
governnlental entity, Inust be sold by
sealed bid
Secondly, there is the logistical question of how the city goes about choosing a developer to grace
with its land. Clearly this does not fall under any professional services procurement whereby
selection is made on qualifications of the individual or finn.
And fmally, the stewardship question arises as to why the city should even consider giving away
land worth admittedly several million dollars.
4.0.3 Risk. Certainly anything worth doing has its own risks. The risk to the city in any
subdivision development is that the developer fails to follow through. Depending in which step
of development that failure occurs, the consequences to the general public are different. The city
may have to take back land it seller-financed or the ,city may see the land distributed to others and
have the 'dream' evaporate on the courthouse steps as the land is auctioned offby a commercial
lender to satisfy creditors.
Page 38 of 45
. .
~ of Paris
Studr of Lake Crook
March, 2001
I
4.0.4 Lot Absorption. A city only lias a certain capacity to absorb newly created lots for
residential development. This absorption rate is determined by population growth, job creation,
decline of existing housing, direction of growth, marketing, and the building capacity of the
community's several home builders. Interest rates, cost of building materials and even natural
disasters in Florida will affect how fast homes can be built in Paris, Texas, Following the east
coast hurricanes of the past few years, for example, the dry wall industry could not produce
enough sheetrock to meet demand and many builders were put on allocations. Due to a lack of
production, face brick is becoming a long-lead ite~ taking months to deliver to ajobsite, The
point is this. Just producing lots will not attract people to Paris, The development of lots will
have to be accompanied by a wide-spread and effective advertising campaign directed primarily
at prospective buyers from outside Paris coupled with an economic development campaign to
provide these people 'with jobs, With 1,180 new lots eventually on-line under an optimal Option
3, there will need to be approximately 1,000 to 2,000 new jobs created.
Table of Survey Results for
Paris Home Builders (1)
)" ~:;;:,T;l; g.~';:';'; -, ;\: - F;' ~'~i:~,~ :t}ivjl*{~i;;~'~[t:~; lð~:\;&;:f Y~l;~~f~-t{ ~~~~U~+~ ~F~~r~1]] ~{JJ-
How many homes \vill you likely complete ill
2001?
6
50
6
5
Is this more or less than last year?
To \vhat price market do YOll try to build?
Less
More
Same
New
$150K
$65K
$140K
$70K
Do YOll favor or oppose the sale of public land
at Lake Crook for residential develooment?
(1) Of the six home builders listed in the Paris Yellow Pages, one does not build in Lamar County
and one did not answer the survey.
Favor
Favor
Favor
Favor
The above table covers the majority of home builders who build in Paris. (Some do not build in
the city but only in the county.) \\'hat the table shows clearly is that absorption of lots in Paris
including those in subdivisions and those fill-in lots through out the city, with the builders Paris
has now is only about 60 to 70 lots per year. If extrapolated then, just the north shore
development under Option 3 would provide the equivalent of seven to eight years inventory if
EVERY house in Paris was built at Lake Crook,
Reading between the lines, builders likely favor sale of public land at Lake Crook because it a)
provides another attractive home site for their customers, b) new subdivisions tend to provide
impetus to the housing market, and c) it provides competition among the lot developers which
can lower the price of lots citywide.
Another point needs to be made. If the development cost of the lots in Option 3, for example,
Page 39 of 45
- .
~ of Paris
Study of Lake Crook
March, 2001
I
are close to $25,000 per lot (counting' ,land, marketing, engineering, and construction) and
assuming the developer will want to make a profit (reasonable assumption), then the retail cost
of the lot will likely have to be at least $35,000 and as high as $50,000. These prices exceed any
lot prices being seen in the Paris market today although they are not exceptional for larger cities
across the state. Assuming then that builders will choke back their tears and pay these prices for
the lots, the minimum price home likely to built on Lake Crook will be $140,000 to $200,000.
From the table above, the largest builder in tenns of volume in Paris, is not building in this price
range, In fact, only twelve homes per year are being built in Paris in the $140,000 range by two
of these four builders. The inventory created by a north shore development under Option 3 then
is not seven years but a ridiculous 45 years EXCLUDING OUTSIDE INFLUENCES.
Specifically, this outside influence would have to come in the form of a professional developing
and marketing team.
4.0.5 Referendum No\v. The argument has been posed that the city is getting the cart before
the horse in doing a feasibility study before it even has authority to sell the land. The proponents
of this argument say the city should have a referendumpllrery on the issue of whether or not
land should be sold and not debate the selling price, the developer's character, and his proposed
development plan. We do not concur with this argument.
.."
