16-ACT ON RES APPROVING CHANGE ORDER NO 1 TO CONTRACT WITH BOBBY SMALLWOOD CONSTRUCTION CO FOR CLARKSVILLE STREET SIDEWALK PROJECTCITY COUNCIL AGENDA ITEM BRIEFING SHEET
Submittal Date:
Originating Departrnent-
Presented By:
Agenda Item No.:
03-20-2012
Engineering, Planning &
Shawn Napier, P.E. Director of
Council Date:
Development
Engineering, Planning &
16.
03-26-2012
Develo ment
RECOMMENDED MOTION:
Deliberate and act on a resolution approving Change Order No. 1 to the contract with to Bobby
Smallwood Construction Co. Inc., for the Clarksville Street Sidewalk Project; authorizing the City
Manager to negotiate and execute all necessary documents.
POLICY ISSUE(S):
Contract Change Order
BACKGROUND:
The Original bid amount is $237,006.62 and the change order is a deduction of $17,479.25. The new
contract amount will be $219,527.37. The attached change order lists what is proposed to be changed.
Other estimated fees include: the transfer of electric services from weather heads to underground lines
and replacing the meter bases that are not up to code -$8,800.00, The fee for Suddenlink to install cable
into the PVG -$1,262.30, Cost for additional easements (surveyor) and bollards around pad mounted
transformers - cost will primarily depend on easement acquisition. The light poles for the project cost
$17,406.40.
BOARD/CAMMISSION RECOMMENDATION:
E XHIBITS:
Resolution, Change Order #1
ACTION:
BUDGET INFO:
❑ Financial Report
❑
Minute Order
Expense
$219,527.37
❑ Departrnent Report
Z
Resolution
Budgeted Amt
$45,000.00
❑ Presentation
❑ Ordinance
yT'D Actual
$13,891.00
❑ Public Hearing ❑ Other
Acct Name
Downtown Sidewalk Replacement
Acct Number
25-0351-40-00
Fisc,Ar, NoTES:
REVIEWED AND APPROVED BY:
Z Administration Z City C1erk Z Eng. Planning & Development ❑ EMS/IT ❑ Finance ❑ Fire
❑ Municipal Court ❑ Legal ❑ Library ❑ Police ❑ Public Works ❑ Utilities
City of Paris 1A5 Revised 2/04/08
Draft
RESOLUTION N0.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS,
APPROVING CHANGE ORDER N0. ONE TO THE CONTRACT BETWEEN
BOBBY SMALLWOOD CONSTRUCTION CO., INC. AND THE CITY OF PARIS,
FOR CLARKSVILLE STREET DOWNTOWN SIDEWALK PROJECT; MAKING
OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND
DECLARING AN EFFECTIVE DATE.
WHEREAS, on March 12 2012, the City Council of the City of Paris passed
Resolution No. 2012-024, awarding the contract for the Clarksville Street Downtown
Sidewalk Project to Bobby Smallwood Construction Co., Inc. of Paris, Texas; and,
WHEREAS, the City Engineer, Shawn Napier, acting as project engineer,
recommends the amendment of the contract for said project based on the actual materials
to be used, and providing for a net decrease amount of $17,479.25 in the contract price, for
a revised contract price of $219,527.37, the contract time will not be increased. The date
for completion of all work will be June 26, 2012; and,
WHEREAS, Change Order No. One attached hereto as Exhibit "A", should in all
things, be approved, and the Interim City Manager should be authorized to execute the
necessary documents.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PARIS, TEXAS:
Section 1. That the findings set out in the preamble of this resolution are hereby
in all things approved.
Section 2. That Change Order No. One to the Contract between Bobby Smallwood
Construction Co., Inc. and the City of Paris for the Clarksville Street Downtown Sidewalk
Project, attached hereto as Exhibit "A", providing for a net decrease of $17,479.25 in the
contract price, for an amended total contract price of $219,527.37, and no increase in
contract time be, and the same is hereby approved.
Section 3. That the Interim City Manager be, and he is hereby, authorized and
directed to execute, on behalf of the City of Paris, any necessary documents, upon the terms
and conditions in Exhibit "A", attached hereto.
