Loading...
12-B Awd Bid-Police & Cts Bldg DRAFT F:ALICEIRESWORKICURRENTI Award Bid - Police & Courts Bldg. Res March 9, 2005 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING AND AUTHORIZING THE AWARD OF A CONSTRUCTION CONTRACT FOR THE CONSTRUCTION AND RECONSTRUCTION AND CONVERSION OF THAT STRUCTURE FORMERLY REFERRED TO AS THE UARCO BUILDING TO A NEW POLICE, COURT, AND JAIL FACILITY; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris, Texas, did heretofore on the 13th day of May, 2002, in Resolution No. 2002-075, authorize the preparation of plans and specifications for a project of reconstruction and conversion of that structure formerly known as the DARCO building to a new police, court, and jail facility; and, WHEREAS, the City Council did heretofore, on the 24th day of August, 2004, in Resolution No. 2004-146 approve the plans and specifications for the aforesaid project; and, WHEREAS, the City Council did heretofore, on the 8th day of November, 2004, in Resolution No. 2004-199 authorize the City's architect and staff to utilize as an alternative procurement procedure the selection of a contract for construction services through the use of competitive sealed proposals in conformance with Section 271.116 of the Local Government Code; and, WHEREAS, by adoption of the aforesaid Resolution No. 2004-199, the City Council likewise authorized the City Manager and his staff to create selection criteria and the weighting of selection criteria for said competitive sealed proposal process; and, WHEREAS, the City has received competitive sealed proposals from interested contractors, has reviewed the aforesaid proposals and weighted the aforesaid proposals in conformance with the City's selection criteria as required by law; and, WHEREAS, as a consequence of said procedure, the City has identified the successful proposer for construction of the aforesaid project; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble to this resolution are hereby in all things approved. Section 2. That a construction contract for the construction, reconstruction and conversion of that structure formerly referred to as the DARCO building to a new police, courts, and jail facility shall be and is hereby authorized for award to Harrison, Walker, & Harper at the negotiated construction price of $ , and the Mayor is hereby authorized to execute and the City Clerk to attest to the aforesaid construction contract. Section 3. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this 14th day of March, 2005. Curtis Fendley, Mayor ATTEST: Janice Ellis, City Clerk APPROVED AS TO FORM: Larry W. Schenk, City Attorney Police & Courts Building Bid Analysis City of Paris 3/10/05 Base Bid (Including Root) Construction Budget (3/8/05) Status : -. Bid Alternates Add Alternate Number 3 Chain link fence at staff parking North & West sides Add Alternate Number 4 Chain link fence at staff parking South sides Add Alternate Number 5 Add asphalt topping to new roads (base installed in bid documents) Add Alternate Number 6 Add binder course at an existing paving on site to remain Deduct Alternate Number 3 Delete new roof with $50,000 allowance to repair existing roof Add Alternate Number 9 Provide additional security cameras $4,098,484 $3,892,135 . $206,349 Over Budget $13,000 $11,000 $47,000 $40,000 ($192.000) $3,250 .J Project Budget Police and Courts Facility City of Paris 3/8/05 11/07/03 02/18/05 03/08/05 Site Acquisition Land Cost 1,275,000 1,275,000 1,275,000 Site Assessment 0 0 0 Closing Costs 0 0 0 Testing Services Subsurface Soils 18,250 18,250 18,250 Construction Materials 10,000 10,000 10,000 Construction Building 3,674,031 3,865,935 3,892,135 Note G Existing Site Utilities Relocation 0 0 0 Landscape 10,000 0 0 Contingency 150,000 100,000 100,000 FF&E Furniture 270,000 270,000 270,000 Note E AV Equipment 41,904 0 0 Note E Communications Tower 0 0 0 Police Lab Equipment 0 0 0 City Budgets Asbestos Abatement 40,663 40,663 40,663 Site Survey 8,033 8,033 8,033 Telephone ' 50,000 50,000 40,000 Note F IT Cabling/Backbone 70,000 0 0 Moving Costs 2,000 2,000 2,000 Communications Relocation 0 0 0 Bond Interest 0 0 0 Site Paving Materials Allowance 20,000 0 0 Note D Project Contingency 0 0 0 Indirect Costs AlE Basic Services 338,000 338,000 338,000 