The other side of this coin is that voters, just like they do on bond issues, \villlikely want to judge
the merits of the sale knowing full \vell what is likely to be built on the site. We cannot conceive
of a voter not wanting full disclosure anymore than \ve can conceive that they will issue the city
staff a blank check to sell as many bonds and do whatever bond-funded activities the staff and
council \vant to do at the moment.
Page 40 of 45
. ... ,..0 - - -
. '
.-.'-' ,. h,
£!!r of Paris
. Study of Lake Crook
March, 2001
,
,
Table of Survey Results for
Paris Developers
~
'1l~~
.. ..f... '<' -':;;""'ii!.«1"'
~ "("~¡':!'W=~rd~
r,.l~&r!~ !H....
What price range home do
you \vish to attract to your
development?
Do you favor or oppose the Oppose if any tax money is
sale of surplus city property used to develop. Would be
at Lake Crook for residential creating competition for
development? himself.
Approx, how many lots do
you have in your
development?
Size of lots?
How many lots are you
selling on average each
year?
Ho\v many unsold but
platted lots do you have in
inventory?
In what year was your flISt
lot sold in your
develo ment?
26 developed
20 future
180
1/2 to 3/4 acre
12,000 s.f.
6 to 7
10 to 15
20 to 25
8 to 9
$120,000 and up
$200,000 and up
No objection
1989
1984
4.0.5. Limitations of this Study. Any prudent investor/developer/marketer is going to make
his or her own analysis based not only on the data we have presented in this study but on their
own experience in marketing and selling lots mostly to 'outsiders'. Our study is not purported
to entail in-depth marketing analysis and other data that a developer would want to review in
conducting his due diligence testing. This study is provided to the City of Paris staff and elected
officials for the purpose of clarifying their options with respect to surplus property around Lake
Crook. Third parties using this study for any other purpose do so at their own risk.
Page 41 of 45
. .
~ of Paris
Study of Lake Crook
March, 2001
I
5.0 RECOMMENDATIONS. '.
5.0.1 Summary of Findings. The facts as we interpret them are these:
-
'0
The estimated cost of development of single family homes on the north shore
does 110t appear to render sllch development practical at this time withollt local
government subsidy or possibly variances from subdivision codes.
0
fVere the cost of development and subsequently the price of lots found to be
affordable, the financial benefits to the city would be enormous over the next
nventy years assuming a tremendously successful marketing effort andflll/ build
out of the development,
0
The costs of Hdoing nothing" u'hi/e seemingly benign are actually enormolls and
gro}/Ìng given the time-vallie of money,
0
There appear to be insurmountable legal, political and logistical obstacles, in
our opinion, to 'giving away' the land.
0
The development of a formally developed park setting for the entire properly,
while initially affordable to construct, would place all incredible burden on staff
to maintain such a park.
0
Dredging of Lake Crook is far too expensive to be cost effective 1l0W.
5.0.3 Recommendations. Because of these fmdings, we propose the following recommendations
for the development of Lake Crook,
2.
3.
1.
Lake Crook should be developed as a mixed use eventually but in the near future (five
to seven years) should remain as park land and open space. Land considered for
development should only include the north shore between the dam and Caviness
Road.
The city, should pursue matching grants through the Texas Parks and Wildlife
Department to construct formal park improvements such as tables, fishing piers, and
campgrounds; set aside land as dedicated open space and habitat park land; and
preserve wetlands; on the south and part of the west shore.
The city should endeavor to improve access to the south shore park by fITst upgrading
Lake Crook Road and then other city roads and encourage Lamar County to improve
or cooperate in improving nearby county roads. NW 19th Street should eventually be
opened into the completed park but gated overnight.
Page 42 of 45
.,'
~ of Paris
Study of Lake Crook
March, 2001
I
4.
5.
....
6.
7.
8.
9.
.
.
The city should renew leases with Archers for Christ which currently has no lease and
later with Maxey Black Powder Rifle Club and Paris Gun Club (as those le~es expire
in 2003 and 2005). Longer term leases (up to twenty five years) will encourage capital
expenditures in this area. The leases should be more restrictive than current leases as far
as acreage and boundaries are concerned.
In eventually developing the north shore, we recommend the city NOT participate
except as seller to the highest bid but set out deed restrictions or pass ordinances to
regulate the use of land adjacent to the lake. Because of the possible requirements for
a referendum to sell public park land, \ve see the following chain of events:
a. The city advertises and receives bids for the purchase of a defined parcel with the
city's requirements for restrictions.
The successful high bidder is allowed a period of say three to six months to do
due diligence, seek financing and prepare a land use plan acceptable to the city;
The land plan is agreed to by the city planning and zoning authorities and the
council;
The authority to sell the land is submitted to the voters.
The property is conveyed \vith appropriate covenants and restrictions.
b,
c.
d.
e.
