25-REHABILITATION OF THE EAST ELEVATED STORAGE TANKCITY COUNCIL AGENDA ITEM BRIEFING SHEET Submittal Date: 05/02/12 Originating Department: Public Works Presented By: Ronald J. Sullivan, P.E, Public A.genda Item No.: Council Date: OS/14/12 Works Director 25, RECOMMENDED MOTION: Award a contract to Classic Protective Coatings, Inc. for the Rehabilitation of the East Elevated Storage Tank in the amount of $808,334.00. POLICY ISSUE(S): Capital Improvements Program BACKGROUND: The rehabilitation of the East Elevated Storage Tank is included in this year's Capital Improvements Budget. Bids were opened for this work on May 1, 2012. We received five bids on this project. The low bid is from Classic Protective Coatings. Our consultant recommends that we award the base bid with additives 1 and 2 for a total project cost of $808,334.00. Note that the additives are contingency items and will only be used if necessary. Therefore Staff recommends that Council award a contract to Classic Protective Coatings, Inc. for the Rehabilitation of the East Elevated Storage Tank in the amount of $808,334.00. BOARD/COMMISSION RECOMMENDATION: EXHIBITS: Resolution, Letter of recommendation, bid tab, proposal of low bidder ACTION: BUDGET INFO: ❑ Financial Report ❑ Minute Order Expense $ 808,334 ❑ Department Report ❑ Resolution Budgeted Amt. $ 900,000 ❑ Presentation ❑ Ordinance ❑ P H bli i ~ O h y'I'D Actual $ 90,000 u c ear ng t er Acct. Name Acct. Number FISCAL NOTES: REVIEWED AND APPROVED BY: ~ Administration ❑ City Clerk ❑ Community Development ❑ EMS/IT ❑ Finance ❑ Fire ❑ Municipal Court ❑ Legal ❑ Library ❑ Police Z Eng./Public Works ❑ Utilities L 5/11/2012 321 RESOLUTION N0. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS, AWARDING THE CONTRACT FOR THE REHABILITATION OF THE EAST ELEVATED STORAGE TANK TO CLASSIC PROTECTIVE COATINGS, INC., THE LOWEST RESPONSIBLE BIDDER; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. Draft WHEREAS, the City Council of the City of Paris did heretofore, advertise for bids for furnishing plant, labor, materials, and equipment, and for performing all work required for the Rehabilitation of the East Elevated Storage Tank in the City of Paris, which bids were received until 3:00 o'clock p.m., Thursday, the 1st day of May, 2012; and, WHEREAS, the lowest responsible bid providing the best value to the City was received from Classic Protective Coatings, Inc., N7670 State Hwy 25, Menomonie, Wisconsin, in the amount of EIGHT HUNDRED EIGHT THOUSAND THREE HUNDRED THIRTY-FOUR DOLLARS AND NO/100 ($808,334.00) and the contract should be awarded to Classic Protective Coatings, Inc., in accordance with the Bidder's Proposal and the other terms and conditions set out in the bid documents attached hereto as Exhibit "A" and, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the bid of Classic Protective Coatings, Inc., N7670 State Hwy 25, Menomonie, Wisconsin, for the Rehabilitation of the East Elevated Storage Tank in the City of Paris is hereby accepted as the lowest responsible bid which provides the best value to the City and the contract for this project is hereby let conditioned upon said contractor executing a contract with the City, providing required bonds, proof of insurance and meeting all of the terms and specifications included in the bid documents attached hereto as Exhibit "A". Section 3. That the City Manager be, and he is hereby, authorized and directed to execute on behalf of the City of Paris all documents necessary for the Rehabilitation of the East Elevated Storage Tank in accordance with the bid documents attached hereto as Exhibit "A". Section 4. That this resolution shall be effective from and after the date of passage. 322 PASSED AND APPROVED this 14th day of May, 2012. A.J. Hashmi, M.D., Mayor ATTEST: Janice Ellis, City Clerk APPROVED AS TO FORM: W. Kent McIlyar, City Attorney " 323 ~ , ~ / • D U N H A M ENCINEERING Inspection. Design. Results. May 2, 2012 DUNHAM ENGINEERING, INC. ww-%v.DunhamEn tn2e;inq com Texas Registration Number: F- 2253 13141 Hill Rd., College Station, TX 77845 City of Paris Public Works Department 50 West Hickory Street Paris, Texas 75460 Attn: Ronald J. Sullivan, P.E., Director of Public Works Phone: (979) 690-6555 Fax: (979) 690-7034 Re: Recommendation of Contractor for Rehabilitation of 1.OMG East Elevated Water Storage Tank Project The purpose of this letter is to recommend a contractor for the above referenced project. A complete bid tabulation from the May 1" public bid opening is attached. The lowest, responsive and responsible bidder, Classic Protective Coatings, Inc. of Menomonie, Wisconsin, is recommended for award. A copy of the Bidder's Proposal is attached. Dunham Engineering has previous satisfactory experience with this contractor and has reviewed submitted references for similar projects, all of which are satisfactory. Along with award of the base bid of $778,334.00, it is recommended that Additive Bid Items Nos. 1& 2 be awarded on an as-needed basis per the Project Specifications, thereby making the maximum contract value not to exceed $808,334.00. If you should have any questions regarding the above recommendations, please feel free to call anytime. Sincerely, ~<l~~t-v~. ' ~i (i f-r- Travis C. T'atum, P.E. I k CX{ilBIT - - 324 I DUNHAM ENGINEERING ING , L% D U N H A/M ~~".DunhamEnqineerin com Registration Numbec F-002253 E N G i N E E R[ N C 13141 Hill Rd. • Coilege Station, TX 77845 • (979) 690-6555 • Mobile: (979) 820-1648 • Fax: (979) 690-7034 Bid Tabulation Sheet City of Paris - Paris, Texas Bids opened 2:00 PM, May 2012 @ City Council Chambers Contractor Base Bid Additive 1 Additive 2 Additive 3 A&M Construction $811.000 $13,000 $4,500 $No Bid Blastco S822,500 S5.000 1 500 SNo Bid Classic Protective Coatings $778,334 $5,000 S25.000 $10.000 M.K. Painting 5807,000 $20,000 $10.000 $No Bid TM[ S1,167,000 S10,000 56,000 $NoBid Dunham Engineering 1 . 32~ SECTIO;'V I11 6IDDEIZ'S C'ROPOSAL Da te ~p 21,_ 2012, Pl'OpOSal Of ~.C~111j~(p. 1 a corporatiun orgaiiized and existing uiuler laws of the State of IC~ -'j.; a pax•tnersl,ip consistinb of an inciividual tradinb as 'I'o: Citv of Paris ~ Public Works Department 50 West Hickvey Street Paris, Texas 75460 Deac Sir: Pucsuant to the Eorgoing Notice to Biddei-s, the undersigned biddez- hereby proposes to do al! the wurk and hirtiish all necessar}= superintendence, (abor, machinery, equipment, tools and materials, and whatever else may be necessary to conlp(ete all the work upon which he bids, as provided by tlle attached specifications and shown o►l the plans, and binds himsetf on acceptance o[ this proposal to execute a contract and bonci, according to the accampanyina forms, Eor perEoriiiing and cornpleting the said work wittiiTi the time stated and maiiltaining saine as reqtiired by the detailed speciEications for the following prices lo wit: RECEl1/ED MAY - 1 2012 CITY MANAGER PARIS, TEXAS SccEion I.[I - 1 1- 32b BASE BID ITEMS Iteiil Estimated DCSCI'IpYIOiI ariCj No. Qulntity Price in WorLis 1. Lump Sum Furnish tnaterial and labor to replace the coating systems pei• tlie Technica( Specificatioiis ~ for a lump sucn of ~ / ~ ciol)ars aizd /Zo cetlts. 2. Lump Sum FU7'i11Sl1 11'tlfeYtdl c"17"1d I1bOI' tO pei'f0J'I11 fhC I'e~.~c11J' 1tEI1lS per the Technical Specifications foi• a lump sul1i of 1-_ ~Gr /~i _ G'~~' t/~ /1 dollars and !/vi cenis. Total Pricc $~:5j `l.. Su~ Base Bid - total of Iteziis 1& 2 above: ~ i. Tz- ao pz' dollars and ceiits Additive Bid Ilems Next Pan,e Secrion III - 2 (~'I U GV~~ l~ ~ MaY - 1 2012 '~is ~~R 1 327 Additive 13id Item #1 Uilit Price E Cll"11tSl1 Ii11feC1S1 111CL li1b0T f0 C('pZll" COI'I"OS10Il liai11ag('d dCt'aS a11d I"lOIeS Up t0 6" in diameter as needed pcr the Technical Specifications for a unit price per area of ctollars anci-&_ cents _..x 200 areas = s~Ci~_ Additive I3id Item #2 LIIIIIt) SLIlII Eurniskl ciiaterial and labor to p.ressure wastz the interior blast cleaned az'ecis to recnove surFace conl-aminants as rieeded per the "Technical Specifications for a lcamp sum of /„~,-.~Y~'~j~' SCtOII'clt'S 111CI-Z~ c e i zfs $~S ~ _7_ ~ Additive Bid Itein #3 Lump Suyn Pricing Not Required Add J),~0~.-. or deduct froin Base Bid to insta(l Alternate Coating System per the Tecklnical Specifications. Section [lt -:3 ` 328 The uizdersigned Uiddei- agrees to coinmcrice woi-k within ten (10) days aftez' the date af written notice to commence work. 'I'lze work will be substantial(y completed in olie htltidred fifty (150) calendai• days subject to the extensions oE tiiiie as are provided by the General Conditions of the Contract. nwner and Coiltractor i•ecogtiize that time is of the essence and that Owner will suffer financial loss if the wark coiitemplated in this Project is not completed witllin the tizlle specified plus any extensions allowed in change orders granted pursuaiit to the General Conditions. Owner and Contraccor recognize the delays, expenses and difficulties involved iat proving the actual Ioss suffered by Owner if the work to be colnpleted in the I'roject is not completed on time. Accordingiy, instead of requiriiig ariy such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Cozitractor shall pay Owi1ei- Two fiundred Fifty Dollars ($250.00) pcr calendar day for each day that expires after the time specified herein far completion of the work. Erlc]osed witll this proposal is a casiiiei•'s or cei-tificd check fo►• ar a bid botid in the suin oflL_-,~'~~1 Dollars, which it is agreed shall be collected and z-etained by the Owner as liquidated da»Zages in the event tllis proposal is accepted by the Owner within tiiii•ty (30) days after the date advei•tised for the receptioil ol bids and the undez•szgned fails to execute the contract and the i-eqtiired bonci with tiic Ownet-, undei- the roilditions hc►•eof, withiai fifteen (75) days after the said proposal is acmpted, otherwise, said check or bond shall be returned to the undersigiied upon demand. The undersigned hereby declaz•es that he has visited the site and has carefully examine(l the contract documents relative Eo the work covered by the above Uid. IZespcctfulty subiiiihled BIddC.'1": i Signed: T i t ( e: Ad di•ess: _Ni b~~ '0')iCsrr: ~Uo , Seal - if bidder is a coz•poi•atioii Section J11 - 4 34,90 1 , : ) U N H A M =NGINEERING lnspection. Deslgn. Resulfs. DUNHAM ENGINEERING, INC. www.DunhamEnqineerina.com Texas Registration Number: F- 2253 13141 Hill Rd., College Station, TX 77845 Phone: (979) 690-6555 Fax: (979) 690-7034 SPECFICATIONS AND CONTRACT DOCUMENTS REHABILITATION OF 1.OMG EAST ELEVATED WATER STORAGE TANK CITY OF PARIS, TEXAS ' y~P.~E 0 F tF~~s 1 ~....i ~ TRAVIS CTATU~ ti 110343 ; ~ ~~CENSE~ ~,~i - PREPARED BY: DUNHAM ENGINEERING, INC. TEXAS REGISTRATION NO. F-2253 13141 HILL ROAD COLLEGE STATION, TEXAS 77845 MARCH 2012 Ownership of Documents: This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of Dunham Engineering, Inc. and is not to be used, in whole or in part for any project without the written authorization of Travis C. Tatum, P.E. 1 320 TABLE OF CONTENTS SECTION DESCRIPTION NUMBER I Notice to Bidders II Instructions to Bidders III Bidder's Proposal IV Standard Form of Agreement V Bonds VI General Conditions VII Special Conditions VIII Technical Specifications A. Summary of Work (SW) B. Technical Specification No. 2(TS 2) Commercial Blast Cleaning C. Technical Specification No. 3(TS 3) Near-White Blast Cleaning D. Technical Specification No. 10 (TS 10) Disinfection of Tank E. Technical Specification No. 20 (TS 20) Paints & Painting F. Technical Specification No. 35 (TS 35) Lead Abatement G. Technical Specification No. 40 (TS 40) Welding DRAWINGS A. 30" Diameter Roof Hatch B. 30" Square Roof Hatch C. 30" Roof Vent D. Ladder - ~ 331 E. Handrail F. Antenna Bracket G. Rafter & Center Ring Repairs H. Splash Pad APPENDIX A. Maps to Site B. Engineer's Report of Inspection C. Laboratory Analysis of Lead Content in Coating D. SSPC Guide 6- Containment E. SSPC Guide 12 - Lighting F. SSPC SP 6- Commercial Blast Cleaning G. SSPC SP 10 - Near-White Metal Blast Cleaning " 332 SECTION I NOTICE TO BIDDERS NOTICE TO BIDDERS OF THE INTENTION OF CITY OF PARIS OF PARIS, TEXAS TO AWARD A CONSTRUCTION CONTRACT FOR THE REHABILITATION OF THE EAST ELEVATED WATER STORAGE TANK. Sealed bids will be received from qualified contractors addressed to Citv of Paris, Public Works Building, 50 West Hickory Street, Paris, Texas 75460 or delivered to the same address unti12:00 PM, APRIL 17, 2012, for furnishing all labor, materials and equipment for the work required for rehabilitation of the water storage tank as listed in the specifications for the East Elevated Water Storage Tank Rehabilitation Project, prepared by Dunham Engineering, Inc. Proposals will be publicly opened and read aloud at the address above at the same time and date. Any bid received after the above closing time will be returned unopened. The work consists of rehabilitating a one million gallon elevated water storage tank located in Paris, Texas. Bids shall include one (1) original and one (1) complete copy and be submitted in a sealed envelope upon the blank form of proposal furnished. Sealed envelopes shall be marked in the upper left hand corner as follows: "DO NOT OPEN IN MAIL ROOM SEALED BID EAST ELEVATED WATER STORAGE TANK REHABILITATION PROJECT TO BE OPENED: 2:00 PM, APRIL 17, 2012" All proposals shall be accompanied by a cashier's or certified check upon a national or state bank in the amount of 5% of the total bid amount, payable to City of Paris or a bid bond in the same amount from a reliable surety company as a guarantee that the bidder will enter into a contract and execute performance and payment bonds within fifteen (15) days after notice of award. Bids without check or bid bond will not be considered. All payment and performance bonds must be issued by a surety licensed by the Texas Department of Insurance and must have a minimum Best Key Rating Guide of "A" or "A_11 SECTION I -1 334 The Contract will be awarded to the responsible bidder who, in the opinion of the Owner and Engineer, is best capable of performing the work. The evaluation shall be based on the contractor's previous work experience, available resources, knowledge of the work and bid price. The OWNER reserves the right to reject any or all bids and to waive any and all informalities in bidding. Plans and specifications are on file at the Engineer's office in College Station, TX. Proposal forms and specifications may be obtained from Dunham Engineering, Inc., 13141 Hill Rd., College Station, Texas 77845, Phone (979) 690-6555, upon deposit of $75.00 per set. The amount of deposit will be refunded to each bidder who returns the documents in good condition within ten days after opening bids or any contractor who returns the documents in good condition before bids are opened. Deposits of Sup1~ iers and subcontractors, and deposits for electronic copies will not be refunded. Contractors who do not return plans before bid date or who do not bid forfeit the bid deposit. Bidders are expected to inspect the site of the work and to inform themselves of local conditions, and carefully examine the specifications and other documents. Should the bidder find discrepancies in, or omissions from the specifications or documents, or have a question regarding their meaning, bidder should at once notify Dunham Engineering and obtain clarification prior to submitting any bid. The project site is located in the 600 block of 25th Street NE, Paris, Texas. Contact the Water System Manager at 903-784-9289 to arrange a site visit. The site can be inspected during normal operating hours Monday - Friday from 8:00 a.m. to 4:00 p.m. A pre-bid conference will not be held. Call the Engineer to ask any question pertaining to the project requirements. Contact the Engineer at office phone No. 979-690-6555. END OF NOTICE TO BIDDERS SECTION I - 2 335 SECTION II INSTRUCTIONS TO BIDDERS PREPARATION AND SUBMISSION OF PROPOSAL Bids shall be prepared by filling in all the blank spaces of the proposal form, which is part of these documents. The proposal may be removed from the bound documents and submitted separately. Bids may be rendered out of form and then subject to rejection by non-responsiveness by failure to supply all information indicated, or by making any limitation, condition or provisions: bids which are out of form are subject to rejection at the discretion of the Owner. Bids shall include one (1) original and one (1) cornplete copy and be submitted in a sealed envelope that is clearly identified with the name and address of the bidder and bearing a statement indicating the project on which the bid is submitted. A bidder may withdraw his proposal only by presenting a written statement to the effect prior to the closing time. The proposal shall be executed in ink in the complete and correct name of the individual, firm, corporation, or combination thereof making the proposal and be signed by the person or persons authorized to legally bind the individual, firm, corporation or combination thereof. 2. EXAMINATION OF SITE Prior to submission of a proposal, the bidder shall have made a thorough examination of the site of the work and of the plans and specifications, and shall become informed as to the location and nature of the proposed construction, labor conditions and all other matters including climate and wind conditions that may effect the cost and time of completion of the work upon which he bids. The submission of a bid by bidder shall be conclusive evidence that he has complied with these requirements. 3. INTERPRETATION OF ESTIMATES OF QUANTITIES The quantities listed in the Proposal Form will be considered as approximate and will be used for the comparison of bids. Payments will be made to the contractor only for the actual quantities of work done or materials furnished in accordance with the contract. The quantity of work to be done and materials to be furnished may be increased or decreased, as allowed by Texas law and provided in the General Provisions. 4. INTERPRETATION OF QUOTED PRICES In case of a difference between the written words and any figure in a proposal, the amount stated in writing will be computed as the bid amount. SECTION II -1 337 5. DISCREPANCIES IN BIDS In case of lack of clarity of a proposal, the Owner will adopt the most advantageous interpretation thereof or may reject the bid. 6. UNBALANCED BIDS Unreasonable or unbalanced unit prices that do not generally reflect industry standard pricing will be cause for rejection of any bids. 7. INTERPRETATION OF PLANS AND SPECIFICATIONS Any written questions as to the meaning of any plans and/ or specifications will be answered by addendum which will be sent to all who have been furnished with contract documents and plans. Questions in writing shall be directed to the Engineer for consideration and response. 8. BID BOND The bidder shall provide with the proposal a cashier's or certified check or a bid bond in the amount equal to five percent (5%) of the total proposal price. All bid securities will be returned to respective bidders within ten (10) days after bids are opened except those which the District elects to hold until the successful bidder has executed the Contract and furnished performance and payment bonds. The successful bidder will receive his bid bond within ten (10) days after execution of the Contract and Owner's acceptance of required performance and payment bonds. 9. METHOD OF AWARD Contract will be awarded to the lowest responsible bidder or to the bidder who provides the goods specified herein at the best value to the Owner, in compliance with Texas Local Government Code, Chapter 252.043. The Owner reserves the right to select the method in the best interest of the Owner. Best value criteria includes but is not limited to: * All costs including installation, maintenance, warranty, overall life cycle. * Quality of the goods and services. * Reputation of the bidder or bidder's goods and services. * Extent to which goods or services meet the Owner's needs. The Owner reserves the right to waive any informalities or technical errors that, in its judgment, will best serve the interest of the Owner. SECTION II -2 , 338 10. CONTRACTOR'S INSURANCE The CONTRACTOR, before starting work for the OWNER, must furnish to the OWNER, Certificates of Insurance or other acceptable evidence from a reputable insurance company or companies (such companies to be acceptable to the Owner) licensed to write insurance in the State of Texas, showing that the CONTRACTOR is covered by the insurance as follows: (1) Statutorv Worker's Compensation Insurance with Employer's Liability Insurance in the amount of $1 000,000. (2) Comprehensive General Liability Insurance with a$1,000,000. Combined Single Limit. (3) Comprehensive Automobile Liability Insurance with a$1,000,000 Combined Single Limit on all self-propelled vehicles used in connection with the contract, whether owned, non-owned or hired. (4) Umbrella Liabilitv Coverage: The insurance shall protect the Contractor and additional insured against all claims in excess of the limits provided under the employer's liability, comprehensive automobile liability, and commercial general liability policies. The liability limits of the umbrella policy shall not be less than $1,000,000.00. The policy shall be an "occurrence" type policy. The Contractor will be required to furnish satisfactory certificates to the Owner for all the above required coverage with the contract. Such certificates shall be from insurance companies acceptable to the Owner, name the Owner as additional insured, provide waiver of subrogation in favor of Owner and include 30 days written notice to the Owner for cancellation or change in the coverage. The Certificates of Insurance must verify that no endorsements limiting or reducing coverage for the additional insured are a part of the liability policy contract. The Contractor shall be responsible for insurance to cover equipment, tools, materials, supplies, etc. used in the performance of work owned or rented, the capital value of which is not included in the cost of this contract. Insurance policies are to be written by companies authorized to do business under the laws of the State of Texas and on forms approved by the State Board of Insurance of the State of Texas. The Contractor shall provide the Owner a copy of all insurance policies. SECTION II -3 " 339 In addition to being authorized to do business in the State of Texas, the insurance company must also be listed on the Department of Treasury Circular 5701isting the Department's approved sureties. 11. INDEMNIFICATION CONTRACTOR SHALL, TO THE FULLEST EXTENT PERMITTED BY LAWS AND REGULATIONS, INDEMNIFY AND HOLD HARMLESS OWNER FROM AND AGAINST ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, FEES OF ENGINEERS, ARCHITECTS, ATTORNEYS AND OTHER PROFESSIONALS AND COURT COSTS) ARISING DIRECTLY, INDIRECTLY OR CONSEQUENTIALLY OUT OF ANY ACTION, LEGAL OR EQUITABLE, BROUGHT BY ANY SUCH OTHER PARTY AGAINST OWNER TO THE EXTENT BASED ON A CLAIM ARISING OUT OF CONTRACTOR'S NEGLIGENT PERFORMANCE OF THE WORK. IT IS THE EXPRESSED INTENT OF THE PARTIES HERETO THAT THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH IS INDEMNITY BY CONTRACTOR TO INDEMNIFY AND PROTECT OWNER FROM THE CONSEQUENCES OF OWNER'S OWN NEGLIGENCE, WHEN THAT NEGLIGENCE ON THE PART OF THE OWNER IS A CONCURRING CAUSE OF THE INJURY, DEATH OR DAMAGE. FURTHERMORE, THE INDEMNITY PROVIDED FOR IN THIS PARAGRAPH SHALL HAVE NO APPLICATION TO ANY CLAIM, LOSS, DAMAGE, AND CAUSE OF ACTION, SUIT AND LIABILITY WHERE THE INJURY, DEATH OR DAMAGE RESULTS FROM THE SOLE NEGLIGENCE OF THE OWNER INDEPENDENT OF THE FAULT OF ANY OTHER PERSON OR ENTITY. 12. ANTITRUST CONTRACTOR hereby assigns to OWNER any and all claims for overcharges associated with this contract which arise under the antitrust laws of the United States, 15 U.S.C.A.Sec.1 et seq. (1973) 13. PRICE OF MATERIALS AND SALES TAX This contract is entered into by an organization which qualifies for exempt revisions pursuant to the Texas Tax Code. The Contractor is responsible for separating the cost of materials and labor to perform the work. 14. SUB-CONTRACTING The bidder shall perform, within his own organization, work of a value of not less than ninety-five (95%) percent of the value of all work embraced in the Contract exclusive of SECTION II -4 ~ . 340 items not commonly found in contracts for similar work or which acquire highly specialized knowledge, craftsmanship and/or equipment not normally available to contractors performing work of the character embraced in the Contract. 15. EXPERIENCE RECORD In order for the OWNER and the ENGINEER to give proper consideration to each bidder and in order to expedite the selection of the lowest responsive and responsible bid, each bidder is required to fill out the EXPERIENCE RECORD form found at the end of this section. SECTION II -5 11 341 EXPERIENCE RECORD Similar Projects Bidder successfully completed within past two (2) years Amount Contract Type Work Date Accepted Name & Phone # Owner Similar Projects Bidder now in process of completing Amount Contract Type Work Date Finish Surety BONDS on Uncompleted Work Amount Contract Amount Bond Current Name, address Owner Name of Surety Company List of Equipment owned by Bidder in serviceable condition and available for use On this project Portion of Work Bidder proposes to sublet, amount, type and to whom Dated at this day of , 201_. Name of Contractor SECTION II -6 ~ ` 342 SECTION III BIDDER'S PROPOSAL Date Proposal of a corporation organized and existing under laws of the State of a partnership consisting of an individual trading as To: City of Paris Public Works Department 50 West Hickory Street Paris, Texas 75460 Dear Sir: Pursuant to the forgoing Notice to Bidders, the undersigned bidder hereby proposes to do all the work and furnish all necessary superintendence, labor, machinery, equipment, tools and materials, and whatever else may be necessary to complete all the work upon which he bids, as provided by the attached specifications and shown on the plans, and binds himself on acceptance of this proposal to execute a contract and bond, according to the accompanying forms, for performing and completing the said work within the time stated and maintaining same as required by the detailed specifications for the following prices to wit: " 344 Section III -1 BASE BID ITEMS Item Estimated Description and No. Quantity Price in Words 1. Lump Sum Furnish material and labor to replace the coating systems per the Technical Specifications for a lump sum of dollars and _ 2. Lump Sum Furnish material and labor to perform the repair items per the Technical Specifications for a lump sum of dollars and Base Bid - total of Items 1& 2 above: $ cents. cents. Total Price $ $ dollars and cents Additive Bid Items Next Page " 345 Section III - 2 Additive Bid Item #1 Unit Price Furnish material and labor to repair corrosion damaged areas and holes up to 6" in diameter as needed per the Technical Specifications for a unit price per area of dollars and cents $ x 200 areas = $ Additive Bid Item #2 Lump Sum Furnish material and labor to pressure wash the interior blast cleaned areas to remove surface contaminants as needed per the Technical Specifications for a lump sum of dollars and cents Additive Bid Item #3 Lurnp Sum Pricing Not Required Add $ or deduct $ from Base Bid to install Alternate Coating System per the Technical Specifications. 1, 346 Section III - 3 The undersigned bidder agrees to commence work within ten (10) days after the date of written notice to commence work. The work will be substantially completed in one hundred twenty (120) calendar days subject to the extensions of time as are provided by the General Conditions of the Contract. Owner and Contractor recognize that time is of the essence and that Owner will suffer financial loss if the work contemplated in this Project is not completed within the time specified plus any extensions allowed in change orders granted pursuant to the General Conditions. Owner and Contractor recognize the delays, expenses and difficulties involved in proving the actual loss suffered by Owner if the work to be completed in the Project is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner Two Hundred Fifty Dollars ($250.00) per calendar day for each day that expires after the time specified herein for completion of the work. Enclosed with this proposal is a cashier's or certified check for ) Dollars, or a bid bond in the sum of ~ Dollars, which it is agreed shall be collected and retained by the Owner as liquidated damages in the event this proposal is accepted by the Owner within thirty (30) days after the date advertised for the reception of bids and the undersigned fails to execute the contract and the required bond with the Owner, under the conditions hereof, within fifteen (15) days after the said proposal is accepted, otherwise, said check or bond shall be returned to the undersigned upon demand. The undersigned hereby declares that he has visited the site and has carefully examined the contract documents relative to the work covered by the above bid. Respectfully submitted, Bidder: Signed: Title: Address: Seal - if bidder is a corporation ~ , 347 Section III - 4 SECTION IV STANDARD FORM OF AGREEMENT As Adopted By THE TEXAS SECTION OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS STATE OF TEXAS COUNTY OF LAMAR THIS AGREEMENT, made and entered into this day of , A.D., 2011, by and between City of Paris, of the City of Paris, of the State of Texas, acting through the , thereunto duly authorized so to do, Party of the First Part, hereinafter termed OWNER, and of the City of , and State of . Party of the Second Part, hereinafter termed CONTRACTOR. WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the Party of the First Part (OWNER), and under the conditions expressed in the bond bearing even date herewith, the said Party of the Second Part (CONTRACTOR), hereby agrees with the said Party of the First part (OWNER) to commence and complete the construction of certain improvements described as follows: Furnish all material and labor for the repair and repainting of the 1.OMG East Elevated Water Storage Tank, located in the 600 block of 251h Street NE, Paris, Texas. in accordance with the base bid and all extra work in connection therewith, under the terms as stated in the General Conditions of the Agreement and at his own proper cost and expense to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said construction in accordance with the conditions and prices stated in the Proposal attached hereto, and in accordance with the Notice to Contractors, General and Special Conditions of Agreement, Plans and other drawings and printed or written explanatory matter thereof, and the Specifications and addenda therefore, as prepared by Dunham Engineering, Inc.,13141 Hill Rd., College Station, Texas 77845, (979) 690- 6555 herein entitled the ENGINEER, each of which has been identified by the CONTRACTOR and the ENGINEER, together with the CONTRACTOR'S written Proposal, the General Conditions of the Agreement, and the Performance and Payment Bonds hereto attached; all of which are made a part hereof and collectively evidence and constitute the entire contract. SECTION IV -1 1 349 The CONTRACTOR hereby agrees to commence work within ten (10) days after the date written notice to do so shall have been given to him, and to substantially complete the same within one hundred twenty (120) calendar days after the date of the written notice to commence work, subject to the extensions of time as are provided by the General Conditions of the contract. OWNER and CONTRACTOR recognize that time is of the essence and that OWNER will suffer financial loss if the work contemplated in the Project is not completed within the time specified plus any extensions allowed in change orders granted pursuant to the General Conditions. OWNER and CONTRACTOR recognize the delays, expenses and difficulties involved in proving the actual loss suffered by OWNER if the work to be completed in the Project is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER Two Hundred Fifty Dollars ($250.00) per calendar day for each day that expires after the time specified herein for completion of the work. IN WITNESS THEREOF, the parties to these presents have executed this Agreement in the year and day first above written. Party, First Part (OWNER) By: ATTEST: (SEAL) Party, Second Part (CONTRACTOR) By: ATTEST: (SEAL) SECTION IV - 2 11 350 BID BOND : BIDDER (Name and Address) SURE71' (Name and Address of Principal Place of Business): OVYNER (Name and Address): BID + BID DUE DATE: PROJECT (Brief Description Including Location): BONll BOND NUMBER: _ ~ . DAT'E: (Nat later than Bid Due Date): PENAL SUM: IN 1NITNESS 1hqHEREOF, Sureh, and Bidder, intending to be legallV bound hereby, subject to the terms printed an the reverse side hereo(, cio each cause this Bid Bond ta be duly executed on its behalf by its authorized officer, agent, vr representabve. BIDDER SU~ETY Bidder's Name and Corporate Sca1 N Signaturr and Title Attest Signature and Tide (Seal) (Seal) Sureh-'s Name and Corporabe Seal Bt•: Signatvre and 1'itle (Att»ch Aower of Attorney) Atbest - Signeture and Title Notc ) Above addresses are m tx used for giving required notice. (2) Anv singular reference tc) Bidder, Surery, Owner or other party shall be considered plura] where applicable. E1CDC Nl.~. 3910-28-t: (7440 Edition) SECTION V 1 1. Bidder and 5ureh-, jointh, anci severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to Owner upon default of Bidder the pena] sum set forth on dhe face of this Bond. 2. Default of Bidder shall occur upan the failure of Bidder to deliver within the time required by the Bidding Documents the executed Agreement required by the Bidding Documents and any perfarmance and payment bonds required b}' the Bidding Document,5 and Contract Documents. 3. This obligation shall be null and void if: 3.1 Owner accepts Bidder's bid and Bidder delivers witlwi the time required by the Bidding Documents (or any extension thereof agreed to in writuig liy Owner) dle executed Agreement required by the Bidding Docuinents and an1~ perfarmance and payment bonds required by the Bidding Documents and Contract Documents, or - 3.2 All bids are rejected b}' Owner, or 33 Owner fails to issue a notice of award to Bidder within the time specified in the Bidding Documents {or any extension thereof agreed to in writing b}' Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereoo. 4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days afier receipt by Bidder and Surety nf Written notice of defauit from Owner, which notice will he given with reasonable promptness, identifying this Bond and the Project and induding a sratement of the amount due. 5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue notice of award agreed to in writing by Owner and Bidder, provided that the time for issuing notice of award including extensions shall not in the aggregate exceed 120 days from Bid Due Date without Surety's written consent. E)CDC NO. 1910-28-C (1990 Edition) 6. No suit or action shall be cammenced under this Bond prior to 30 calendar da}•s after dir notice ot default required in paragraph 4 abovr is received b5f Bidder and Surety, and in no case later than one year after Bid Due Date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which dle Project is located. Notice required hereunder shall be in writing and sent to Bidder and Surety at dieii respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, pos4ge pre-paid, and shall be deemed to be effective upon receipt by the parhy concerned. 9. Surety shall cause to be attached to this Bond a current and effective Power af Attomey evidencing the authoriiy of the officer, agent or representative who executed t}tis Bond on behalf of Surety to exec-ite, seal and deliver such Bond and bind the Surety thereby. 10. This Band is intended to conform to all applicabie statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of the Bond conflicts with any applicable provision of any applicable statute, then the provision of said sfiatute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in fuli force and effect. 11. The term "bid" as used herein includes a bid, offer or proposal as applicable. 35~ SECTION V 2 PERFORMANCE BOND STATE OF TEXAS COUIVTY OF KNOW AL,L MEN BY THESE PRESENTS: That of the City of , County of , and State of as principal, and authorized under the laws of the State of Texas to act as surety on bonds for principals, are held and firmly bound unta (Owner), in the penal sum of Dollars ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, adrninistrators, executors, successors and assigns, jointlti, and severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, dated day of , 20 , to which contract is hereby referred to and made a part hereof as fuliy and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Contract, and shall in all respects duly and faithfully observe and perform all and singular the covenants, condiHons and agreements in and by said contract agreed and covenanted by the Principal to be orserved and performed, and according to the true intent and meaning of said Contract and the Plans and Specifications hereto arunexed, then this obligation shall be void; otherwise, to remaul in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code and all liabilities on this bond shall be determined in accordance with the provisions of said Article to the same extent as if it were copied at length herein. Sw•ety, for value received, stipulates and agrees that no change, extension of time, alteration or additian to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and i# does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder. _ . 354 SECTION V-3 II` 11'ITNESS WHEREOF, the said Principal and Suret}' have signed and sealed this instrumeilt this dav of , 20 (SEAL) Prinripal BN,: Title: Address: (SEAL) Surety Bv: Title: Address: Telephone: Telephone: Naine and address af the Resident Agency of Suretv is: File Number: Couittersignature of officer, director, principal or shareholder of the Resident Agerlt of Suretv: Printed Name: 355 SECTION V 4 PAYMENT BOND STATE OF TEXAS COUNTY OF KN01ti' ALL MEN BY THESE PRESENTS: That of the City of County of ~ and State of , as principal, and authorized under the laws of the State of Texas to act as surety on bonds for principals, are lleld and firmly bound unto (O-ATner), un the penal sum of Dollars ) for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly arid severally, by these presents: WHEREAS, the Principal has entered into a certain written contract with the Owner, dated day of 20 , ta which contract is hereby referred to and made a part hereof as full}J and to the same extent as if copied at length herein. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Pru-icipal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided £or in said contract, then, this obligation shall be void; otherwise, to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of the Texas Government Code and all liabilities on this bond shall be determined in accordance with the provisions of said Articie to the same extent as if it were copied at length herein. Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, or to the work performed thereunder, or the plans, specifications, or drawings accornpanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder. SECTION V-S- - 35,6 IN 1NITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this dav of 20 (SEAL) Principal By: Title: Address: Telephone: (SEAL) Surety By: Title: Address: Telephone: Name and address af the Residenk Agency of Surety is: File Number: Countersigriature of officer, director, principal or shareholder of the Resident Agent of Sureh' Printed Name: SECTION V-6- ~ 357 This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the controlling Laws and Regulations. STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT Prepared by ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE and Issued and Published Jointly by ACEC :1-xua~Qmvncuo, l'.r.niiu.cc(:o.ir,cn< <Ri~~__ ~MIr(~/_aA~Nr7si~ ASCE American Society of Civii Engineers National Society of Professional Engineers Prolesslona! fngineers 1n PNva1e Practice AMERICAN COUNCIL OF ENGINEERING COMPANIES ASSOCIATED GENERAL CONTRACTORS OF AMERICA AMERICAN SOCIETY OF CNIL ENGINEERS PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE A Practice Division of the NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS Endorsed by v CONSTRUCTION SPECIFICATIONS INSTITUTE EJCDC C-700 Standard General CondiHons of the Construction Conhact Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. ` 359 These General Conditions have been prepared for use with the Suggested Forms of Agreement Between Owner and Contractor (EJCDC G520 ar G525, 2007 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other. Comments concerning their usage are contained in the Narrative Guide to the EJCDC Construction Documents (EJCDC C-001, 2007 Edition). For guidance in the preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (EJCDC C-800, 2007 Edition). Copyright C) 2007 National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314-2794 (703) 684-2882 www.nspe.or~ American Council of Engineering Companies 1015 15th Street N.W., Washington, DC 20005 (202) 347-7474 www.acec.org American Society of Civil Engineers 1801 Alexander Bell Drive, Reston, VA 20191-4400 (800) 548-2723 www.asce.org Associated General Contractors of America 2300 Wilson Boulevard, Suite 400, Arlington, VA 22201-3308 (703) 548-3118 www.agc.org The copyright for this EJCDC document is owned jointly by the four EJCDC sponsoring organizations and held in trust for their benefit by NSPE. EJCDC C-700 Standard General Conditions of the ConstrucNon Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. ~ ~ 3.60 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Article 1- Definitions and Terminology 1.01 Defined Terms 1.02 Terminology Page .....................1 .....................1 5 Article 2 - Preliminary Matters 2.01 Delivery of Bonds and Evidence of Insurance 2.02 Copies of Documents 2.03 Commencement of Contract Times; Notice to Proceed 2.04 Starting the Work 2.05 Before Starting Construction 2.06 Preconstruction Conference; Designation ofAuthorized Representatives 2.07 Initial Acceptance of Schedules Article 3- Contract Documents: Intent, Amending, Reuse 3.01 Intent . . . . . . . . . . . . . . . . . . . . . . 3.02 Reference Standards 3.03 Reporting and Resolving Discrepancies 3.04 Amending and Supplementing Contract Documents 3.05 Reuse of Documents 3.06 Electronic Data 6 6 6 6 7 7 7 7 8 8 8 9 9 ..............10 ..............10 Article 4- Availability of Lands; Subsurface and Physical Conditions; Hazardous Enviromnental Conditions; Reference Points 11 4.01 Availability of Lands ...................................................................................................................11 4.02 Subsurface and Physical Conditions 11 4.03 Differing Subsurface or Physical Conditions .............................................................................12 4.04 Underground Facilities ................................................................................................................13 4.05 Reference Points ..........................................................................................................................14 4.06 Hazardous Environmental Condition at Site ..............................................................................14 Article 5- Bonds and Insurance 16 5.01 Performance, Payment, and Other Bonds 16 5.02 Licensed Sureties and Insurers 16 5.03 Certificates of Insurance 17 5.04 Contractor's Insurance 17 5.05 Owner's Liability Insurance 19 5.06 Property Insurance 19 5.07 Waiver of Rights 20 5.08 Receipt and Application of Insurance Proceeds 21 EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright O 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. PaQei 361 5.09 Acceptance of Bonds and Insurance; Option to Replace 21 5.10 Partial Utilization, Acknowledgment of Property Insurer 22 Article 6 - Contractor's Responsibilities ....................................22 6.01 Supervision and Superintendence ....................................22 6.02 Labor; Working Hours ....................................22 6.03 Services, Materials, and Equipment 22 6.04 Progress Schedule ....................................23 6.05 Substitutes and "Or-Equals" 23 6.06 Concerning Subcontractors, Suppliers, and Others ....................................25 6.07 Patent Fees and Royalties ....................................27 6.08 Permits ....................................27 6.09 Laws and Regulations 28 6.10 Taxes .................................28 6.11 Use of Site and Other Areas ....................................28 6.12 Record Documents 29 6.13 Safety and Protection 29 6.14 Safety Representative 30 6.15 Hazard Communication Programs .....................................30 6.16 Emergencies 30 6.17 Shop Drawings and Samples 31 6.18 Continuing the Work .....................................32 6.19 Contractor's General Warranty and Guarantee 33 6.20 Indemnification .....................................33 6.21 Delegation of Professional Design Services .....................................34 Article 7- Other Work at the Site .....................................35 7.01 Related Work at Site .....................................35 7.02 Coordination .....................................35 7.03 I.,egal Relationships .....................................36 Article 8 - Owner's Responsibilities .....................................36 8.01 Coinmunications to Contractor .....................................36 8.02 Replacement of Engineer 36 8.03 Furnish Data 36 8.04 Pay When Due .....................................36 8.05 Lands and Easements; Reports and Tests ......................................36 8.06 Insurance 36 8.07 Change Orders ......................................37 8.08 Inspections, Tests, and Approvals ......................................37 8.09 Limitations on Owner's Responsibilities ......................................37 8.10 Undisclosed Hazardous Environmental Condition 37 8.11 Evidence of Financial Arrangements ......................................37 8.12 Compliance with Safety Program ......................................37 Article 9- Engineer's Status During Construction 37 9.01 Owner's Representative 37 EdCDC C-700 Standard General Conditions of the ConstrucNon Contract Copyright C 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e ii " 362 9.02 Visits to Site 37 9.03 Project Representative .................................................................................................................38 9.04 Authorized Variations in Work 38 9.05 Rejecting Defective Work ...........................................................................................................38 9.06 Shop Drawings, Change Orders and Payments 39 9.07 Determinations for Unit Price Work ..........................................................................................39 9.08 Decisions on Requirements of Contract Documents and Acceptability of Work 39 9.09 Limitations on Engineer's Authority and Responsibilities ........................................................39 9.10 Compliance with Safety Program ...............................................................................................40 Article 10 - Changes in the Work; Claims .....................................................................................................40 10.01 Authorized Changes in the Work ...............................................................................................40 10.02 Unauthorized Changes in the Work ............................................................................................41 10.03 Execution of Change Orders .......................................................................................................41 10.04 Notification to Surety ..................................................................................................................41 10.05 Claims ..........................................................................................................................................41 Article 11 - Cost of the Work; Allowances; Unit Price Work .......................................................................42 11.01 Cost of the Work 42 11.02 Allowances 45 11.03 Unit Price Work 45 Article 12 - Change of Contract Price; Change of Contract Times 46 12.01 Change of Contract Price 46 12.02 Change of Contract Times ..........................................................................................................47 12.03 Delays 47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work .......................48 13.01 Notice of Defects .........................................................................................................................48 13.02 Access to Wark 48 13.03 Tests and Inspections ..................................................................................................................49 13.04 Uncovering Work ........................................................................................................................49 13.05 Owner May Stop the Work 50 13.06 Correction or Removal of Defective Work 50 13.07 Correction Period 50 13.08 Acceptance of Defective Work 51 13.09 Owner May Correct Defective Work 52 Article 14 - Payments to Contractor and Completion 52 14.01 Schedule of Values 52 14.02 Progress Payrnents ......................................................................................................................52 14.03 Contractor's Warranty of Title 55 14.04 Substantial Completion ...............................................................................................................55 14.05 Partial Utilization 56 14.06 Final Inspection ...........................................................................................................................57 14.07 Final Payment ..............................................................................................................................57 14.08 Final Completion Delayed 58 EJCDC C-700 Standard General Conditions of the Construction Contract Copyright O 2007 National Sociely of Professional Engineers for EJCDC. All rights reserved. Paee iii ` , 363 14.09 Waiver of Claims 58 Article 15 - Suspension of Work and Termination 59 15.01 Owner May Suspend Work 59 15.02 Owner May Terminate for Cause 59 15.03 Owner May Terminate For Convenience 60 15.04 Contractor May Stop Work or Terminate 60 Article 16 - Dispute Resolution 61 16.01 Methods and Procedures 61 Article 17 - Miscellaneous 61 17.01 Giving Notice 61 17.02 Computation of Times ................................................................................................................62 17.03 Cumulative Remedies 62 17.04 Survival of Obligations 62 17.05 Controlling Law 62 17.06 Headings 62 EJCDC C-700 Standard General Conditions of the ConstrucNon Conlract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Page iv 364 ARTICLE 1- DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in the Bidding Requirements or Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda-Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement-The written instrument which is evidence of the agreement between Owner and Contractor covering the Work. 3. Application for Payment-The form acceptable to Engineer which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos-Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Bid-The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be perfonned. 