Cost Estimating 10,800 10,800 10,800 Civil Engineering 36,000 36,000 24,600 Note B Landscape Design 4,400 4,400 3,600 Note B AN /Acoustical Engineer 20,500 20,500 20,500 ADA Consultant 3,750 3,750 3,750 Structural Engineering 14,700 14,700 14,700 Technology Consultant 13,000 13,000 13,000 Interior Design & Furniture Selection 38,000 38,000 38,000 As-Builts (existing) 4,000 4,000 0 Note C Reimbursable (Budget Only) 38,000 38,000 38,000 Total Project Budget 6,161,031 6,161,031 6,161,031 Note A Note A: Note B: Note C: Note D: Note E: Note F: Note G: Total project budget includes $161,031 in bond interest accrual as of 1117/2003. City to perform C.A portion of civil & landscape services. As-builts deleted from AlE contract. Site paving materials allowance moved to construction budget. AIV equipment included in construction budget. Final contract cost from City Add $10,000 from telephone budget, $11,400 from civil engineering, $800 from landscape design, $4,000 AlE as-builts. PR-t Item # 1 Item #2 Item #3 Item #4 Item #5 Item #7 Item 8b . ~ Item ##9 -Item #10 Item #11 Item ## 12 Item #13 Item #15 Item #16 Item #17 Item #18 # Item #19 Item ##20 . Item ##21 Exhibit A Paris Police and Courts Facility Post-Bid Cost Reductions 3/10/05 Item Delete sidewalks connecting court and police entrances. (Keep signage and walk to police but add stair and handrails) Delete portion of masonry screen wall at police entrance. Modify masonry screen walls to double width brick with pilasters @ 16-8" O.C.. Provide Renaissance Masonry in lieu of cast stone at masonry screen walls. Modify copings to 4" in lieu of8". Delete wall coverings at specific corridors (Public areas) Delete portions of stone tile at walls of public toilets. Provide vinyl wall covering. Simplify Monument Sign (allowance $7000) . Delete the following video cameras: #13, #14, #20, #25, #27, #28 and #29. Delete type F doors (glass panels) except those associated with the public lobbies and courtroom. Provide type B doors. Delete portion of African mahogany veneered doors. Provide plastic lamented doors (mahogany vene~r appearance). Delete areas of2~ x 2' lay-in-ceiting tiles and provide 2' x 4' lay-in ceiling tiles Delete overhead projector and recessed projection screen associated with jury. Alternate light fixture package. (Need to review submittal -$10,000) Use fiber board below insulation to create roof slopes-result in RJO insulation value Reduce size of new windows in existing walls to have 7' height. Provide one hour rating at Janitor ##1085. Delete recessed signage, lightning, and cast stone at police and courts entrance signs. Place sign on flat surface Provide base project paving in lieu of porous paving at mechanical yard. Modify transaction windows at police records and court clerks. HWH VE Bid Items Item #5 Delete northern drive including two pole lights. Item #7 Delete two flags (Concrete base an~ lights to be priced) .. Item ##9C Delete motorized shades at Communications # II 52. Item ## 14 Column CI2 to remain at courtroom. Delete one row of seating Item # I 58 Provide raised wood floor at Judge's bench in lieu of concrete Item ##28 Seal concrete floors at detention area in lieu of staining. Item ##32 Delete appliances trom contract Move to furniture budget. Item ##32 Utilize subcontractor test and balance in lieu of certified test and balance. PR-2 Item #1 Item ##4 PR-3 Item #2 . Item #3 Item ##4 . Item ##5 Item ##6a Item #7 Delete all cast stone at remaining masonry Modify all screen walls to be double wythe, no cast stone Delete electric flush valves and utilize manual . Delete electrical rolling shades at courtroom and utilize manual shades VE of AN equipment( Reduction Allowance of$5000) Delete chain link fencing at N.E. corner of building at mechanical yard. Change water heater specifications( 200 Gallons) Modify time clock sytem HV AC control to 7 day programmable thermostats Budget Adjustments Item #1 Furniture Adjustment Total Cost Reduction Budget Overage Current Status . .' . Reduction $1,770 $10,139 $0 $0 $8,185 $5,941 $3,000 $2,940 $1,050 $1,615 $1,488 $5,000 $10,000 $9,000 $1,622 $0 $1,685 $15,000 $8,183 $15,000 $2,400 $2,500 $30,000 $2,000 $3,500 $5,200 $9,500 $6,432 $3,250 $2,000 $5,000 $5,000 $11,565 $10,000 $6,384 $206,349 $206.349 $0