A system of hiking/biking/\valking trails on the north shore and south shore similar
to what is shown in Option 2 should be commenced. Use of these areas for archery and
hunting should be permitted under seasonal use or special events but not to unduly
restrict others from entering the property when it can be done safely.
The city should hire a caretaker/warden with the completion of early improvements
to the south shore park to protect the city's investment.
The city should come to grips with its vandalism and criminal activity image at Lake
Crook by:
a. Increasing police presence at the lake.
b. Use vandal resistant materials for all construction
c. Adopt the use of newer and cheaper television recorders to catch vandals in the
act.
Improve lighting at piers and boat ramps, .
Renlove any signs of vandal attack as soon as discovered.
d.
e.
The city should "adopt and attack" the south shore park development priority list
shown below:
Page 43 of 45
..
..
, '
~ of Paris
Study of Lake Crook
March, 2001
I
,
,
SOUTH SHORE PARK RECOMMENDED IMPROVEMENTS
1 Repair damaged fishing pier; replace missing boards; add hand rails ASAP
and ladders; improve access to fishing piers \vith hard surfaced
walks; light piers.
2 Increase police patrols of the park; offer rewards for information on ASAP
vandals;
3 Publicize the park more and increase traffic by offering special ASAP
events;
4 Continue to underbrush and open up the tree canopy; remove dead continuous
trees and low lying limbs;
5 Add more picnic tables, concrete pads, trash barrels and cook tops 2001
6 Add security lighting and security cameras 2002
.., 7 Install lockable, vandal resistant restrooms with aerobic treatment 2002
system; install potable \vater system and \vater fountains
8 Construct playground and cushioned play surface 2002
9 Begin to pave roads in the park beginning \vith the primary entry 2003
road and branching off to the boat ramps; add lighted tie-up docks
on one side of each boat ramp.
10 Begin the hikelbike unimproved trails along the south shore line 2003
where the road is closed for the present; provide better signage.
11 Construct an enclosed fishing shelter and expand the fishing pier 2004
12 Hire a caretaker/warden and install an on-site residence 2004
13 Construct tent camping sites near the shore line 2005
14 Construct paved connection to NW 19th Street with gate 2005
15 Construct RV campgrounds with utility connects and bath house 2006
16 Complete paving of all park roads and parking areas 2008
10.
The city should certainly keep its options open on the north shore allowing golf course,
residential or commercial developers the opportunity to analyze for themselves the
feasibility of developing those lands. There could come a time when conditions are ripe
for such private investment. We do not concur that the time is here and now!
Page 44 of 45
- '--,'-' -'~""'-': - ..
-
0;>
~ of Paris
Study of Lake Crook
March, 2001
I
6.0
CONCLUSION
6.0.1 ,General. The 2,700 acre Lake Crook property is an asset with a fabulous potential and
like Lmus said to Charlie Brown in the "Peanuts" comic strip,
"There is no greater burden than a great potential. "
From public participation, interviews and meetings we clearly see there is no consensus in Paris
on what to do with this potential. In a very clearly worded survey question, the overwhelming
majority of Paris citizens do not want the city to sell surplus property now. Likewise, the
majority of respondents want the city to do something to improve the Lake Crook land.
As professional engineers and land planners we quickly see the vision of a beautiful row of
waterfront homes and a shoreline drive road that provides even the non-residents with a
spectacular vie\v of the lake. On the other hand, as conservationists we see the beauty in raw,
undisturbed land \vith turkey, water fowl, and deer along the shore. The best of both \vorlds
would be some of each.
We have provided three different development concepts and one non-development concept for
the City of Paris, We mistakenly call them options \vhereas they are not options at all . . . they
are concepts. The term "options" implies a plan \vith no flexibility whatsoever, We actually favor
and recommend a blend of these concepts.
Consulting Engineer and Planner,
Calvin T, (Terry) Brannon, FE, RPLS
"",'-.-.', '~-- '.,>r'"",,f-"""~""'~"--' .~.- r'I'."..."" ,"'~~"..~,,:-,.,',. ",
, "., ' ,-: "'-':'4i~ ." " ;':":"--.~ ,~04_\ . , 'j.~o. ~- --.~~ [;' -¡:,-".-~"-:'~""f"'i'.:I":~.:i:"J?-,;;"'~"}:' ;.".'.', >+ - ~~
",,:""l' " -,-..~ - -- ,... "-" ""-"")(1 -. '.;-3.'- ./'Q',.:.. '-_v; "-":,~,,,,,,""i-')-""~~~'..(~-' ""'.-.,.~'C.~'--"!"
,.' ,-,',.'-"-:;,¡:-~._',.."",,;,,-,,.,,:,,-.....'_..-.-'-,~-,,.' -'.-- ",---,', . ,'-.'~ ..'" ". "-'~"";':-,,:,,,..I""" .-;~'
Page 45 of 45