6. Bidder-The individual or entity who submits a Bid directly to Owner. 7. Bidding Documents-The Bidding Requirements and the proposed Contract Documents (including all Addenda). 8. Bidding Requirements-The advertisement or invitation to bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 9. Change Order A document recommended by Engineer which is signed by Contractor and Owner and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement. 10. Claim-A demand or assertion by Owner or Contractor seeking an adjustment of Contract Price or Contract Times, ar both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim. 11. Contract-The entire and integrated written ageement between the Owner and Contractor concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. EJCDC C-700 Standard General Conditions of the Conshuction Contract Copyright 9) 2007 National Society of Professional Engineers for EJCDC. Ail rights reserved. Page 1 of 62 -1.. 365 12. Contract Documents-Those items so designated in the Agreement. Only printed or hard copies of the items listed in the Agreement are Contract Documents. Approved Shop Drawings, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 13. Contract Price-The moneys payable by Owner to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 14. Contract Times-The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any; (ii) achieve Substantial Completion; and (iii) complete the Work so that it is ready for final payment as evidenced by Engineer's written recommendation of final payment. 15. Contractor-The individual or entity with whom Owner has entered into the Agreement. 16. Cost of the Work-See Paragraph 11.0 1 for definition. 17. Drawings-That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined. 18. Effective Date of the Agreement-The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 19. Engineer-The individual or entiry named as such in the Agreement. 20. Field Order-A written order issued by Engineer which requires minor changes in the Work but which does not involve a change in the Contract Price or the Contract Times. 21. General Requirements-Sections of Division 1 of the Specifications. 22. Hazardous Environmental Condition-The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 23. Hazardous Waste-The term Hazardous Waste shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time. 24. Laws and Regulations; Laws or Regulations-Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 25. Liens---Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 26. Milestone-A principal event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 2 of 62 _ 366 27. Notice of Award-The written notice by Owner to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, Owner will sign and deliver the Agreement. 28. Notice to Proceed-A written notice given by Owner to Contractor fixing the date on which the Contract Times will commence to run and on which Contractor shall start to perform the Wark under the Contract Documents. 29. Owner-The individual or entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 30. PCBs-Polychlorinated biphenyls. 31. Petroleum-Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 32. Progress Schedule-A schedule, prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. 33. Project-The total construction of which the Work to be perfonned under the Contract Documents may be the whole, or a part. 34. Project Manual-The bound documentary information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, which may be bound in one or more volumes, is contained in the table(s) of contents. 35. Radioactive Material-Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended froin time to time. 36. Resident Project Representative-The authorized representative of Engineer who may be assigned to the Site or any part thereof. 37. Samples-Physical examples of materials, equipment, or warkmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 38. Schedule of Submittals-A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 39. Schedule of Values-A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright (D 2007 National Society of Professional Engineers for E.ICDC. AII rights reserved. Paee 3 of 62 - ~ 367 40. Shop Drawings-All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 41. Site-Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by Owner which are designated for the use of Contractor. 42. Specifications-That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. 43. Subcontractor-An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 44. Substantial Completion-The time at which the Work (or a specified part thereo fl has progressed to the point where, in the opinion of Engineer, the Work (or a specified part thereoo is sufficiently complete, in accordance with the Contract Documents, so that the Work (or a specified part thereo fl can be utilized for the purposes for which it is intended. The terms "substantially complete" and "substantially completed" as applied to all or part of the Work refer to Substantial Completion thereof. 45. Successful Bidder-The Bidder submitting a responsive Bid to whom Owner makes an award. 46. Supplementary Conditions-That part of the Contract Documents which amends or supplements these General Conditions. 47. Supplier-A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 48. Underground Facilities-All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 49. Unit Price Work-Work to be paid for on the basis of unit prices. 50. Work-The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 51. Work Change Directive-A written statement to Contractor issued on or after the Effective Date of the Agreement and signed by Owner and recommended by Engineer ordering an E.TCDC C-700 Standard General Conditions of the Construction Contract Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 4 of 62 368 addition, deletion, or revision in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Times. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through F are not defined but, when used in the Bidding Requirements ar Contract Documents, have the indicated meaning. B. Intent of Certain TeYms or Adjectives: The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of professional judgment by Engineer. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of Engineer as to the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such tertn or adjective is not intended to and shall not be effective to assign to Engineer any duty or authority to supervise or direct the perfonnance of the Work, or any duty or authority to undertake responsibility contrary to the provisions of Paragraph 9.09 or any other provision of the Contract Documents. C. Day: 1. The word "day" means a calendar day of 24 hours measured from midnight to the next midnight. D. Defective: The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to Engineer's recommendation of final payment (unless responsibility for the protection thereof has been assumed by Owner at Substantial Completion in accordance with Paragaph 14.04 or 14.05). EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright 0 2007 Na6onal Society of Professional Engineers for EJCDC. All rights reserved. Page 5 of 62 a, ~ E. Furnish, Install, Perform, Provide: 1. The word "furnish," when used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition. 2. The word "install," when used in connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use. 3. The words "perform" or "provide," when used in connection with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use. 4. When "furnish," "install," "perform," or "provide" is not used in connection with services, materials, or equipment in a context clearly requiring an obligation of Contractor, "provide" is implied. F. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 - PRELIMINARY MATTERS 2.01 Del ivery of Bonds and Evidence of Insurance A. When Contractor delivers the executed counterparts of the Ageement to Owner, Contractor shall also deliver to Owner such bonds as Contractor may be required to furnish. B. Evidence of Insurance: Before any Work at the Site is started, Contractor and Owner shall each deliver to the other, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance which either of them or any additional insured may reasonably request) which Contractor and Owner respectively are required to purchase and maintain in accordance with Article 5. 2.02 Copies of Documents A. Owner shall furnish to Contractor up to ten printed or hard copies of the Drawings and Project Manual. Additional copies will be furnished upon request at the cost of reproduction. 2.03 Commencement of Contract Times; Notice to Proceed A. The Contract Times will commence to run on the thirtieth day after the Effective Date of the Agreement or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 30 days after the Effective Date of the Agreement. In no event will the Contract Times commence to run later than the sixtieth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever date is earlier. EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright (D 2007 National Society of Professional Engineers for E.TCDC. All rights reserved. Paee 6 of 62 ` - -3 70 2.04 Starting the Work A. Contractor shall start to perform the Work on the date when the Contract Times commence to run. No Work shall be done at the Site prior to the date on which the Contract Times commence to run. 2.05 Before Starting Consti-uction A. Preliminary Schedules: Within 10 days after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), Contractar shall submit to Engineer for timely review: 1. a preliminary Progress Schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents; 2. a preliminary Schedule of Submittals; and 3. a preliminary Schedule of Values for all of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve as the basis for progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. 2.06 PreconstYUCtion Conference; Designation of Authorized Representatives A. Before any Work at the Site is started, a conference attended by Owner, Contractor, Engineer, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to in Paragraph 2.05.A, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records. B. At this conference Owner and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit instructions, receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party. 2.07 Initial Acceptance of Schedules A. At least 10 days before submission of the first Application for Payment a conference attended by Contractor, Engineer, and others as appropriate will be held to review for acceptability to Engineer as provided below the schedules submitted in accordance with Paragraph 2.05.A. Contractor shall have an additional 10 days to make corrections and adjustments and to complete and resubmit the schedules. No progess payrnent shall be made to Contractor until acceptable schedules are submitted to Engineer. 1. The Progress Schedule will be acceptable to Engineer if it provides an orderly progression of the Work to completion within the Contract Times. Such acceptance will not impose on EJCDC C-700 Standard Generai CondiHons of the ConstrucNon Contract Copyright C 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Paee 7 of 62 ~ 1 371 Engineer responsibility for the Progress Schedule, for sequencing, scheduling, or progress of the Work, nor interfere with or relieve Contractor from Contractor's full responsibility therefor. 2. Contractor's Schedule of Submittals will be acceptable to Engineer if it provides a workable arrangement for reviewing and processing the required submittals. Contractor's Schedule of Values will be acceptable to Engineer as to form and substance if it provides a reasonable allocation of the Contract Price to component parts of the Work. ARTICLE 3- CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to Owner. C. Clarifications and interpretations of the Contract Documents shall be issued by Engineer as provided in Article 9. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of Owner, Contractor, or Engineer, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to Owner, Engineer, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright 0 2007 Natlonal Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 8 of 62 . 1 372 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. Contractor shall promptly report in writing to Engineer any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from Engineer before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation ,(b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to Engineer in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph 6.16.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguiry, or discrepancy between the provisions of the Contract Documents and: a. the provisions of any standard, specification, manual, or code, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents); or b. the provisions of any Laws or Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation). 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by either a Change Order or a Work Change Directive. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by one or more of the following ways: EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright O 2007 NaHonal Society of Professional Engineers for E.ICDC. All rights reserved. Pa¢e 9 of 62 ~ ~ ~ / ~ 1. A Field Order; 2. Engineer's approval of a Shop Drawing or Sample (subject to the provisions of Paragraph 6.17.D.3); or 3. Engineer's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereo fl prepared by or bearing the seal of Engineer or its consultants, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of Owner and Engineer and specific written verification or adaptation by Engineer. B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by Owner or Engineer to Contractor, or by Contractor to Owner or Engineer, that may be relied upon are limited to the printed copies (also known as hard copies). Files in electronic media fonnat of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. Because data stored in electronic media format can deteriorate or be modified inadvertently or otherwise without authorization of the data's creator, the party receiving electronic files agrees that it will perform acceptance tests or procedures within 60 days, after which the receiving party shall be deemed to have accepted the data thus transferred. Any errors detected within the 60-day acceptance period will be corrected by the transferring party. C. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C 2007 NaNonal Society of Professional Engineers for EJCDC. All rights reserved. Paee 10 of 62 _ . . ~ l~ ARTICLE 4- AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. Owner shall furnish the Site. Owner shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. Owner will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. If Contractor and Owner are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of any delay in Owner's furnishing the Site or a part thereof, Contractor may make a Claim therefor as provided in Paragraph 10.05. B. Upon reasonable written request, Owner shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed and Owner's interest therein as necessary for giving notice of or filing a mechanic's or construction lien against such lands in accordance with applicable Laws and Regulations. C. Contractor shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.02 Subsurface and Physical Conditions A. Reports and Drawings: The Supplementary Conditions identify: 1. those reports known to Owner of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or make any claim against Owner or Engineer, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. EJCDC C-700 Standard General CondiHons of the Construcfion Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Page 11 of 62 1. 375 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: l. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.16.A), notify Owner and Engineer in writing about such condition. Contractor shall not further disturb such condition or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so. B. Engineer's Review: After receipt of written notice as required by Paragraph 4.03.A, Engineer will promptly review the pertinent condition, determine the necessity of Owner's obtaining additional exploration or tests with respect thereto, and advise Owner in writing (with a copy to Contractor) of Engineer's findings and conclusions. C. Possible Price and Times Adjustments: 1. The Contract Price or the Contract Times, or both, will be equitably adjusted to the extent that the existence of such differing subsurface or physical condition causes an increase or decrease in Contractor's cost of, or time required for, performance of the Work; subject, however, to the following: a. such condition must meet any one or more of the categories described in Paragraph 4.03.A; and b. with respect to Work that is paid for on a unit price basis, any adjustment in Contract Price will be subject to the provisions of Paragraphs 9.07 and 11.03. 2. Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times i£ a. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to Owner with respect to Contract Price and Contract Times by the submission of a Bid or becoming bound under a negotiated contract; or b. the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test, or study of the Site and EJCDC C-700 Standard General Conditions of the Construction Contract Copyright OO 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 12 of 62 . 376 contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for Contractor prior to Contractor's making such final commitment; or c. Contractor failed to give the written notice as required by Paragraph 4.03.A. 3. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, a Claim may be made therefor as provided in Paragraph 10.05. However, neither Owner or Engineer, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors shall be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. 4.04 Underground Facilities A. Shown or Indicated.• The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to Owner or Engineer by the owners of such Underground Facilities, including Owner, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. Owner and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination of the Wark with the owners of such Underground Facilities, including Owner, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.16.A), identify the owner of such Underground Facility and give written notice to that owner and to Owner and Engineer. Engineer will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the EJCDC C-700 Standard General Condidons of the Construction Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Page 13 of 62 ~ 1 377 consequences of the existence or location of the Underground Facility. During such time, Contractor shall be responsible for the safety and protection of such Underground Facility. 2. If Engineer concludes that a change in the Contract Documents is required, a Work Change Directive or a Change Order will be issued to reflect and document such consequences. An equitable adjustment shall be made in the Contract Price or Contract Times, or both, to the extent that they are attributable to the existence or location of any Undergound Facility that was not shown or indicated or not shown or indicated with reasonable accuracy in the Contract Documents and that Contractor did not know of and could not reasonably have been expected to be aware of or to have anticipated. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment in Contract Price or Contract Times, Owner or Contractor may make a Claim therefor as provided in Paragraph 10.05. 4.05 Reference Points A. Owner shall provide engineering surveys to establish reference points for construction which in Engineer's judgment are necessary to enable Contractor to proceed with the Work. Contractor shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of Owner. Contractor shall report to Engineer whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized.• Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Except for such reliance on such "technical data," Contractor may not rely upon or make any claim against Owner or Engineer, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: l. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. E,1CDC C-700 Standard General Conditions of the Construcfion Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. PaQe 14 of 62 • 378 C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Enviromnental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.16.A); and (iii) notify Owner and Engineer (and promptly thereafter confirm such notice in writing). Owner shall promptly consult with Engineer concerning the necessity for Owner to retain a qualified expert to evaluate such condition or take corrective action, if any. Promptly after consulting with Engineer, Owner shall take such actions as are necessary to permit Owner to tiinely obtain required permits and provide Contractor the written notice required by Paragraph 4.06.E. E. Contractor shall not be required to resume Work in connection with such condition or in any affected area until after Owner has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed safely. If Owner and Contractor cannot agree as to entitlement to or on the amount or extent, if any, of any adjushnent in Contract Price or Contract Times, or both, as a result of such Work stoppage or such special conditions under which Work is agreed to be resumed by Contractor, either party may make a Claiin therefor as provided in Paragraph 10.05. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then Owner may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. If Owner and Contractor cannot agee as to entitlement to or on the amount or extent, if any, of an adjustment in Contract Price or Contract Times as a result of deleting such portion of the Work, then either pariy may make a Claim therefor as provided in Paragraph 10.05. Owner may have such deleted portion of the Work performed by Owner's own forces or others in accordance with Article 7. G. To the fullest extent permitted by Laws and Regulations, Owner shall indemnify and hold harmless Contractor, Subcontractors, and Engineer, and the officers, directors, members, pariners, employees, agents, consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition, provided that such Hazardous Environmental Condition: (i) was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be included within the scope of the Work, and (ii) was not created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Owner to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. EJCDC C-700 Standard General Condirions of the Construction Contract Copyright C) 2007 NaHonal Society of Professional Engineers for E.TCDC. All rights reserved. Page IS of 62 379 H. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contractor is responsible. Nothing in this Paragraph 4.06.14 shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. 1. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 5- BONDS AND INSURANCE 5.01 Performance, Payment, and Other Bonds A. Contractor shall furnish perfonnance and payment bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. These bonds shall remain in effect until one year after the date when final payment becomes due or until completion of the correction period specified in Paragraph 13.07, whichever is later, except as provided otherwise by Laws or Regulations or by the Contract Documents. Contractor shall also furnish such other bonds as are required by the Contract Documents. B. All bonds shall be in the fonn prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a certified copy of that individual's authority to bind the surety. The evidence of authority shall show that it is effective on the date the agent or attorney-in-fact signed each bond. C. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of Paragraph 5.01.B, Contractor shall promptly notify Owner and Engineer and shall, within 20 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs S.OI.B and 5.02. 5.02 Licensed Sureties and Insurers A. All bonds and insurance required by the Contract Documents to be purchased and maintained by Owner or Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also EJCDC C-700 Standard General Conditions of the Construction Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 16 of 62 1-, 380 meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.03 Certificates of Insurance A. Contractor shall deliver to Owner, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by Owner or any other additional insured) which Contractor is required to purchase and maintain. B. Owner shall deliver to Contractor, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by Contractor or any other additional insured) which Owner is required to purchase and inaintain. C. Failure of Owner to demand such certificates or other evidence of Contractor's full compliance with these insurance requirements or failure of Owner to identify a deficiency in compliance from the evidence provided shall not be construed as a waiver of Contractor's obligation to maintain such insurance. D. Owner does not represent that insurance coverage and limits established in this Contract necessarily will be adequate to protect Contractor. E. The insurance and insurance limits required herein shall not be deemed as a limitation on Contractor's liability under the indemnities granted to Owner in the Contract Documents. 5.04 Contractor's Insurance A. Contractor shall purchase and maintain such insurance as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees; 3. claims for damages because of bodily injury, sickness or disease, or death of any person other than Contractor's employees; 4. claims for damages insured by reasonably available personal injury liability coverage which are sustained: EJCDC C-700 Standard General Conditions of the Construction Contract Copyright OO 2007 National Society of Professional Engineers (or EJCDC. All rights reserved. Paee 17 of 62 , 1 ~ 81 a. by any person as a result of an offense directly or indirectly related to the employtnent of such person by Contractor, or b. by any other person for any other reason; 5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and 6. claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. B. The policies of insurance required by this Paragraph 5.04 shall: with respect to insurance required by Paragraphs 5.04.A.3 through 5.04.A.6 inclusive, be written on an occurrence basis, include as additional insureds (subject to any customary exclusion regarding professional liability) Owner and Engineer, and any other individuals or entities identified in the Supplementary Conditions, all of whom shall be listed as additional insureds, and include coverage for the respective officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of all such additional insureds, and the insurance afforded to these additional insureds shall provide primary coverage for all claims covered thereby; 2, include at least the specific coverages and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater; 3. include contractual liability insurance covering Contractor's indemnity obligations under Paragraphs 6.11 and 6.20; 4. contain a provision or endorsement that the coverage afforded will not be canceled, materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the Contractor pursuant to Paragraph 5.03 will so provide); 5. remain in effect at least until final payment and at all times thereafter when Contractor may be correcting, removing, or replacing defective Wark in accordance with Paragraph 13.07; and 6. include completed operations coverage: a. Such insurance shall remain in effect for two years after final payrnent. b. Contractor shall furnish Owner and each other additional insured identified in the Supplementary Conditions, to whom a certificate of insurance has been issued, evidence satisfactory to Owner and any such additional insured of continuation of such insurance at final payment and one year thereafter. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paae 18 of 62 ~ 1 50, 5.05 Owner's Liabiliry Insurance A. In addition to the insurance required to be provided by Contractor under Paragraph 5.04, Owner, at Owner's option, may purchase and maintain at Owner's expense Owner's own liability insurance as will protect Owner against claims which may arise from operations under the Contract Documents. 5.06 Property Insurance A. Unless otherwise provided in the Supplementary Conditions, Owner shall purchase and maintain property insurance upon the Work at the Site in the amount of the full replacement cost thereof (subject to such deductible amounts as may be provided in the Supplementary Conditions or required by Laws and Regulations). This insurance shall: l. include the interests of Owner, Contractor, Subcontractors, and Engineer, and any other individuals or entities identified in the Supplementary Conditions, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them, each of whom is deemed to have an insurable interest and shall be listed as a loss payee; 2. be written on a Builder's Risk "all-risk" policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, deinolition occasioned by enforceinent of Laws and Regulations, water damage (other than that caused by flood), and such other perils or causes of loss as may be specifically required by the Supplementary Conditions. 3. include expenses incurred in the repair or replacement of any insured properiy (including but not limited to fees and charges of engineers and architects); 4. cover materials and equipment stored at the Site or at another location that was agreed to in writing by Owner prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by Engineer; 5. allow for partial utilization of the Work by Owner; 6. include testing and startup; and 7. be maintained in effect until final payment is made unless otherwise agreed to in writing by Owner, Contractor, and Engineer with 30 days written notice to each other loss payee to whom a certificate of insurance has been issued. B. Owner shall purchase and maintain such equipment breakdown insurance or additional property insurance as may be required by the Supplementary Conditions or Laws and Regulations which will include the interests of Owner, Contractor, Subcontractors, and Engineer, and any other individuals or entities identified in the Supplementary Conditions; and the officers, directors, EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 NaNonal Society oT Professional Engineers for EJCDC. All rights reserved. Paee 19 of 62 383 members, partners, employees, agents, consultants and subcontractors of each and any of them, each of whom is deemed to have an insurable interest and shall be listed as a loss payee. C. All the policies of insurance (and the certificates or other evidence thereoo required to be purchased and maintained in accordance with this Paragraph 5.06 will contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each other loss payee to whom a certificate of insurance has been issued and will contain waiver provisions in accordance with Paragraph 5.07. D. Owner shall not be responsible for purchasing and maintaining any property insurance specified in this Paragraph 5.06 to protect the interests of Contractor, Subcontractors, or others in the Work to the extent of any deductible amounts that are identified in the Supplementary Conditions. The risk of loss within such identified deductible amount will be borne by Contractor, Subcontractors, or others suffering any such loss, and if any of them wishes property insurance coverage within the limits of such amounts, each may purchase and maintain it at the purchaser's own expense. E. If Contractor requests in writing that other special insurance be included in the property insurance policies provided under this Paragraph 5.06, Owner shall, if possible, include such insurance, and the cost thereof will be charged to Contractor by appropriate Change Order. Prior to commencement of the Work at the Site, Owner shall in writing advise Contractor whether or not such other insurance has been procured by Owner. 5.07 Waiver of Rights A. Owner and Contractor intend that all policies purchased in accordance with Paragaph 5.06 will protect Owner, Contractor, Subcontractors, and Engineer, and all other individuals or entities identified in the Supplementary Conditions as loss payees (and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them) in such policies and will provide primary coverage for all losses and damages caused by the perils or causes of loss covered thereby. All such policies shall contain provisions to the effect that in the event of payment of any loss or damage the insurers will have no rights of recovery against any of the insureds or loss payees thereunder. Owner and Contractor waive all rights against each other and their respective officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them for all losses and damages caused by, arising out of or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work; and, in addition, waive all such rights against Subcontractors and Engineer, and all other individuals or entities identified in the Supplementary Conditions as loss payees (and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them) under such policies for losses and damages so caused. None of the above waivers shall extend to the rights that any party making such waiver may have to the proceeds of insurance held by Owner as trustee or otherwise payable under any policy so issued. B. Owner waives all rights against Contractor, Subcontractors, and Engineer, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them for: EJCDC C-700 Standard General Conditions of the Construction Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 20 of 62 384 1. loss due to business interruption, loss of use, or other consequential loss extending beyond direct physical loss or damage to Owner's property or the Work caused by, arising out of, or resulting from fire or other perils whether or not insured by Owner; and 2. loss or damage to the completed Project or part thereof caused by, arising out of, or resulting from fire or other insured peril or cause of loss covered by any property insurance maintained on the completed Project or part thereof by Owner during partial utilization pursuant to Paragraph 14.05, after Substantial Completion pursuant to Paragraph 14.04, or after final payment pursuant to Paragraph 14.07. C. Any insurance policy maintained by Owner covering any loss, damage or consequential loss referred to in Paragraph 5.07.B shall contain provisions to the effect that in the event of payrnent of any such loss, damage, or consequential loss, the insurers will have no rights of recovery against Contractor, Subcontractors, or Engineer, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them. 5.08 Receipt and Application of Insurance Proceeds A. Any insured loss under the policies of insurance required by Paragraph 5.06 will be adjusted with Owner and made payable to Owner as fiduciary for the loss payees, as their interests may appear, subject to the requirements of any applicable mortgage clause and of Paragraph 5.08.13. Owner shall deposit in a separate account any money so received and shall distribute it in accordance with such agreement as the parties in interest may reach. If no other special agreement is reached, the dainaged Work shall be repaired or replaced, the moneys so received applied on account thereof, and the Work and the cost thereof covered by an appropriate Change Order. B. Owner as fiduciary shall have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within 15 days after the occurrence of loss to Owner's exercise of this power. If such objection be made, Owner as fiduciary shall make settleinent with the insurers in accordance with such agreement as the parties in interest may reach. If no such agreement among the parties in interest is reached, Owner as fiduciary shall adjust and settle the loss with the insurers and, if required in writing by any party in interest, Owner as fiduciary shall give bond for the proper performance of such duties. 5.09 Acceptance of Bonds and Insurance; Option to Replace A. If either Owner or Contractor has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the other party in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the objecting party shall so notify the other party in writing within 10 days after receipt of the certificates (or other evidence requested) required by Paragraph 2A1.B. Owner and Contractor shall each provide to the other such additional information in respect of insurance provided as the other may reasonably request. If either party does not purchase or maintain all of the bonds and insurance required of such party by the Contract Documents, such party shall notify the other pariy in writing of such failure to purchase prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. Without prejudice to any other right or remedy, the other party may elect to obtain equivalent bonds or insurance to protect such other party's EJCDC C-700 Standard General Conditions of the Construction Contract Copyright (D 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 21 of 62 ` ` 3C35 interests at the expense of the party who was required to provide such coverage, and a Change Order shall be issued to adjust the Contract Price accordingly. 5.10 Partial Utilization, Acknowledgment of Property Insurer A. If Owner finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in Paragraph 14.05, no such use or occupancy shall commence before the insurers providing the property insurance pursuant to Paragraph 5.06 have acknowledged notice thereof and in writing effected any changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perfonn the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. Contractor shall not be responsible for the negligence of Owner or Engineer in the design or specification of a specific means, method, technique, sequence, or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. B. At all times during the progress of the Work, Contractor shall assign a competent resident superintendent who shall not be replaced without written notice to Owner and Engineer except under extraordinary circumstances. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during regular working hours. Contractor will not permit the performance of Work on a Saturday, Sunday, or any legal holiday without Owner's written consent (which will not be unreasonably withheld) given after prior written notice to Engineer. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work. EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 22 of 62 386 B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of Owner. If required by Engineer, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. C. All materials and equipment shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 6.04 PYOgress Schedule A. Contractor shall adhere to the Progress Schedule established in accordance with Paragraph 2.07 as it may be adjusted from time to time as provided below. Contractor shall submit to Engineer for acceptance (to the extent indicated in Paragraph 2.07) proposed adjustments in the Progress Schedule that will not result in changing the Contract Times. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Proposed adjustments in the Progress Schedule that will change the Contract Times shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Times may only be inade by a Change Order. 6.05 Substitutes and "Or-Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to Engineer far review under the circumstances described below. "Or-Equal " Items: If in Engineer's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by Engineer as an "or-equal" item, in which case review and approval of the proposed item may, in Engineer's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. in the exercise of reasonable judgment Engineer determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paae 23 of 62 387 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service. b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the Owner or increase in Contract Times; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in Engineer's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Paragraph 6.05.A.1, it will be considered a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow Engineer to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by Engineer from anyone other than Contractor. c. The requirements for review by Engineer will be as set forth in Paragraph 6.05.A.2.d, as supplemented by the General Requirements, and as Engineer may decide is appropriate under the circumstances. d. Contractor shall make written application to Engineer for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design, b) be similar in substance to that specified, and c) be suited to the same use as that specified; 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of Substantial Completion on time, b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with Owner for other work on the Project) to adapt the design to the proposed substitute item, and EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright O 2007 Nationai Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 24 of 62 _ ` . 388 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; 3) will identify: a) all variations of the proposed substitute item from that specified, and b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by Engineer. Contractor shall submit sufficient information to allow Engineer, in Engineer's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by Engineer will be similar to those provided in Paragraph 6.05.A.2. C. Engineer's Evaluation: Engineer will be allowed a reasonable tiine within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.B. Engineer may require Contractor to furnish additional data about the proposed substitute item. Engineer will be the sole judge of acceptability. No "or equal" or substitute will be ordered, installed or utilized until Engineer's review is complete, which will be evidenced by a Change Order in the case of a substitute and an approved Shop Drawing for an "or equal." Engineer will advise Contractor in writing of any negative determination. D. Special Guarantee: Owner may require Contractor to furnish at Contractor's expense a special performance guarantee or other surety with respect to any substitute. E. Engineer's Cost Reiinbursement: Engineer will record Engineer's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not Engineer approves a substitute so proposed or submitted by Contractor, Contractor shall reimburse Owner for the reasonable charges of Engineer for evaluating each such proposed substitute. Contractor shall also reimburse Owner for the reasonable charges of Engineer for making changes in the Contract Documents (or in the provisions of any other direct contract with Owner) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity (including those acceptable to Owner as indicated in Paragraph 6.06.B), whether initially or as a replacement, against whom Owner may have reasonable objection. Contractor shall not be EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 National Society of Professional Engineers for E.1CDC. Atl rights reserved. PaQe 25 of 62 l.. 389 required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection. B. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, or other individuals or entities to be submitted to Owner in advance for acceptance by Owner by a specified date prior to the Effective Date of the Agreement, and if Contractor has submitted a list thereof in accordance with the Supplementary Conditions, Owner's acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the Bidding Documents or the Contract Documents) of any such Subcontractor, Supplier, or other individual or entity so identified may be revoked on the basis of reasonable objection after due investigation. Contractor shall submit an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity, and the Contract Price will be adjusted by the difference in the cost occasioned by such replacement, and an appropriate Change Order will be issued. No acceptance by Owner of any such Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, shall constitute a waiver of any right of Owner or Engineer to reject defective Work. C. Contractor shall be fully responsible to Owner and Engineer for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or fumishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between Owner or Engineer and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of Owner or Engineer to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. D. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. E. Contractor shall require all Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work to communicate with Engineer through Contractor. F. The divisions and sections of the Specifications and the identifications of any Drawings shall not control Contractor in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade. G. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of Owner and Engineer. Whenever any such agreement is with a Subcontractor or Supplier who is listed as a loss payee on the property insurance provided in Paragraph 5.06, the agreement between the Contractor and the Subcontractor or Supplier will contain provisions whereby the Subcontractor or Supplier waives all rights against Owner, EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 26 of 62 ~ ~ Contractor, Engineer, and all other individuals or entities identified in the Supplementary Conditions to be listed as insureds or loss payees (and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them) far all losses and damages caused by, arising out of, relating to, or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work. If the insurers on any such policies require separate waiver forms to be signed by any Subcontractor ar Supplier, Contractor will obtain the same. 6.07 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, ar device is specified in the Contract Documents for use in the perfortnance of the Work and if, to the actual knowledge of Owner or Engineer, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by Owner in the Contract Documents. B. To the fullest extent permitted by Laws and Regulations, Owner shall indemnify and hold harmless Contractor, and its officers, directors, members, partners, employees, agents, consultants, and subcontractors from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals, and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device specified in the Contract Documents, but not identified as being subject to payment of any license fee or royalty to others required by patent rights or copyrights. C. To the fullest extent pennitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.08 Permits A. Unless otherwise provided in the Supplementary Conditions, Contractor shall obtain and pay for all constnzction permits and licenses. Owner shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. Owner shall pay all charges of utility owners for connections for providing permanent service to the Work. EJCDC C-700 Standard General Condifions of the ConstrucNon Contract Copyright C 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 27 of 62 ` 39 1 6.09 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither Owner nor Engineer shall be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.03. C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids) having an effect on the cost or time of performance of the Work shall be the subject of an adjustment in Contract Price or Contract Times. If Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a Claim may be made therefor as provided in Paragraph 10.05. 6.10 Taxes A. Contractor shall pay all sales, consumer, use, and other siinilar taxes required to be paid by Contractor in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work. 6.11 Use of Site and Other Areas A. Linzitation on Use of Site and OtherAreas: 1. Contractor shall confine construction equipment, the storage of materials and equipinent, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. Should any claim be made by any such owner or occupant because of the perfortnance of the Work, Contractor shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. 3. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright O 2007 NaNonal Society of Professional Engineers for EJCDC. All rights reserved. Page 28 of 62 4 392 by any such owner or occupant against Owner, Engineer, or any other party indemnified hereunder to the extent caused by or based upon Contractor's performance of the Work. B. Removal of Debris During Performance of the Work.• During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Cleaning: Prior to Substantial Completion of the Work Contractor shall clean the Site and the Work and make it ready for utilization by Owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents. D. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.12 Record Documents A. Contractor shall maintain in a safe place at the Site one record copy of all Drawings, Specifications, Addenda, Change Orders, Work Change Directives, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to Engineer for reference. Upon completion of the Work, these record documents, Samples, and Shop Drawings will be delivered to Engineer for Owner. 6.13 Safety and Pirotection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Page 29 of 62 393 shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of Owner's safety programs, if any. The Supplementary Conditions identify any Owner's safety programs that are applicable to the Work. D. Contractor shall inform Owner and Engineer of the specific requirements of Contractor's safety program with which Owner's and Engineer's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of Owner or Engineer or anyone employed by any of them, or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of Contractor or any Subcontractor, Supplier, or other individual or entity directly or indirectly employed by any of them). F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and Engineer has issued a notice to Owner and Contractor in accordance with Paragraph 14.07.B that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.14 Safety Representative A. Contractor shall designate a qualified and experienced safety representative at the Site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. 6.15 Hazard Communication Programs A. Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Site in accordance with Laws or Regulations. 6.16 Emergencies A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give Engineer prompt written notice if Contractor believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If Engineer determines that a change in the Contract Documents is EJCDC C-700 Standard General CondiGons of the ConstrucHon Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. PaQe 30 ot 62 394 required because of the action taken by Contractor in response to such an emergency, a Work Change Directive or Change Order will be issued. 6.17 Shop Drawings and Samples A. Contractor shall submit Shop Drawings and Samples to Engineer for review and approval in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each subinittal will be identified as Engineer may require. 1. Shop Drawings: a. Submit number of copies specified in the General Requirements. b. Data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show Engineer the services, materials, and equipment Contractor proposes to provide and to enable Engineer to review the information for the limited purposes required by Paragraph 6.17.D. 2. Samples: a. Submit number of Samples specified in the Specifications. b. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as Engineer may require to enable Engineer to review the submittal for the limited purposes required by Paragraph 6.17.D. B. Where a Shop Drawing or Sainple is required by the Contract Documents or the Schedule of Submittals, any related Work perfonned prior to Engineer's review and approval of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. Submittal Procedures: 1. Before submitting each Shop Drawing or Sample, Contractor shall have: a. reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents; b. determined and verified all field measurements, quantities, dimensions, specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto; c. determined and verified the suitability of all materials offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and d. determined and verified all information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. EJCDC G700 Standard General CondiHons of the ConstrucHon Contract Copyright C) 2007 NaHonal Society of Professional Engineers tor EJCDC. All rights reserved. Page 31 of 62 L, 395 2. Each submittal shall bear a stamp or specific written certification that Contractor has satisfied Contractor's obligations under the Contract Documents with respect to Contractor's review and approval of that submittal. 3. With each submittal, Contractor shall give Engineer specific written notice of any variations that the Shop Drawing or Sample may have from the requirements of the Contract Documents. This notice shall be both a written communication separate from the Shop Drawings or Sample submittal; and, in addition, by a specific notation made on each Shop Drawing or Sample submitted to Engineer for review and approval of each such variation. D. Engineer's Review: Engineer will provide timely review of Shop Drawings and Samples in accordance with the Schedule of Submittals acceptable to Engineer. Engineer's review and approval will be only to detennine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Engineer's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. 3. Engineer's review and approval shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Paragraph 6.17.C.3 and Engineer has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample. Engineer's review and approval shall not relieve Contractor from responsibility for complying with the requirements of Paragraph 6.17.C.1. E. Resubmittal Procedures: 1. Contractor shall make corrections required by Engineer and shall return the required number of corrected copies of Shop Drawings and submit, as required, new Samples for review and approval. Contractor shall direct specific attention in writing to revisions other than the corrections called for by Engineer on previous submittals. 6.18 Continuing the Work A. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or disagreements with Owner. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by Paragraph 15.04 or as Owner and Contractor may otherwise agree in writing. EJCDC C-700 Standard General CondiHons of the ConstrucHon Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. PaQe 32 of 62 ~ 1 396 6.19 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that all Work will be in accordance with the Contract Documents and will not be defective. Engineer and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, ar improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by Engineer; 2. recommendation by Engineer or payment by Owner of any progress or fmal payment; 3. the issuance of a certificate of Substantial Completion by Engineer or any payment related thereto by Owner; 4. use or occupancy of the Work or any part thereof by Owner; 5. any review and approval of a Shop Drawing or Sample submittal or the issuance of a notice of acceptability by Engineer; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by Owner. 6.20 Indemnification A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless Owner and Engineer, and the officers, directors, members, partners, employees, agents, consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to the performance of the Work, provided that any such claim, cost, loss, or damage is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the Work itsel fl, including the loss of use resulting therefrom but only to the extent caused by any negligent act or omission of Contractor, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work or anyone for whose acts any of them may be liable. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 33 of 62 , 397 B. In any and all claims against Owner or Engineer or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors by any employee (or the survivor or personal representative of such employee) of Contractor, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Wark, or anyone for whose acts any of them may be liable, the indemnification obligation under Paragraph 6.20.A shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for Contractor or any such Subcontractor, Supplier, or other individual or entity under workers' compensation acts, disability benefit acts, or other employee benefit acts. C. The indemnification obligations of Contractor under Paragraph 6.20.A shall not extend to the liability of Engineer and Engineer's officers, directors, members, partners, employees, agents, consultants and subcontractors arising out o£ 1. the preparation or approval of, or the failure to prepare or approve maps, Drawings, opinions, reports, surveys, Change Orders, designs, or Specifications; or 2. giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage. 6.21 Delegation of Professional Design Ser-vices A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. Contractor shall not be required to provide professional services in violation of applicable law. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, Owner and Engineer will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, Shop Drawings and other submittals prepared by such professional. Shop Drawings and other submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to Engineer. C. Owner and Engineer shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided Owner and Engineer have specified to Contractor all performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 6.21, Engineer's review and approval of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. Engineer's review and approval of Shop Drawings and other submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.17.D.1. EJCDC C-700 Standard General Conditions of the Conslruction Contract Copyright C) 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Page 34 of 62 E. Contractor shall not be responsible for the adequacy of the performance or design criteria required by the Contract Documents. ARTICLE 7- OTHER WORK AT THE SITE 7.01 Related Work at Site A. Owner may perform other work related to the Project at the Site with Owner's employees, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then: 1. written notice thereof will be given to Contractor prior to starting any such other work; and 2. if Owner and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in Paragraph 10.05. B. Contractor shall afford each other contractor who is a pariy to such a direct contract, each utility owner, and Owner, if Owner is perfonning other work with Owner's employees, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of Engineer and the others whose work will be affected. The duties and responsibilities of Contractor under this Paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of Contractor in said direct contracts between Owner and such utility owners and other contractors. C. If the proper execution or results of any part of Contractor's Work depends upon work perfonned by others under this Article 7, Contractor shall inspect such other work and promptly report to Engineer in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects and deficiencies in such other work. 7.02 Coordination A. If Owner intends to contract with others far the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. EJCDC C-700 Standard General CondiHons of the ConstrucHon Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 35 of 62 399 B. Unless otherwise provided in the Supplementary Conditions, Owner shall have sole authority and responsibility for such coordination. 7.03 Legal Relationships A. Paragraphs 7A 1.A and 7.02 are not applicable for utilities not under the control of Owner. B. Each other direct contract of Owner under Paragraph 7.01.A shall provide that the other contractor is liable to Owner and Contractor for the reasonable direct delay and disruption costs incurred by Contractor as a result of the other contractor's wrongful actions or inactions. C. Contractor shall be liable to Owner and any other contractor under direct contract to Owner for the reasonable direct delay and disruption costs incurred by such other contractor as a result of Contractor's wrongful action or inactions. ARTICLE S - OWNER'S RESPONSIBILITIES 8.01 Communications to Contractor A. Except as otherwise provided in these General Conditions, Owner shall issue all communications to Contractor through Engineer. 8.02 Replacement of Engineer A. In case of termination of the einployment of Engineer, Owner shall appoint an engineer to whom Contractor makes no reasonable objection, whose status under the Contract Documents shall be that of the former Engineer. 8.03 Furnish Data A. Owner shall promptly furnish the data required of Owner under the Contract Documents. 8.04 Pay When Due A. Owner shall make payrnents to Contractor when they are due as provided in Paragraphs 14.02.C and 14.07.C. 8.05 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to Owner's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site. 8.06 Insurance A. Owner's responsibilities, if any, with respect to purchasing and maintaining liability and property insurance are set forth in Article 5. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 National Society of Professional Engineers for E.1CDC. All rights reserved. PaQe 36 of 62 400 8.07 Change Orders A. Owner is obligated to execute Change Orders as indicated in Paragraph 10.03. 8.08 Inspections, Tests, and Approvals A. Owner's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03.B. 8.09 Limitations on Owner's Responsibilities A. The Owner shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. Owner will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. 8.10 Undisclosed Hazardous Environmental Condition A. Owner's responsibility in respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.11 Evidence of Financial Arrangements A. Upon request of Contractor, Owner shall furnish Contractor reasonable evidence that financial arrangements have been made to satisfy Owner's obligations under the Contract Documents. 8.12 Compliance with Safety Program A. While at the Site, Owner's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which Owner has been informed pursuant to Paragraph 6.13.D. ARTICLE 9- ENGINEER'S STATUS DURING CONSTRUCTION 9.01 Owner's Representative A. Engineer will be Owner's representative during the construction period. The duties and responsibilities and the limitations of authority of Engineer as Owner's representative during construction are set forth in the Contract Documents. 9.02 Visits to Site A. Engineer will make visits to the Site at intervals appropriate to the various stages of construction as Engineer deems necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, Engineer, for the benefit of Owner, will determine, in general, if the Work is proceeding in accordance with the Contract Documents. Engineer will not be required to make exhaustive or EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Page 37 of 62 - 401 continuous inspections on the Site to check the quality or quantity of the Work. Engineer's efforts will be directed toward providing for Owner a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and observations, Engineer will keep Owner informed of the progress of the Work and will endeavor to guard Owner against defective Work. B. Engineer's visits and observations are subject to all the limitations on Engineer's authority and responsibility set forth in Paragraph 9.09. Particularly, but without limitation, during or as a result of Engineer's visits or observations of Contractor's Work, Engineer will not supervise, direct, control, or have authority over or be responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and progams incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. 9.03 Project Representative A. If Owner and Engineer agree, Engineer will furnish a Resident Project Representative to assist Engineer in providing more extensive observation of the Work. The authority and responsibilities of any such Resident Project Representative and assistants will be as provided in the Supplementary Conditions, and limitations on the responsibilities thereof will be as provided in Paragraph 9.09. If Owner designates another representative or agent to represent Owner at the Site who is not Engineer's consultant, agent or employee, the responsibilities and authority and limitations thereon of such other individual or entity will be as provided in the Supplementary Conditions. . 9.04 Authorized Variations in Work A. Engineer may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on Owner and also on Contractor, who shall perform the Work involved promptly. If Owner or Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times, or both, and the parties are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a Claim may be made therefor as provided in Paragraph 10.05. 9.45 Rejecting Defective Work A. Engineer will have authority to reject Work which Engineer believes to be defective, or that Engineer believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. Engineer will also have authority to require special inspection or testing of the Work as provided in Paragaph 13.04, whether or not the Work is fabricated, installed, or completed. EJCDC C-700 Sta►►dard General CondiHons of the ConstrucHon Contract Copyright O 2007 NaHonai Society of Professional Engineers for EJCDC. All rights reserved. PaEe 38 of 62 402 9.06 Shop Drawings, Change Orders and Payments A. In connection with Engineer's authority, and limitations thereof, as to Shop Drawings and Samples, see Paragraph 6.17. B. In connection with Engineer's authority, and limitations thereof, as to design calculations and design drawings submitted in response to a delegation of professional design services, if any, see Paragraph 6.21. C. In connection with Engineer's authority as to Change Orders, see Articles 10, 11, and 12. D. In connection with Engineer's authority as to Applications for Payment, see Article 14. 9.07 Determinations for Unit Price Work A. Engineer will determine the actual quantities and classifications of Unit Price Work performed by Contractor. Engineer will review with Contractor the Engineer's preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). Engineer's written decision thereon will be final and binding (except as modified by Engineer to reflect changed factual conditions or more accurate data) upon Owner and Contractor, subject to the provisions of Paragraph 10.05. 9.08 Decisions on Requirements of Contract Documents and Acceptability of Work A. Engineer will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. All matters in question and other matters between Owner and Contractor arising prior to the date final payment is due relating to the acceptability of the Work, and the interpretation of the requirements of the Contract Documents pertaining to the performance of the Work, will be referred initially to Engineer in writing within 30 days of the event giving rise to the question. B. Engineer will, with reasonable prompmess, render a written decision on the issue referred. If Owner or Contractor believes that any such decision entitles them to an adjustment in the Contract Price or Contract Times or both, a Claim may be made under Paragraph 10.05. The date of Engineer's decision shall be the date of the event giving rise to the issues referenced for the purposes of Paragraph 10.05.13. C. Engineer's written decision on the issue referred will be final and binding on Owner and Contractor, subject to the provisions of Paragraph 10.05. D. When functioning as interpreter and judge under this Paragraph 9.08, Engineer will not show partiality to Owner or Contractor and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. 9.09 Limitations on Engineer's Authority and Responsibilities A. Neither Engineer's authoriry or responsibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by Engineer in good faith either to exercise EJCDC C-700 Standard General Conditions of the Construction Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Page 39 of 62 k- . 403 or not exercise such authoriry or responsibility or the undertaking, exercise, or performance of any authority or responsibility by Engineer shall create, impose, or give rise to any dury in contract, tort, or otherwise owed by Engineer to Contractor, any Subcontractor, any Supplier, any other individual or entity, or to any surety for or employee or agent of any of them. B. Engineer will not supervise, direct, control, or have authority over or be responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. Engineer will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. C. Engineer will not be responsible for the acts or omissions of Contractor or of any Subcontractor, any Supplier, or of any other individual or entity performing any of the Work. D. Engineer's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds, certificates of inspection, tests and approvals, and other documentation required to be delivered by Paragraph 14.07.A will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests, and approvals that the results certified indicate compliance with, the Contract Documents. E. The limitations upon authority and responsibility set forth in this Paragraph 9.09 shall also apply to the Resident Project Representative, if any, and assistants, if any. 9.10 Compliance with Safety Program A. While at the Site, Engineer's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which Engineer has been informed pursuant to Paragraph 6.13.D. ARTICLE 10 - CHANGES IN THE WORK; CLAIMS 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, Owner may, at any time or from time to time, order additions, deletions, or revisions in the Work by a Change Order, or a Work Change Directive. Upon receipt of any such document, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). B. If Owner and Contractor are unable to agree on entitlement to, or on the amount or extent, if any, of an adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a Work Change Directive, a Claim may be made therefor as provided in Paragraph 10.05. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 National Society of Professional Engineers for EdCDC. All rights reserved. Pa¢e 40 of 62 - 404 10.02 Unauthorized Changes in the Work A. Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.16 or in the case of uncovering Work as provided in Paragraph 13.04.D. 10.03 Execution of Change Orders A. Owner and Contractor shall execute appropriate Change Orders recommended by Engineer covering: 1. changes in the Work which are: (i) ordered by Owner pursuant to Paragraph 10.0 1.A, (ii) required because of acceptance of defective Work under Paragraph 13.08.A or Owner's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Times which are agreed to by the parties, including any undisputed sum or amount of time for Work actually perfonned in accordance with a Work Change Directive; and 3. changes in the Contract Price or Contract Times which embody the substance of any written decision rendered by Engineer pursuant to Paragraph 10.05; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal, Contractor shall carry on the Work and adhere to the Progress Schedule as provided in Paragraph 6.18.A. 10.04 Notification to Surety A. If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted to reflect the effect of any such change. 10.05 Claims A. Engineer's Decision Required: All Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the Engineer for decision. A decision by Engineer shall be required as a condition precedent to any exercise by Owner or Contractor of any rights or remedies either may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Claims. B. Notice: Written notice stating the general nature of each Claim shall be delivered by the claimant to Engineer and the other party to the Contract promptly (but in no event later than 30 days) after the start of the event giving rise thereto. The responsibility to substantiate a Claim shall rest with the party making the Claim. Notice of the amount or extent of the Claim, with supporting data EJCDC C-700 Standard General CondiHons of the ConstrucNon Contract Copyright C 2007 National Society of Professional Engineers for EJCDC. All rights reserved. PaQe 41 of 62 L 405 shall be delivered to the Engineer and the other pariy to the Contract within 60 days after the start of such event (unless Engineer allows additional time for claimant to submit additional or more accurate data in support of such Claim). A Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01.13. A Claim for an adjustment in Contract Times shall be prepared in accordance with the provisions of Paragraph 12.02.B. Each Claim shall be accompanied by claimant's written statement that the adjustment claimed is the entire adjustment to which the claimant believes it is entitled as a result of said event. The opposing party shall submit any response to Engineer and the claimant within 30 days after receipt of the claimant's last submittal (unless Engineer allows additional time). C. Engineer's Action: Engineer will review each Claim and, within 30 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any, take one of the following actions in writing: 1. deny the Claim in whole or in part; 2. approve the Claim; or 3. notify the parties that the Engineer is unable to resolve the Claim if, in the Engineer's sole discretion, it would be inappropriate for the Engineer to do so. For purposes of further resolution of the Claim, such notice shall be deemed a denial. D. In the event that Engineer does not take action on a Claim within said 30 days, the Claim shall be deemed denied. E. Engineer's written action under Paragraph 10.05.C or denial pursuant to Paragraphs 10.05.C.3 or 10.05.1) will be final and binding upon Owner and Contractor, unless Owner or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. F. No Claim for an adjustment in Contract Price or Contract Times will be valid if not submitted in accordance with this Paragraph 10.05. ARTICLE 11 - COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragaph 11.01.13, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work or because of the event giving rise to the Claim. Except as otherwise may be agreed to in writing by Owner, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall not include any of the costs itemized in Paragraph 11.01.13, and shall include only the following items: EJCDC C-700 Standard General Conditions oTthe Construction Contract Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Pape 42 of 62 , 406 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by Owner and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, shall be included in the above to the extent authorized by Owner. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. All cash discounts shall accrue to Contractor unless Owner deposits funds with Contractor with which to make payments, in which case the cash discounts shall accrue to Owner. All trade discounts, rebates and refunds and returns from sale of surplus materials and equipment shall accrue to Owner, and Contractor shall make provisions so that they may be obtained. 3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by Owner, Contractor shall obtain competitive bids from subcontractors acceptable to Owner and Contractor and shall deliver such bids to Owner, who will then determine, with the advice of Engineer, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 4. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 5. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Wark. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by Owner with the advice of Engineer, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright C) 2007 Nationai Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 43 of 62 - 407 said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. d. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable, as imposed by Laws and Regulations. e. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. f. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work (except losses and damages within the deductible amounts of properiy insurance established in accordance with Paragraph 5.06.1)), provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of Owner. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of detennining Contractor's fee. g. The cost of utilities, fuel, and sanitary facilities at the Site. h. Minor expenses such as telegrams, long distance telephone calls, telephone service at the Site, express and courier services, and similar petty cash items in connection with the Work. i. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.0 1.A.1 or specifically covered by Paragraph 11.0 l.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 44 of 62 408 limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind and the costs of any item not specifically and expressly included in Paragraphs 11.01.A. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragaph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.O1.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to Engineer an itemized cost breakdown together with supporting data. 11.02 Allowances A. It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to Owner and Engineer. B. Cash Allowances: 1. Contractor agrees that: a. the cash allowances include the cost to Contractor (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances, and no demand for additional pa}nnent on account of any of the foregoing will be valid. C. Contingency Allowance: 1. Contractor agrees that a contingency allowance, if any, is for the sole use of Owner to cover unanticipated costs. D. Prior to final payment, an appropriate Change Order will be issued as recommended by Engineer to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to EJCDC C-700 Standard General Conditions of the ConstrucHon Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. PaQe 45 of 62 L ~ 409 the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by Engineer subject to the provisions of Paragraph 9.07. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. Owner or Contractor may make a Claim for an adjustment in the Contract Price in accordance with Paragraph 10.05 i£ the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work; and 3. Contractor believes that Contractor is entitled to an increase in Contract Price as a result of having incurred additional expense or Owner believes that Owner is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. Any Claim for an adjustment in the Contract Price shall be based on written notice submitted by the party making the Claim to the Engineer and the other party to the Contract in accordance with the provisions of Paragraph 10.05. B. The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Price will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0 1.C.2); or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under Paragraph 12.01.B.2, on the basis of the Cost of the Work (deternuned as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.0 1.C). EJCDC C-700 Standard General Conditions of the Construction Contract Copyright C) 2007 NaHonal Society of Professional Engineers for EJCDC. AIl rights reserved. Page 46 of 62 - 410 C. Contractor's Fee: The Contractor's fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; ar 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0 1.A.1 and 11.0 1.A.2, the Contractor's fee shall be 15 percent; b. far costs incurred under Paragraph 11.0 1.A.3, the Contractor's fee shall be five percent; c. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.01.C.2.a and 12A1.C.2.b is that the Subcontractar who actually performs the Work, at whatever tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.01.A.1 and 11.O1.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent of the amount paid to the next lower tier Subcontractor; d. no fee shall be payable on the basis of costs itemized under Paragraphs 11.O1.A.4, 11.O1.A.5, and 11.O1.B; e. the amount of credit to be allowed by Contractor to Owner for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent of such net decrease; and f. when both additions and credits are involved in any one change, the adjustment in Contractor's fee shall be computed on the basis of the net change in accordance with Paragraphs 12.0 1.C.2.a through 12.0 1.C.2.e, inclusive. 12.02 Change of Contract Times A. The Contract Tiines may only be changed by a Change Order. Any Claim for an adjustment in the Contract Times shall be based on written notice submitted by the party making the Claim to the Engineer and the other pariy to the Contract in accordance with the provisions of Paragraph 10.05. B. Any adjustment of the Contract Times covered by a Change Order or any Claim for an adjustment in the Contract Times will be determined in accordance with the provisions of this Article 12. 12.03 Delays A. Where Contractor is prevented from completing any part of the Work within the Contract Times due to delay beyond the control of Contractor, the Contract Times will be extended in an amount equal to the time lost due to such delay if a Claim is made therefor as provided in Paragraph 12.02.A. Delays beyond the control of Contractor shall include, but not be limited to, acts or EJCDC C-700 Standard General Conditions of the Construction Contract Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 47 oT 62 411 neglect by Owner, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. B. If Owner, Engineer, or other contractors or utility owners performing other work for Owner as contemplated by Article 7, or anyone for whom Owner is responsible, delays, disrupts, or interferes with the performance or progress of the Work, then Contractor shall be entitled to an equitable adjustment in the Contract Price or the Contract Times, or both. Contractor's entitlement to an adjustment of the Contract Times is conditioned on such adjustment being essential to Contractor's ability to complete the Work within the Contract Times. C. If Contractor is delayed in the performance or progress of the Work by fire, flood, epidemic, abnormal weather conditions, acts of God, acts or failures to act of utility owners not under the control of Owner, or other causes not the fault of and beyond control of Owner and Contractor, then Contractor shall be entitled to an equitable adjustment in Contract Times, if such adjustment is essential to Contractor's ability to complete the Work within the Contract Times. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph 12.03.C. D. Owner, Engineer, and their officers, directors, members, partners, employees, agents, consultants, or subcontractors shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. E. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects A. Prompt notice of all defective Work of which Owner or Engineer has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work A. Owner, Engineer, their consultants and other representatives and personnel of Owner, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright (D 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 48 of 62 U%- 412 13.03 Tests and Inspections A. Contractor shall give Engineer timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. Owner shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents except: 1. for inspections, tests, or approvals covered by Paragraphs 13.03.C and 13.03.1) below; 2. that costs incurred in connection with tests or inspections conducted pursuant to Paragraph 13.04.B shall be paid as provided in Paragraph 13.04.C; and 3. as otherwise specifically provided in the Contract Documents. C. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereoo specifically to be inspected, tested, or approved by an employee or other representative of such public body, Contractor shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in connection therewith, and furnish Engineer the required certificates of inspection or approval. D. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, or approvals required for Owner's and Engineer's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipinent submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to Owner and Engineer. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of Engineer, Contractor shall, if requested by Engineer, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense unless Contractor has given Engineer timely notice of Contractor's intention to cover the same and Engineer has not acted with reasonable prompmess in response to such notice. 13.04 Uncovering Work A. If any Work is covered contrary to the written request of Engineer, it must, if requested by Engineer, be uncovered for Engineer's observation and replaced at Contractor's expense. B. If Engineer considers it necessary or advisable that covered Work be observed by Engineer or inspected or tested by others, Contractor, at Engineer's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as Engineer may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. EJCDC C-700 Standard General Conditions of.the ConshucHon Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paee 49 of 62 - 413 C. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and Owner shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount thereof, Owner may make a Claim therefor as provided in Paragraph 10.05. D. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Times, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the parties are unable to agree as to the amount or extent thereof, Contractor may make a Claim therefor as provided in Paragraph 10.05. 13.05 Owner May Stop the Work A. If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Wark in such a way that the completed Work will conform to the Contract Documents, Owner may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of Owner to stop the Work shall not give rise to any duty on the part of Owner to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by Engineer, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replaceinent of work of others). B. When correcting defective Work under the terms of this Paxagaph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair Owner's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within one year after the date of Substantial Completion (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents) or by any specific provision of the Contract Documents, any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by Owner or permitted by Laws and Regulations as contemplated in Paragraph 6.11.A is found to be defective, Contractor shall promptly, without cost to Owner and in accordance with Owner's written instructions: EJCDC C-700 Standard Generai Conditions of the Construction Contract Copyright 0 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Pa¢e 50 of 62 ~ 414 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by Owner, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of Owner's written instructions, or in an emergency where delay would cause serious risk of loss or damage, Owner may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claiins, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work A. If, instead of requiring correction or removal and replacement of defective Work, Owner (and, prior to Engineer's recommendation of final payment, Engineer) prefers to accept it, Owner may do so. Contractor shall pay all, claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to Owner's evaluation of and determination to accept such defective Work (such costs to be approved by Engineer as to reasonableness) and for the diminished value of the Work to the extent not otherwise paid by Contractor pursuant to this sentence. If any such acceptance occurs prior to Engineer's recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and Owner shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. If the parties are unable to agree as to the amount thereof, Owner may make a Claim therefor as provided in Paragraph 10.05. If the acceptance occurs after such recommendation, an appropriate amount will be paid by Contractor to Owner. EJCDC C-700 Standard General CondiHons of the Construcdon Contract Copyright C) 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Paee 51 of 62 415 13.09 Owner May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from Engineer to correct defective Work, or to remove and replace rejected Work as required by Engineer in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, Owner may, after seven days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, Owner shall proceed expeditiously. In connection with such corrective or remedial action, Owner may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, take possession of Contractor's tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which Owner has paid Contractor but which are stored elsewhere. Contractor shall allow Owner, Owner's representatives, agents and employees, Owner's other contractors, and Engineer and Engineer's consultants access to the Site to enable Owner to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and Owner shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the ainount of the adjustment, Owner may make a Claim therefor as provided in Paragraph 10.05. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's defective Work. D. Contractor shall not be allowed an extension of the Contract Times because of any delay in the performance of the Work attributable to the exercise by Owner of Owner's rights and remedies under this Paragraph 13.09. ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values A. The Schedule of Values established as provided in Paragraph 2.07.A will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to Engineer. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. At least 20 days before the date established in the Agreement for each progress payment (but not more often than once a month), Contractor shall submit to Engineer for review an EJCDC C-700 Standard General Conditions otthe ConstrucHon Contract Copyright C) 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Paae 52 of 62 416 Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Wark but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest therein, all of which must be satisfactory to Owner. 2. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that all previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 3. The amount of retainage with respect to progress payments will be as stipulated in the Agreement. B. Review ofApplications: 1. Engineer will, within 10 days after receipt of each Application for Payment, either indicate in writing a recommendation of payment and present the Application to Owner or return the Application to Contractor indicating in writing Engineer's reasons for refusing to recommend payment. In the latter case, Contractor may inake the necessary corrections and resubmit the Application. 2. Engineer's recommendation of any payment requested in an Application for Payment will constitute a representation by Engineer to Owner, based on Engineer's observations of the executed Work as an experienced and qualified design professional, and on Engineer's review of the Application for Payment and the accompanying data and schedules, that to the best of Engineer's knowledge, information and belief: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Unit Price Work under Paragraph 9.07, and any other qualifications stated in the recommendation); and c. the conditions precedent to Contractor's being entitled to such payment appear to have been fulfilled in so far as it is Engineer's responsibility to observe the Work. 3. By recommending any such payrnent Engineer will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or EJCDC C-700 Standard General CondiHons of the ConstrucNon Contract Copyright O 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Page 53 of 62 - 417 involved detailed inspections of the Work beyond the responsibilities specifically assigned to Engineer in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by Owner or entitle Owner to withhold payment to Contractor. 