Section 4. That this resolution shall be effective immediately upon passage.
i 4 p
Allo3
Texas Department of Rural Affairs
Construction Contract Change Order Approval Request
Owner (contractor Locaiity):
Contract For (projea descriptior,):
Date: March 26, 2012
City of Paris
RE-BID Downtown Sidewalk
P.O. Box 9037
Reptacement - Clarksville St.
Project No.: TCF #710222
Paris, TX 75461
Phone #:903-785-7511
Contractor:
Engineer:
TxCDBG Contract No.
Bobby Smallwood Construction
Hayter Engineering, Inc.
TCF #710222
1795 NE 17'h
4445 SE Loop 286
Paris, TX 75460
Paris, TX 75460
Change Order No.: One (1)
Agreement Date: 3/12/12
Phone 903-785-0303
Phone 903-727-2350
En ineer's Pro'ect No.: 180050
You are hereb re uested to com I with the followin chan es from the contract lans and s ecifications:
Item
Description of Changes-Quantities, Units, Unit Prices,
Decrease in
Increase in
No.
Chan e in Com letion Scheduled, Etc.
Contract Price
Contract Price
4
Delete resurfacing existing sidewalk, (351) SF @
($13,60125)
$38.75/SF = ($13,601.25)
8
Delete Single 8" trench drain, (9) EA @$2,792.00/EA =
($25,128.00)
($25,128.00)
8
Add single one-piece 8" trench drain fabricated by North
$22,500.00
Texas Fabrication, 9 EA @ $2,500.00/EA = $22,500.00
9
Delete Double 8" trench drain, (1) EA @$6,250.00/EA =
($6,250.00)
($6,250.00)
9
Add double one-piece 8" trench drain fabricated by North
$5,000.00
Texas Fabrication, 1 EA @ $5,000.00IEA= $5,000.00
TOTAL
(E17,479.25)
Chan e in Contract Price
Chan e in Contract Time
Ori inal Contract Price: $237,006.62
Ori inal Contract Time: 105 da s
Previous Change Order(s)
Net Change From Previous
No, to No. $0.00
Chan e Orders 0 da s
Contract Price Prior to
Contract Time Prior to
this Chan e Order $237,006.62
this Chan e Order 105 da s
Net Decrease of
Net Increase/Decrease of
this Chan e Order $17,479.25
this Chan e Order 0 da s
Contract Price With all
Contract Time With all
A roved Chan e Orders $219,527.37
A roved Chan e Orders 105 da s
Cumulative % Chan e in Contract Price: 7.38%
reimbursement of costs approvea by tnis cnange oraer is suDject io approvai Qy ine vrrice.
ENGIIVEER
q ~
,
Date:
APPROVED:
By:
OWNER (Authorized Signature)
Date:
148 EXHIBIT IK
ACCEPTED:
By:
CONTRACTOR (Authorized
Signature)
Date:
JUSTIFICATION FOR CHANGE
Grant Recipient: City of Paris
TxCDBG Contract No.: 710222
Change Order No. One (1)
1. Wiil this Change Order increase or decrease
the number of beneficiaries? ❑ Increase ❑ Decrease x No Change
If there is a change, how many beneficiaries will be affected? Total UM
2. Effect of this change on scope of work: O Increase ❑ Decrease x No Change
3. Effect on operation and maintenance costs: ❑ Increase ❑ Decrease x No Change
4. Are all prices in the change order dependent upon unit prices
found in the original bid? ❑ Yes x No
If "No", explain: Trench drains will be manufactured as one
piece instead of 2' sections for cost savings.
5. Will this change be completed within the contract period?
If "No", expected completion date:
(completion date)
x Yes ❑ No
6. Has this change created new circumstances or environmental
conditions which may affect the project's impact, such as
concealed or unexpected conditions discovered during actual
construction? ❑ Yes x No
If "Yes", is an Environmental Re-assessment required? ❑ Yes ❑ No
7. Is the Texas Commission on Environmental Quality (TCEQ)
clearance still valid? x Yes ❑ No
8. Is the TCEQ permit approval still valid? (sewer projects only) ❑ Yes ❑ No
9. Are the handicapped access requirements/approval
still valid (if applicable)? x Yes ❑ No
10. Are other TxCDBG contractual special condition clearance
still valid? x Yes ❑ No
(If no, specify):
Notice: * Generally, a cumulative change in the contract price in excess of 25% cannot be approved.
Generally, items not included or identifying unit costs in the original bid documents cannot be
approved as change order items.