4. Neither Engineer's review of Contractor's Work for the purposes of recommending payments nor Engineer's recommendation of any payment, including fmal payment, will impose responsibility on Engineer: a. to supervise, direct, or control the Work, or b. for the means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or c. for Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work, or d. to make any examination to ascertain how or for what purposes Contractor has used the moneys paid on account of the Contract Price, or e. to determine that title to any of the Work, materials, or equipment has passed to Owner free and clear of any Liens. 5. Engineer may refuse to recommend the whole or any part of any payment if, in Engineer's opinion, it would be incorrect to make the representations to Owner stated in Paragraph 14.02.13.2. Engineer may also refuse to recommend any such payment or, because of subsequently discovered evidence or the results of subsequent inspections or tests, revise or revoke any such payment recommendation previously made, to such extent as may be necessary in Engineer's opinion to protect Owner from loss because: a. the Work is defective, or completed Work has been damaged, requiring correction or replaceinent; b. the Contract Price has been reduced by Change Orders; c. Owner has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or d. Engineer has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Payment Becomes Due: 1. Ten days after presentation of the Application for Payment to Owner with Engineer's recommendation, the amount recommended will (subject to the provisions of Paragraph 14.02.13) become due, and when due will be paid by Owner to Contractor. EJCDC C-700 Standard General Conditions ot the Construction Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. PaEe 54 of 62 _ - 418 D. Reduction in Payment: 1. Owner may refuse to make payinent of the full amount recommended by Engineer because: a. claims have been made against Owner on account of Contractor's performance or furnishing of the Work; b. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to Owner to secure the satisfaction and discharge of such Liens; c. there are other items entitling Owner to a set-off against the amount recommended; or d. Owner has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.5.a through 14.02.B.5.c or Paragraph 15.02.A. 2. If Owner refuses to make payment of the full amount recommended by Engineer, Owner will give Contractor immediate written notice (with a copy to Engineer) stating the reasons for such action and promptly pay Contractor any amount remaining after deduction of the amount so withheld. Owner shall promptly pay Contractor the amount so withheld, or any adjustment thereto agreed to by Owner and Contractor, when Contractor remedies the reasons for such action. 3. Upon a subsequent detennination that Owner's refusal of payment was not justified, the amount wrongfully withheld shall be treated as an amount due as determined by Paragraph 14.02.C.1 and subject to interest as provided in the Agreement. 14.03 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payinent, whether incorporated in the Project or not, will pass to Owner no later than the time of payment free and clear of all Liens. 14.04 Substantial Completion A. When Contractor considers the entire Work ready for its intended use Contractor shall notify Owner and Engineer in writing that the entire Work is substantially complete (except for items specifically listed by Contractor as incomplete) and request that Engineer issue a certificate of Substantial Completion. B. Promptly after Contractor's notification, Owner, Contractor, and Engineer shall make an inspection of the Work to determine the status of completion. If Engineer does not consider the Work substantially complete, Engineer will notify Contractor in writing giving the reasons therefor. C. If Engineer considers the Work substantially complete, Engineer will deliver to Owner a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before EJCDC C-700 Standard General Conditions of the Construction Contract Copyright @ 2007 NaHonal Society of Professional Engineers for EJCDC. All rights reserved. Page 55 of 62 - 419 final payment. Owner shall have seven days after receipt of the tentative certificate during which to make written objection to Engineer as to any provisions of the certificate or attached list. If, after considering such objections, Engineer concludes that the Work is not substantially complete, Engineer will, within 14 days after submission of the tentative certificate to Owner, notify Contractor in writing, stating the reasons therefor. If, after consideration of Owner's objections, Engineer considers the Work substantially complete, Engineer will, within said 14 days, execute and deliver to Owner and Contractor a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed or corrected) reflecting such changes from the tentative certificate as Engineer believes justified after consideration of any objections from Owner. D. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will deliver to Owner and Contractor a written recommendation as to division of responsibilities pending final payment between Owner and Contractor with respect to security, operation, safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and guarantees. Unless Owner and Contractor agree otherwise in writing and so inform Engineer in writing prior to Engineer's issuing the definitive certificate of Substantial Completion, Engineer's aforesaid recommendation will be binding on Owner and Contractor until final payment. E. Owner shall have the right to exclude Contractor from the Site after the date of Substantial Completion subject to allowing Contractor reasonable access to remove its property and complete or correct items on the tentative list. 14.05 Partial Utilization A. Prior to Substantial Completion of all the Work, Owner may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which Owner, Engineer, and Contractor agree constitutes a separately functioning and usable part of the Work that can be used by Owner for its intended purpose without significant interference with Contractor's performance of the remainder of the Work, subject to the following conditions: Owner at any time may request Contractor in writing to permit Owner to use or occupy any such part of the Work which Owner believes to be ready for its intended use and substantially complete. If and when Contractor agrees that such part of the Work is substantially complete, Contractor, Owner, and Engineer will follow the procedures of Paragraph 14.04.A through D for that part of the Work. 2. Contractor at any time may notify Owner and Engineer in writing that Contractor considers any such part of the Work ready for its intended use and substantially complete and request Engineer to issue a certificate of Substantial Completion for that part of the Work. 3. Within a reasonable time after either such request, Owner, Contractor, and Engineer shall make an inspection of that part of the Work to determine its status of completion. If Engineer does not consider that part of the Work to be substantially complete, Engineer will notify Owner and Contractor in writing giving the reasons therefor. If Engineer considers that part of the Work to be substantially complete, the provisions of Paragraph 14.04 will apply with respect to certification of Substantial Completion of that part of the Work and the division of responsibility in respect thereof and access thereto. EJCDC C-700 Standard Genersl Conditions of the Construction Contract Copyright 0 2007 Narional Society of Professional Engineers for EJCDC. All rig6ts reserved. Pa¢e 56 of 62 _ 420 documentation as required by the Contract Documents, Engineer is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled, Engineer will, within ten days after receipt of the final Application for Payment, indicate in writing Engineer's recommendation of payment and present the Application for Payment to Owner for payment. At the same time Engineer will also give written notice to Owner and Contractor that the Work is acceptable subject to the provisions of Paragraph 14.09. Otherwise, Engineer will return the Application for Payment to Contractor, indicating in writing the reasons for refusing to recommend final payment, in which case Contractor shall make the necessary corrections and resubmit the Application for Payrnent. C. Payment Becomes Due: Thirty days after the presentation to Owner of the Application for Payment and accompanying documentation, the amount recommended by Engineer, less any sum Owner is entitled to set off against Engineer's recommendation, including but not limited to liquidated damages, will become due and will be paid by Owner to Contractor. 14.08 Final Completion Delayed A. If, through no fault of Contractor, final completion of the Work is significantly delayed, and if Engineer so confirms, Owner shall, upon receipt of Contractor's final Application for Payrnent (for Work fully completed and accepted) and recommendation of Engineer, and without tenninating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by Owner for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if bonds have been furnished as required in Paragraph 5.01, the written consent of the surety to the payment of the balance due for that portion of the Work fully completed and accepted shall be submitted by Contractor to Engineer with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Claims. 14.09 Waiver of Claims A. The making and acceptance of final payment will constitute: 1. a waiver of all Claims by Owner against Contractor, except Claims arising from unsettled Liens, from defective Work appearing after final inspection pursuant to Paragraph 14.06, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from Contractor's continuing obligations under the Contract Documents; and 2. a waiver of all Claims by Contractor against Owner other than those previously made in accordance with the requirements herein and expressly acknowledged by Owner in writing as still unsettled. EJCDC C-700 Standard General Conditions of the Construction Contract Copyright 0 2007 National Society of Professional Engineers for EJCDC. All rights reserved. _ Page 58 of 62 ~ 422 to pay Contractor any sum finally determined to be due, then Contractor may, upon seven days written notice to Owner and Engineer, and provided Owner or Engineer do not remedy such suspension or failure within that time, terminate the Contract and recover from Owner payment on the same terms as provided in Paragraph 15.03. B. In lieu of terminating the Contract and without prejudice to any other right or remedy, if Engineer has failed to act on an Application for Payment within 30 days after it is submitted, ar Owner has failed for 30 days to pay Contractor any sum finally determined to be due, Contractor inay, seven days after written notice to Owner and Engineer, stop the Work until payment is made of all such amounts due Contractor, including interest thereon. The provisions of this Paragraph 15.04 are not intended to preclude Contractor from making a Claim under Paragraph 10.05 for an adjustment in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to Contractor's stopping the Wark as permitted by this Paragraph. ARTICLE 16 - DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either Owner or Contractor may request mediation of any Claim submitted to Engineer for a decision under Paragraph 10.05 before such decision becomes final and binding. The mediation will be governed by the Construction Industry Mediation Rules of the American Arbitration Association in effect as of the Effective Date of the Agreement. The request for mediation shall be submitted in writing to the American Arbitration Association and the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.05.E. B. Owner and Contractor shall participate in the mediation process in good faith. The process shall be concluded within 60 days of filing of the request. The date of termination of the mediation shall be determined by application of the mediation rules referenced above. C. If the Claim is not resolved by mediation, Engineer's action under Paragraph 10.05.C or a denial pursuant to Paragraphs 10.05.C.3 or 10.05.D shall become final and binding 30 days after termination of the mediation unless, within that tiine period, Owner or Contractor: 1. elects in writing to invoke any dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other pariy to submit the Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Claim to a court of competent jurisdiction. ARTICLE 17 - MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ EJCDC C-700 Standard General CondiHons of the Construction Contract Copyright C) 2007 National Society oT Professional Engineers for EJCDC. All rights reserved. Paee 61 of 62 ~.V 423 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. 17.02 Computation of Times A. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation. 17.03 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 17.04 Survival of Obligations A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Controlling Law A. This Contract is to be governed by the law of the state in which the Project is located. 17.06 Headings A. Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. EJCDC C-700 Standard General Conditions of the Construcdon Contract Copyright C) 2007 National Society of Professional Engineers for EJCDC. All rights reserved. Paire 62 of 62 1 424 SECTION VII SPECIAL CONDITIONS 1. GENERAL The provisions of this section of specifications shall govern in the event of any conflict between them and the "General Conditions of Agreement". 2. ENGINEER The word "Engineer" in these specifications shall be understood as referring to Dunham Engineering, Inc. of College Station, Texas, Engineer of the Owner. 3. OWNER All references to OWNER in these documents refer to City of Paris of Paris, Texas. 4. EXAMINATION OF SITE OF PROJECT Prospective bidders shall make a careful examination of the site of the project, climatic conditions to be encountered, improvements to be performed, disposal sites for surplus materials, and as to method of providing ingress and egress to any private properties, and methods of handling traffic during construction of the entire project. 5. QUALIFICATION OF LOW BIDDER Before being awarded a contract, the apparent low, responsive and responsible bidder shall submit such evidence as the Engineer may require to establish his financial responsibility, experience and possession of such equipment as may be needed to prosecute the work in an expeditious, safe, environmentally sound and satisfactory manner. Before being awarded the contract, the Contractor must identify the foreman intended to be assigned to the project. Once approved by the Engineer, the foreman may not be removed from the job unless approved in writing by the Engineer. This specifically precludes the foreman supervising more than one jobsite and specifically requires that the foreman be on the jobsite 100% of the time when work is being performed. If the foreman leaves the jobsite for any reason, work must cease. Section VII - . 426 6. TIME ALLOWED FOR COMPLETION Time allotted for the completion of all items of work shall be one hundred fifty (150) days, which time shall begin on the tenth (10) day after the issuance of the Work Order. The Work Order shall consist of a written request by the Engineer for the Contractor to proceed with the construction of the project. 7. LIQUIDATED DAMAGES FOR DELAY The Contractor agrees that time is the essence of this contract, and that for each calendar day of delay beyond the number of calendar days herein agreed upon for the completion of the work herein specified and contracted for (after due allowance for any extension of time as may be granted pursuant to the General Conditions of Agreement) the Owner may withhold, permanently, from the Contractor's total compensation, the sum of Two Hundred Fifty ($250.00) Dollars per calendar day as liquidated damages for such delay. Owner and Contractor recognize that time is of the essence and that Owner will suffer financial loss if the work contemplated in this Project is not completed within the time specified plus any extensions allowed in change orders granted pursuant to the General Conditions. Owner and Contractor recognize the delays, expenses and difficulties involved in proving the actual loss suffered by Owner if the work to be completed in the Project is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay Owner Two Hundred Fifty Dollars ($250.00) per calendar day for each day that expires after the time specified herein for completion of the work. 8. ADDENDA Bidders desiring further information or interpretation of the plans or specifications must make request for such information to the Engineer in writing, prior to seven (7) days before the bid opening. Answers to all such requests will be given in writing to all bidders, in addendum form, and all addenda will be bound with, and made a part of, the Contract Documents. No other explanation or interpretation will be considered official or binding. Should a bidder find discrepancies in, or omission from, the plans, specifications, or other contract documents, or should he be in doubt as to their meaning, he should at once notify the Engineer in writing in order that a written addendum may be sent to all bidders. Any addenda issued prior to five (5) days of the opening of bids will be mailed or delivered to each Contractor contemplating the submission of a proposal on this work. Any addenda issued within five (5) days of bid opening will be faxed or overnight mailed to each prospective bidder. The proposal as submitted by the Contractor will be so constructed as to include any addenda, if such are issued by the Engineer prior to five (5) days of the opening of bids. Section VII - 2 427 9. REFERENCE SPECIFICATIONS Where reference is made in these specifications to specifications compiled by other agencies, organizations or departments, such reference is made for expediency and standardization from the material supplier's point of view, and such specifications referred to are hereby made a part of these specifications as if fully written out herein. Whenever reference is made to the furnishing of materials for testing thereof to conform to the standards of any technical society, trade organization, or regulatory body, it shall be construed to mean the latest standard, code, specification or tentative specification adopted and published at the time of advertisement for bids, even though reference has been made to an earlier standard, and such current standards are made a part hereof to the extent which is indicated or intended. Referenced standards shall include all comments and best practices indicated in the Standard, even if not specifically required by the Standard. In the event the Referenced Specification conflicts with the Project Specification, the Project Specification shall govern. 10. PROJECT MAINTENANCE The Contractor shall maintain and keep in good repair the improvements covered by these plans and specifications during the life of the contract. Existing improvements at the project location shall at all times be protected by the Contractor during the construction specified herein. All such prior existing improvements shall be left in a condition equal or better to that prior to the start of construction. 11. FENCES, DRAINAGE CHANNELS AND SURPLUS EXCAVATION Boundary fences or other improvements temporarily removed to permit this construction shall be replaced in the same location and left in a condition as good or better than that in which they were originally found. 12. DISPOSAL OF WASTE The Contractor is responsible for testing and disposal of all waste products associated with the project. 13. CLEANUP 1. During Construction - The Contractor shall at all times keep the job site as free from all material, debris and rubbish as is practicable and shall remove same from any portion of the job site, when it becomes objectionable, in the opinion of the Engineer or Owner. Section VII - 3 ~ ~ 428 2. Final - Upon completion of the work the Contractor shall remove from the site, all plant, materials, tools and equipment belonging to him, and leave the site with an appearance acceptable to the Engineer. 14. LIGHTS AND POWER The Contractor shall provide temporary lighting and facilities required for the proper execution and inspection of the work in accordance with SSPC Guide 12. Electrical power for lighting and hand tools is available on site at no cost to the Contractor. All air compressors shall be engine driven. 15. COPIES OF PLANS AND SPECIFICATTONS FURNISHED Three (3) sets of the Plans and Specifications shall be furnished without charge to the Contractor for construction purposes. 16. COMPENSATION, PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE Each and every Contractor performing work at the site will not commence work until he has secured all the required insurance. This also applies to all sub-contractors who will be working on the site. Coverage to be carried is shown in Paragraph 10, Instruction to Bidders, Section II. 17. PORTABLE TOILET FACILITIES The Contractor shall provide portable toilet facilities when workers are present. 18. PARTIAL PAYMENTS In accordance with the General Conditions (Application for Progress Payment), the end of the month is established as the progress payment date and the amount of retainage will be ten percent (10%). Contractors that submit requests for progress payments prior to the end of the month will receive payment less 10% retainage for that month's progress by the end of the following month. All retainage will be paid on the final payment. Contractor's affidavit of bills paid must be submitted with request for final payment. Section VII - 4`, 42 9 19. WORKING HOURS & CITY NOISE ORDINANCE Owner has no restrictions on working hours other than no earlier than 7 AM and no later than 7 PM daily. Contractor must comply with City noise ordinance, and all other ordinances during the project. Section VII - 5 , - 430 SECTION VIII TECHNICAL SPECIFICATIONS SUMMARY OF WORK 1. SCOPE OF CONTRACT The City of Paris, Texas has a 1.OMG, multi-column elevated water storage tank that is to be rehabilitated and repainted under the terms of this contract. General information on the tank is provided at the end of this document in the Engineer's Report of Inspection dated January 4, 2012. Generally, the interior and exterior coatings will be replaced and miscellaneous structural steel repairs will be made. The specific repairs and repainting required are outlined in this Section. The tank is located in the 600 block of 25th Street NE, in the City of Paris, Texas (see maps in Appendix). Containment (i.e. shrouding) and lead abatement is required during the exterior abrasive blasting operations to protect the environment. The exterior coating system contains greater than 1% lead by weight. See Technical Specification No. 35 - Lead Abatement (TS 35) in this document for lead abatement requirements. A laboratory analysis of the coatings is provided at the end of this document in the Appendix. It shall be the responsibility of the bidders to carefully inspect the site and all pertinent parts and devices on the tank to ascertain the quantity of surface preparation, necessary repairs, and painting required to clean the tank properly, paint, repair, and place it back into operation in accordance with these contract specifications. The information on the tank provided in the Engineer's Report of Inspection is general in nature and should not be relied upon to determine bid quantities or other bidding factors. The Contractor shall use the materials specified, or materials of another manufacturer that are deemed equal in the opinion of the Engineer to the materials specified. All interior paint will conform to Standard 61 of the National Sanitation Foundation (NSF) and will be on the NSF approved list of inside finish materials. In the event the Contractor desires to substitute the products of another manufacturer, he shall apply to the Engineer in writing at least fourteen (14) days prior to the bid date requesting substitution, and shall furnish with his request complete descriptive materials on the products along with NSF Certification plus full manufacturers recommendations of surface preparation and application. 2. PRODUCTS SW-1 - 432 A. All abrasive material used in the removal of existing protective coating systems will be silica free and low dust producing. Materials such as copper slag and Green Diamond are permitted. Abrasives derived from coal or petroleum product that leaves an oily residue on the surface of the steel are not permitted. Submit abrasive selection for approval. B. All paints, thinners and associated products used in the application of the protective coating systems will be manufactured by Tnemec Company of Kansas City, Mo., unless an alternate coating system is selected as provided for in Paragraph 1- Scope of Contract or Paragraph 10 - Alternate Coating Systems. Pricing for alternate coating systems is NOT required. 3. REPAIR ITEMS OF WORK All welding repairs must be completed before any paint is applied to the structure. All interior and exterior surfaces must be blasted and primed, and any additive repairs made, before any intermediate or finish coats may be applied to the struciure. All welding shall be in accordance with AWS Structural Welding Code D1.1 and these Specifications, including TS 40 of the Technical Specifications. (1) Remove existing 24" diameter roof hatch and weld new 30" diameter hatch in its place per Detail in Drawings Section. (2) Remove existing 30" square aluminum hatch adjacent to center vent on roof and weld new 30" square hatch in its' place per Detail in Drawings Section. (3) Remove existing 24" diameter center vent and install new 30" diameter vent in its place per Detail in Drawings Section. (4) After blast cleaning leg base plates, replace loose grout with new non- shrink grout. Replace only loose grout after sandblast cleaning. (5) Replace all ladders on structure with new AWWA style ladders per Detail in Drawings Section. This includes leg ladder starting 10' above grade to balcony, exterior ladder from balcony to center vent, interior bowl ladder from top hatch opening on roof to floor of tank and interior riser ladder from floor of bowl to grade. Install new cable style galvanized DBI/SALA safety climb devices with cable grabs on each ladder. Total of four climb devices and cable grabs required, a. Roll roof ladder to curvature of tank. Measure radius of tank in field to obtain roll dimension. Submit shop drawing to Engineer for SW-2 ~ 1 433 approval. b. Install interior bowl ladder below top hatch opening and provide Approx.l2' long x 6" angle supports to wall spaced at 10' intervals. Measure in field to obtain exact length. Submit shop drawing to Engineer for approval. Position new ladder directly below new 30" diameter top hatch for easy access. c. Insta118' long aluminum climb prevention gate on bottom of leg ladder, LADDER GATE or equal. Submit catalog cut to Engineer for approval. (6) Insta118' diameter x 42" tall handrail on roof of tank centered around top vent. Provide 1.5' wide opening in handrail at roof ladder and weld handrail support to each side of roof ladder. See Detail in Drawings Section. Install one 110 volt electrical double outlet on roof handrail and one on balcony handrail. Run new electrical wires from grade to both outlets in new pipe conduit required in item (8) below. (7) Install 6 antenna brackets on roof handrail and 8 antenna brackets on balcony handrail spaced evenly around circumference. See Detail in Drawings Section. (8) Remove all conduits from structure prior to sandblasting. Install two 4" diameter steel pipes with one on each side of leg ladder welded to 6" square x 1/4' thick A36 steel plates aligned vertically to pipe and spaced at 10' intervals to support pipes. Pipes run from grade to roof Approx.l' from ladder handrails. Pipes are to be blasted and painted as permanent part of structure and will be used as conduit for communications wires. (9) Replace one (1) bent balcony handrail brace with new 2" x 2" angle. Measure in field for exact length, brace is Approx. 4' long. (10) Install new 4" tall x 24" diameter raised curb at balcony floor plate opening for leg ladder. Curb to be welded to opening with new A36 steel plate rolled to opening diameter. (11) Remove 15 existing truss rafters on interior of tank and insta1115 new 6" x 6" x 3/8" angle rafters each Approx. 40' long. Roll rafters to curvature of tank. Measure radius in field for exact roll. Install rafters with leg down and seal weld both side of rafter to ceiling. Rafters may be spliced in no less than 10' lengths for ease of erection. Seal weld all splices. Rafters to run from rafter support ring to side wall. See Detail in sw-3 434 Drawings Section. (12) Remove existing rafter support ring below roof vent and install new 8' diameter x 6" x 6" x 3/8" angle rafter support ring. Weld new support ring to ceiling. Weld ends of each rafter to rafter support ring. Provide temporary construction bracing as required while installing ring and rafters. See Detail in Drawings Section. (13) Remove 3 abandoned 6" channels lying flat on roof and previously used to support antenna bracket next to center vent. (14) Remove existing probe holder on roof of tank and weld 6" diameter x 1/4" thick plate over hole. (15) Replace existing overflow pipe with new 16" diameter schedule 40 steel pipe from grade to existing high water line. Replace interior weir pipe with new pipe weir. Install new overflow pipe supports spaced Approx. 10' apart using 6" square x 1/4' thick A36 steel plate positioned vertically from leg to pipe. Install new CLOW or MUELLER flap vale on end of pipe. Match existing overflow level. Location of overflow pipe must be approved by Engineer's Field Representative on site prior to installation. (16) Provide and install concrete splash pad below overflow pipe. See Detail in Drawings Section. Ensure splash pad slopes away from tank and toward drainage area at a 1/12 downward slope. Location of splash pad must be approved by Engineer's Field Representative on site prior to installation. (17) Provide temporary plywood cover to protect roof of existing building located behind leg ladder. Building is approx. 8' square x 8' tall. Cover building roof with plywood to protect exterior during sandblasting and painting. Remove plywood cover after painting is complete. (18) Remove existing cathodic protection system from structure including all cover plates on roof and all wiring on interior of tank. Weld 6" diameter x 1/4" thick A36 steel plates over all (Approx.l5) existing access holes on roof. Weld top side only and caulk interior side at ceiling. (19) Provide and insta111' wide x 1/4" thick A36 steel reinforcing pad in bowl of tank around riser pipe penetration. Re-pad to be welded all around to tank floor and riser. Re-pad to be Approx. 6' O.D. and 5' I.D. SW - 4 _ _ 435 (20) City will have one SCADA antenna positioned on roof of tank at all times during project. This antenna controls water level in all City tanks and is controlled by building located near leg ladder. After shroud support center tree is installed, contractor will move SCADA antenna to top of shroud support center tree where it will remain until shroud is removed. Antenna is omni-directional and may be moved to facilitate work but must remain operational during project. Once shroud is removed, contractor will move SCADA antenna to permanent location on roof handrail. Owner will run coax wire for SCADA antenna in new pipe conduit installed by contractor as part of project. (21) Grind welded lugs on structure smooth, including old ladder lugs, old rigging clips and shroud clips. New shroud clips shall be ground smooth, blasted and painted per the exterior coating specification after containment has been removed. (22) Optional Work Item: At contractor's own expense, holes may be cut in tank's roof plate to provide rigging ports for interior of tank. If holes are cut, weld one 2 diameter threaded pipe coupling in each hole. Blast and paint couplings as part of exterior work. Close holes at end of job with galvanized coated threaded plugs. Submit number of holes proposed and methods to cut and close to Engineer for approval. (23) Provide and install new stainless steel nuts, bolts and neoprene gaskets in all manways after interior paint has cured. Do not paint stainless steel nuts and bolts. 4. REPAIR OF PITS & PRIOR CORROSION DAMAGE After abrasive blast cleaning, Engineer's Field Representative will inspect the steel surface to determine the repair procedure. The repairs may be made by using epoxy paste or by welding as directed by the Engineer' Field Representative. Those pits deeper than 1/8" will be repaired by welding. Pits less than 1/8" deep will be repaired with epoxy paste. Epoxy paste shall be applied after the zinc rich primer has been applied per the appropriate coating specification in this document. Repair all deep pits by welding pit flush with surface of tank. Average size of deep pits is 1" diameter x 1/8 deep. Repair all shallow pits by filling with 100% solids epoxy Tnemec pit filler. Average size of shallow pits is 1" diameter x less than 1/8" deep. Assume 200 deep pits to be repaired by welding, and 2 gallons of epoxy pit filler to repair shallow pits in base bid. Additive bid item below shall be utilized if additional repairs are required: SW-5 436 Additive Bid Item #1: Repair by welding up to 200 holes or corrosion damaged areas up to 6" in diameter, after abrasive blast cleaning. Areas shall be repaired by welding 1/4" steel plates to the tank per AWS D1.1. Blast and paint entire area affected by repair according to the appropriate coating specification in this document. Repairs shall be authorized by Engineer's Field Representative as needed. Work shall be performed on a unit price basis. 5. PROTECTIVE COATING REPLACEMENT All coating operations shall be performed in accordance with SSPC PA-1, SSPC PA-2, AWWA D102 and these Specifications, including TS 2, 3, and 20 of the Technical Specifications. A. Interior Surface Preparation & Coating: (1) The work covered by this part of the specification includes painting the entire inside surface area of the tank, including the wet riser pipe. The Contractor shall furnish all materials required for the painting and shall install them in accordance with the manufacturer's written directions and these specifications. (2) Abrasive blast clean all areas below HWL in bowl to SSPC SP-6 Commercial Blast Standard. A suitable angular anchor profile of at least 2.0 mils as determined by Test-Tex strips shall be established. All areas shall be pressure washed with clean water per SSPC SP-1 prior to blasting to prevent embedment of contaminants from existing coating. (3) Remove all blast debris from tank and inspect the interior surface area for pits and soluble salt contamination. Soluble iron salt concentration, chloride concentration AND conductivity must be measured via test strips and a conductivity meter in accordance with the manufacturer's instructions. Submit testing method and equipment to Engineer for approval. (4) Repair deep pits by welding. Shallow pits shall be repaired with 100% solids epoxy paste after zinc-rich primer is applied. (5a) If soluble iron salt or chloride concentration is above 100 ppm, or conductivity is above 30 µS/cm2, pressure wash per SSPC SP-1 all blast cleaned areas to reduce soluble salt content to less than the above limits. (Additive Bid Item #2). SW - 6 ~ ~ 437 (5b.) When soluble salt concentrations and conductivity are below the limits set in 5a above, install desiccant dehumidification equipment and abrasive blast clean all interior surfaces including areas above HWL to near-white standard per SSPC SP-10. Dehumidification equipment must remain operational and running from time the near-white blast commences and run 24 hours per day until five days after the final coat of paint is applied. The unit must control the environment to keep the air inside tank and riser at less than 50% relative humidity at all times. Minimum desiccant dehumidification equipment required is an HC- 9000 GA desiccant with 50 KW generator as supplied by DH Technologies or equal. (6) Apply NSF approved three coat system of zinc rich primer top coated with two coats of polyamide epoxy to all interior surfaces: Prime coat: Tnemec Series 94 H20 Hydro-Zinc @ 2.5-3.5 mils DFT. Stripe coat: Tnemec Series 20 thinned as much as allowable and brushed into all welds and along all edges. Intermediate and Finish coats: Tnemec Series 20 applied @ 4- 5 mils DFT each coat. Minimum thickness required for the total system is 12 mils DFT. Each succeeding coat of paint will vary from the preceding in color so as to be able to verify coverage. Color of finish coat of paint shall be Tnemec Tank White. (7) Apply Sikaflex or equal NSF approved caulk/ sealer to all interior un- welded seams including rafters and ceiling plates. B. General Provisions for Interior Paint Systems: All sharp edges, weld seams, and other items difficult to coat shall receive a brush applied coat of the intermediate coating thinned as much as possible in accordance with the manufacturer's directions liberally worked in after the prime coat and prior to the finish coat of paint. During and after final application of each coating, all metal surfaces shall be checked with appropriate wet and dry mil gauges to ensure that the required thickness of coating is being obtained. The Contractor shall provide a set of standards with the gauge so that accuracy can be checked. After the paint thickness meets these specifications and has cured for at least five days, the Contractor shall test the entire surface of the paint system for SW-7 ~ 438 holidays with a low voltage wet sponge detector in accordance with NACE SP0188. Holidays shall be marked and reworked until no further holidays appear. After all holiday checking is complete, the point of ground connection shall be carefully coated. Each coat shall be s ra ed on in accordance with the manufacturer's recommendations. Rolling interior paint is not permitted. The type of spray nozzle, the fluid pressure at the gun, the distance from the gun to the surface being painted and the speed of travel of the gun shall be as recommended by the manufacturer. Thinning shall be done as recommended. All paint in the fluid pot and lines shall be cleaned out with thinner before application of the paint is begun. The thinner may be used also for cleaning the painting equipment at the end of each day's operations. Each coat shall be dry to touch before the next coat is applied. Follow the manufacturer's directions explicitly. The Contractor is cautioned that small amounts of paint are intoxicating and large amounts tend to be toxic. The Contractor shall make provisions to keep the tank well ventilated during the spraying and drying operation to protect the personnel and to facilitate drying of the coating by solvent evaporation. During the actual spraying operations, all personnel within the tank shall be furnished with either an appropriate respirator or source of external air such as a compressed air line to a sandblasting head mask. At least two (2) men shall be in the tank during spraying operations. C. Exterior Area Surface Preparation & Coating: (1) The work covered by this part of the specifications includes painting the entire exterior surface area of the tank. It also includes painting any steel outside the tank such as vents, hatches, steel retaining rings, exposed yard piping and all other items outside the tank. Data Plates shall NOT be painted over. The Contractor shall furnish all materials required for the painting and shall install them in accordance with the manufacturer's written direction and these specifications. (2) The existing exterior coating system contains rg eater than 1% lead by weight. A laboratory analysis of the coatings is provided at the end of this document in the Appendix. Containment and lead abatement is required during the exterior abrasive blasting operations. See Technical Specification No. 35 - Lead Abatement (TS 35) in this document for containment and lead abatement requirements. Containment must be SW - 8 - 439 capable of withstanding winds up to 25 mph. Containment and lead abatement plan must be submitted to Engineer for approval. (3) Abrasive blast clean the entire exterior surface area to SSPC-SP 6 Commercial Blast Standard. A suitable angular anchor profile of at least 2.0 mils as determined by Test-Tex strips shall be established. All areas shall be pressure washed with clean water per SSPC SP-1 prior to blasting to prevent embedment of contaminants from existing coating. If containment is lowered or removed for any reason during blasting or painting operations, surface must be pressure washed with clean water per SSPC SP-1 to remove surface contaminants prior to continuing work. (4) Repair deep pits by welding. Shallow pits shall be repaired with 100% solids epoxy paste after zinc-rich primer is applied. (5) Apply four coat Zinc Rich Primer/ Epoxy/ Polyurethane/ Fluor opolymer system: Prime coat: Tnemec Series 94 H20 Hydro-Zinc applied @ 2.5-3.5 mils DFT. Stripe coat: Tnemec Series 20 or 66 polyamide epoxy thinned as much as allowable and brushed into all weld seams. 1St Intermediate coat: Tnemec Series 20 or 66 polyamide epoxy applied @ 4-5 mils DFT. 2na Intermediate coat: Tnemec Series 750 polyurethane applied at 2.5-4 mils DFT. Finish coat: Tnemec Series 700 Hydroflon fluoropolymer applied @ 2-3 mils DFT. Total system thickness must be 10.0 mils DFT minimum. Each succeeding coat of paint will vary from the preceding in color so as to be able to verify coverage. Color of finish coat of paint will be determined by Owner after Contractor submits color choices chart. (6) After all exterior painting is complete; install two (2) logos on sides of tank similar to existing logos. Use Tnemec Series 700 Hydroflon for logos. Engineer shall provide logo detail to Contractor upon approval by Owner. All dimensions to be field verified by Contractor prior to ordering pounce patterns. Contractor shall use DuPont Tyvek pounce patterns, or equal, as provided by TankLogos.com of Nashville, TN. Phone: (615) 473-0272. D. General Provisions for Exterior Paint Systems SW-9 440 Each coat shall be sprayed or rolled on in accordance with the manufacturer's recommendations and these specifications. The type of spray nozzle, the fluid pressure at the gun, the distance from the gun to the surface being painted and the speed of travel of the gun shall be as recommended by the manufacture. Thinning shall be done as recommended. All paint in the fluid pot and lines shall be cleaned out with thinner before application of the paint is begun. The thinner may be used also for cleaning the painting equipment at the end of each day's operations. All sharp edges, weld seams, nuts, bolts and other items difficult to coat shall receive a brush applied coat of the specified epoxy coating thinned as much as possible in accordance with the manufactures direction liberally worked in after prime coating and prior to the second coat of paint. During and after final application of each coating, all metal surfaces shall be checked with appropriate wet and dry mil gauges to insure that the required thickness of coating is being obtained. The Contractor shall provide a set of standards with the gauge so that accuracy can be checked. Each coat shall be dry to touch before the next coat is applied. Follow the manufacturer's directions explicitly. 6. CLEANING INSIDE OF TANK The tank will be drained and the Contractor will be responsible for cleaning any accumulated sand and silt prior to start of work. All material used in the blasting operations, sediment in the tank, rust, paint and scale accumulated from the cleaning operations and all other material in the tank, shall be removed from the tank by the Contractor and properly disposed of. 7. DISINFECTING THE TANK The disinfection of the tank is the responsibility of the Contractor. The Contractor shall use chlorination methods as specified in AWWA C652 and TS 10 of the Technical Specifications. The Owner will fill the tank and perform bacteriological testing. If the sample fails, the Contractor will disinfect the tank again. Job is not complete until tank passes bacteriological testing as required by Health Dept. 8. GUARANTEE AND CLEANUP The Contractor shall guarantee to the Owner for a period of one (1) year the tank and appurtenances from the date of final inspection and acceptance to the extent that he will SW-10 441 repair any defects which may appear in the structure due to faulty painting, repairs or other work. In addition, it shall be the responsibility of the Contractor to meet with the Engineer and inspect the tank eleven and one-half (11 1/2) months from the date of the final acceptance to determine whether the tank is still in a serviceable condition and then correct all deficiencies under the warranty. Upon completion of all work, the Contractor shall remove all surface materials and rubbish and dispose of in accordance with directions of the Engineer. He shall repair all damage caused by his workers and shall leave the premise in a clean and orderly condition. 9. INSPECTION A. The Engineer's Field Representative will perform quality assurance inspections of the contractor's work on a hold-point basis. The Contractor is required to perform his own quality control. B. No work will progress beyond the designated hold-point until approved by Engineer's Field Representative. C. The following hold-points are designated: (1) All welding repairs completed prior to painting. (2) Reinforcement properly installed prior to placing concrete. (3) Containment erection completed (as required). (4) Surface contaminants removed (as required). (5) Blast profile obtained and degree of blast completed (6) Prime coat completed. (7) Stripe coat completed. (8) Intermediate coat completed. (9) Finish coat completed. (10) Holiday detection test of interior completed. SW-11 . . 442 (11) Cure test of interior completed. D. The Contractor is required to coordinate with the inspector and to provide 24 hours notice to request a hold-point inspection. Hold-point inspections shall not be scheduled during weekends or Federal Holidays. E. The Contractor shall submit daily weather and progress reports, including anticipated work schedule for the next 7 days, to Engineer & Engineer's Field Representative via email. F. The Contractor is responsible for providing safe rigging to gain access to all work areas to be inspected. All rigging must conform to OSHA Standard 1910. G. The Contractor is responsible for providing recommended lighting per SSPC Technology Guide 12 (See Guide in Appendix) to illuminate the work and inspection areas. H. If the Contractor does not provide adequate lighting or safe rigging to properly inspect the work, the inspection will be postponed until such time as the Engineer can schedule an inspection to determine if the work may progress beyond the hold-point. 10. ALTERNATE COATING SYSTEMS Contractors mav provide alternate pricing for the following coating systems: A. Interior coating system: Interior prime coat: Sherwin-Williams Corothane I Galvapac Zinc or Induron Indurazinc MC 67 applied @ 2.5 - 3.5 mils DFT. Interior stripe, intermediate & finish coat: Sherwin-Williams Macropoxy 646 PW or Induron PE 70 applied @ 4.0 to 6.0 mils DFT each coat. Interior seam sealer & pit filler: Sherwin-Williams Steel Seam FT 910 or Induron Aquatapoxy A-6. Total interior system thickness must be 12.0 mils DFT minimum. B. Exterior coating system: Exterior prime coat: Sherwin-Williams Corothane 1 Galvapac Zinc or Induron DF 67 applied at 2.5-3.5 mils DFT. Exterior stripe and 1St intermediate coat: Sherwin-Williams Macropoxy 646 PW or Induron Armorguard @ 4.0-5.0 mils DFT. SW-12 ' 443 Exterior 2na intermediate coat: Sherwin-Williams Hi-Solids Polyurethane or Induron Indurethane 6600 Plus Polyurethane @ 2.0-3.0 mils DFT. Exterior finish coat & logos: Sherwin-Williams Fluorokem or Induron Fluorothane @ 2.0-3.0 mils DFT. Total exterior system thickness must be 10.0 mils DFT minimum. C. All contractors must provide pricing based on the Tnemec coating systems in the base bid. Alternate coating system pricing, if provided, will be shown on the Bid Schedule as an ADD or DEDUCT to overall base bid. D. The Owner will decide whether to accept the base bid with the Tnemec coating system or to accept the alternate coating system price if one is provided. SW-13 : 444 TECHNICAL SPECIFICATION NO. 2 COMMERCIAL BLAST CLEANING 2.01 SCOPE This specification covers the procedure required for the commercial blast cleaning of structural steel surfaces prior to painting or coating. 2.02 DEFINITION Commercial blast cleaning is a method of preparing metal surfaces for painting or coating by removing mill scale, rust-scale, paint, or foreign matter to the degree hereafter specified, by the use of abrasives propelled through nozzles or by centrifugal wheels. A commercial blast cleaned surface finish is defined as one from which all oil, grease, dirt, rust-scale and foreign matter are removed completely from the surface and all rust, mill scale, and old paint have been completely removed except for slight shadows, streaks, or discoloration's caused by rust stain, mill scale oxides or slight, tight residues of paint or coating that may remain; if the surface is pitted, slight residues of rust or paint, may be found in the bottom of pits: at least two-thirds of each square inch of surface area shall be free of all visible residues and the remainder shall be limited to the light discoloration, slight staining or tight residues mentioned above. Photographic or other visual standards of surface preparation may be used to modify or further define the surface if specified in the contract. 2.03 PROCEDURES Commercial blast cleaning shall consist of the following sequence of operations: A. Heavy deposits of oil or grease shall be removed by the methods outlined in Specification SSPC-SP 1-63, "Solvent Cleaning". Small quantities of oil or grease may be removed by the blast cleaning operation. If oil and grease are removed by blast cleaning, the abrasive shall not be reused if such reuse is detrimental to the surface. B. Excessive rust-scale may be removed by impact tools, as outlined in Specification SSPC-SP 2-63, "Hand Tool Cleaning", or SSPC-SP 2-63, "Power Tool Cleaning", or by special blasting equipment. C. The surface of the metal shall be blast cleaned to a commercial finish by any of the following methods: TS2-1 y1 445 1. Dry abrasive blasting using compressed air blast nozzles and dry blast media of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. 2. Wet or water vapor abrasive blasting using compressed air blast nozzles, water and blast media of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. 3. Grit blasting using compressed air blast nozzles and crushed grit made of cast iron, malleable iron, steel, or synthetic grits other than sand, of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. G-25 abrasive material. 4. Shot blasting using compressed air nozzles and cast iron, steel, or synthetic grits shot of a maximum size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. S-330. 5. Closed, recirculating nozzle blasting using compressed air, vacuum, and any of the preceding abrasive. 6. Grit blasting using centrifugal wheels and crushed grit made of cast iron, malleable iron, steel, or synthetic grits other than sand, of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. G-25. 7. Shot blasting using centrifugal wheels and cast iron, steel, or synthetic grits shot of a maximum size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. S-330. The surface, if wet sandblasted, shall be cleaned by rinsing with fresh water to which sufficient corrosion inhibitor has been added to prevent rusting, or with fresh water followed immediately by an inhibitive treatment. This cleaning shall be supplemented by brushing, if necessary, to remove any residue. The compressed air used for nozzle blasting shall be free of detrimental amounts of condensed water or oil. Adequate separators and traps shall be provided. TS2-2 . 446 Blast cleaning operations shall be done in such manner that no damage is done to partially or entirely completed portions of the work. Dry blast cleaning operations shall not be conducted on surfaces that will be wet after blasting and before painting, or when ambient conditions are such that any visible rusting occurs before painting or coating. If any rust forms after blast cleaning, the surface shall be re-blasted before painting. The blast cleaned surface shall be examined for any traces of oil, grease, or smudges. If present, they shall be removed as outlined in Specification SSPC-SP 1-63, "Solvent Cleaning". The height of profile of the anchor pattern produced on the surface shall be limited to a maximum height that will not be detrimental to the life of the paint film. The maximum particle sizes specified in paragraphs 1 to 7 may produce an anchor pattern that is too high or too rough for the paint system to be used. In such cases the abrasive sizes should be reduced. If the application of the second coat of paint is deferred, an adequate reduction in anchor pattern depth shall be made. The blast cleaned surface should be further treated or primed, as specified in the agreement covering the work, preferable within 24 hours after blast cleaning when practicable, but in any event before any visible or detrimental rusting occurs. Where chemical contamination of the surface may occur, the steel should be painted as soon as possible after blast cleaning. 2.04 SAFETY PRECAUTIONS If fire or explosion hazards are present, proper precautions shall be taken before any work is done. If the structure previously contained flammable materials, it shall be purged of dangerous concentrations. Nozzle blast operators exposed to blast dust shall wear a U. S. Bureau of Mines approved helmet connected to a source of clean, compressed air. Ts2-3.. 44'7 Filter type air respirators should be worn by all others who are exposed to blast dust environment. Adequate protection for personnel from flying particles shall also be provided in any blasting operation. Safety goggles shall be worn by all persons near any blasting operation. Blast hoses shall be grounded to dissipate static charges. TS2-4 _ 44$ TECHNICAL SPECIFICATION NO. 3 NEAR-WHITE BLAST CLEANING 3.01 SCOPE This specification covers the procedure required for the near-white blast cleaning of structural steel surfaces prior to painting or coating. 3.02 DEFINITION Near-white blast cleaning is a method of preparing metal surfaces for painting or coating by removing mill scale, rust-scale, paint, or foreign matter to the degree hereafter specified, by use of abrasives propelled through nozzles or by centrifugal wheels. A near-white blast cleaned surface finish is defined as one from which all oil, grease, dirt, rust-scale and foreign matter are removed completely from the surface and all rust, mill scale, and old paint have been completely removed except for very light shadows, very slight streaks, or slight discoloration caused by rust stain, mill scale oxides or slight, tight residues of paint or coating that may remain; if the surface is pitted, slight residues of rust or paint, may be found in the bottom of pits; at least.95 percent of each square inch or surface area shall be free of all visible residues and the remainder shall be limited to the light discoloration, slight staining or tight residues mentioned above. Photographic or other visual standards of surface preparation may be used as provided in the Appendix to modify or further define the surface if specified in the contract. The overall blast cleaning effort expended (nozzle time) shall be not less than (2/3) of that required to produce a White-Metal Surface Finish on the same surface; nor should it be more than 95 percent of such effort required. This limitation shall not be construed as a waiver of any of the above requirements. 3.03 PROCEDURES Near-White blast cleaning shall consist of the following sequence of operations: A. Heavy deposits of oil or grease shall be removed by the methods outlined in Specification SSPC-SP 1-82, "Solvent Cleaning". Small quantities of oil or grease maybe removed by the blast cleaning operation. If oil or grease are removed by blast cleaning, the abrasive shall not be reused if such reuse is detrimental to the surface. TS3-1. - ~ 449 B. Excessive rust-scale may be removed by impact tools, as outlined in Specification SSPC-SP 2-82, "Hand Tool Cleaning", or SSPC-SP 3-82, "Power Tool Cleaning", or by special blasting equipment. C. The surface of the metal shall be blast cleaned to a near-white finish by any of the following methods: 1. Dry sandblasting using compressed air blast nozzles and dry sand of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. Sieve series. 2. Wet or water vapor sandblasting using compressed air blast nozzles, water and sand of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. 3. Grit blasting using compressed air blast nozzles and crushed grit made of cast iron, , malleable iron, steel, or synthetic grits other than sand, of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. G-25 abrasive material. 4. Shot blasting using compressed air nozzles and cast iron, malleable iron, steel, or synthetic shot of a maximum size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. S-330. 5. Closed, recirculating nozzle blasting using compressed air, vacuum, and any of the preceding abrasives. 6. Grit blasting using centrifugal wheels and crushed grit made of cast iron, malleable iron, steel, or synthetic grits other than sand, of a maximum particle size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. G-25. 7. Shot blasting using centrifugal wheels and cast iron, steel, or synthetic grits shot of a maximum size no larger than that passing through a 16 mesh screen, U. S. sieve series. The largest commercial grade of inetal grit permitted by this specification is SAE No. 5-330. The surface, if dry blasted, shall be brushed with clean brushes made of hair, bristle, or fiber, or blown off with compressed air (From which detrimental oil and water have been removed), or cleaned by vacuum, for the purpose of removing any traces of blast TS3-2 450 products from the surface, and also for the removal of abrasive from pockets and corners. The surface, if wet sandblasted, shall be cleaned by rinsing with fresh water to which sufficient corrosion inhibitor has been added to prevent rusting, or with fresh water followed immediately by an inhibitive treatment. This cleaning shall be supplemented by brushing, if necessary, to remove any residue. The compressed air used for nozzle blasting shall be free of detrimental amounts of condensed water or oil. Adequate separators and traps shall be provided. Blast cleaning operations shall be done in such manner that no damage is done to partially or entirely completed portions of the work. Dry blast cleaning operations shall not be conducted on surfaces that will be wet after blasting and before painting, or when ambient conditions are such that any visible rusting occurs before painting or coating. If any rust forms after blast cleaning, the surface shall be reblast cleaned before painting. The blast cleaned surface shall be examined for any traces of oil, grease, or smudges. If present, they shall be removed as outlined in Specification SSPC-SP 1-82, "Solvent Clearung". The height of profile of the anchor pattern produces on the surface shall be limited to a maximum height that will not be detrimental to the life of the paint film. The maximum particle sizes specified in paragraphs 1 to 7 may produce an anchor pattern that is too high or too rough for the paint system to be used. In such cases the abrasive sizes should be reduced. If the application of the second coat of paint is deferred, an adequate reduction in anchor pattern depth shall be made. The blast cleaned surface should be further treated or primed, as specified in the agreement covering the work, preferably within 24 hours after blast cleaning when practicable, but in any event before any visible or detrimental rusting occurs. Where chemical contamination of the surface may occur, the steel should be painted as soon as possible after blast cleaning. TS3-3 451 3.04 SAFETY PRECAUTIONS If fire or explosion hazards are present, proper precautions shall be taken before any work is done. If the structure previously contained flammable materials, it shall be purged of dangerous concentrations. Nozzle blast operators exposed to blast dust shall wear a U. S. Bureau of Mines approved helmet connected to a source of clean, compressed air. Filter type air respirators should be worn by all others who are exposed to blast dust environment. Adequate protection for personnel from flying particles shall also be provided in any blasting operation. Safety goggles shall be worn by all persons near any blasting operation. Blast hoses shall be grounded to dissipate static charges. TS3-4 ~ 452 TECHNICAL SPECIFICATION NO. 10 DISINFECTION OF TANK 10.01 GENERAL After construction or repairs have been completed, the tank shall be disinfected before it is placed or replaced in service. Any of the three alternatives given in this standard (Sec.10.03) shall be followed, as approved by the Owner. Prior to sterilization, the Contractor shall insure that all foreign material is removed from the tank, to include flushing the fill pipe. 10.02 INFORMATION TO BE SUPPLIED BY OWNER The Owner approves disinfection using the following details: A. Disinfection procedure 1, 2 or 3 to be followed B. The Contractor shall be responsible for performing the disinfection. Owner will supply water at no cost to the Contractor. C. The Contractor will be responsible for securing the check test samples which the Owner will deliver to the County Health Laboratory for testing. D. The tank does not receive final clearance of completion until the test samples have been declared satisfactory. Should the samples fail, the tank will be drained, re-chlorinated, filled and retested until the samples are satisfactory. All materials including water used for retest will be at Contractor's expense. 10.03 DISINFECTION PROCEDURES A. Procedure 1- Direct Application of Strong Chlorine Solution to Inner Surfaces. Chlorine solution - Dissolve one ounce 65% calcium hypochlorite (HTH or Perchloron) as a paste in each 24 gallons of clean water; or add 4 fluid ounces of 5% liquid bleach to each 8 gallons of clean water; or add 4 fluid ounces of 14 % liquid bleach to each 24 gallons of clean water. Each of these solutions has about a 200 mg/1 concentration of available chlorine. Dosages may be decreased for an extremely clean tank or where high residual concentrations, after filling, are undesirable. TS10-1 - 453 2. Application - Spray the chlorine solution over the inner surface of the cleaned, empty structure using spraying equipment, or whitewash brushes. 3. Contact period - The chlorine solution should remain on the surface for AT LEAST 45 minutes. After that, the structure may be filled with potable water and allowed to set 18 hours. 4. Testing - After the contact and 18 hour setting period, a sample will be drawn, tested and upon reading of zero coliform will be turned back into service. B. Procedure 2- Adding Disinfectant to Water as Structure is Filled 1. Chlorine solution - Dissolve'/z lb. 70% calcium hypochlorite (HTH or Perchloron) as a paste in each 1,000 gallons of clean water needed to fill the structure to five percent of the total volume; or add 1 fluid ounce of 5% liquid bleach to each 8 gallons of clean water; or add 1 fluid ounces of 14 % liquid bleach to each 24 gallons of clean water. This gives a concentration of about 50 mg/1 available chlorine in the five percent of volume. For greatest effectiveness, add paste in batches as structure is being filled. 2. Contact period - Allow the chlorinated water to remain in the structure not less than 6 hours, add water to completely fill the tank and hold for 24 hours. 3. Test as in item A-4 above. C. Procedure 3- Adding disinfectant with a Portable Chlorinator as Water Enters the Structure. 1. Chlorine solution - Use chlorine solution sufficient to produce a concentration of 50 mg/1(see Procedure 2), available chlorine. If the flow rate of water is unknown and the dose cannot be computed, add chlorine solution until a water sample shows a dark red or brown color when a DPD chlorine residual test is run. Add to five percent as above in item 2. 2. Contact period - Allow chlorinated water to remain in the structure not less than 6 hours, then fill the tank as above and hold for 24 hours. 3. Test as in item A-4 above. Ts1o-2 454 L~ 10.4 RECORD OF COMPLIANCE A. The record of compliance will be the bacteriological test certifying that the water held in the tank is free of coliform bacteria contamination. Ts1o-3_, 455 TECHNICAL SPECIFICATION NO. 20 PAINTS AND PAINTING INTERIOR AND EXTERIOR COATING SYSTEMS 20.01 GENERAL 1. The objectives of these specifications are: A. To govern selection of coating materials of established quality and performance to provide optimum corrosion protection to the surfaces to be coated. B. To set standards of workmanship and application necessary to produce a first class job. C. To provide the Contractor with appropriate product information or references thereto necessary to obtain required quality application. Contractor shall be responsible for preparation of surfaces, application, protection and drying of paint coatings, and for supplying the appropriate tools, tackle, scaffolding, labor, and materials necessary to complete the painting work. 2. All painting shall be done strictly in accordance with the paint manufacturer's instructions and shall be performed in a manner satisfactory to the Engineer. Painting shall be done at such times as the Engineer and the Contractor may agree upon in order that clean, dust-free and neat work may be obtained. 3. Contractor is responsible for obtaining all necessary product data from the paint manufacturer and/ or its representative prior to start of painting. 4. Quality of paints and coatings: The paints and paint products of Tnemec Company, Inc., Kansas City, Missouri, are the standard paints. The usual "or equal" clause shall apply. No request for approval of an additional manufacturer will be considered which will decrease the film thickness designated and/or the number of coats to be applied or which offers a change from generic type of coating specified or its quality. Request for additional manufacturer shall contain, in writing, the full name of each product, descriptive literature and data sheets, instructions for use, its generic type and its nonvolatile content by volume. In no case will a request for substitution be TS20-1 1 456 considered unless received by the ENGINEER in writing at least seven days prior to the established bid date. 5. Surfaces to receive paint: A. All machinery, equipment and metal work, EXCEPT aluminum, bronze, copper, lead and stainless steel. Galvanized surfaces are to be coated only when so designated and proper instructions are given. B. All exposed metal piping. 6. Operational testing of equipment, machinery, and/ or piping shall be completed before application of finish painting. 7. Follow requirements of Section 1910.144 Safety Color Code for marking physical hazards as set forth in Standards of OSHA, U. S. Department of Labor. Other colors shall be selected by the Engineer Standard Color Chart. 8. Contractor shall furnish to paint manufacturer or its vendor representative a takeoff of areas to be painted showing square footage's to be coated with each designated generic type paint. Based on this data, vendor shall certify that Contractor has purchased sufficient quantities of the specified paint materials to obtain desired film thickness as required in the painting schedule. 9. All materials and workmanship shall be guaranteed for a period of one year from date of the Owner's Certificate of Acceptance. 20.02 WORKMANSHIP Contractor shall employ only skilled workmen qualified to apply paints and finish coatings. Apply paints, with approved equipment, so as to achieve even film of uniform thickness, avoiding runs, sags, or other blemishes. Allow all coats of paint to dry thoroughly between succeeding coats, as required by the manufacturer. Allow a minimum of twelve (12) hours between successive coats. Do not submerge nor bury any coated structure, nor immerse any coating until all such coatings shall have (1) been brought to total specified dry film thickness and (2) shall have been allowed to reach maximum cure as required for the coatings involved as recommended by the paint manufacturer. Apply all paints in strict accordance with the manufacturer's recommendation and instruction. TS20-2 . . 4 20.04 INTERIOR PAINT SYSTEMS The work covered by this section of the specification includes painting the entire inside area of the tank. It shall also include painting any steel inside the tank such as roof supports, ladders, safety grates, and all other items inside the tank. The Contractor shall furnish all materials required for the painting and shall install them in accordance with these specifications. Interior coating shall be a three coat system of zinc rich primer/ epoxy/ epoxy with the thickness as prescribed and approved by the Engineer. All bolted seams and weld seams will be brush coated with a mixture of 50% epoxy, 50% thinner after prime coat and prior to second coat. 20.05 EXTERIOR PAINTING The work covered by this section of the specification includes painting the entire outside surface area of the tank including all appurtenances such as ladders, handrails, vents, piping, hatches and manways. Safety climb devices, galvanized and stainless steel hardware and all data plates shall not be coated unless otherwise specified. The Contractor shall furnish all materials required for the painting and shall apply them in accordance with the manufacturer's instructions and approved by the Engineer. The exterior coating shall be a four coat system of zinc-rich primer/ epoxy/ polyurethane/fluoropolymer as set forth in the Summary of Work in the Technical Specifications. The thickness of application will be as specified and approved by the Engineer. The CONTRACTOR shall take all the necessary precautions to minimize "over spray" or damage to surrounding property. This may include the use of shrouding or not working when the winds are blowing. An alternate means would be rolling or brushing in lieu of spraying, with the approval of the ENGINEER. Should the CONTRACTOR determine that an over spray has occurred, immediate action shall be undertaken to remove the paint before it has time to set. Normally if epoxy and polyurethane are not cleaned in less than 48 hours, the paint will develop a set that will preclude effective removal. Upon starting the work, the CONTRACTOR will provide data as to his method of over spray removal, should an over spray occur. This may be accomplished by either in-house forces or by a commercial cleaning company. Ts2o-4, 459 20.06 APPLICATION OF PAINT 1. Delivery - Storage: Deliver paint to job site in the original, sealed and labeled containers of the paint manufacturer. Store paints in one convenient location under cover to prevent harm from exposure to weather and damage from sparks and flames. Labels must remain legible during field storage period. Empty cans must remain on job site until painting application is approved by the Engineer. Protect floors of this area, and other areas where painting is done, with suitable drop cloths; remove dirty rags and wastes from the building at the end of each day. Upon completion of painting operations, clean off all paint spots, oil and stains from all surfaces and leave project in perfect condition as far as painting work is concerned. 2. Mixing and Thinning: Use only those thinners and solvents specified in the paint formulation of plaint being used, and mix only in proportions as recommended by the paint manufacturer. 3. Atmospheric and Surface Conditions: Apply coatings at temperature above 50 degrees F., and relative humidity below 85%, and with a 15 m.p.h. wind maximum. The 15 m. .h. wind veloci ma have to be lowered if there is a possibility of over sprav occurr". No coating work shall be done under unfavorable weather conditions and then only with the specific approval of the manufacturer and Engineer. All surfaces to be painted shall have their readiness for painting approved by the Engineer before work is started. 4. Coverage and Film Thickness: Employ spreading rate prescribed by the manufacturer for each specific paint, to obtain minimum dry film thickness as recommended by the manufacturer and as described in this specification. Dry film thickness shall be checked with an appropriate calibrated dry film gauge provided by the Contractor, such as the Elcometer, Microtest or Posi-Test, or equal. Where necessary, the Tooke Gauge may be used for film thickness determination. The Tooke gauge visually demonstrates the number of coats of paint as well as total thickness and shall be used in cases of arbitration, should such instances arise. 5. Drying Times: Allow each coat of paint to dry thoroughly, as specified by the manufacturer before succeeding coat is applied. Do not immerse coating until appropriate dry film thickness has been obtained and finished coating system has been allowed to cure at least seven days, or as recommended by the paint manufacturer if longer. TS20-5` 460 6. Method of Application: Apply paint materials by brush, roller or spray (air or airless) as dictated by the manufacturer's instructions and as approved by the Engineer. When spraying, each coat shall be sprayed on in strict accordance with the manufacturer's recommendations. The type of spray nozzle, the fluid pressure at the gun, the air pressure at the gun, the distance from the gun to the surface being painted and the speed of travel of the gun shall be exactly as recommended by the manufacturer. Thinning shall be done as recommended by the manufacturer. All paint in the fluid pot and lines shall be cleaned out with thinner before application of the paint is begun. The thinner may be used also for cleaning the painting equipment at the end of each day's painting operation. Each coat shall be dry to touch before the next coat is applied. At least iwo hours drying time shall be allowed between coats, however, it is best to follow the recommendation of the manufacturer. The Contractor is cautioned that small amounts of the paint fumes are intoxicating and large amounts tend to be toxic and fatal. The Contractor shall make provisions to keep the tank well ventilated during the spraying and drying operations to protect the personnel and to facilitate drying of the coating by solvent evaporation. 20.07 INSPECTION During the sandblasting, to whichever degree of cleanliness is specified, checks must be continually made to insure that the cleanliness called for is being met; and that the proper profile as required by the coating system to be utilized is being achieved. The cleanliness is covered by the SSPC Visual Standards and the profile may be checked by use of a Testex Micrometer Dial Thickness Gauge. During and after each coating of paint, all ferrous metal surfaces shall be checked with an Elcometer, Microtest, Posi-Test or other approved dry film thickness gauge to insure that the specified dry film thickness has been attained. After the paint thickness on the inside meets the required thickness of these specifications, the Contractor shall furnish a holiday detector such as a Tinker and Rasor, or other suitable instrument, and test the entire surface of the paint system for holidays. This is done by connecting the holiday detector ground connection to the shell of the tank and connecting the detector lead to a damp sponge mop and wiping it over the surface of the tank. Areas where holidays are found shall be marked in chalk and recoated. After recoating, the areas shall be again rechecked with the holiday detector. If additional holidays are found, the areas shall be recoated and rechecked until the entire surface is free of holidays. After the holiday checking is completed, the point of ground connection of the holiday detector shall be thoroughly painted. Holiday detection shall not be required on the exterior surface of the tank. TS20-6 . - 461 TECHNICAL SPECIFICATION NO. 35 LEAD ABATEMENT 35.01 SCOPE This specification covers the requirements for lead abatement projects where lead levels exceed 1.0%. The Contractor must not only protect his workers in accordance with OSHA regulation but also must insure the environment is protected in accordance with EPA regulation. 35.02 LEAD LEVELS The coatings on this project have been tested and contain lead levels above 10,000 ppm or above 1.0%. A copy of the test results are provided in the Drawings Section. 35.03 REFERENCES/ DEFINITIONS a. Texas Commission on Environmental Quality (TCEQ) guidelines including TCEQ Rule 111.135 for removing coatings on elevated water storage tanks. b. 29 CFR 1926.62, Lead. (OSHA) c. Steel Structures Painting Council (SSPC) Lead Removal Guides: - SSPC - Guide 6(CON) - Guide for containing debris generated during paint removal operations - SSPC - Guide 7(DIS) - Guide for disposal of lead-contaminated surface preparation debris d. Lead-containing paint on this project is any paint containing more than 10,000 ppm or 1.0 % of lead as tested in a laboratory in accordance with ASTM D-3335. e. Hazardous waste: Paint debris is classified as hazardous waste due to the characteristic of toxicity, if after testing to Toxicity Characteristic Leaching Procedure (TCLP), the leachate contains any of the elements in the concentrations listed below: Barium 100 mg/1 Cadmium 1 mg/ 1 Chromium 5 mg/ 1 Ts35-1 - 462 Lead 5 mg/1 f. Generator: The OWNER of the tank is the generator for this project. The CONTRACTOR for the lead paint removal on the tank is a co-generator. g. Containment System: Includes the containment structure i.e., walls, floor, supporting structure and entryways used to surround the tank to control the dust and debris generated by the Contractor during lead paint removal. h. Ventilation System: Includes forced air input such as fans or blowers to circulate air inside containment structure and exhaust air filtration such as dust collectors to trap and filter air before it leaves the containment structure. 35.04 ABRASIVE BLASTING CONTROL REQUIREMENTS 4.1 The control requirements of TCEQ TACB Reg. 1 for coatings containing more than 10,000 ppm lead are the control requirements for removing the lead coating by abrasive operations. 4.2 Shrouded wet abrasive or hydroblast are the only methods approved for removal of the exterior coatings on this project. 4.3 Dry abrasive blasting of the interior coating is approved as long as no visible emissions to the atmosphere result from such cleaning. 35.05 CRITERIA FOR CONTAINMENT SYSTEM 1. The Contractor will design a containment system for the work area that is an SSPC Class 2A or better in accordance with above reference SSPC Guide 6 (CON). See Table at the end of this document. The containment will control environmental emissions according to the criteria listed in Section 35.06 of this specification and control the working environment within the containment according to the criteria listed in Section 35.07 of this specification. In the event of a conflict between SSPC Guide 6(CON) and this specification, the requirements of this specification will prevail. In addition to the containment structure, ground covers will be used beneath the containment to prevent contamination of the soil. The Class 2A Containment must have all of the following components: TS35-2 463 95% shade factor flexible shrouding material supported by a flexible cable style structure. The joints must be fully sealed and the entryway must be overlapped. Forced air through the use of fans or blowers must be used to move air inside the containment structure at a minimum cross draft velocity of 100 ft./min or minimum down draft velocity of 60 ft./min. If dust collectors are used, they must be sized using the controlling minimum velocity and must be positioned to trap and filter air before it leaves the structure. 2. The Contractor must inspect the structure thoroughly to insure the containment structure can be properly supported. This includes inspection of the roof support system prior to containment support system design. 3. The Contractor must submit containment system design to include dead load considerations to the Engineer for review. Sizing criteria for dust collectors, if used, must also be included. The design must also address removal of the containment support system from the structure to insure the new coatings are not damaged. 35.06 CRITERIA FOR CONTROLS OVER ENVIRONMENTAL EMISSIONS 1. Monitoring environmental emissions to include all costs associated with obtaining and operating the required equipment and testing procedures are the responsibility of the Contractor. Air and soil conditions will be monitored by the Contractor for this period. 2. Air quality in the immediate vicinity of the project will be monitored by the Contractor to insure it is not contaminated with lead due to the Contractor's work methods in removal of the lead paint. Note: This is the purpose of the containment system and the air monitoring is a check on how well the containment system is working. 3. Ambient Air Quality - the criteria for assessing the adequacy of the controls over lead particulate emissions will be as follows: 3a. Emissions in excess of 6.75 micrograms per cubic meter of TSP (total suspended particulate) Lead over an 8 hour period will be cause for shutdown of the project until corrections to the containment are made to comply with this level. TS35-~ _ 464 Note: This level is based on an average work day of 8 hours for 60 days of surface preparation to insure the quarterly average of 1.5 microgram per cubic meter over a 24 hour day is not exceeded. 3b. Monitoring for this level will be accomplished using high volume TSP air samplers. Three (3) samplers will be used and the exact location of the test sites will be determined by the Engineer. Generally, one will be placed upwind, one downwind and one near the entryway of the containment system. Locations of high risk such as schools will also be considered in placement of TSP monitors. 3c. Three days of baseline monitoring will be conducted prior to abrasive blasting in order to determine pre-existing conditions. 3d. Monitoring will be continuous for the first 5 work days of abrasive blasting. If all readings are below the required emissions, frequency of monitoring may be reduced by the Engineer. It is anticipated that frequency level will not fall below one (1) reading per sampler per week. 3e. All monitors will remain in place during the entire project or until the Engineer releases the Contractor from this requirement. Release from monitoring must be in writing. Once all abrasive blasting is complete, monitoring operations will normally cease. 3f. It benefits the Contractor to obtain test results in a timely manner since monitoring must be done daily until continuous positive results are evidenced by the Engineer. The Contractor must submit the name of the testing lab to the Engineer and also the anticipated turn-around time to receive test results. 4. Soil Quality: The Contractor will not contaminate the soil with lead. Samples of the soil will be removed and tested by the Contractor for total lead content at specific locations prior to project start-up and at the same locations upon completion. 4a. The total number of soil samples will be approximately twenty (20) with half being taken before and half being taken after the project is completed. The exact location of the soil test sites will be determined by the Engineer. 4b. Laboratory analysis for total lead content of the soil will be conducted in accordance with EPA Method 3050. TS35-4- • 465 4c. It will be the Contractor's responsibility to return the soil to background levels if the analysis upon project completion shows an increase in soil levels above 100 ppm lead. 35.07 CRITERIA FOR CONTORL OVER WORKER PROTECTON 1. OSHA requirements for the protection of workers will be in accordance with 29 CFR 1926.62. Lead. 2. A written Worker Protection Program addressing compliance with each of the items below shall be provided by the contractor. 1. Action level 2. Permissible exposure limit 3. Exposure assessment monitoring 4. Compliance plan 5. Respiratory protection Protective work clothing and equipment 7. Housekeeping g. Hygiene facilities and practices 9. Medical surveillance 10. Medical removal protection 11. Employee information and training 12. Signs 13. Record keeping 14. Observation of monitoring 3. Competent Person - The Contractor must identify in writing the name, job title and qualifications of the person that will be designated as the competent person on the project site. 3a. By OSHA definition, the competent person has the knowledge required to recognize problem areas in lead abatement and the authority to shut the job down until the problem is corrected. 3b. The competent person must ltl of debrisl lead abatement operations such as abrasive blasting or remova 3c. The project foreman may be designated as the competent person but he must have the required training to ensure his competency in lead removal projects. Twenty years of lead paint application/r e~°e ts and he many aspects1of e the person competent since the OSHA requir complying with it only became effective in late 1993. Accordingly, recent TS35-5 - 4s+s training & Certification by SSPC, NACE or other acknowledged sources such as trained Professional Engineers or a Certified Industrial Hygienist is required to be considered current and competent. Photocopies of Certificates of Training must be furnished to the Owner to prove that the competent person is indeed trained for lead abatement according to OSHA requirements. 35.08 CRITERIA FOR HANDLING HAZARDOUS WASTE 1. The Owner is the generator of the waste for this project and the Contractor is the co-generator. 2. The Contractor is responsible for implementing the following procedures in dealing with the lead paint removal debris: a. Representative samples of the debris will be selected and tested by TCLP. At a minimum, 4 samples will be tested per roll off container. This is a rate of 1 TCLP/4 tons of abrasive debris. b. The Contractor is required to submit the name of the laboratory doing the testing. If possible, the same laboratory doing the air monitoring should be considered. 3. Waste Stabilization: The Contractor is advised that stabilization of the debris to reduce its leachablility is permitted. a. The use of propriety materials added to the abrasive (e.g., Blastox - TM) is allowed. 4. Hazardous Waste: if the tests of the debris show the waste to be hazardous, the following requirements will apply: Site Storage and Handling: a. The Contractor will use proper containers to store waste on site. Containers must be sealed to prevent wind from dispersing debris. b. Paint debris will not be placed directly on the uncovered ground and must be shielded to prevent dispersion of the debris by wind or rain. c. Any evidence of improper storage will be reason to shut job down until corrective action is taken. d. The Contractor must apply for an EPA identification number. TS35-6 _ _ 467 e. The Contractor may hire a licensed waste disposal contractor to assist in the handling and disposition of the debris. 5. Transportation and Disposal of Debris; a. The Contractor must arrange to have the debris transported from the site and disposed of properly in accordance with TCEQ Waste Disposal Guidelines. b. The Contractor may employ only licensed transporters and only licensed disposable facilities may be used. c. Signed manifest will be returned to the Engineer to verify that all steps of handling and disposal process have been completed properly. d. Final completion of the project will not be given including recommendation for final payment until all manifests have been submitted to the Engineer. 6. Clearance Testing: The Contractor will thoroughly vacuum, wash or otherwise decontaminate reusable items prior to removal from the project site. This includes but is not limited to equipment, all shrouding materials, ground covers, change and shower facilities. If adequate cleaning is not possible, the materials will be treated as waste and disposed of properly. 35.09 SUBMITTALS: The Contractor will provide written programs for each of the items below a minimum of 30 days prior to beginning work. 1. Abatement Progam: The Contractor will provide a written plan for the methods to be employed for surface preparation to remove the lead contaminated paint, containment of the structure during abatement, ventilation and collection of debris. 2. Environmental Monitoring Program: The Contractor will provide a written plan for the monitoring of soil and air protection procedures. This plan will include the name and location of the laboratory to be used for testing. It will also include the type and name of the high volume air monitors to be employed. 3. Worker Protection ProQram: The Contractor will provide a written plan for the protection of his workers in accordance with 29 CFR 1962.62. The plan will TS35-7 468 include the name of the laboratory that will do the blood lead testing and the name and location of the laboratory that will test the personnel air monitors for exposure assessment. The Plan must also address required training and Certification of such training for all workers and the competent person. 4. Disposal of Debris Program: The Contractor will submit a written plan detailing the procedures used to properly handle, store and test debris to determine if it is hazardous. In addition, the program must identify the license number of transporters and disposal facilities to be employed. The written program must also explain how manifesting will be addressed. 5. TCEQ Notification: Contractor shall notify in writing the appropriate TACB regional office and any local authorities having jurisdiction over abrasive blasting activities of the blasting in writing in accordance with TCEQ Rule 111.135. Prior to notification, contractor shall submit a copv to the Engineer for approval. Per Rule 111.135, the notification must include: (1) the location of the tank; (2) the name of the abrasive blasting company; (3) the weight percent of lead in the coating; (4) the control methods to be used; and (5) the expected hours of operation and scheduled start and finish dates. TS35-8 4s9 TECHNICAL SPECIFICATION NO. 40 WELDING CARBON STEEL 40.01 GENERAL A. All welding performed on the tank or structure will be done in accordance with American Welding Society (AWS) Structural Welding Code D1.1. B. All metal used for the fabrication of manways, hatches, ladders or other such accessories to be permanently welded to the tank or structure will meet the specifications of ASTM A36 Group One carbon steel with a minimum yield point of 36,000 I'SI. C. All material must be purch e No r d of foreign s teel wlill be al w ed. provided to document sam purchase 40.02 WELDING PROCESS All welders will be qualified under the AWS D1.1 code with shielded metal arc welding (SMAW) procedures. Minimum plate thickness for welding test will be 1/2" using E6010 or E7018 electrodes. Welders will only weld in positions for which they have been tested and qualified. 40.03 WELD SIZE The minimum filet weld size shall be as follows: 1/4" -1/i' base metal thickness = 3/16" fillet weld over lh " - 3/4" base metal thickness =1/4' fillet weld over 3/4" -1" base metal thickness = 5/16" fillet weld 40.04 SYMBOLS AND DEFINITIONS Standard symbols and definitions will be as stated in the AWS Code D1.1. TS40-1 ~ ~ 470 40.05 WORKMANSHIP A. Welding shall not be done when the ambient temperature is lower than zero degrees F or when surfaces are wet or when wind velocities are greater than 15 MPH. B. Base metal preparation shall insure the surfaces to be welded are smooth and free from tears, cracks or other discontinuities. The surfaces shall be free of dirt, grease, loose mill scale, rust, slag and other foreign substances. C. The completed weld surface will be ground smooth and flush to produce a workmanlike finish capable of being coated. D. All weld spatter will be removed from the weld area. E. The parts to be joined by fillet welds will be brought together as close as possible. If the separation is greater than 1/16", the leg of the fillet weld will be increased by the amount of the root opening. The root opening will not exceed 3/16". F. Discontinuities such as undercut, unfilled craters and porosity will be repaired. Repairs will be made using grinders or by gouging in order to remove the unacceptable portion of the weld. G. Fillet welds may be slightly convex, flat or slightly concave. The maximum convexity and concavity shall be 1/16". 40.06 FILLER METAL A. Filler metal requirements for welding with SMAW procedures will meet the requirements of AWS 5.1 Mild Steel Covered Arc Welding Electrodes. B. Electrode type will be either E6010 or E7018. Welders must be qualified for the specific electrode used. C. Electrodes will be purchased in hermetically sealed containers and shall be dry before use. D. Low-hydrogen electrodes may only be dried once. E. Electrodes that have been wet will not be used. TS40-2 ~'~1 40.07 PROCEDURE A. The classification and size of the electrode, arc length, voltage and amperage shall be suited to the thickness of the material, type of groove and welding position. Welding current shall be within the range recommended by the electrode manufacturer. B. The maximum diameter of electrodes shall be as follows: (1) 5/16" for all welds made in flat position except for root passes. (2) 1/4" for horizontal fillet welds. (3) 1/4' for root passes of fillet welds in the flat position. C. The maximum size of single-pass fillet welds and root passes of multiple-pass fillet welds shall be as follows: (1) 3/8" in the flat position. (2) 5/16" in the horizontal or overhead position. (3) 1h" in the vertical position. D. The progression of all passes in the vertical position shall be upwards. 40.08 INSPECTION A. All welds will be visually inspected by a Certified Welding Inspector using nondestructive techniques. B. All discontinuities will be repaired. Most commonly encountered discontinuities include porosity, slag, incomplete fusion, incomplete penetration, undercut, overlap and cracks. C. Repairs will be made at the Contractor's expense. Work will not proceed further until defective welds are repaired. TS40-3 . 47Z 707:- DIA. TOP HATCH P LAN . yV ~ TRAVIS G TATUM rr0~006000".0.00.0 ~ ~o ; 110343 : zlt 32' IAH 07~ 1/4' AND PA..L...... , TYP. 1/4' PLATE FOR ffHATCH COVER N M ~ N ~ NP. 114' PLATE F❑R HA7CH ❑PENING NECK :r 30' OPENING NP. NP. SECTION A-A Round Roof Hatch ~ - 474 f bNGiNEERII 114' RL FOR HINGE ~ AND PADIDCK HASP A 1/4' PLATE FpR HATCH COVER 1/4' PLATE FOR HATCH pPENiNG NECK n,P ~ 30' OPENING ~ SECTION A-] YP. ` 475 I Squflre Roof Hatch 30" SO. TOP HATCH i.k .ki ~ . . :k':.............. TRAVIS t; ( i UA4 . _ . . . ~uNHa NGINEERiN FTOP VENT 36' `v ~ LO 36" DIA. DOME CAP(MIN. 3/16") STANDARD OR SHALLOW FLANGED AND DISH-HEAD. BOLT TO VENT RISER WI7Ft 3/4" BOLT. Dome must completely cover vent pipe openings. 6 CUT-OUTS FOR VENT 4"x6" #16 MESH F18ERGlASS WINDOW SCREEN AROUND VENT PIPE ANO OVERLAP BY 3". H0L0 IN PLACE WITH FIBERGLASS HOSE CLAMPS AT TOP & 80TTOM FIBERGLASS HOSE CtANPS ~ USE 6-5/8" HOLES EQUAL SPACE OR 15-1/2" O.C. FOR 1/2" $OLTS. Ft,4NGES TO BE 1/4" PL. BOITS TO BE STAINtESS STEEL. 30" Install new vent flange. SECTION A-A VENT PIPE (MIN. 7 /4") A ~ FIBERGIASS WINDOW SCREEN RiSER W 30" OIA, PIPE 11 3/4" PLAN ~ - 476 ~ ~ '1 7t, ~ • . • ~ TRAVIS C TATUM q ; 110343 . s F.° n,. ti~ t.F'c..••.. a Top Vent U N H jl~N NGINEE,• _ _ LADDER DETAIL FABRICATE LADDER IN 20 FT. LENGTHS MAXIMUM W! 10" LONG x 2 112" WIDE x 3/8" PLATE STANDOFFS EVERY 10 FT. MAX, BOTH S?DES. Interior tadder below top hatch to require larger standof fs per Spec. ~ATTACHMEMT FpR IADDER ~ 3 0 0 1/2'x3/8' EEI FLAT BM - P. LADDER MOUn7ING 3/4' D NON-S. 2'x3/8' IADDER SIDE RA7LS 7YP. RUNGS vELD Alt ARqUND •'~71 TRAVIS C tA~UM s00000, #.0• ~ ~ 1034 3 If~ ~~~S ~NAI f NG+"''T STANDARD AWWA IADD£R Lodder AR RUNGS ~ AlL ARbUND i U N H A 477 SIDE/MOUNTiNG VIEW FANDRAIL DETAIL POSTS TO ROOF, TYP HANDRAIL POSTS, TOP AND MID RAII 3" x 3" x 1/4" ANGLE TO P RAl L- POST MID RAiL--/ KICK PLATE 4"x 1 /4" PIATE FILLET WELD TOE PLATE NOTE: ATTACH HANDRAILS TO LADDER W/ FiLLET WELDS ALL RAILS AND ?0 POSTS 5-E=' VI W Hondrail _ 4'~ 8 u~c H a NGINEERIN ~ Z/z l/&i 1 ~ ~ 479 Zr2 Z-/4-, z-- 70 FT. APPROX. DWMETER EXISIING TANK CENTER SUPPORT PoNG, - I TO BE RENOVED ~c 15 EYJSTiNG 1RUSS iYPE TANK ROOF RAFTERS, TO 8E REAIOVEO 4 ~ N d 11 S` tl ~ p 11 " u n a n M a u a n a " n ~ ~ ' ~ ~i M 4 0 Tp b O y n B . q p II 4 ElOS11N9 TANK ~ R YAN~ 4yRDER. TROAFR1WN !1 1l N N ROOF PLAN - EXISTlNG NO SCAL£ 10 FT. APPROX. fliAMETER NEW CENTER SUPPORT PoNG NEW 15 RAfTERS, 1-664/8 (ROLLED 6' DtA) 16x6x3/$ (ROLLfD SEAL WEiD TO ROOF TO ROOF PROFlLE) SFlll WEID TO ROOF a i V Ni ~I 1 11 n u k 11 n u n f~ ~ n I ; macss=~°zz~ j` ry~ a cs:ves.::aasa~czce~sa~~ _'~=c -cb Aw t._ p 11 1~~ P~ c 4 1 y 4 N' i' °r. b s 2 u ~ SfAt WE10 NEM' RAFiERS TO WINO GIRDER a ROOF PLA~Nl NO SCJILE EXISTING TANK ROOF VENi TO BE RElAOVE p(IS11NG TMIK ROOF PUTES TO RE1~WN ~ ~ 15 EXISfING iRUSS iYPE TANK ROOF RAiiEltS, TO SE RE110VE0 % EXISTING TANK CENiER ' SUPPORT RING. Tp 8£ RDlOVED EXISTiNG TNIK RAFTER - IXISIING TANK WALL WINO GIRDER, TO RE1AN 70 Ff. rPPROx. oLkYETER ROOF SECTION - EXISTING I NOTES: NO SGLE t. SHORE NND SUPPQRT 11E ROOF AT THE CENTER TOP BEfORE REM041NG THE 005T1NG CENTER COppRES510N RINC. 2. REMOVE ONE RAf1ER TO OE1ER111NE ROLL RADIUS +wo LENcn+ FoR FABFWAnon. 3. REPiACE NO ►IORE THNi iW0 RAFiERS AT A 111AE. SEAL MIEID REPLACEMENt RAFiEFtS TO fXISTING TANK ROOF PUTES. UPPER M10 IOWER SUPPORT R[NGS CENfEft $UPPORT RfNG, L 2 tYP. RAFiER, N;~ SfE DETN 7- SEE OETAII 1 KE1Y TAtiK ROOF 4ENf L6x6x3*~~ CDMR SUPPORT NEW 15 RAFfERS ' , (ROU.ED TO ROOF PROFILE) OlA) M6x 1•61x3y/~8 ~(ROIIpE`~D 6 ~{,I~y n41.Y n~M M SfAL WELp WIffER TO EXIST. WIND qROFR, SEE DEfNI 3 DOSiiN6 TANK WTER J E%ISTING TANK WAI.L WMID CiRDER, TO REAWN 70 FT. APPROX. WUEiER ROOF SECTION ir ~ ; r~NO SCALE A r / .~O• ~ .....:*i TRAVIS C TATUM _ _ _ , _ r ~ 110343 ~ @C E N S ji ~1ONAL FNj•i U N H A' NGINEERiN J- DPI*N JCP DAn 0 1 /27/2012 1 OF 2 1~ _ 480 EXISTING TANK ROOF PLATE EXISTING TANK ROOF PLATE TYPICAI. RAfTER, L6x6z3/8, (ftOUED TO ROOF PROFltE) SEAL WELOED TO ROOF PLATE sEx wELn rtWU ro OfIST. TMIK ROOF PLATE DETAIL 1 NO SCaI.E QqSfING TANK ROOF PLATE - iYPICAI RAfTER, 16z6x3/8, (ROllED TO ROOF PROFlIE) - SEAL N'EM TO ROOF PLATE DETAIL 2 NO SCALE TYAICAL RAFIER, l6x6x3/8, (ROLLFD TO ROOF PROFlIE) SFAL M'EtDE[) TO ROOF PLATE SEAL WEID RAfTER TO EXIST. $Uf'POaT RING DfISfINC TANK RAiTER SUPPORT RING, TO RELWWN DETAIL 3 NO SCALE TYP. SHOP FABRIG1TfD RAfiER ANO fqNG c_.._.. . W. SPLK:E DETAIL 4 NO SCALf O ~ ~e • s ~ ~ ~ ~ i* ~~~~i* TRAVIS C' tA 1 UM ~ •~~~~11~~Iw~~~~~~~~~f • ~ t 110343 - 1 O~s i O i~c+~ ~~'~G\a~`'"'? { S N - _ - . _ F t = lpNAI E U N HA iNEERIN G N ` w i ~ + G..J'~ ~ L.~.- ! DRJIWN JCP ~TE V 1 27 , 2O 12 SHEET 2 0F 4 (ENTER SUPPORT PoNG L6x6x3/8 (ROLLEO 6' DW) SEN. WEID TO RaOF RODF VENT OPENING SEAL WELD REPtACEMENT ~ CENIER SUPPORT RING TO EXIST. TMIK ROOF PLATE 481 Notes: 1. All concrete work shall be in accordance with ACI 318. 2. All concrete shall have a minimum 28 day compressive strength of 3,000 psi. 8,'0" ~ i I S I I ~ I I I I ~ ( i lo,o F o ; ~ PIAN VIEW , a f ° ~ N i i_illEl(I-1lI;i~ 6„ 4' . 4A fi. ~_-,lil ~11l~~~t SEC i ION viEW 14 BARS ~ AT BQT10M, CONT. 0 Spiash Pad ► U N H A I NGINEERIN #a saRs AT 12" O.C.E.W. 482 V bryY~rq ItMSAf Gry 1 c a ict.~> ~ ~ s.»r 9 ~ou. caa~ p Oo . ' M omae ` . R9 fauN a•+••~ r . n wnr.m f • 9 Ma•: lwv ~ ` . , W'~'A Hat'nt' Ftest ~ ` 0 ♦ C.~MW. 6M9'-'~ p O + O rn.. . . . _u Y m .c l.-, E ~ MY~n . C TY„+? • O OFryrD~~P > OMlihoms ~'-w., U'nlNwm;,O O R4mR"if A...w-.. . ~ R y rMrwo rmib~Ar4anarn ~c .(h+ Ntw.'• , ~ ~ ~„y.. - 0 Hal.~ns h~•~1t o ~ • O ~ c ` . ~ W.i.w F.` vrv &aI rF, _ ~ LMuou ~ c 0 SM~w Ki~alf.x~pyi O ~ rIV~...l (Me ivr., fu..w'r. O y . O Oh~~~ee c , u...,. y Y~ ~ew+, o Lr•o,.., o Va,a o o . s.~ v+n: ro.. • .,..a.a o ~ a ~ 7c.a e ~ u~r...ti.., u• o i...w Aw_.n0 D C~.~.~}r r~ T. NOE ~ O S~O~ OrJ r! RuirlRrv'I NM PGWo~ ~ c~--wo Louroitns Texas Paris , ° ~ . a,..,~, CGryw 'r'D ' Nuev6 . C Dyt . {YlQiZ Wu~~1G'aa. • • . , ~ ' ~ K•~~ - ~ b. . ~ . i 0 ~ . u lJ ~ i D r ~ ` . ~ 6~wmw~ . • a e-.. ~ , ~ W ~ R ~ . . - . , ..m P.yei H~h.w e e'h~r ' r ~ t ~ J i.aCp , ~ w S,.4v.: V Wm s r, ~.~e •J. ~ ~ w... sP e s~ oAtpn . p Caraaa, OPWio ~ kj • ' fiOWl~ '.AM- p~Mmd O e 0 pFonwortn ~b Mef.w+e~~•• ~ cw"H' a. . r. p.. b~ o ac.u,n ~ 'yk, D , i. c . . . ~ e I/e~ tl!~ ~L9t?be~ye r:ou~c.roo~~ i ` - 484 ~ `y . . P~ P S S ~ SFB` b~+~ Ila No...ye,. lu'ps C r Y ' r U i' (y ' „ i ~ ` f_'i • , ~ . o . _ :t^ ~ Tank locNlon: ~ - ••A•' 251h St►Nt NORMMt _ - Y ♦ r t^ .G. . .a ~`l. . . L i+ c - ff t.. . ♦ A.e...+.~..:..qi. ~+p ` . . i ~Y ~QOIIbu ple f. ~R 4., IYCU1nOYJ,L'OoqM - 185 33°40'00.59" N; 95°31'45.25"W DE3 D U N H A M ENGINEERING lnspectlon. Deslgn. Results. DUNHAlVi ENGINEERING, INC. wvvw.DunhamEngineermo.com Texas Registrafion Number: F- 2253 13141 Hill Rd , College Station, TX 77845 Phone: (979) 690-6555 Fax: (979) 690-7034 ENGINEERING REPORT OF INSPECTION EAST ELEVATED WATER STQRAGE TANK PARIS, TEXAS . •.~s 1 ~ • . 7RAVIS C_ TATUM .................1 9: .110343 :Q /f b/2ot -X-- Prepared by DUNHAM ENGINEFRING, INC. RF_,GISTRAI'lON NO. F-2253 13i41 HILI. RUAD COLLCGE STATION. TEXAS 77845 JANUARY 2012 thwnership vfDocumer7ts: This documeill cn7cl Ihe ideus cr»d de.sig»s incorpor•uted herein. as un inslrzar7ell! OfpTOfC'SS701?QI servire, i.ti ihe prvper•t.>> qfDtmham EnRineering. Inc. und i.e nni io fie used in wlzole ni- inpa►•i,for ant- prqjeci vvil{avut ihe ivriuen uulhor•izaJion of Ti•trvis C. Tutum, P. E. - - 487 j , . :)U NHA~ =NGINEER N Inspection. Destgn. Resufts. DUNHAM ENGINEERING, INC. www DunhamEnqineerinq.com Texas Registration Number: F- 002253 9 690-7034 13141 Hill Rd., College Station, TX 77845 Phone: (979) 690-6555 Fax.(97 ) Report of Inspection East Elevated Water Storage Tank at 600 Block of 25th Street NE Paris, Texas Conducted by: Travis C. Tatum, P.E.; Jimmy D. Dunham, P.E.; Burnie Burns, CWI, CCI Date: January 4, 2012 1. CONSTRUCTION The 1.OMG welded steel tank was built bDr evel 95107nand the height to ten welded steel legs. The height to low wate upper capacity level is 150'. The overall height of the structure is approximately 165'. The shape of the bowl is a double ellipse. The structure is located in a residential area and surrounded by a security fence. The overall working area within the fence is approximately 125' x 125'. 2. FOUNDATION The ten welded steel pipe legs are anchored to the concrete footings with two anchor bolts per leg. The concrete footings are level and in good condition. The footings project above grade ap nr{hexconcret. The base plat s and bolts anc h o r b o l t s and t h e b o l t s a r e s n u g are rusting. No evidence of uneven settlement was observed. 3. RISER PIPE The 5' diameter wet riser is plumb with no leaks noted. The 24" diameter manway in the base was not opened for the inspection. The riser is anchored to a concrete foundation with bolts that are in good condition as is the concrete. The riser has no interior ladder. A safeiy grate is covering the interior riser pipe opening. A metal control building is attached to the base of the riser pipe. The door to the structure is locked. 488 4. LEVEL DEVICE A pressure gauge at the base of the riser is located inside the metal building and is operational. The tank is also equipped with liquid level electrodes. 5. OVERFLOW The 12" diameter overflow pipe runs on the exterior of the tank and ends at ground level with a flap valve that does not properly close. The base of the overflow weir is rusting. The pipe discharges onto a concrete splash pad that is insufficient for the volume of water that may be discharged. One of the welded pipe supports is cracked, and isolated corrosion damaged areas were noted along the pipe. 6. RODS & STRUTS The 60 wind rods and 20 riser rods are straight with no excessive bending noted. No problems were noted with their pinned connections. The tower structure has two strut levels. The 20 struts are level and in good condition. The struts are structural steel channels stitch welded back to back. No problems were noted with their connections. 7. LADDERS The exterior ladders are in fair condition with no loose rungs or bolts noted. The leg ladder is cut off 10' above grade and has a cable style safety climb device. The roof rolling ladder runs from the upper side wall at the balcony to the top vent and is in fair condition and is equipped with a cable style safety climb device. The ladder at the balcony runs to the bottom of the roof rolling ladder; has no safety climb device and is in fair condition. The interior bowl ladder is in poor condition and is not properly positioned for safe access. The ladder has no safety climb device. 8. BALCONY The balcony is in generally good condition with approximately 10% of the floor plate area rusting. The 36" high handrails are in good condition with no cracked welds noted. 2 - - 489 The balcony has no manway. The handrails are supporting several antennas, and coax cables are running across the top of the handrails. 9, TOP HATCH The 24" diameter top hatch operates properly and is locked. A 30" square hatch is located on the roof near the vent and is also locked. The 30" hatch has an aluminum hatch cover that is not hinged. 10. TOP VENT The 24" diameter vent is in fair condition due to corrosion damage. The vent is properly screened. 11. ROOF The roof is properly sloped and in go the contion. cen t~ aft h support rung. The ra fers6 truss rafters that run from the wall are in poor condition due to corrosion damage to the 321ateral support rods. Half of the rods are hanging down and providing no support. At least two have fallen in the tank. The remaining rods are severely corroded. 12. OBSTRUCTION LIGHTS & ANTENNAS The structure has no obstruction lig Sta~ atached to the r ght side of the ladder e handrails and tank roof. Coax cab A rigid conduit run is located on the left side of the ladder but is not hooked up to power. A communications building is located adjacent to the leg ladder. 13. INTERIOR The tank was partially drained for the inspection. Access was gained through the top hatch and down the interior ladder. The water level was at the balcony. No evidence of insects or floating debris was noted. The water quality was clear. The bowl walls have evidence of prior corrosion damage in the form of shallow pitting. 14. PROTECTIVE COATINGS The exterior coating system is not providing adequate corrosion protection. Approximately 5% rust was noted on the overall exterior of the structure. Approximately 25% of the paint system is peeling. The coating system consists of a lead based alkyd prime coat with epoxy and aluminum topcoats. 490 The average thickness is 25 mils and the coating system is not tightly adhered to the steel. The lead content is in excess of 13,000 ppm or 1.3 % by weight (laboratory analysis attached). The interior coating is an epoxy system of 20 mils and is in fair condition. Approximately 5% rust was noted on the interior tank shell. All of the rafters are rusting. The lead content is approximately 60 ppm. 15. CATHODIC PROTECTION The tank has an abandoned impressed current cathodic protection system that is not operational. The anode cover plates on the roof are not properly sealed, and one is completely missing. A total of 16 anode access holes are located on the roof. 16. CONCLUSIONS & RECOMMENDATIONS a) The structure was built in 1957 and is in need of rehabilitation. The roof support structure and the protective coatings are damaged beyond repair and should be replaced. b) The protective coatings are no longer providing adequate corrosion protection and need to be replaced. The high lead content in the exterior coating requires engineering controls to protect the environment when it is removed (laboratory analysis attached). c) The roof support system is in poor condition due to severe corrosion damage. The lateral support rods for the truss rafters are corroded and some are broken. Access onto the roof and into the tank should be restricted until the roof support is repaired. d) The anode cover plates on the roof are not properly sealed and one is completely missing, resulting in a 6" diameter hole into the water compartment. e) Estimated construction cost to completely rehabilitate the structure, including containment and lead abatement per TCEQ regulations is $600,000. 4~ 491 txterior view l-- 492 Exterior view Riser manway 6- 4 9 3 Tower support structure Data plate Uvernow exit , _ 494 Cracked overflow pipe support 495 ~ ; Tw Typical foundation with damaged grout First strut tevei 9- , 496 Leg ladder ana controi nuIIuu16s Second strut level so__ 497 Typical wing plate connections 11 - 498 Riser-bowl connecnon Lactaer ana oaicui►y Balcony 12- - 499 Overflow pipe above balcony 13 ` 500 ` Roof and vent KooT laaaer anu av LLa«1 L 24" hatch 14 501 Missing anode cover ; ~ Roof 15 - 502 Interior roof support structure 16 , 503 Corroded rafters and ladder Center support ring 17 504 lnterior water comparnnent Severely corroded ratter connecnons ThOMAS ANAlyTiCAI _ Enviranmental & Analytical Tesfing Services SQIL • PLANT TISSUE • WATER • WASTEWATER Company: Dunham Engineering Submitted By: Jim Dunham Clicnt Code: 006 Rcport No.: 001027 Loc;ation: City of Paris, TX EST 26 NE Page l of 2 Reporc Date: 09/22i03 Date Callected 09/1 b"03 Date Received: 09/18103 Matrix: Paint Ciiips Lab ID: 001027-1 am le ID: Exterior Paint 'arameter Result 1~'[DL Units Tech Date Time Metl~od Lcad 13.250 2~ PPn: A3A 09/22/03 8:15 7420* Lab ID: 001~27-2 Sam lc ID: Interior Paint Lead Time I~'tethod Parameter Result ?~4DL Units Tech Date 60 20 ppni AJA 09/22/03 9:15 7420* Sam le ID: Blank Pararneter Kesult A'[nL Units <0.2 0.2 Ppm Lcatl * Tcst Mcthods for EN'aluatin~ Solid «'aste, EPA SW-846 LaU ID: 001027-81k Tecli Date Time Method AJA C19~'22I03 8:15 7420* Jacob Alan ~ LaUorator}~ 1~1a Iler ' Thomas Analytical Services, Inc. 2151 Harvey Mitchell Pkwy. S.. Suite 303 • College Station. TX 77840-5237 Telephone (979) 680-1801 • Fax (979) 764-2152 Website: www thomasanalyticai.com • Email: inlo@thomasanalytical.com 1- 506 Page 2 of 2 QC Report Client Codc: 006 Rcpott No.: 00 ] 027 Samp3e ID: Extcrior Paint Dupliratc Analysis - Parameter C?riginal Result Duplicate Result RPD RPD Max. Lead 13.250 15,750 4.3 20 Sam le ID: lnterior Paint Spike. Analysis Parameter Spike Added easared Cnnc. % Recovery Kecovery, Limits Lead 100 112.3 112% 75 - 125 Laboratorp Controi Sample Parameter True V~It~e Result Recover~v QC Limits Lead 275 308 112% RO - 120 J~b- A I a„-7_ Llboa•atorv M~ a~cr ~ " 507 SSPC-Guide 6 October 1, 2004 SSPC: The Society for Protective Coatings TECHNOLOGY GUIDE NO. 6 Guide for Containing Surface Preparation Debris Generated During Paint Removal Operations 1. Scope 1.1 This guide describes methods of paint removal, con- tainment systems and procedures for minimizing or preventing emissions from escaping the work area, and procedures for assessing the adequacy of the controls over emissions. 2.2 OUTLINE OF GUIDE 2.2.1 Procedures Included in this guide: • Selecting Methodsof Surface Preparation and Debris Collection (Section 4.1) • Specifying Containment Systems (Section 4.2) • Selecting Methods for Assessing the Quantity of 1.2 The containment systems are categorized in up to four classes per type of paint removal method, based on the extent to which emissions are controlled. 1.3 This guide is primarily intended for use with steel structures; however, some of the methods and materials may be suited for use on concrete, aluminum, wood, or other ma- terials of construction. 1.4 This guide is intended to be used by facility owners, specifiers, designers, and contractors. It may also be used by other interested parties. 1.5 A discussion of ventilation is included in the guide to assist users in both controlling emissions to the environment, and in enhancing worker protection and visibility within the containment. It is important to recognize that ventilation systems alone may or may not be sufficientto fully protect workerswhen the paint being removed contains lead or other toxic metals, and additional work practice and/or administrative controls and respiratory protection may be required to control worker exposures. Requirements or evaluation methods for worker health and safety are outside the scope of this guide. 2. Description and Definitions 2.1 GENERAL: During surface preparation, airborne particulate and debris from the removal of paint (particularly paints containing lead, cadmium, and chromate pigments) can contaminate the air, soil, and water surrounding work sites. The potential environmental hazards are reduced by minimiz- ing or eliminating the airborne particulate, and by containing and collecting the debris. Controlling airborne particulate and other emissions may be necessary to comply with Federal, state, and local regulations. Emissions (Section 4.3) • Implementing Containment Project (Section 4.4) 2.2.2 The guide also includes descriptions and comen- taries on: • Methods of Coating Removal (Section 5.1) • Methods of Cotlecting Debris (Section 5.2) • Containment Enclosure Components (Section 5.3) • Ventilation System Components (Section 5.4) • Methods for Assessing Quantity of Emissions and Methods of Assessing Efficiency of Debris Collection and Bulk Abrasive Recovery (Section 5.5) 2.3 DEFINITIONS 2.3.1 Action Level for Lead: Employee exposure, without regard to the use of respirators, to an airborne concentration of lead of 30 micrograms per cubic meter of air (30 Ng/m3) calculated as an eight-hour TWA per OSHA General Industry Standard 29 CFR 1910.1025 and OSHAConstruction Industry Standard 29 CFR 1926.62. 2.3.2 Containment System: A containment system in- cludes the cover panels, screens, tarps, scaffolds, supports, and shrouds used to enclose an entire work area or a paint removal tool. The purpose is to minimize or prevent the debris generated during surface preparation from entering into the environment, and to facilitate the controlled collection of the debris for disposal. Containment systems may also employ the use of ground covers or water booms. 2.3.3 Emfssions: When used inthis guide, emissions from the containment that require control include airborne plumes of material, as well as spills or leaks of water, abrasive, paint chips, and debris. 509 9-1 SSPC-Guide 6 October 1, 2004 2.3.3 Ventilation System: Ventilation systems include both natural ventilation and mechanical ventilation (fans, hoods, and duct work), to provide air movement across the work area, and dust collectors to clean the discharged air. 2.3.4 PM-10: Particulate matter (dust) less than 10 mi- crometers (0.39 mils) in aerodynamic equivalent diameter. (Aerodynamic equivalent diameter is defined as the diameter of a unit density sphere having the same settling velocity as the particle in question, regardless of its shape and density.) 2.3.5 Permissible Exposure Limlt (PEL) for Lead: Maximum aliowable employee average exposure per OSHA General Industry Standard 29 CFR 1910.1025 and OSHA Construction Industry Standard 29 CFR 1926.62. 2.3.6 Time Weighted Average (TWA): Concentrations of airborne toxic materials which have been weighted for a certain time duration, usually eight hours. PA Guide 5 Guide to Maintenance Coating of Steel Structures in Atmospheric Service Guide 7 Guide for the Disposal of Lead Contaminated Surface Preparation Debris Guide 16 Guide to Selec6on of Dust Collectors TU 7 Conducting Ambient Air, Soil, and Water Sampling During Surface Preparation and Paint Disturbance Activities 3.4 U. S. GOVERNMENT CODE OF FEDERAL REGU- LATIONS: 29 CFR 1926.62 29 CFR 1910.1025 40 CFR, Part 50 Appendix G3 2.3.7 Impenetrable: Impervious to dust and wind. 2.3.8 Impermeable: Impervious to water. 3. Referenced Documents 3.1 The latest issue, revision, or amendment of the refer- enced standards in effect on the date of invitation to bid shall govern, unless otherwise specified. Standards marked with an asterisk are referenced only in the Notes, which are not requirements of this specification. 3.2 If there is a conflict between the requirements of any of the cited referenced standards and this specification, the requirements of this specification shall prevail. NOTE: New governmental regulations or amendments to existing ones become effective as scheduled by the gov- ernmental agency, independent of the date of bid. 3.3 SSPC: THE SOCIETY FOR PROTECTIVE COAT- INGS: pg 2 Specification for Cleanliness of Re- cycled Ferrous Metallic Abrasives Interim Final Rule on Lead Expo- sure in Construction' Occupational Safety and Health Standards (Lead)z National Ambient Air G2uality Standard for Lead 3.5 U. S. DEPARTMENT OF HEALTH AND HUMAN SERVICES, NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (NIOSH): Method 7082 Lead' Method 7300 Elementss 3.6 U. S. DEPARTMENT OF LABOR, OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION6 OSHA 3142 Lead in Construction 3.7 U. S. ENVIRONMENTAL PROTECTION AGENCY:' Method 3050 AcidDigestionofSediments,Siudges and Soils 3.8 AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS:B Industrial Ventilation - Manual of Recommended Practices ' Text can be found at http://www.osha.gov/pls/oshaweb (10/2002) zText can be found at http://www.osha.gov/pls/oshaweb (10/2002) 3 Text can be found at http://a257.g.akamaitech.neU7/257/2422/12feb20041500/edocket.access.gpo.gov/cfr_2004fjulqtr/40cfr50.12.htm ° Text can be found at http://www.cdc.gov/search.do?action=search&queryText=Method+7082 5 Available from http://www•cdc.gov/nioshlnmam/pdfs/7300.pdf 6 http://www.osha.gov/SLTC/constructionlead/index.html has links to downloadable. pdfs of this rule. ' US Environmental Protection Agency (EPA), 1200 Pennsylvania Avenue, NW, Washington, DC 20460; http://Www.epa.gov/epaoswer/haz- waste/test/3-series.htm e American Conference of Governmental Industrial Hygienists, 1330 Kemper Meadow Drive, Cincinnati, Ohio 45240, 513-742-2020. www. acgih.org 9_2- - 510 SSPC-Guide 6 October 1, 2004 3.9 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI):9 be noted that the abrasive used for abrasive blast cleaning may contain toxic components. * ANSI 29.2 (1979) Fundamentals Governing the Design and Operation of Local Exhaust Systems *ANSI Z9.2 (2001) Fundamentals Governing the Design and Operation of Exhaust Systems * ANSUASC Z9.4 (1997) Exhaust Systems - Abrasive Biasting Operations - Ventila- tion and Safe Practice 3.10 NATIONAL FIRE PREVENTION ASSOCIATIONtO NFPA 701 Standard Methods of Fire Tests for Flame Propagation of Textiles and Films 4. Procedures 4.1 SELECTING METHODS OF SURFACE PREPARA- TION AND DEBRIS COLLECTION 4.1.1 SurfacePreparation Method: Prior to selecting and specifying a containment system, it is necessary to determine the method to be used for surface preparation of the steel. Considerations for selecting surface preparation follow. 4.1.1.1 Coatings can be removed from the surface by a variety of techniques. These include: Abrasive blasting (e.g. open blasting with expendabie abrasives, open blasting with reusable abrasives, vacuum [closed] blasting with reusable abrasives, nonrecirculating closed blast systems). Water blasting and pressurized water jetting (with or without abrasives). Chemical stripping. Hand and power tool cleaning (with and without local- ized exhaust). 4.1.1.2 Methods vary significantly in their productivity, degree of cleanliness and surface profile achieved, utility and support requirements, dust and waste produced, clean-up required, and costs. For example, open abrasive blasting with expendable abrasives requires the greatest quantity of abrasive and produces the greatest quantity of dust and debris. Methods which do not utilize abrasive generally produce the least amount of dust and debris. NOTE: The toxicity characteristic of the waste is indepen- dent of the volume of the waste generated (e.g., paint chips alone or paint chips combined with abrasive). It should also 4.1.1.3 Before specifying a method of surface prepara- tion, the manufacturer of the coating to be applied should be consulted to assure that the degree of cleaning and surface profile produced will be satisfactory for coating system per- formance. 4.1.2 Methods for Collecting Debris: Debris may be collected from the surface at the point of cleaning (e.g., with vacuum) or from the general work area. The collection method should be selected in conjunction withthe paint removal method and the containment system design to assure a completely integrated operation. The debris should be collected on a regu- lar basis and not left to accumulate over the course of a job. Methods of collecting debris are described in Section 5.2. In addition to collecting debris within containment, debris that escapes the contained area should be removed on a rou- tine basis (e.g., end of work day, or as specified) to prevent winds or rain from carrying it onto surrounding property, into soil, ground, or storm sewers, or into bodies of water. 4.2 SPECIFYING CONTAINMENT SYSTEMS 4.2.1 The facility owner or representative should specify the class of containment required and/or the environmental monitoring criteria that will be used to verify the containment's effectiveness. The specified containment should be main- tained in accordance with the approved design throughout the course of surface preparation. Because of uncertainties in the measurement and significance of containment efficiencies, it is not a good practice to simply specify a level or percent of containment. Methods for specifyi ng containment systems and items that should be considered are found in Sections 4.2.2, 42.3, and 4.2.4. Containment for paint application is beyond the scope of this guide. 4.2.2 Containment System Classes: The classifications described below vary in the degree to which the containment design can be effective in controlling emissions of dust and debris into the environment. Note that emissions requiring control include spills and leaks of material in addition to plumes of airborne dust and debris. The degree of emissions control is greatest for Class 1 and least for Class 4. Selection of a containment system with greater emission control capability is required for surface preparation methods which produce the greatest quantity of dust and debris. Containments with lesser emissions control capability are required for surFace preparation methods which produce the least quantity of dust and debris. For example, a Class 1 containment for abrasive blastcleaning (designated 1 A) 9 American National Standards Institute, 1819 L Street, NW, Suite 600, Washington, DC 20036. Standards downloadable from www.ansi.org. 10 NFPA (National Fire Protection Association), 1 Batterymarch Park, Quincy, MA 02169-7471 Telephone: +1 617 770-3000 Fax: +1 617 770- 07 or www.nfpa.org. ~-3 511 SSPC-Guide 6 October 1, 2004 involves the use of more elaborate containment components than Class 1 for power tool cleaning (designated 1 P). For this reason, individual tables have been prepared to identify the containment components for each of the classes according to the type of removal method. When vacuum shrouding is employed around the removal tool, controls equivalent to Class 1 may be achieved through the use of ground covers or free hanging tarpaulins. 4.2.2.1 Class 1: This system provides the highest level of emissions control. For abrasive blast cleaning, Class 1 A normally requires air impenetrabie walls, ceiling, and floors, as applicable, with rigid or flexibie framing, fully sealed joints, airlock or resealable entryways, and negative air pressure achieved by forced or natural air flow (verified by instrument or visual monitoring) and exhaust air filtration. [NOTE: Class 2 from the original 1992 Guide 61(CON) was combined with Class 1 in 1994 and designated as Class 1 A.] For wet methods of preparation, Class 1 W normally re- quires water impermeable walis, ceiling, and floors with rigid or flexible framing, fully sealed joints, resealable entryways, and negative air achieved by forced or natural air flow (verified visually) and exhaust air filtration. For chemical stripping, Class 1 C normally requires water impermeable and chemical resistant walls, ceiling, and floors, as applicable, and floors with rigid or flexible framing, fully sealed joints and overlapping entryways, and forced or naturai air flow with exhaust air filtration.When pressure washing is used to remove the dislodged paint, it may be necessary to specify one of the containments from Table W for the control of the water and waste. For hand or power tool cleaning, Class 1 P normally requires air impenetrable walis with rigid or fiexible framing, fully sealed joints, resealable entryways, and negative air achieved through forced or natural air flow (verified visually) and exhaust air filtration. 4.2.2.2 Class 2: This system provides a high level of emissions controi. For abrasive blast cleaning, Class 2A normally utilizes air impenetrable walls, ceiling, and floors, as applicable, with rigid or flexible framing, fully sealed joints, partially sealed entryways, negative air pressure achieved by forced or natural air flow (verified visualiy) and exhaust air filtration. [NOTE: Class 3 in the original 1992 Guide 61(CON) was redesignated as Class 2A in 1994.] For wet methods of preparation, Class 2W normally requires water impermeable walls, ceiling, and floors, as ap- plicable, rigid orflexible framing, fully sealed joints, overlapping entryways, and natural air flow. For chemical stripping, Class 2C normally requires water impermeable and chemical resistant walls, ceiling, and floors, as applicable, and floors with rigid or flexible framing, fully sealed joints, overlapping entryways, and natural air flow. When pressure washing is used to remove the dislodged paint, it may be necessary to specify one of the containments from Table W for the control of the water and waste. For hand or powertool cieaning, Class 2P normally requires air penetrable or impenetrable walls, ceiling, and floors, as ap- plicable, rigid orflexibleframing, fully sealed joints, overlapping or open seam entryways, and natural air flow. 4.2.2.3 Class 3: This system provides a moderate level of emissions control. For abrasive blast cleaning, Class 3A normally utilizes air penetrable watis, ceiling, and floors, as applicable, with rigid or flexible framing, partially sealed joints and entryways and exhaust air filtration. [NOTE: Class 4 in the original 1992 Guide 61(CON) was redesignated as Class 3A in 1994.] For wet methods of preparation, Class 3W normally requires water impermeable wails, ceiling and floors, as ap- plicable, minimai framing, partially sealed joints, open seam entryways, and natural air flow. For chemical stripping, Class 3C normally requires water impermeable and chemical resistant walls, ceiling, and floors, as applicable minimal framing, partially sealed joints, open seam entryways and natural air flow. When pressure washing is used to remove the dislodged paint, it may be necessary to specify one of the containments from Table W for the control of the water and waste. For hand or power tool cleaning, Class 3P normally re- quires air penetrable walls, ceiling, and floors, as applicable, minimal framing, partialiy sealed joints, open seam entryways, and natural air flow. 4.2.2.4 Class 4: This system provides a minimai level of emissions control. For abrasive blast cleaning, Class 4A normally utilizes air penetrable walls ceiling, and floors, as applicable, with flexible framing, open seams and entryways, and natural air flow. For wet methods of preparation, Class 4W utilizes water- penetrable walls, ceiling, and floors, as applicable, with flexible framing and natural air flow to collect dislodged debris while allowing the water to pass though. For chemical stripping, this class is not applicable. For hand or power tool cleaning, this class is not ap- plicable. 4.2.2.5 Containment Class Tables: Tables A, W, C, and P list various containment and ventilation components which can be utilized to achieve these different classes. Table A is used for abrasive blast cleaning, Table W for water blasting/water jetting, Table C for chemical stripping, and Table P for hand or power tooi cleaning. The components are described in Sections 5.3 and 5.4. Note that other combinations of containment and ventilation components may provide dust and debris control similar to those suggested in the tables. 4.2.3 Other Considerations in Specifying and Selecting Containment Systems: a. Type of structure (simple flat plate or beams versus complex trusses and joists). 9-4- - 512 SSPC-Guide 6 October 1, 2004 b. Load bearing capacity and integrity of the containment system and of the structure. NOTE: Containment systems may need to be reviewed by a registered professional engineer prior to erection and use to confirm the structural adequacy of the containment and the effect of various loads imposed. c. Size and elevation of structure (e.g., elevated water tank, small secondary bridge, etc.). d. Location of structure (e.g., rural, urban, over water, etc.). e. Proximity to other buildings, structures, operating equipment, and traffic. Tight confines may not permit the construction of certain containment devices. f. Local climate (e.g., heavy winds, rain, snow, etc.). g. Permitting. The construction of containment devices may be regulated by codes. h. Construction of structure (such as riveted or welded). On certain structures, the welding of containment system brackets adjacent to riveted seams should be avoided. i. Additional work to be performed inside containment (e.g., the control of paint overspray). 4.3 SELECTING METHODS FOR ASSESSING THE QUANTITY OF EMISSIONS 4.3.1 The specifier should select one or more of the fol- lowing methods for monitoring the amount of dust or debris that escapes the work area.These methods are described in Section 5.5. Method A: Visible Emissions Method B: Ambient Air Monitoring for PM-10 Method C: Occupational Monitoring of Area Emissions of Lead Method D: AmbientAir Monitoring forToxic Metals (TSP Lead) Method E: Soil Analysis for Toxic Metals Method F: Water and Sediment Analysis for Toxic Metals Method G: Visuai Assessment of Site Cleanliness 4.3.2 If one or more of the methods is specified, the specification should identifythe method selected, the frequency and duration of the tests that wiil be employed, the location of the monitors (in the case of instrument monitoring), and the acceptance criteria. 4.4 IMPLEMENTiNG CONTAINMENT PROJECT 4.4.1 Preparation of Written Specification: The specifier should incorporate the information derived in 4.1 through 4.3 in a written document that clearly defines what is required of the contractor, what is to be furnished by the owner, and how the work will be evaluated. It is also recommended that the specifier identify applicable regulations, codes, ordinances, etc., and the associated enforcement agencies. In addition, the document should include names of key contacts and provi- sions for resolving disputes. 4.4.21mplementation of Contalnmentand Monitoring: The owner should assure that the work is monitored as described above (see also Sections 9 and 10 of SSPC-PA Guide 5). A high level of involvement by the owner eitherdirectly orthrough knowledgeable designates should be maintained throughout the course of the project. Because of the newness of much of this technology, there is often a need to modify the specific terms of the specification, such as the paint removal methods employed, the design and construction of the containment, and the methods for monitoring the emissions. 4.4.3 Project Documentation: It is vital that the facility owner be provided with accurate and complete records of all the documents and activities including specifications, inspec- tion and work reports, change orders, weather conditions, various mitigating factors, contractor suppliers, activities by regulatory agencies in monitoring orguiding the work, disposal records and test results and data derived from containment, ventilation, air, soil, and other monitoring. These records and data are invaluable in evaluating the qualiry of the work and in determining conformance with the specifications. In addition, they can be added to the database being developed by the protective coatings industry on the most cost-effective and efficient means of debris containment. 4.4.4 Disposal of Debris: Surface preparation debris (e.g., spent abrasives and containment materials that cannot be reused), must be disposed of in accordance with Federal and state regulations on solid and hazardous waste. For more information, see SSPC-Guide 7. 4.4.5 Cleaning of Reusable Equipment and Materials: Loose surtace lead dust should be removed from equipment, containment materials, and other reusable items prior to transportation off-site. 5. Descriptions of Methods and Systems 5.1 METHODS OF COATING REMOVAL: The following is a list of inethods that can be used successfully to remove coatings and to collect the debris. Mists, dusts, and debris cre- ated may or may not contain toxic metals. All waste discharges should be tested for toxic metals. The list is not considered to be ali-inclusive, as new and innovative methods are continu- ally being developed. 5.1.1 Hand Tool Cleaning: Includes chipping hammers, scrapers, wire brushes, and sandpaper. 5.1.2 Power Tool Cleaning: Includes power operated wire brushes, sanders, scrapers, grinders, descalers, needle guns, and rotary peening equipment. - 513 9-5 SSPC-Guide 6 October 1, 2004 5.1.3 Power Tool Cleaning with Localized Exhaust: Includes power tools which contain integral vacuum-equipped shrouding. Abrush or rubber sleeve on the shrouding conforms to the surface to enhance the control of dust and debris col- lection. 5.1.4 Waterjetting Without Abrasive: Includes all types of pressurized water jetting systems. The action of the water with or without cleaning solutions or rust inhibitors provides the cleaning. Pressures are as stated by the manufacturer of the equipment. Note that when removing hazardous paints, high pressures and certain cleaning solutions may cause the hazardous substances to be carried with the water. This water should be recycled orcollected and disposed of properly. Water jetting at pressures from 10,000 to 30,000 psi is often called high pressure water jetting, and, at pressures over 30,000 psi, ultra high pressure water jetting. 5.1.5 Waterjetting With Abrasive: Includes pressurized water jetting systems with abrasive injection. Variations may mix abrasive and water in a separate tank or at the nozzle, or inject abrasive into the water stream. Pressures required as stated by the manufacturer of the equipment. Note that when removing hazardous paints, high pressures and certain cleaning solutions or rust inhibitors may cause the hazardous substances to be carried with the water. This water should be recycled or collected and disposed of properly. Water jetting at pressures from 10,000 to 30,000 psi is often called high pressure water jetting, and, at pressures over 30,000 psi, ultra high pressure water jetting. 5.1.6 WetAbrasive BlastCleaning: Includescompressed air blasting systemsthat incorporate water into the blast stream. Variations may mix abrasive and water in a separate tank or at the nozzle, or apply the water to the abrasive as it exits the nozzle. Pressures are required as stated by the manufactu rer of the equipment. Notethatwhen removing hazardous paints, high pressures and certain cleaning solutions or rust inhibitors may cause the hazardous substances to be carried with the water. This water should be collected and disposed of properly. 5.1.7 Open Abrasive Blast Cleaning with Expendable Abrasives: Blast cleaning using compressed air to propel abrasives through noules. The spent abrasives, paint, debris, trash, etc. are collected for disposal. Expendable abrasives are those which are not normally reused after the initial blast. For the purposes of this guide, expendable abrasives include natural minerals (e.g., quartz sand, flint, garnet, staurolite, olivine, etc.), and mineral slags formed in electric power gen- eration (coal slag) or in smelting metals such as copper or nickel. Manufactured abrasives, such as aluminum oxide, and vegetable abrasives (e.g., walnut shell, corn cob, etc.) might also be included. CAUTION: Some expendable abrasives may contain heavy metals. 5.1.8 Open Abrasive Blast Cleaning with Reusable Abrasives: Blast cleaning using compressed air to propel abrasives through nozzles, except that the abrasives are col- lected, cleaned of paint and debris, and reused. Cast steel, malleable iron, chilled cast iron, garnet, and aluminum oxide abrasives are typically used. An abrasive's ability to be re-used depends on its type, durability, and hardness. (For more infor- mation, see SSPC-AB 2.)The abrasive reciaimer (collection and cleaning equipment) may be an integral part of the blast machine or it may be housed in a separate machine. Blast- ing and abrasive reclamation may operate simultaneously or independently. The use of re-usable abrasives may reduce the volume of waste by a factor of 50 or more compared to expendable abrasives. 5.1.9 Closed Abrasive Blast Cleaning with Re-Usable Abrasives: Blast cleaning using compressed air or centrifugal wheels within a vacuum assembly to propel abrasives toward a surface and simultaneously remove the abrasive and debris. Once the collected abrasives are cleaned of paint and debris, they are reused. Reusable abrasives may reduce the volume of waste by a factor of 50 or more compared to expendabie abrasives. Systems can be recirculating or non-recirculating. 5.1.9.1 Vacuum Blasting: Blast cleaning using com- pressed air to propel abrasives toward a surface. A special vacuum assembly equipped with a brush or rubber sleeve surrounds the blast nozzle, sealing it to the surface. The seal must be maintained between the assembly and the surface to create a completely closed biasting cycle. The abrasive is recirculated automatically, cleaned of paint and debris, and returned for reuse. Cast steel, malleable iron, chilled cast iron, and aluminum oxide abrasives are typically used. 5.1.9.2 Wheel Blast Cleaning: Blast cleaning wheei as- semblies that propel abrasive to the surface using centrifugal force. A special vacuum assembly with a mask that seals the centrifugal wheel assembly to the surface is required. The seal must be maintained between the assembly and the surface to create a completely closed blasting cycle. The abrasive is recirculated automatically, cleaned of paint and debris, and returned for reuse. Cast steel, malleable iron, or chilled cast iron abrasives are typically used. 5.1.9.3 Mechanical Non-Recirculating Blast System: Equipment that shrouds the blast nozzle to contain and remove the debris. The abrasive may or may not be reused. If it is reused, cleaning the debris from the abrasive is accomplished as a separate operation. 5.1.10 Chemical Stripping: Use of chemical stripping solutions or slurries applied to the paint surface. Effectiveness of the chemicals may be enhanced by applying a cover such as cloth or paper to the surface after application to prevent - 514 9-6 SSPC-Guide 6 October 1, 2004 evaporation. The softened paint is removed by peeling the cover or by hand scraping. Washing, flushing, and neutraliza- tion of the surface may be required, as well as collection of the rinsings for proper disposal. NOTE: Chemical stripping solu- tions themselves can be hazardous and may require special handling and disposal. 5.2 METHODS OF COLLECTING DEBRIS: Methods of collection inciude, but are not limited to, the following: 5.2.1 Localized Collection at Point of Cleaning: This method involves surrounding the coating removal equipment with a localized containment enclosure equipped with a vacuum (i.e. localized exhaust) to permit the collection of the debris as it is being generated. The localized containment or chamber should conform to the surface (e.g., to irregularities such as welds, angles, and appurtenances as well as flat surtaces) through the use of masks, brushes, or other suitabie means that will minimize the escape of abrasive, dust, paint, or debris. This method may be more effective in controlling emissions when used on large open structures such as tank shells as compared with complex structures such as joists or trusses. The vacuum machine may be an integral part of the coating removal equipment or abrasive reclaimer, or may be a sepa- rate machine, but coating removal and vacuuming must be accomplished simultaneously. 5.2.2 General Area Collection: This method of collection involves the removal of spent abrasive and paint debris from a containment structure that encloses the work area, workers, and tools, rather than only enclosing the removal tool itself. Coilection methods include, but are not limited to: 5.2.2.1 Bulk Collection: Collection of debris from ground covers, floor, deck, or structure components, either during or after surface preparation. Collection may include the use of brooms, magnetic brooms, brushes, shovels, wheelbarrows, buckets, bucket loaders, vacuums, vacuum trucks, conveyors, or other suitable means. Note that in the case of hazardous paint removal, OSHA regulations place restrictions on the use of some of these methods. 5.2.2.2 Channeling: Controlling the flow of debris in the direction of a central removal location is accomplished by the use of tarps, rigid panels, augers, funnels, or other suitable materials or equipment. The materials should be selected with consideration of the nature of the debris being channelled (e.g. water, chemical stripper, dry particulate, etc.). At the removal location, further collection may be accomplished using me- chanical conveyors, vacuums, orother means. The channelling materials and equipment may be a part of, or independent of, the containment structure. 5.2.3 Work Site Collection: This method of collection involves the removal of spent abrasive and paint debris from the work site and surrounding property outside of containment. Collection should occur on a routine basis (e.g., at the end of each work day, or as specified) to prevent dispersion by wind or rain. The bulk collection methods described in 5.2.2.1 are suitable for this purpose. 5.3 CONTAINMENT ENCLOSURE COMPONENTS: The components of containment enclosures are identified below. Consideration should be given to the use of flame retardant materials when applicable. Tables A, W, C, and P provide guidance on combining each of the components to design a containment system Specifiers should research local regula- tions and jobsite conditions regarding the use of flame retardant materials. NFPA 701 provides an example of the testing that can be required. 5.3.1 Containment Materials 5.3.1.1 Type A1 - Rigid: Containment materials consist of single panels, interlocking panels, or modular fabrications constructed of plywood, aluminum, rigid metal, plastic, or similar materials. 5.3.1.2 Type A2 - Fiexible: Containment materials are comprised of screens, tarps, drapes, plastic sheeting, or similar materials. 5.3.2 Penetrability of Containment Materials 5.3.2.1 Type B1 - Air Impenetrable: Materials that are impervious to dust or wind, including, but not limited to: • Tarps or Drapes: Formed or coated woven material free of holes or openings. Piastic Sheeting: Single or double ply, heavy wall construction plastic. Reinforced plastic may be neces- sary for some applications. Panels: Panels of plywood, aluminum, corrugated plastic, metal, or similar rigid materials. NOTE: Open- ings in materials reduce recovery efficiencies. 5.3.2.2 Type B2a - Air Penetrable-Tightly Woven: Material that is tightly woven, but not coated. Material is capable of retaining airborne particles but because it is not coated, does not meet the definition of Air Impenetrable. Tightness of the weave may be compromised with extended use. 5.3.2.3 Type 62b - Ai r Penetrable-Open Mesh: Material that is formed or woven to allow air flow but that can retain some airborne particles. NOTE: The design wind loads of air penetrable materials such as screens are the same as air impenetrabie materials such as tarps. Openings in materiais reduce recovery efficiencies 5.3.2.4 Type B3a - Water Impermeable: Material that is impermeable to water. 515 9-7 SSPC-Guide 6 October 1, 2004 5.3.2.5 Type B3b - Water Permeable: Open mesh mate- rial that is formed or woven with openings less than 25 mils (100 micrometers) in greatest dimension. Material is capable of coltecting debris, while allowing water to pass though. 5.3.2.6 Type 64 - Chemical Resistant: Material that is resistant to chemical stripping solutions and impermeable to the water used for rinsing. 5.3.3 Support Structure 5.3.3.1 Type C1 - Rigid Support Structures: These structures allow no movement and are comprised of scaffolding and framing to which the containment materials are affixed. 5.3.3.2 Type C2 - Flexible Support Structures: These structures allow minor movement and are comprised of cables, chains, or similar systems to which the containment materials are affixed. 5.3.3.3 Type C3 - Minimal Support Structures: These structures involve littleto no supporting structure beyond cables or chains required to affix the containment materials to the structure itself and perhaps to the floor or ground. 5.3.4 Treatment of Joints 5.3.4.1 Type Di - Fully Sealed Joints: All mating joints between the containment materials and the structure and floor, ceiling, or ground are sealed. Sealing includes overlapping of seams when using flexible materials and the use of stitching, taping, caufking, or other sealing measures. Consideration should be given to the chemical or water resistance of the seafing materials as appropriate. 5.3.4.2 Type D2 - Partially Sealed Joints: The contain- ment materials are mated together. The use of overlapping seams is recommended, but complete sealing of all joints is not required. 5.3.5 Entryways 5.3.5.1 Type E1 - Entryway Through Airlocks with Resealable Doors: This entry system includes access doors that are capable of being repeatedly resealed. Air locks are used in addition, in order to minimize air exchanges and air losses through the entryways. 5.3.5.2 Type E2 - Entryway Through Resealable Doors: The use of doorways that are capable of being repeatedly resealed. Entryways should not be sealed with "C"-clamps that can only be accessed from one direction. 5.3.5.3 Type E3 - Entryway Through Overiapping Door Tarps: The use of multiple flap overlapping door tarps to minimize dust escape through the entryway. 5.3.5.4 Type E4 - Entryway Through Open Seams: Spe- cial doors are not employed. Entry into the work area is made through unsealed seams in the containment materials. 5.4 VENTILATION SYSTEM COMPONENTS: Items to be considered when assessing the requirements of ventilation systems are addressed below. Tables A, W, P, and C provide guidance on combining the containment and ventilation re- quirements. Note that when designing a ventilation system, it is necessary to balance the static pressure with the input air flow to avoid collapsing ductwork or the containment due to high negative pressures. Additional information on ventilation and exhaust design is found in References 3.8 and 3.9. NOTE: The selection of the ventilation system from the information in this guide is to assist in the control of emissions released through the atmosphere, but does not assure worker safety. Representative air sampling in the worker's breath- ing zone for air contaminants should always be conducted when employees may be exposed in excess of the specified OSHA limits, and depending upon the results, changes to the ventilation system may be necessary. Air sample coilection and anatysis methods must conform to OSHA standards and NIOSH methods. 5.4.1 Air Supply (Intake) Points 5.4.1.1 Type F1 - Controlled Air Supply (Intake): The use of baffles, louvers, flap seals, filters, and ducts on sup- ply air points to preclude inadvertent escape of abrasive and debris. They may or may not be used in combination with fans (see 5.4.2.1). 5.4.1.2 Type F2 - Open Air Supply (Intake): Open air entry points without the use of ducts, valves, or baffles. 5.4.2 Input Air Flow 5.4.2.1 Type G1 - Forced Input Air Flow: Fans or blow- ers are used at the supply air points or other locations within containment to assist air flow through the containment struc- ture. When used with a negative pressure system, the input air flow must be properly balanced with the exhaust capacity throughout the range of operations. 5.4.2.2 Type G2 - Natural Input Air Flow: Fans or blow- ers are not used at supply air entry points. 5.4.3 Air Pressure Inside Containment 5.4.3.1 Type H1 - Instrument Verification: An aver- age negative pressure throughout the enclosure of at least 0.03"(0.08 cm) water column (W.C.) relative to ambient condi- tions should be maintained during the surface preparation and clean-up operations. Manometers or magnehelic gages can be used to verify negative pressure. 9-& - 516 SSPC-Guide 6 October 1, 2004 5.4.3.2 Type H2 - Visual Verification: Negative pressure must be employed as verified through the concave nature of the wall, ceiling, or floor materials while taking into account wind effects. Smoke or other visible means inside or outside the containment can be used to observe air flow patterns. 5.4.3.3 Type H3 - Not Required: Specified degree of negative pressure not required. 5.4.5 Exhaust Air Flow/Dust Collection 5.4.5.1 TypeJi -Air Filtration Required: Forced exhaust air flow into dust collectors (wet or dry) or baghouses sized appropriately for the type and size of particulate matter and for the volume and velocity of air moved through the contain- ment. SSPC Guide 16 provides information on the selection of dust collectors. 5.4.4 Air Movement Inside Containment: Air movement is utilized inside containment for several reasons: • to reduce the exposure of workers to airborne dust (e.g., in 29 CFR 1926.62, OSHA stipulates that en- gineering controls must be instituted to the extent feasible to control worker exposure to lead dust) • to improve visibility • to remove dust laden air • to aid in preventing contaminants from escaping into the environment (e.g., in 40 CFR 260-268 EPA stipulates that no hazardous debris is permitted to be deposited on the ground, but no specific criteria have been established to achieve these goals) 5.4.4.1 Type 11 - Minimum Air Movement is Specified: Achieving air movement through the containment requires the use of inechanical ventilation (see Note 7.1). Air movement may be specified by several methods, such as the following: • establishing a minimum velocity of air (fpm) in cross- draft or down draft (see Note 7.2) • establishing aminimum volumeof air(cfm) to ventilate a given volume of containment The selection of inethods and criteria for specifying or producing air movement should be based on an analysis of project-specific conditions, including the blasting pressure, number and size of blast nozzles, type, size and friability of abrasive, flow rate of abrasive, the lead or toxic metal content, thickness and age of the paint being removed, the type and size of structure being prepared, and the configuration of the containment system being installed. While there are generally accepted criteria for specifying air movement, air velocity past the worker is often a primary consideration when designing ventilation systems, because of worker protection issues. 5.4.4.2 Type 12 - Minimum Air Movement is Not Speci- fied: Under this approach, the specifier does not establish any criteria for minimum air movement in containment. Note that when removing lead-containing paints, it may still be necessary to utilize feasible engineering controls to reduce airborne lead exposure in accordance with the provisions of 29 CFR 1926.62 and to prevent the escape of airborne lead particulates from the containment. 5.4.5.2 Type J2 - Air Filtration Not Required: Natural exhaust air flow is employed without the use of forced air or dust filtration. Littie control overthe debris being emitted into the environment is possible when using dust-producing methods of preparation such as abrasive blasting. 5.5 METHODS FOR ASSESSING QUANTITY OF EMISSIONS: Surtace preparation and paint removal opera- tions produce dust and debris which may be emitted into the environment. Methods for quantifying the amount of dust and debris escaping the work area are described below. MethodsA and G provide immediate feedback on the emissions created. Methods B, C, and D require days to receive results. Methods E and F provide resuits upon project completion. Users should contact the appropriate state and local authorities to ascertain which of the methods are accepted for monitoring emissions, and to establish the appropriate acceptance criteria. Guidance on methods of monitoring is found in SSPC-TU 7. NOTE: Testing for PM-10ormonitoring ofvisible emissions may be of limited applicabilityor relevance to a hazardous paint removal project. Monitoring for the toxic metal (e.g., lead as in 5.5.4) may provide more useful and meaningful data. 5.5.1 Method A-Visible Emissions: Observations of vis- ible emissions from the work area provide immediate feedback on the pertormance of the containment system. Two methods can be used: 5.5.1.1 General Surveillance: Visible emissions are permitted at given frequencies or durations provided they do not extend beyond an established boundary line (e.g., property line). Possible frequencies include: • Level 0 Emissions - No visible emissions. NOTE: This level is typically not achievable during abrasive blasting. Levell Emissions-Randomemissionsofacumulative duration of no more than 1% of the work day (e.g., five minutes in an eight hour work day). Level 2 Emissions - Random emissions of a cumulative duration of no more than 5% of the work day (e.g., 24 minutes in an eight hour work day). Level 3 Emissions - Random emissions of a cumula- tive duration of no more than 10% of the work day (e.g., 48 minutes in an eight hour work day). 9-9 - ~ 51'7 SSPC-Guide 6 October 1, 2004 Level 4 Emissions - Emissions are unrestricted and may occur at any time. NOTE: The workday activities for timing emissions en- compass surface preparation and clean-up only. 5.5.1.2 Opacity Scale: Opaciry measurements are made by trained, certified observers. Ascale from 0% to 100%, in 5% increments, is used. Measurements are typically made at 15 second intervals for given periods of time (e.g., 30 minutes). The acceptance criteria must be established by the specifier. For example, a criteria might restrict the opacity to no more than 20% for any three minute period in 60 minutes. Local regulations may provide guidance as to the level of opacity that should be required. 5.5.2 Method B-AmbientAir Monitoring for PM-10: High volume air samplers equipped with PM-10 heads are used to assess the total amount of particulate matter 10 micrometers (0.39 mils) or less in size that escape the contained work area. The number of monitors to be used is based on wind direction and proximity to homes, playgrounds, businesses, bodies of water, etc. The National Ambient Air Quality Standard for PM-10 according to 40 CFR Part 50 is 150 Ng/m3 over a 24 hour period. 450 Ng/m3 over an eight hour period may provide a rational method for applying the EPA criteria, provided no emissions occur from the worksite during the remaining 16 hours. Monitoring should be conducted for a few days prior to beginning the work (for8 hoursto 24 hours perday, as appropri- ate) in order to establish background levels. Depending upon the variability of the results, full-time background monitoring throughout the project may be necessary. 5.5.3 Method C-0ccupatlonal Monitoring of Area Emis- sions for Lead: When lead paint is being removed, air quality measurements for lead can be determined in accordance with NIOSH Method 7082 or equivalent, using personal monitors outside of areas or equipment that may potentially emit lead. Action Level lead limits are 30 Ng/m3 (0.03 mg/m3) per OSHA General Industry Standard 29 CFR 1910.1025 and OSHA Construction Industry Standard 29 CFR 1926.62. The perimeter of the work area should be isolated using signs, barriers, and ribbons in all locations where the Action Level is exceeded. Areas and equipment that should be monitored and isolated include, but are not limited to, the containment, dust collector, and abrasive recycling equipment. 5.5.4 Method D-EPA Ambient Air Monitoring for Toxic Metals: When removing paints containing toxic metals, air quality measurements for the toxic metals can be made by instrument monitoring in accordance with EPA criteria. The selection of monitoring locations should be based on fac- tors including wind direction, surface or terrain irregularities, and proximity to homes, playgrounds, businesses, bodies of water, etc. Depending upon the variability of the results, full-time background monitoring throughout the project may be necessary. High volume air samplers equipped for the collection of total suspended particulate (TSP) are used. When removing paints containing lead, the filters are analyzed for lead in accordance with the EPA 40 CFR Part 50, Appendix G. The Nationai Ambient Air Quality Standard for Lead according to 40 CFR Part 50 is 1.5 Ng/m3 as a 90 day average. NOTE: Since paint removal operations are not normally conducted continuously over a 90 day period, it may be nec- essary to establish a daily criteria for monitoring. Note that the suggested modification of the procedure shown below may not be acceptable to state or local environment officials. The appropriate officials should be contacted prior to its implementation. DA =(90 = PD) x 1.5 Ng/m3 DA = Daily Allowance (Ng/m3) PD = Number of preparation days anticipated in a 90-day period The above calculation provides an allowance criteria for a 24-hour period. In order to convert this value to an allowance corresponding to the hours worked, do the following: ADA = DA (24 = H) ADA = Adjusted Daily Allowance (pg/m3) DA = Daily Allowance (Ng/m3) H= Hours worked in 24 hours 5.5.5 Method E-Soil Analysis forToxic Metals:Apre-job and post-job soil analysis for toxic metals (e.g. lead) is usefulfor determining if adequate ground protection was employed. Prior to project start-up, select test sites beneath the structure if applicable and a minimum of one to two from 10 to 100 ft(3 to 30 m) away from the structure in each of four direc- tions. Long structures such as bridges may require additional sampiing locations. Documentthe specific location of each site. At each test site, center and align a 1 ft2 (30.5 cm2) template parallel or tangential to the structure. Remove a sample of soil 3/4 in (1.9 cm) in diameter and 1/2 in (1.3 cm) in depth at the center of the square and at each of the four corners. Combine the five soil plugs in a single bag to represent the sample at the given location. At project completion, return to the same locations and remove a similar sample. Analyze the pre-job and post-job soil samples for the appropriate toxic metals in accordance with EPA Method 3050 or equivalent. The specifier must establish the increase allowable, if any. NOTE: It should be recognized that the preexisting levels of toxic metals in the soil (e.g., lead) can vary considerably from one location to the next (even within one or two feet) due to prior land use, past paint removal projects, previous paint spills, leaded gasoline, and other factors. This should be taken into consideration when specifying the use of soils tests and when interpreting the results. 9-1 0 - - 518 SSPC-Guide 6 October 1, 2004 5.5.6 Method F-Water and Sediment Analysis for Toxic Metals: Pre-job and post-job assessment of toxic met- als (e.g., lead) in sediment can be useful in determining if proper protection of a water body has been achieved. Pre-job sampling should be accomplished in discrete locations around and beneath the project site to a sediment depth of no more than 6 in (15.6 cm). Samples should be removed at the same locations upon project completion. Sampling of water may or may not provide valuable infor- mation due to the transient nature of the toxic metal (e.g. lead) in fast moving water bodies (sediment analysis may be a more reliable indicator). However, for sedentary bodies of water or if a drinking water intake is located nearby, pre-job and post-job water sampling and analysis may be beneficial. 5.5.7 Method G-Visual Assessment of Site Cleanli- ness: A visual assessment of the cleanliness of the work site and surrounding property is made each day and upon project completion. Pre-existing debris is identified and mapped in advance, or preferably is removed prior to work or as part of the contract. By removing the debris in advance, disputes over the responsibility for clean up are eliminated. By having a visually ciean project site before the work begins, it provides another means for verifying the suitabiliry ofthe projectcontrols. For example, the presence of spent abrasives on the ground will indicate that a containment leak or breach has occurred. Under this method, the site and surrounding property are free of accumulations of debris each day and are free of all visible debris upon project completion. 6. Disciaimer 6.1 While every precaution is taken to ensure that all in- formation furnished in SSPC guides is as accurate, complete, and useful as possible, SSPC cannot assume responsibility nor incur any obligation resuiting from the use of any materials, coatings, or methods described herein, or of the guide itself. 6.2 This guide does not attempt to address problems concerning safety associated with its use. The user of this specification, as well as the user of all products or practices described herein, is responsible for instituting appropriate health and safety practices and for ensuring compliance with all governmental regulations. 7.2 The OSHA Interim Final Rule on Lead in Construc- tion (29 CFR 1926.62) does not specify air velocities moving through containment, but it states that engineering and work practice controls must be utilized as necessary to reduce airborne exposures. 7.3 The construction industry ventilation standard (29 CFR 1926.57) refers to ANSI Z9.2-1960 with regard to abra- sive blast cleaning. ANSI Z9.2-1960 was revised in 1979 and again in 2001. ANSI Z92-1979 in Table A2 suggests a down- draft velocity in abrasive blasting rooms of 60 to 100 feet per minute. The 2001 version has removed the technical design data from the standard and instead refers to other resources for this information (described below). ANSI Z9.4-1985 (revised in 1997) addresses ventilation in abrasive blasting rooms. Both the 1985 and 1997 versions suggest provision of a downdraft ranging from 60 to 90 feet per minute (the larger the floor area, the lower the air flow recom- mendation), or across draft of 100 feet per minute when remov- ing coatings containing toxic metals by dry abrasive blasting. Both ANSI Z9.2-2001 and ANSI Z9.4-1997 refer to "In- dustrial Ventilation, A Manual of Recommended Practice" published by the American Conference of Governmental Industrial Hygienists (ACGIH) as the definitive resource in the area of industrial ventilation. Figure VS-80-01, Abrasive Blasting Room, of"Industrial Ventilation" suggests a down draft velocity of 50 to 100 feet per minute (with a typicai choice of 80 feet per minute) and a cross draft velocity of 100 feet per minute. These recommendations are for operator visibility and to control the escape of contaminants into adjacent work areas. SSPC recognizes that fixed abrasive blast rooms are not the same as field containment structures, and is making no representations regarding the suitability of the velocities (whether too much or too little). For example, Federal Highway Administration research involving air movement inside contain- ment when removing lead paint by abrasive blast cleaning Research Report Number RD-94-100) found no significant differences in worker lead exposures at cross-draft veloci- ties of 70 to 300 feet per minute. (The abrasives involved in the study were steel grit and minerai sand.) The blast room information is presented in these Notes due to the link to ANSI Z9.2 that is provided through 29 CFR 1926.57, and because it may provide information that could be beneficial to some users of the guide. 7. Notes 7.1 In the preamble to 29 CFR 1926.62, OSHAstates (pg 26614) that it believes an exposure reduction factor of 50% will be achievable for mechanical ventilation systems. If feasible engineering controls do not reduce the exposure below the PEL, administrative controls, good work practices, and effective use of respiratory protective equipment are needed in addition to feasible engineering controls to help control worker exposures to lead and other toxic metals. 7.4 ANSI Z9.2-1979 and 2001 indicates that large solid particies usually cannot be captured by conventional air flow patterns, but that air flow patterns should ensure that hy- gienically significant particle sizes are captured. Hygienically significant particle sizes are defined as those which are less than 10 micrometers in size. It suggests that the larger particle sizes should be allowed to fall to the floor to be removed by housekeeping practices. As a result, when designing ventila- tion systems for containment, primary consideration shouid be given to the movement of the hygienically significant particle - _ 519 9-11 SSPC-Guide 6 October 1, 2004 sizes through the enclosure to the exhaust hood in combina- tion with good housekeeping practices to remove the heavier particles. 7.5 ANSI Z9.2-1979 states in paragraph 4.8.1(1) that if data on control velocity and volume are not available in reli- able published information, control velocity and volume can be determined by measurement of actual air-flow velocities for projects on which control has been attained. ANSI Z9.2-2001 simply refers to "Industrial Ventilation" and appropriate ANSI, OSHA, and NIOSH publications for recommended airflow rates. Little information has been published regarding control velocities in field containments. As a result, the specifier may consider allowing the contractor to demonstrate that the proposed air velocity inside containment will provide the necessary and desired controls (i.e., reduced worker exposures, controlled blood lead levels, controlled emissions, etc.) to comply with the OSHA mandate for engineering controls. 9-12` ` 520 SSPGGuide 6 October 1, 2004 ~ F 2 W Z O a 2 0 U ~ W H Z} ~ W Q U F H J Q ~ J 2 m W > W ~ 0 U) Z ¢a mZ aw i 2 Z aa m Z Q O ~ U U. O N Z 0 Q 2 m ~ 0 U y ~ 0 C O C O C O C 0 y N c 2 ~ = = = 0 N . L~ lL ii LL C 7 L ~j W Q Q O W N N ~ 0 ~ C ~ E E o E E 2 E .2 m a c ~ ~ a i CF > L6 0 C U ~ d C U ~ d a ~ O ~ O cq ~ U) Z Z a Q - - N N ~ ~ ~ ~ :3 ~ ~ ~ N N Q 2 .2 ~ ui a m N i~ ? v i m c > U > .2 p Q C•_ N= N= SCL 2~ ~ M > _ > _ > Z Z > `n N Q 3 ~ . I ~ ~ ~ <f j O LL CV ,.7. ` N2 LL L6 C LL ~ (D (D ~ ~ Z LL Z Z Z C7 C'3 0) 0) CD Q O O N O N C a1 Y a ~ a ~ 0 ~ O U O U O U N ~ ~ LL , , LL LL LL LL LL Ln co Y 0 0 0 , m d N N ~ ro Q fd E a E w~ > WN O > c a O 9 a) a c a 9 N ~ c (n U) , vcn vtn w w ~ ~ w ; w w w C LL N LL N LL d d N t6 0 Q~ QU) N N QU) ~ N ~ N ❑ O E ~ m v ~ ~ ~ ~ y 76 E ~ > Ch O 7 ~ d V m X ~ m X ~ m ' . cn 2 ui ~ LL , LL N ~ U c~ U c~ U U- cl) ~ U U U ~ ~ ~ o Q~O ° N m ~ M N Q ~ Q ~ Q ~ > > -p N l0 C ma) ma) ma) N C T c R7 N a a a E a E a m (D 0) E a m i a C ~ N N N N ' ' ' X 2 rn X ~ 2 rn x ~ N rn x ~ d 0 ~ ll ~ lL ~ LL ~ LL V ~ Q ~ a ~ ¢ ~ a a a a a ('6 LO C d.2 Q Q Q Q E N N (o tt C V (A (q N tq `0 n N c m m `~c m o c O D U U U _ UU N L H ~ N y O C U ~6 U ~ > y a o ptmj M f0 N~ c` G N _ U mCD ~ 'V1 L n N C L ~ ~°n ~ a 0 Co O1 'X V t ~ Lc~ 3 '0 0 0 ~ E V O C O N:2 ~ C ~ ' ' (D Q C m > "C T Z6 N C U C .O C (A ~ O_ d~ L m > v... Co a) ~ ~ o U Ccc N y~ a ~ C V O - ~ m v~ o ~ .n c (D n c m c ~ ca c m ~ - 3c yE E m Q ~ ~ro3 t~a~ a) o N L 3 m~ E° `o v ° U N ~ > o i a CCD ro E y> m fC V ~ 0 ~ ~ O N co c~c c~ o c ' o ~ 0 v ~n ~ ~ E • a (D N o E cu a :t co g ~ N Z N p y tn ''~O V N O n ~ E C •N ~ E C N2 ~ E y C a(D C 'C (n a ftS N m T V a) o ' ~ ~ ~ n ~ O C CU C U" Cf6 N in y C p 3 N m c mco C cC ~ E V Ta ~ E d 7 , m ~ c ~ -0 a) ~ d C N > .L.. C ~ ~ C a) L c~a~ ~oc i t a ~ m ` ~~Q> mo m x m o ~ ~ v o N 0)0 a'~ c ~ C C N ll ~ p~~ N C U U ~ N U c 0 ~ O C a0 ~ ~ C ` N ~0 O d 7~ 7 E 0 c m U Qa y ro5 EC) c~ a o ~ C~ V E C C O E Qc) O 0 E N C~ V~ 0 YN ~ U N ~ 2 CD Ln C ~ ~ 5 U , ~ ~ ~ N C~ i f C a p (0 cp • T a 0 t pa . ~°oyy~a N i y ca ~ N rn u ~ N E E p~~ f~ C L 3 ~ f6 ~ tll 0 °p° ~ rn : r- A E N O O.CO y ~ C Q E ~ c o 0 0 ~ c d 0) - a C y iV ~0 ~ t N O a ul ~n V w 2-0 6 a c ~ ~ 0 o 2 V n ~ ~ ~ ro a d E y ~n 5 ~ c co . - N'0 T O) p iC ~ tn C o "p 3 ~ c S ~O a io o f m t A E C m L E C 0 E m f cC V U N N E V c o y~ m o y C .y' ' ~ E` o Y `Q N C1 N 'y L O - V E ~ N ' f0 0 ~ y :8 N d C O ~ cc C C o j y > 7 ~ N C 7 y N L a d Qt ~ c0 'a y C N f A L d N L F z, w~c 0 N M st tn (p N N N ~ d y z z z z z z . 9-13 1 - 521 1 SSPC-Guide 6 October 1, 2004 Containment Classification Class 1 W Class 2W Class 3W Class 4W TABLE W - WATER BLASTING/WATERJETTING* COMBINATIONS OF CONTAINMENT AND VENTILATION SYSTEM COMPONENTS Containment System Ventilation (5.4 of SS PC-Guide 6 ) 5.3.1 2 3 5 5.3.3 5.3.4 5.3.5 5.4.1 Air P~ 5.4.3 - Air 5Air 5.4.5 ExhaUSt Containme . . Penetrability Su PPort Structure Joints Entryway Make- I t Air Flow Pressure Movement Dust Filtration nt Materials U P B1- Air C1- G1 - A1 - Rigid Impenetrable Rigid D1- F2 - Forced H2 -Visual Minimum J1- Air A2 Flexible AND B3a - Water C2 - Full Seal E2 - Resealable Open G2 _ Veritication Specified Filtration Impermeable Flexible Natural C1- A1 - Rigid 63a - Water Rigid Dt- E3 - F2 - G 2- H3 - Not 12 - Not J2 - Not A2 - ermeable Im Full Overlap Open Natural Required Specified Required p C2 _ Seal Flexible Flexible A1 - Rigid B3a - Water C3 - E4-Open F2 - G2 - H3 - Not 12 - Not J2 - Not q2 ermeable Im Minimal Partial Seam Open Natural Required Specified Required - p Seal Flexible A1 - Rigid B3b - Water C2 D 2 E4- Open F2 - G2 - H3 - Not 12 - Not J2 - Not A2 - Permeable Flexible Partial Seam Open Natural Required Specified Required Flexible Seal Note 1: When designing a ventilation system, care must be taken to balance the static pressure with the input airflow to avoid collapsing the containment or ductwork due to high negative pressure. Note 2: The table occasionally identifies two options for a given component. For example, containment materials (5.3.1) are shown as being either rigid or flexible. If the specifier requires the use of rigid materials only, this restriction must be specified separately. Note 3: Class 4W will capture dislodged paint chips and debris, but will not contain the water used for cleaning. ~ When vacuum shrouded waterjetting is employed, ground covers or free-hanging tarpaulins may provide controls equivalent to Class 1 W. TABLE P- POWER TOOL CLEANING* COMBINATIONS OF CONTAINMENT AND VENTILATION SYSTEM COMPONENTS 4 of SSPC-Guide 6) Ventilation (5 Containment System . 5.4.5 Containment 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.4,1 Air 5.4.2 Input Air 5.4.3 - Air 5.4.4 Air Exhaust Classification Containment penetrability Support Joints Entryway Make•Up Flow Pressure Movement Dust Materials Structure Filtration G1- A1- Rigid C1- Rigid pl_ F1 - Forced H2 -Visual 11- Minimum J1- Air Class 1 P g~_ Air Impenetrable Cp _ Full E2 - Controlled G2 - Verification Specitied Filtration A2 Flexible Flexible Seal Resealable Natural A1- Rigid B1- Air Impenetrable C1- Rigid p~ E3 - Overlap G2 - H3 • Not 12 - Not J2 - Not Class 2P C2 Full F2 - Open Natural Required Specified Required A2 Flexible B2a or B2b - Flexible Seal E4 - Open Air Penetrable Seam A1- Rigid 82a or 132b - C3 - D2 partial E4 - 0Pen F2 - Open G2 - H3 - Not i d R 12 - Not ecified S J2 - Not Required I Class 3P Air Penetrable Minimal Seal Seam Natural re equ p A-2 Flexible Note 1: When designing a ventila[ion system, care must be taken to balance the static pressure with the input air flow to avoid collapsing the containment or ductwork due to high negative pressure. Note 2: The table occasionally identities two options for a given component. For example, containment materials (5.3.1) are shown as being either rigid or flexible. If the specifier requires the use of rigid materials only, this restriction must be specified separately. ~ For hand tool cleaning or vacuum shrouded power tool cleaning, ground covers or free-hanging tarpaulins may provide controls equivalent to Class 1 P. 9-14- - 522 SSPC-Guide 6 October 1, 2004 TABLE C - CHEMICAL STRIPPING COMBINATIONS OF CONTAINMENT AND VENTILATION SYSTEM COMPONENTS Containment System Ventilation (5.4 oi SSPC-Guide 6) Containment Classification 5.3.1 Containment 5.3.2 5.3.3 Support 5.3.4 5.3.5 5.4.1 Air 5.42 Input Air 5.4.3 - Air 5.4.4 Air 5.4.5 Exhaust Materials penetrability Structu re Joints Entryway Make-Up Flow pressure Movement Dust Filtration 81- Air Impenetrable AND G1- A1- Rigid B3a - Water C1- Rigid E3 - Forced Class 1C Impermeable Dt- Full Overlap F2 - Open H3 - Not 12 - Not Filtration A2 Flexible AND C2-Flexible Seal G2 - Required Specified 84-Chemical Natural Resistant B3a - Water A1- Rigid Impermeable C1- Rigid Dt- Full E3 - G 2- H3 - Not 12 - Not J2 - Not Ciass 2C AND Seal Overlap F2 - Open Natural Required Specified Required A2 Flexible B4-Chemical C2-Flexible Resistant B3a - Water A1- Rigid Impermeable C3 D2 - E4 - Open G2 - H3 - Not 12 - Not J2 - Not Class 3C AND Minimal Partial Seam F2 - Open Natural Required Specified Required A-2 Flexible 64-Chemical Seal Resistant Note 1: When designing a ventilation system, care must be taken to balance the s[atic pressure with the input airflow to avoid collapsing ihe containment or duciwork due to high negative pressure. Note 2: The table occasionally identifies two options for a given component. For example, containment materials (5.3.1) are shown as being either rigid or flexible. If the specitier requires the use of rigid materials only, this restriction must be specified separately. Note 3: When pressure washing is used to remove the dislodged paint, it may be necessary to specify one of the containments from Table W for the control of the water and waste. 9-15 ~ ~523 SSPC-Guide 12 June1,1998 Editorial Revisions November 1, 2004 SSPC: The Society for Protective Coatings TECHNOLOGY GUIDE NO. 12 Guide for Illumination of Industrial Painting Projects 1. Scope 1.1 This guide provides information on the quantity and qualityof lighting on industrial painting projectsthat is conducive to achieving qualitysurtace preparation and coating application, productivity, inspection/quality control, and accident preven- tion. 1.2 This guide is intended for use by facility owners, specifiers, designers, and contractors. 2.5 The recommended levels of illumination contained in this guide are a result of both objective and subjective examination of lighting conditions in a variery of work spaces: tanks, containments, blast and paint rooms, shop floors, and other situations where similar conditions exist. The resulting lighting recommendations are believed to be comfortable for the workers, contributing to distortion-free work surtaces and adequate levels of illumination for performing general surface preparation, painting and inspection activities in the work space. Natural lighting, artificial lighting, or a combination of the two may be used to achieve the levels specified in this guide. 2. Background 2.1 Lighting standards have been established for most industrial applications by the American National Standards Institute (ANSI). One standard addressesthe temporary lighting conditions common to most industrial painting projects. ANSI Z117.1, "Safety Requirements for Working in Tanks and Other Confined Spaces," establishes minimum requirements for safe entry, continued work in, and exit from tanks and other confined spaces. The ANSI standard sets entry procedures which include the use of a permit to authorize illumination of the space. No specific criteria on illumination are stated. 2.2 Adequate illumination improves productivity and motivation while poor illumination increases the risk of acci- dents and costs of operation. Additional illumination beyond recommended levels may be beneficial but not essential to achieving these objectives. In addition, unnecessarily high lighting levels add to the cost of procurement, installation, and maintenance and may have a negative impact on safety and productivity due to increased glare. Light with substantial color bias, regardless of foot candles, can hinder the observation of the true condition of the work surface. 2.3 While natural lighting or use of white containment materials may provide adequate levels of illumination, once the decision to use artificial lighting to illuminate a work area is made, portions of the National Fire Protection Association (NFPA) and Occupational Safety and Health Administration (OSHA) regulations on portable lamps and wiring installation have direct application. However, an integrated guide specific tothe coatings industry is necessaryto help establish minimum standardson quality and quantity of light, as well as consolidate applicable electrical hazard controls. 2.4 Refer to any and all appropriate sections which pertain to portable lamps: NFPA 70, "National Electric Code" and OSHA regulations 29 CFR Sections 1926.402-408. 3. Referenced Standards 3.1 AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) STANDARDS: RP7 Practice for Industrial Lighting Z117.1 Safety Requirements for Confined Spaces 3.2 FEDERAL SPECIFICATIONS AND STANDARDS: Code of Federal Regulations Title 29, Chapter XVII, Occupational Safety and Health Administration (OSHA): Part 1910 Occupational Safety and Health Standards, Subpart J--General Environmental Controls 29 CFR 1910.146 Permit-required confined spaces Part1926--Safetyand Health Regu- lations for Construction, Subpart K- Electrical, Installation Safety Requirements 29 CFR 1926.402 Applicabiliry 29 CFR 1926.403 General requirements 29 CFR 1926.404 Wiring design and protection 29 CFR 1926.405 Wiring methods, components, and equipment for general use 29 CFR 1926.406 Specific purpose equipment and installation 29 CFR 1926.407 Hazardous (classified) locations 29 CFR 1926.408 Special systems 29 CFR 1926.449 Definitions applicable to Subpart K -Electrical 3.3 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) STANDARDS: 70 Nationat Electric Code 9-47 525 SSPC-Guide 12 June1,1998 Editorial Revisions November 1, 2004 3.4 UNDERWRITERS' LABORATORIES (UL) STANDARDS, ANSI APPROVED: 298 Standard for Portable Electric Hand Lamps 1598 Standard for Luminaries (replaces all below) 4. Definitions Confined space: Per29 CFR 1910.146, a confined space is a space that: (1) is large enough and so configured that an employee can bodily enter and perform assigned work; and (2) has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry); and (3) is not designed for continuous occupancy. Foot candles: A unit of illumination; the illumination at a point on a surface which is one foot from, and perpendicular to, a uniform point source of one candle. General work area lighting: The level of illumination throughout a work area, measured at various locations on the horizontal work plane, at least six feet from the nearest light source. Non-permit required confined space: Aconfined space that does not contain or, with respect to atmospheric hazards, have the potential to contain any hazard capabie of causing death or serious physical injury. Permit required confined space: A confined space that has one or more of the following characteristics: (1) contains or has the potential to contain a hazardous atmosphere; (2) contains a material that has the potential for engulfing an entrant; (3) has an internal configuration such that an entrant could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and tapers to a smaller cross-section; or (4) contains any other recognized safety or health hazard. Task-specific lighting: The level of illumination required for performing specific visual tasks (e.g., inspection). White Nght: Light containing all wavelengths in the visible range at similar intensity. 5. General Conditions 5.1 MONITORING STRATEGY 5.1.1 Quantityof Existing (Natural) Light: Some natural light will be present in most work areas during daylight hours and the color of any containment materials (e.g., white tarps) may improve natural light. The amount of natural light will depend on factors such as time of year, time of day, orientation of the work area, and prevailing weather conditions. Although it is not likely that the quantity and quality of natural light will be sufficient for work in most confined spaces, the amount of additional lighting necessary to meet the recommendations of this guide will be affected by the amount of ambient natural light available. Measurements should be made with a light meter held at or placed on the surface. With the sensor aligned perpendicular to the surface, make a minimum of five measure- ments which are representative of the work area. Record each and calculate the average of the measurements. 5.1.2 Effect of Airborne Dust: Airborne dust will reduce visibility. Consideration must be given to the amount of loose debris which may be created during paint removal or applica- tion operations. Depending on the expected concentration of airborne dust, provisions may be required for its removal prior to the start of work in order for adequate illumination to be achieved. 5.2 CLASSIFICATION OF LOCATIONS: Once the evalu- ation of the work area is complete the work locations should be classified as one of the following: 5.2.1 Hazardous locations where the potential for explo- sion and/or fire exists. Hazardous locations are defined as those locationswhere quantities offlammable gases orvapors, explosives, combustible dusts, fibers, or flyings are present or likely to become present. Lighting fixtures used in hazardous locations must be explosion proof and Underwriters Laboratory or Factory Mutual approved for use in the appropriate Class and Division atmosphere. See Appendix A for a discussion of hazardous locations. 5.2.2 Non-Hazardous locations where the potential for explosion and/or fire does not exist. Lighting fixtures used in nonhazardous locations must be designed to UL Standard 298. 5.2.3 Wet locations where installations are underground or in concrete slabs or masonry in direct contact with the earth, and locations subject to saturation with water or other liquids, such as unprotected locations exposed to weather. Lighting fixtures used in wet locations must be designed to UL 1598. 6. Illumination Requirements 6.1 A light meter with readings in foot candles shouid be used to verify the adequacy of the illumination. For general work area measurements, the meter should be placed on a horizontal plane parallel with the work surface (e.g., walking across staging). For task specific measurements, the meter should be held at, or placed on, the surface, with the sensor aligned perpendicular to the surface. Make a minimum of five measurements representative of the work area or task. Compare the average to the criteria in Tabie 1 and Table 2. 7. Recommendations The recommendations below are applicable for any artificial lighting required to achieve adequate illumination of a given work area or specific task. 9-4g - 526 SSPC-Guide 12 June 1, 1998 Editorial Revisions November 1, 2004 7.1 ALL LOCATIONS 7.1.1 All lighting equipment must be durable and designed for the intended work environment. 7.1.2 Portable lamps and fixtures should be encased in a nonconductive, shatterproof material, which serves as an electrical insulator providing additional protection from elec- trical shock, abrasion, and corrosion resistance. Lamps and fixtures should also be equipped with substantial guards to prevent contact with personnel, containment materials, etc. 7.1.3 Use only heavily insulated cable with an abrasive resistant casing, at least gage 14/2 SO AWG or heavier and designed for hard or extra-hard usage, per NFPA 70 (e.g., types S, ST, SO, STO). into the specific electrical line supplying the power to the light fixture. 8. Proper Use and Maintenance of Lighting Equipment 8.1 LIGHTING FIXTURES 8.1.1 All lighting systems should be removed from the direct spray of paint, abrasives, or other materials. Impacts of air flow patterns from any ventilation system in operation should also beconsidered. Paint overspray with accumulations on fixtures reduces the amount of light emitted and restricts heat dispersement of the light, which may cause premature failure or overheating. 7.1.4 Use of white light is recommended, as it is closest to natural light. White light does not visually distort the surface being worked on or being inspected. Lighting equipment capable of providing white light should be selected for task specific lighting where practical. 7.2 NONHAZARDOUS, WET LOCATIONS: All lighting fixtures having an electrical supply service greaterthan 12 volts must be properly grounded, have ground fault circuit interrupter (GFCI) protection, or have an integrated circuit breaker wired 8.1.2 Do not tape over the lens or cover areas designed for heat dispersement, as this may cause severe damage to the fixture and significantly reduces bulb life. 8.1.3 Do not drop or drag lighting fixtures. 8.2 POWER CORDS AND CONNECTORS 8.2.1 Periodically inspect GFCis, plugs, integrated circuit breakers, and power cords, as well as all power cord connections. TABLE 1 WORK AREA ILLUMINATION REGIUIRMENTS IN FOOT CANDLES' Minimum Recommended General Work Area2 10 20 Task specific - surtace preparation and coating application3 20 50 Task specific - inspection 50 200 Based upon levels of illumination recommended for sample occupational tasks in ANSI/IES RP 7. The level of illumination throughout a work area, measured at various locations on the horizontal work-plane, at least 6 feet (2 m) from the nearest light sources. (See Section 6.1). An illumination level of 20 foot candles is recommended for corridors, scaffolds, and other walking surfaces. The level of illumination for pertorming specific visual tasks (i.e., surface preparation, coating application, and inspection) measured at the work surface in conjunction with the intended light source (See Section 6.1) TABLE 2 MAXIMUM LUMINANCE RATIOS' Between task and adjacent darker surroundings2 Between task and adjacent lighter surroundings 5 to 13 1 to 5 ' Maximum luminance ratios recommended are based upon areas (indoor or outdoor) where it is completely impractical to control reflectances and difficult to alter environmental conditions. 2 The eyes function more efticientlly and comfortably when the illumination levels within the work environments are not too different from those of the seeing task. 3 Based upon maximum luminance ratios trom ANSI/IES RP 7 52 9-49 SSPC-Guide 12 June 1, 1998 Editorial Revisions November 1, 2004 8.2.2 Do not modify or otherwise alter connectors. Use an outlet that is compatible with the connector. 8.2.3 Immediately replace or repair any device or cable that appears to be worn or broken. 8.3 REPAIRS 8.3.1 Disconnect power and remove any lights or electrical apparatus needing repair outside any hazardous atmosphere before performing repairs. 8.3.2 All connections, seals and assemblies must be repaired per the manufacturer's instructions, using the manufacturer's recommended parts. 8.3.3 Parts for repair other than those specified by the manufacturer of the lighting system should not be used. 8.3.4 Replacement bulbs other than those specified by the manufacturer of the lighting system should not be used. 9. Disclaimer This material has been developed under the published procedures of SSPC: The Society for Protective Coatings, which has been designed to assure the appointment of technically competent committees having balanced representation. While these procedures assure the highest degree of care, neither SSPC, its members, northose participating in its activities accept any liability resulting from compliance or noncompliance with the provisions given herein, for any restrictions imposed on materials or processes, or for the completeness of the text. SSPC has no power or authority to police or enforce compliance with the contents of this document, and any certi- fication of products stating compliance with requirements of this document is made at the peril of the certifier. 10. Notes 10.1 Air cooled lighting systems, which direct the flow of compressed air across the lens or around the globe, help to keep the lens free of contaminants, prolong bulb life, and generally are of higher intensity required for the lighting of areas with high concentrations of airborne dust. 10.2 OTHER PERTINENT STANDARDS: Other industry standards which may be pertinent for iilumination in industriai painting projects are listed below. 10.2.1 National Fire Protection Association (NFPA) Standards: 70E Standard for Electrical Safety Requirements for Employee Workplaces 77 Recommended Practice on Static Electriciry 497 Recommended Practicenfor the Classifica- tion of Flammable Liquids, Gases, orVapors, and of Hazardous (Classified) Locations for Electrical Installations in Chemical Process Areas. 654 Standard for Prevention of Fire and Dust Explosions from the Manufacturing, Pro- cessing, and Handling of Combustible Particulate Solids 10.2.2 Underwriters' Laboratories (UL) Standards, ANSI Approved: 781 Standard for Portable Electric Lighting Units for Use in Hazardous (Classified) Locations Appendix A. Explosion Hazards A.IBACKGROUND Achieving acceptable levels of illumination by natural or artificial means in the industrial painting industry is complicated due to the complexity of structures, vision inhibiting dust, and potentially hazardous concentrations of expiosive dust or solvent vapors. This append ix has been added to provide some direction, but is not considered a requirement of this guide. A. 2 DEFINITIONS Hazardous locations are classified as Ciass I, Class II, or Class III depending upon the physical properties of the substances which are present. These classes are further subdivided as Division 1 or Division 2. Class I locations: Class I locations are those in which flam- mable gases or vapors are or may be present in the air in quantities sufficient to produce explosive or ignitable mixtures. Class I locations include the following: Class I Division 1: A Class I Division I location is a loca- tion (a) in which hazardous concentrations of gases or vapors may exist under normal operating conditions or (b) in which hazardous concentrations of such gases or vapors may exist frequently because of repair or mainte- nance operations or because of leakage or (c) in which breakdown or faulty operation of equipment or processes might release hazardous concentrations (e.g., greaterthan 10% of the Lower Explosive Limit) of flammable gases or vapors and might also cause simultaneous failure of electric equipment. Class I, Division 2: A Class I, Division 2 location is a location (a) in which volatile flammable liquids or flam- mable gases are handled, processed or used, but in which the hazardous liquids, vapors, orgases will normally be confined within closed containers or closed systems from which they can escape only in case of accidental rupture or breakdown of such containers or systems, or 9-50 528 SSPC-Guide 12 June 1, 1998 Editorial Revisions November 1, 2004 in case of abnormal operations of equipment, or (b) in which hazardous concentrations of gases or vapors are normally prevented by positive mechanical ventilation, and which might become hazardous through failure or abnormal operations of the ventilation equipment, or (c) that is adjacent to a Class I, Division 1 locations and to which hazardous concentrations of gases or vapors might occasionally be communicated unless such communica- tion is prevented by adequate positive pressure ventilation from asource ofclean air, and effective safeguards against ventilation failure are provided. Class tl locations: Class II locations are those that are hazardous because ofthe presence of combustible dust. Class II locations include the following: Class II, Division 1: AClass II, Division 1 location is a loca- tion: (a) in which combustible dust is or may be in suspen- sion in the air under normal operating conditions, in quanti- ties sufficient to produce explosive or ignitable mixtures; or (b) where mechanical failure or abnormal operation of machinery or equipment might cause such explosive or ignitable mixtures to be produced, and might also provide a source of ignition through simultaneous failure of electric equipment, operation of protection devices, or from other causes, or (c) in which combustible dusts of an electricaliy conductive nature may be present. Class II, Division 2: A Class II, Division 2 location is a location in which: (a) combustible dust will not normally be in suspension in the air in quantities sufficient to produce explosive or ignitable mixtures, and dust accumu- lations are normally insufficient to interfere with the normal operation of electrical equipment or other apparatus; or (b) dust may be in suspension in the air as a result of infrequent malfunctioning of handling or processing equipment, and dust accumulations may be ignitable by abnormal operation or failure of electrical equipment or other apparatus. Class III locations: Class III locations are those that are hazardous because of the presence of easily ignitable fibers or flyings (e.g., dust) but in which such fibers or flyings are not likely to be in suspension in the air in quantities sufficient to produce ignitable mixtures. Class III locations include the following: Class III, Division 1:ACIass III, Division 1 location is a loca- tion in which easily ignitable fibers or materials producing combustible flyings are handled, manufactured, or used. Class III, Division 2: A Class III, Division 2 location is a location in which easily ignitable fibers are stored or handled, except in process of manufacture. Note: The above definitions of hazardous (classified) loca- tions are taken directly from 29 CFR 1926.449. Refer to the OSHA standard for additional information and examples for each classification. Hazardous Atmosphere: An atmosphere that may expose employees to the risk of death, incapacitation, impair- ment of ability to self-rescue (that is, escape unaided from a permit space), injury, or acute illness from one or more of the following causes: (1) flammable gas, vapor, or mist in excess of 10 percent of its lower flammable limit (LFL); (2) airborne combustible dust at a concentration that meets or exceeds its LFL; (3) atmospheric oxygen concentration below 19.5% or above 23.5%; (4) atmospheric concentration of any substance for which a dose or a permissible exposure limit is published in subpart G, Occupational Health and Environmentai Control, or in subpart Z, Toxic and Hazardous Substances, which could result in employee exposure in excess of its dose or permis- sible exposure limit; (5) any other atmospheric condition that is immediately dangerous to life or health. NOTE: This definition is taken directly from 29 CFR 1910.146. For the purposes of this guide, onlythose considerations in selecting lighting dealing with the concentrations of flammable vapors or combustible dusts [items (1) and (2) above] are addressed. The reader is cautioned to consider all other aspects of a hazardous atmosphere as described above. lower Flammable Limit: The lower limit of flammability of a gas or vapor at ordinary ambient temperatures expressed in percent of the gas or vapor in air by volume. Lower Flammable Limit is synonymous with Lower Explosive Limit. A.3 EVALUATION OF WORK SITES: Before any aspect of an industrial painting project commences, the location must be evaluated to determine whether a hazardous atmosphere exists. This evaluation involves a thorough inspection of the work location and often includes both a visual inspection and monitoring for atmospheric hazards. OSHA's permit-required confined space standard (29 CFR 1910.146) requires that employers test and monitor spaces with instruments which detect all aspects of hazardous atmospheres that may be encountered. OSHA has classified atmospheric hazards into three categories: toxic; asphyxiating; and flam- mable or explosive atmospheres. Monitoring tests are typi- cally performed using a direct reading instrument which gives an instantaneous assessment of the degree of atmospheric hazard. From a lighting perspective, the minimum required tests in any suspect hazardous atmosphere include oxygen level, the concentration of flammable gases or vapors, and the concentra- tion of combustibie dust. A.4 SURVEY CONSIDERATIONS: Initial testing for hazards may not be enough. Periodic or continuous testing may be req uired, as conditions can change and become hazardous during the painting project. Conditions may also vary throughout a work space. Concentrations of flammable gases and vapors may vary depending on their physical characteristics (i.e., heavier gases may tend to concentrate near the bottom of tightly sealed spaces while light gases may concentrate near their emission source or near the top of the space). With this in mind, a monitoring strategy must be developed which takes into account both the physical properties of potential atmospheric hazards and the physical characteristics of the structure. The instrumentation 9-51 529 SSPC-Guide 12 June 1, 1998 Editorial Revisions November 1, 2004 used to monitor the atmosphere must be ciassified as intrinsi- cally safe or Underwriters' Laboratories (UL) or Factory Mutual (FM) approved for Class I, Division 1 atmospheres. A.5 HAZARDOUS LOCATIONS, CLASS I AND CLASS II A.5.1 Explosion proof lighting will be used whenever painting with a paint containing combustible solvents or performing any operation which introduces combustible compounds into a confined space. A.5.2 All explosion proof lighting fixtures used must be designed to comply with the requirements of NFPA 70. A.5.3 All retated connectors must be rated in the same manner or be located outside the hazardous location/work space. 9-52 530 SSPC-SP 6/NACE No. 3 January 1, 2007 SSPC: The Society for Protective Coatings JOINT SURFACE PREPARATION STANDARD SSPC-SP 6/NACE NO. 3 Commercial Blast Cleaning This The Society for Protective Coatings (SSPC)/NACE International (NACE) standard represents a consensus of those individual members who have reviewed this document, its scope, and provisions. It is intended to aid the manufacturer, the consumer, and the general public. Its acceptance does not in any respect preclude anyone, whether he has adopted the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not addressed in this standard. Nothing contained in this SSPC/NACE standard is to be construed as granting any right, by implication or otherwise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by Letters Patent, or as indemnifying or protecting anyone against liability for infringement of Letters Patent. This standard represents current technology and should in no way be interpreted as a restriction on the use of better procedures or materials. Neither is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the usefulness of this standard in specific instances. SSPC and NACE assume no responsibility for the interpretation or use of this standard by other parties and accept responsibility for only those official interpretations issued by SSPC or NACE in accordance with their governing procedures and policies which preclude the issuance of interpretations by individual volunteers. Users of this SSPC/NACE standard are responsible for reviewing appropriate health, safety, environmental, and regulatory documents and for determining their applicability in relation to this standard prior to its use. This SSPC/NACE standard may not necessarily address all potential health and safety problems or environmental hazards associated with the use of materials, equipment, and/or operations detailed or referred to within this standard. Users of this SSPC/NACE standard are also responsible for establishing appropriate health, safety, and environmental protection practices, in consultation with appropriate regulatory authorities if necessary, to achieve compliance with any existing applicable regulatory requirements prior to the use of this standard. CAUTIONARY NOTICE: SSPC/NACE standards are subject to periodic review, and may be revised or withdrawn at any time in accordance with technical committee procedures. SSPC and NACE require that action be taken to reaffirm, revise, or withdraw this standard no later than five years from the date of initial publication. The user is cautioned to obtain the latest edition. Purchasers may receive current informa- tion on all standards and other publications by contacting the organizations at the addresses below: OSSPC: The Sociery for Protective Coatings 40 24th Street, Sixth Floor Pittsburgh, PA 15222 (telephone +1 877/281-7772) ONACE International 1440 South Creek Houston, TX 77084-4906 (telephone +1 281 /228-6200) Foreword This joint standard covers the use of blast cleaning abrasives to achieve a defined degree of cleaning of steel surfaces prior to the application of a protective coating or lining system. This standard is intended for use by coating or lining specifiers, applicators, inspectors, or others who may be responsible for defining a standard degree of surface cleanliness. The focus of this standard is commercial blast cleaning. White metal blast cleaning, near-white metal blast cleaning, industrial blast cleaning, and brush-off blast cleaning are addressed in separate standards. Commercial blast cleaning provides a greater degree of cleaning than industrial blast cleaning (SSPC-SP 14/NACE No. 81) but less than near-white metal blast cleaning (SSPC- SP 10/NACE No. 21). Commercial blast cleaning is used when the objective is to remove all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter, leaving staining or shadows on no more than 33 percent of each unit area of surface. The difference between a commercial blast cleaning and a near-white metal blast cleaning is in the amount of staining permitted to remain on the surface. Commercial blast cleaning allows stains or shadows on 33 percent of each unit area of surface. Near-white metal blast cleaning allows staining or shadows on only 5 percent of each unit area of surtace. The difference between a commercial blast cleaning and an industrial blast cleaning is that a commercial blast cleaning removes all visible oil, grease, dust, dirt, mill scale, rust, coating, 532 SSPC-SP 6/NACE No. 3 January 1, 2007 oxides, corrosion products, and other foreign matter from all surfaces and allows stains to remain on 33 percent of each unit area of surface, while industrial blast cleaning allows defined mill scale, coating, and rust to remain on less than 10 percent of each unit area of surface and allows defined stains to remain on all surfaces. This joint standard was originally prepared in 1994 and reaffirmed in 2000 bythe SSPC/NACETask GroupAon Surface Preparation by Abrasive Blast Cleaning. This joint task group includes members of both the SSPC Surface Preparation Committee and the NACE Unit Committee T-6G on Surface Preparation. It was reaffirmed in 2006 by the SSPC Surface Preparation Committee and NACE Specific Technology Group (STG) 04, Protective Coatings and Linings: Surface Preparation. in SSPC/NACE standards, shall and must are used to state mandatory requirements. Shou/d is used to state that which is considered good and is recommended but is not absolutely mandatory. May is used to state that which is considered optional. Section 1: General 1.1 This joint standard covers the requirements for commercial blast cleaning of uncoated orcoated steel surtaces by the use of abrasives. These requirements include the end condition of the surface and materials and procedures neces- sary to achieve and verify the end condition. 1.2 The mandatory requirements are described in Sections 1 to 9. Section 10, "Comments," and Appendix A, "Explanatory Notes," are not mandatory requirements of this standard. 1.3 Information about the function of commercial blast cleaning is in Paragraph A1 of Appendix A. 1.4 Information about use of this standard in maintenance coating work is in Paragraph A2 of Appendix A. Section 2: Definitions 2.1 Commercial Blast Cleaned Surface: A commercial blast cleaned surface, when viewed without magnification, shall be free of all visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter. Random staining shall be limited to no more than 33 percent of each unit area of surface (approximately 5,800 mm2 [9.0 in.z]) (i.e., a square 76 mm x 76 mm [3.0 in. x 3.0 in.]) and may consist of light shadows, slight streaks, or minordiscolorations caused by stains of rust, stains of miil scale, or stains of previously applied coating. 2.1.1 Acceptable variations in appearance that do not affect surface cleanliness as defined in Paragraph 2.1 include 2~ variations caused by type of steel, original surface condition, thickness of the steel, weld metal, mill or fabrication marks, heat treating, heat-affected zones, blasting abrasives, and differences because of blasting technique. 2.1.2 SSPC-VIS 13 may be specified to supplement the written definition. In any dispute, the written definition set forth in this standard shall take precedence over reference photographs and comparators. Additional information on reference photographs and comparators is in Paragraph A3 of Appendix A. Section 3: Associated Documents 3.1 The latest issue, revision, or amendment of the docu- ments listed in Paragraph 3.3 in effect on the date of invitation to bid shall govern unless otherwise specified. 3.2 If there is a conflict between the requirements of any of the documents listed in Paragraph 3.3 and this standard, the requirements of this standard shall prevail. 3.3 Documents cited in the mandatory sections of this standard include: Document Title SSPC-AB 14 Mineral and Slag Abrasives SSPC-AB 25 Cleanliness of Recycled Ferrous Metailic Abrasives SSPC-AB 36 Ferrous Metallic Abrasives SSPC-SP 1' Solvent Cleaning SSPC-VIS 1 Guideand Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning Section 4: Procedures Before Cleaning 4.1 Before blast cleaning, visible deposits of oil, grease, or other contaminants shall be removed in accordance with SSPC-SP 1 or other agreed-upon methods. 4.2 Before biast cleaning, surface imperfections such as sharp fins, sharp edges, weld spatter, or burning slag should be removed from the surtace to the extent required by the procurement documents (project specification). Additional information on surface imperfections is in Paragraph A4 of Appendix A. 4.3 If reference photographs orcomparators are specified to supplement the written standard, the condition of the steel priorto blast cleaning should be determined before the blasting commences. Additional information on reference photographs and comparators is in Paragraph A3 of Appendix A. 533 SSPGSP 6/NACE No. 3 January 1, 2007 Section 5: Blast Cleaning Methods and Operation the film thickness of coating applied over the surface profile is in Paragraphs A7 and AS of Appendix A. 5.1 Clean, dry compressed air shall be used for nozzle blasting. Moisture separators, oil separators, traps, or other equipment may be necessary to achieve this requirement. 5.2 Any of the following methods of surface prepara- tion may be used to achieve a commercial blast cleaned surface: 5.2.1 Dry abrasive blasting using compressed air, blast nozzles, and abrasive. 5.2.2 Dry abrasive blasting using a closed-cycle, recir- culating abrasive system with compressed air, blast nozzle, and abrasive, with or without vacuum for dust and abrasive recovery. 5.2.3 Dry abrasive blasting using a closed-cycle, recircu- lating abrasive system with centrifugal wheels and abrasive. 5.3 Other methods of surface preparation (such as wet abrasive blast cleaning) may be used to achieve a commer- cial blast cleaned surface by mutual agreement between those responsible for establishing the requirements and those responsible for performing the work. Information on the use of inhibitors to prevent the formation of rust immediately after wet abrasive blast cleaning is in Paragraph A5 of Appendix A. Section 6: Blast Cleaning Abrasives 6.1 The selection of abrasive size and type shall be based on the type, grade, and surface condition of the steel to be cleaned, the type of blast cleaning system used, the finished surtace to be produced (cleanliness and surtace profile [rough- ness]), and whether the abrasive will be recycled. 6.2 The cleanliness and size of recycled abrasives shall be maintained to ensure compliance with this standard. 6.3 The blast cleaning abrasive shall be dry and free of oil, grease, and other contaminants as determined by the test methods found in SSPC-AB 1, SSPC-AB 2, and SSPC-AB 3. 6.4 Any limitations on the use of specific abrasives, the quantity of contaminants, or the degree of allowable embed- ment shall be included in the procurement documents (project specification) covering the work, because abrasive embedment and abrasives containing contaminants may not be accept- able for some service requirements. Additional information on abrasive selection is in Paragraph A6 of Appendix A. 6.5 When a coating is specified, the cleaned surface shall be roughened to a degree suitable for the specified coating system. Additional information on surface profile and Section 7: Procedures Following Blast Cleaning and Immediately Prior To Coating 7.1 Visible deposits of oil, grease, or other contaminants shall be removed according to SSPC-SP 1 or another method agreed upon by those parties responsible for establishing the requirements and those responsible for performing the work. 7.2 Dust and loose residues shall be removed from prepared surfaces by brushing; blowing off with clean, dry air; vacuum cleaning; or other methods agreed upon by those responsible for establishing the requirements and those responsible for performing the work. 7.2.1 The presence of toxic metals in the abrasives or coating being removed may place restrictions on the methods of cleaning permitted. The chosen method shall comply with all applicable regulations. 7.2.2 Moisture separators, oil separators, traps, or other equipment may be necessary to achieve clean, dry air. 7.3 After blast cleaning, any remaining surface impertec- tions (e.g., sharp fins, sharp edges, weld spatter, burning slag, scabs, slivers) shall be removed to the extent required by the procurement documents (project specification). Any damage to the surface profile resulting from the removal of surtace imperfections shall be corrected to meet the requirements of Paragraph 6.5. Additional information on surface imperfections is in Paragraph A4 of Appendix A. 7.4 Immediately prior to coating application, the entire surface shalf comply with the degree of cleaning specified in this standard. Any visible rustthat forms on the surface of the steel after blast cleaning shall be removed by recleaning the rusted areas before coating. Information on chemical contamination, rust-back (rerusting), and the effect of dew point (surface condensation) is in Paragraphs A9, A10, and A11 of Appendix A. Section 8: Inspection 8.1 Work performed and materials supplied under this standard are subject to inspection by a representative of those responsible for establishing the requirements. Materials and work areas shali be accessible to the inspector. The proce- dures and times of inspection shail be as agreed upon by those responsible for establishing the requirements and those responsible for performing the work. 8.2 Conditions not complying with this standard shall be corrected. In the case of a dispute, an arbitration or settlement 3- 534 SSPC-SP 6/NACE No. 3 January 1, 2007 procedure established in the procurement documents (project specification) shall be followed. If no arbitration or settlement procedure is established, a procedure mutually agreeable to purchaser and supplier shall be used. 8.3 The procurement documents (project specification) should establish the responsibility for inspection and for any required affidavit certifying compliance with the specification. Section 9: Safety and Environmental Requirements 9.1 Because abrasive blast cleaning is a hazardous opera- tion, all work shall be conducted in compliance with applicable occupational and environmental health and safety rules and regulations. 5. SSPC-AB 2(latest revision), "Cleanliness of Recycled Ferrous Metallic Abrasives" (Pittsburgh, PA: SSPC). 6. SSPC-AB 3(latest revision), "Ferrous MetallicAbrasives" (Pittsburgh, PA: SSPC). 7. SSPC-SP 1(latest revision), "Solvent Cleaning" (Pitts- burgh, PA: SSPC). 8. SSPC-SP COM (latest revision), "Surface Preparation Commentary for Steel and Concrete Substrates" (Pittsburgh, PA: SSPC). 9. SSPC-PA Guide 4 (latest revision), "Guide to Maintenance Repainting with Oil Base orAlkyd Painting Systems" (Pittsburgh, PA: SSPC). Section 10: Comments (Nonmandatory) 10.1 Additional information and data relative to this standard are inAppendixA. Detailed information and data are presented in SSPC-SP COM.B The recommendations in Appendix A and SSPC-SP COM are believed to represent good practice, but are not to be considered requirements of the standard. The sections of SSPC-SP COM that discuss subjects related to commercial blast cleaning are listed below. Subject Commentary Section Abrasive Selection ...........................6 Film Thickness .........................10 Maintenance Repainting ........................4.2 Reference Photographs .........................11 Rust-Back (Rerusting) .......................4.5 Surface Profile .......................6.2 Weld Spatter ....................4.4.1 Wet Abrasive Blast Cleaning .......................8.2 References 1. SSPC-SP 14/NACE No. 8(latest revision), "Industrial Biast Cleaning" (Pittsburgh, PA: SSPC, and Houston, TX: NACE). 2. SSPC-SP 10/NACE No. 2(latest revision), "Near-White Metal Btast Cleaning" (Pittsburgh, PA: SSPC, and Houston, TX: NACE). 3. SSPC-VIS 1(latest revision), "Guide and Reference Photographs for Steei Surtaces Prepared by Dry Abrasive Blast Cleaning" (Pittsburgh, PA: SSPC). 4. SSPC-AB 1(latest revision), "Mineral and Slag Abrasives" (Pittsburgh, PA: SSPC). 10. NACE Standard SP0178 (formerly RP0178-2003) (latest revision), "Design, Fabrication, and Surtace Finish Practices for Tanks and Vessels to Be Lined for Immersion Service" (Houston, TX: NACE). 11. NACE Standard RP0287 (latest revision), "Field Measure- ment of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape" (Houston, TX: NACE). 12. ASTMO) D 4417 (latest revision), "Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel" (West Conshohocken, PA: ASTM). 13. SSPC-PA2 (latest revision), "Measurement of Dry Coating Thickness with Magnetic Gages" (Pittsburgh, PA: SSPC). 14. SSPC-SP 12/NACE No. 5(latest revision), "Surface Prepa- ration and Cleaning of Metals by Waterjetting Priorto Recoating" (Pittsburgh, PA: SSPC, and Houston, TX: NACE). 15. SSPC-Guide 15 (latest revision), "Field Methods for Retrieval and Analysis of Soluble Salts on Steel and Other Nonporous Substrates" (Pittsburgh, PA: SSPC). Appendix A: Explanatory Notes (Nonmandatory) A1 FUNCTION: Commercial blast cleaning (SSPC- SP 6/NACE No. 3) provides a greater degree of cleaning than industrial blast cieaning (SSPC-SP 14/NACE No. 8) but less than near-white metal blast cleaning (SSPC-SP 10/NACE No. 2). It should be specified only when a compatible coating will be applied. The primary functions of blast cieaning before coating are (a) to remove material from the surface that can cause early failure of the coating and (b) to obtain a suitable surtace profile (roughness) to enhance the adhesion of the ASTM International (ASTM), 100 Barr Harbor Drive, West Coshohocken, PA 19428-2959. 4 - 535 SSPC-SP 6/NACE No. 3 January 1, 2007 new coating system. The hierarchy of blasting standards is as follows: white metal blast cleaning, near-white metal blast cleaning, commercial blast cleaning, industrial blast cleaning, and brush-off blast cleaning. A2 MAINTENANCE COATING WORK: When this stan- dard is used in maintenance coating work, specific instructions should be provided on the extent of surface to be blast cleaned or spot blast cleaned to this degree of cleanliness. in these cases, this degree of cleaning applies to the entire specified area. For example, if all weld seams are to be cleaned in a maintenance operation, this degree of cleaning applies to 100 percent of all weld seams. If the entire structure is to be prepared, this degree of cleaning applies to 100 percent of the entire structure. SSPC-PA Guide 49 provides a description of accepted practices for retaining old sound coating, removing unsound coating, feathering, and spot cleaning. A3 REFERENCE PHOTOGRAPHS AND COMPARA- TORS: SSPC-VIS 1 provides color photographs for the various grades of surface cleaning as a function of the initial condition of the steel. The photographs B SP 6, C SP 6, D SP 6, G, SP 6, GZ SP 6, and G3 SP 6 depict surfaces cleaned to commercial grade. Other availabie reference photographs and comparators are described in Section 11 of SSPC-SP COM. A4 SURFACE IMPERFECTIONS: Surface imperfections can cause premature coating failure when the service is severe. Coatings tend to pull away from sharp edges and projections, leaving little or no coating to protect the underlying steel. Other features that are difficult to cover and protect properly include crevices, weld porosities, laminations, etc. The high cost of the methods to remedy surface imperfections (such as edge rounding and weld spatter removal) should be weighed against the costs of a potential coating failure. Poorly adhering contaminants, such asweld slag residues, loose weld spatter, and some minor surface laminations, may be removed during the blast cleaning operation. Other surface defects (steel laminations, weld porosities, or deep corrosion pits) may not be evident until the surface cleaning has been completed. Repair of such surface defects should be pianned properly because the timing of the repairs may occur before, during, or after the blast cleaning operation. Section 4.4 of SSPC-SP COM and NACE Standard SP017810 contain addi- tional information on surface impertections. A5 WET ABRASIVE BLAST CLEANING: Steel that is wet abrasive blastcleaned may rust rapidiy. Clean watershould be used for rinsing. It may be necessary to add inhibitors to the water or apply them to the surface immediately after blast cleaning to temporarily prevent rust formation. The use of inhibitors or the application of coating over siight discoloration should be in accordance with the requirements of the coating manufacturer. CAUTION: Some inhibitive treatments may interfere with the performance of certain coating systems. A6 ABRASIVE SELECTION: Types of inetallic and nonmetallicabrasives arediscussed in SSPC-SP COM. Blasting abrasives may become embedded in, or leave residues on, the surface of the steel during cleaning. While such embedment or residues are normally not detrimental, care should be taken to ensure that the abrasive is free from detrimental amounts of water-soluble, solvent-soluble, acid-soluble, or other soluble contaminants (particulariy if the cieaned steel is to be used in an immersion environment). Criteriaforselecting and evaluating abrasives are in SSPC-AB 1, SSPC-AB 2, and SSPC-AB 3. A7 SURFACE PROFILE: Surface profile is the rough- ness of the surface that results from abrasive blast cleaning. The profile height is dependent on the size, shape, type, and hardness of the abrasive, particle velocity and angle of impact, hardness of the surface, amount of abrasive recycling, and the proper maintenance of working mixtures of grit and/or shot. The allowable minimum/maximum height of profile is usually dependent on thethickness ofthe coating to be applied. Large particle-sized abrasives (particularly metallic) can produce a surface profile that may be too high to be adequately covered by a single thin-film coat. Accordingly, the use of larger abrasives should be avoided in these cases. However, larger abrasives may be needed for thick-film coatings or to facilitate removal of thick coatings, heavy mill scale, or rust. If control of surface profile (minimum/maximum) is deemed to be sig nificant to coating performance, it should be add ressed in the procurement documents (project specification). Typical surface profile heights achieved with commercial abrasive media are shown in Table 6 of SSPC-SP COM. Surtace profile shoufd be measured in accordance with NACE Standard RP0287" or ASTM D 4417.12 A8 FILM THICKNESS: it is essential that ample coating be applied after blast cleaning to adequately cover the peaks of the surface profile. The dry-film thickness of the coating above the peaks of the profile should equal the thickness known to be needed for the desired protection. If the dry-film thickness overthe peaks is inadequate, premature rust-through or coating failure wili occur. To ensure that coating thicknesses are properly measured, the procedures in SSPC-PA213shouid be used. A9 CHEMICALCONTAMINATION: Steel contaminated with soluble salts (e.g., chlorides and sulfates) develops rust- back rapidly at intermediate and high levels of humidity. These soluble salts can be present on the steel surface prior to blast cleaning as a result of atmospheric contamination. In addition, contaminants can be deposited on the steel surface during blast cleaning if the abrasive is contaminated. Therefore, rust- back can be minimized by removing these salts from the steel surface and eliminating sources of recontamination during and after blast cieaning. Wet methods of removai are described in SSPC-SP 12/NACE No. 5.74 Identification of the contaminants 5 - 536 SSPC-SP 6/NACE No. 3 January 1, 2007 along with theirconcentrations maybe obtained from laboratory and field tests as described in SSPC-Guide 15.15 A10 RUST-BACK: Rust-back (rerusting) occurs when freshly cleaned steel is exposed to moisture, contamination, or a corrosive atmosphere. The time interval between blast cleaning and rust-back varies greatly from one environment to another. Under mild ambient conditions, if chemical contami- nation (see Paragraph A9) is not present, it is best to blast clean and coat a surface on the same day. Severe conditions may require a more expeditious coating application to avoid contamination from fallout. Chemical contamination should be removed prior to coating. A11 DEW POINT: Moisture condenses on any surface that is colder than the dew point of the surrounding air. It is therefore recommended that the temperature of the steel surtace be at least 3°C (5 °F) above the dew point during dry blast cleaning operations. It is advisable to visually inspect for moisture and periodically check the surface temperature and dew point during blast cleaning operations and to avoid the application of coating over a damp surface. 6 - 537 SSPC-SP 10/NACE No. 2 January 1, 2007 SSPC: The Society for Protective Coatings JOINT SURFACE PREPARATION STANDARD SSPC-SP 10/NACE NO. 2 Near-White Metal Blast Cleaning This The Society for Protective Coatings (SSPC)/NACE International (NACE) standard represents a consensus of those individual members who have reviewed this document, its scope, and provisions. It is intended to aid the manufacturer, the consumer, and the general public. Its acceptance does not in any respect preclude anyone, whether he has adopted the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not addressed in this standard. Nothing contained in this SSPC/NACE standard is to be construed as granting any right, by implication or otherwise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by Letters Patent, or as indemnifying or protecting anyone against liability for i nfringement of Letters Patent. This standard represents current technology and should in no way be interpreted as a restriction on the use of better procedures or materials. Neither is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the usefulness of this standard in specific instances. SSPC and NACE assume no responsibility for the interpretation or use of this standard by other parties and accept responsibility for only those official interpretations issued by SSPC or NACE in accordance with their governing procedures and policies which preclude the issuance of interpretations by individual volunteers. Users of this SSPC/NACE standard are responsible for reviewing appropriate health, safety, environmental, and regulatory documents and for determining their applicability in relation to this standard prior to its use. This SSPC/NACE standard may not necessarily address all potential health and safety problems or environmental hazards associated with the use of materials, equipment, and/or operations detailed or referred to within this standard. Users of this SSPC/NACE standard are also responsible for establishing appropriate health, safety, and environmental protection practices, in consultation with appropriate regulatory authorities if necessary, to achieve compliance with any existing applicable regulatory requirements prior to the use of this standard. CAUTIONARY NOTICE: SSPC/NACE standards are subject to periodic review, and may be revised or withdrawn at any time in accordance with technical committee procedures. SSPC and NACE require that action be taken to reaffirm, revise, or withdraw this standard no later than five years from the date of initial publication.The user is cautioned to obtain the latest edition. Purchasers may receive current information on all standards and other publications by contacting the organizations at the addresses below: OSSPC: The Sociery for Protective Coatings 40 24th Street, Sixth Floor Pittsburgh, PA 15222 (telephone +1 877/281-7772) ONACE International 1440 South Creek Houston, TX 77084-4906 (telephone +1 281/228-6200) Foreword This joint standard covers the use of blast cleaning abrasives to achieve a defined degree of cleaning of steel surfaces prior to the application of a protective coating or lining system. This standard is intended for use by coating or lining specifiers, applicators, inspectors, or others who may be responsible for defining a standard degree of surface cleanliness. The focus of this standard is near-white metal blast cleaning. White metal blast cleaning, commercial blast cleaning, industrial blast cleaning, and brush-off blast cleaning are addressed in separate standards. Near-white metalblastcleaning provides a greaterdegree of cleaning than commercial blast cleaning (SSPC-SP 6/NACE No. 31) but less than white metal blast cleaning (SSPC-SP 5/NACE No. 12). Near-white metal blast cleaning is used when the objective is to remove all rust, coating, and mill scale, but when the extra effort required to remove all stains of these materials is determined to be unwarranted. Staining shall be limited to no more than 5 percent of each unit area of surtace. Near-white metal blast cleaning allows staining on only 5 percent of each unit area of surface, while commercial blast cleaning allows staining on 33 percent of each unit area of surface. White metal blast cleani ng does not permit any staining to remain on the surface. This joint standard was originally prepared in 1994 and reaffirmed in 2000 by the SSPC/NACE Task Group A on Surface Preparation by Abrasive Blast Cleaning, and NACE Unit Committee T-6G on Surface Preparation. This joint task 539 SSPC-SP 10/NACE No. 2 January 1, 2007 group includes membersof both the SSPC Surface Preparation Committee and the NACE Unit Committee T-6G on Surface Preparation. It was reaffirmed in 2006 by the SSPC Surface Preparation Committee and NACE Specific Technology Group (STG) 04, Protective Coatings and Linings: Surface Preparation. In SSPC/NACE standards, shall and must are used to state mandatory requirements. Should is used to state that which is considered good and is recommended but is not absolutely mandatory. May is used to state that which is considered optional. Section 1: General 1.1 This joint standard covers the requirements for near- white metal blast cleaning of uncoated or coated steel surtaces by the use of abrasives. These requirements include the end condition of the surface and materials and procedures neces- sary to achieve and verify the end condition. 1.2 The mandatory requirements are described in Sections 1 to 9. Section 10, "Comments," and Appendix A, "Explanatory Notes," are not mandatory requirements of this standard. 1.3 Information about the function of near-white metal blast cleaning is in Paragraph A1 of Appendix A. 1.4 Information about use of this standard in maintenance coating work is in Paragraph A2 of Appendix A. Section 2: Definitions 2.1 Near-White Metal Blast Cleaned Surtace: A near- white metal blast cleaned surface, when viewed without magnification, shall be free of ali visible oil, grease, dust, dirt, mill scale, rust, coating, oxides, corrosion products, and other foreign matter. Random staining shall be limited to no more than 5 percent of each unit area of surface (approximately 5,800 mm2 [9.0 in.2] (i.e., a square 76 mm x 76 mm [3.0 in. x 3.0 in.]), and may consist of light shadows, slight streaks, or minor discolorations caused by stains of rust, stains of mill scale, or stains of previously applied coating. 2.1.1 Acceptabie variations in appearance that do not affect surface cleanliness as defined in Paragraph 2.1 include variations caused bythe rype of steei, original surface condition, thickness of the steel, weld metal, mill or fabrication marks, heat treating, heat-affected zones, blasting abrasives, and differences because of blasting technique. 2.1.2 SSPC-VIS 13 may be specified to supplement the written definition. In any dispute, the written definition set forth in this standard shall take precedence over reference photographs and comparators. Additional information on reference photographs and comparators is in Paragraph A3 of Appendix A. Section 3: Associated Documents 3.1 The latest issue, revision, or amendment of the docu- ments listed in Paragraph 3.3 in effect on the date of invitation to bid shall govern unless otherwise specified. 3.2 If there is a conflict between the requirements of any of the documents listed in Paragraph 3.3 and this standard, the requirements of this standard shall prevail. 3.3 Documents cited in the mandatory sections of this standard include: Document Title SSPC-AB 14 Mineral and Siag Abrasives SSPC-AB 25 Cleaniiness of Recycled Ferrous Metallic Abrasives SSPC-AB 36 Ferrous Metallic Abrasives SSPC-SP 1' Solvent Cleaning SSPC-VIS 1 Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning Section 4: Procedures Before Cleaning 4.1 Before blast cleaning, visible deposits of oil, grease, or other contaminants shall be removed in accordance with SSPC-SP 1 or other agreed-upon methods. 4.2 Before blast cleaning, surtace imperfections such as sharp fins, sharp edges, weld spatter, or burning slag should be removed from the surface to the extent required by the procurement documents (project specification). Additional information on surface imperfections is in Paragraph A4 of Appendix A. 4.3 If reference photographs orcomparators are specified to supplement the written standard, the condition of the steel priorto blast cleaning should be determined before the blasting commences. Additional information on reference photographs and comparators is in Paragraph A3 of Appendix A. Section 5: Blast Cleaning Methods and Operation 5.1 Clean, dry compressed air shall be used for nozzle blasting. Moisture separators, oil separators, traps, or other equipment may be necessary to achieve this requirement. 5.2 Any of the following methods of surface preparation may be used to achieve a near-white metal blast cleaned surface: 2 540 SSPC-SP 10/NACE No. 2 January 1, 2007 5.2.1 Dry abrasive blasting using compressed air, blast nozzles, and abrasive. agreed upon by those parties responsible for establishing the requirements and those responsible for performing the work. 5.2.2 Dry abrasive blasting using a closed-cycle, recir- culating abrasive system with compressed air, blast nozzle, and abrasive, with or without vacuum for dust and abrasive recovery. 5.2.3 Dry abrasive blasting using a closed-cycle, recircu- lating abrasive system with centrifugal wheels and abrasive. 5.3 Other methods of surface preparation (such as wet abrasive blast cleaning) may be used to achieve a near-white metal blast cleaned surface by mutual agreement between those responsible for establishing the requirements and those responsible for pertorming the work. Information on the use of inhibitors to prevent the formation of rust immediately after wet abrasive blast cleaning is in Paragraph A5 of Appendix A. Section 6: Blast Cieaning Abrasives 6.1 The selection of abrasive size and rype shall be based on the type, grade, and surface condition of the steel to be cleaned, the type of blast cleaning system used, the finished surface to be produced (cleanliness and surface profile [rough- ness]), and whether the abrasive will be recycled. 6.2 The cleanliness and size of recycled abrasives shall be maintained to ensure comp►iance with this standard. 6.3 The blast cleaning abrasive shall be dry and free of oil, grease, and other contaminants as determined by the test methods found in SSPC-AB 1, SSPC-AB 2, and SSPC-AB 3. 6.4 Any limitations on the use of specific abrasives, the quantity of contaminants, or the degree of allowable embed- ment shall be included in the procurement documents (project specification) covering the work, because abrasive embedment and abrasives containing contaminants may not be accept- able for some service requirements. Additional information on abrasive selection is in Paragraph A6 of Appendix A. 6.5 When a coating is specified, the cleaned surtace shall be roughened to a degree suitable for the specified coating system. Additional information on surface profile and the film thickness of coating applied over the surface profile is in Paragraphs A7 and A8 of Appendix A. Section 7: Procedures Following Blast Cleaning and Immediately Prior to Coating 7.1 Visible deposits of oil, grease, or other contaminants shall be removed according to SSPC-SP 1 or another method 7.2 Dust and loose residues shall be removed from prepared surtaces by brushing; blowing off with clean, dry air; vacuum cleaning; or other methods agreed upon by those responsibie for establishing the requirements and those responsible for performing the work. 7.2.1 The presence of toxic metals in the abrasives or coating being removed may place restrictions on the methods of cleaning permitted. The chosen method shall comply with all applicable regulations. 7.2.2 Moisture separators, oil separators, traps, or other equipment may be necessary to achieve clean, dry air. 7.3 After blast cleaning, any remaining surtace impertec- tions (e.g., sharp fins, sharp edges, weld spatter, burning slag, scabs, slivers) shall be removed to the eutent required by the procurement documents (project specification). Any damage to the surtace profile resulting from the removal of surtace imperfections shall be corrected to meet the requirements of Paragraph 6.5. Additional information on surface imperfections is in Paragraph A4 of Appendix A. 7.4 Immediately prior to coating application, the entire surface shali comply with the degree of cleaning specified in this standard. Any visible rust that forms on the surtace of the steel after blast cleaning shall be removed by recleaning the rusted areas before coating. Information on chemical contamination, rust-back (rerusting), and the effect of dew point (surface condensation) is in Paragraphs A9, A10, and A11 of Appendix A. Section 8: Inspection 8.1 Work performed and materials supplied under this standard are subject to inspection by a representative of those responsibfe for establishing the requirements. Materials and work areas shall be accessible to the inspector. The proce- dures and times of inspection shall be as agreed upon by those responsible for establishing the requirements and those responsible for performing the work. 8.2 Conditions not complying with this standard shall be corrected. In the case of a dispute, an arbitration or settlement procedure established in the procurement documents (project specification) shall be followed. If no arbitration or settlement procedure is established, a procedure mutually agreeable to purchaser and supplier shall be used. 8.3 The procurement documents (project specification) should establish the responsibility for inspection and for any required affidavit certifying compliance with the specification. 3 541 SSPC-SP 10/NACE No. 2 January 1, 2007 Section 9: Safety and Environmentai Requirements 8. SSPC-SP COM (latest revision), "Surface Preparation Commentary for Steel and Concrete Substrates" (Pittsburgh, PA: SSPC). 9.1 Because abrasive blast cleaning is a hazardous opera- tion, ali work shall be conducted in compliance with applicable occupational and environmental health and safety rules and regulations. Section 10: Comments (Nonmandatory) 10.1 Additional information and data relative to this standard are inAppendixA. Detailed information and data are presented in SSPC-SP COM.B The recommendations in Appendix A and SSPC-SP COM are believed to represent good practice, but are not to be considered requirements of the standard. The sections of SSPC-SP COM that discuss subjects related to near-white metal blast cleaning are listed below. Subject Commentary Section Abrasive Selection ............................6 Film Thickness ..........................10 Maintenance Repainting .........................4.2 Reference Photographs ..........................11 Rust-Back (Rerusting) .........................4.5 Surface Profile .........................6.2 Weld Spatter ......................4.4.1 Wet Abrasive Blast Cieaning .........................8.2 References 1. SSPC-SP 6/NACE No. 3(latest revision), "Commercial Blast Cleaning" (Houston, TX: NACE, and Pittsburgh, PA: SSPC). 2. SSPC-SP 5/NACE No. 1(latest revision), "White Metal Blast Cleaning" (Pittsburgh, PA: SSPC, and Houston, TX: NACE). 3. SSPC-VIS 1(latest revision), "Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning" (Pittsburgh, PA: SSPC). 4. SSPC-AB 1(latest revision), "Mineral and SlagAbrasives" (Pittsburgh, PA: SSPC). 5. SSPC-AB 2(latest revision), "Cleanliness of Recycled Ferrous Metallic Abrasives" (Pittsburgh, PA: SSPC). 6. SSPC-AB 3(latest revision), "Ferrous Metallic Abrasives" (Pittsburgh, PA: SSPC). 7. SSPC-SP 1(latest revision), "Solvent Cleaning" (Pitts- burgh, PA: SSPC). 9. SSPC-PAGuide 4 (latest revision), "Guide to Maintenance Repainting with Oil BaseorAlkyd Painting Systems" (Pittsburgh, PA: SSPC). 10. NACE Standard SP0178 (formerly RP0178-2003) (latest revision), "Fabrication Details, Surtace Finish Requirements, and Proper Design Considerations for Tanks and Vessels to Be Lined for Immersion Service" (Houston, TX: NACE). 11. NACE Standard RP0287 (latest revision), "Field Measure- ment of Surface Profile of Abrasive Blast-Cleaned Steel Surfaces Using a Replica Tape" (Houston, TX: NACE). 12. ASTMO) D 4417 (latest revision), "Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel" (West Conshohocken, PA: ASTM). 13. SSPC-PA2 (latest revision), "Measurement of Dry Coating Thickness with Magnetic Gages" (Pittsburgh, PA: SSPC). 14. SSPC-SP 12/NACE No. 5 (latest revision), "Surface Prepa- ration and Cleaning of Metals by Waterjetting Priorto Recoating" (Pittsburgh, PA: SSPC, and Houston, TX: NACE). 15. SSPC-Guide 15 (latest revision), "Field Methods for Retrieval and Analysis of Soluble Salts on Steel and Other Nonporous Substrates" (Pittsburgh, PA: SSPC). Appendix A: Explanatory Notes (Nonmandatory) A1 FUNCTION: Near-white metal blast cleaning (SSPC- SP 10/NACE No. 2) provides a greater degree of cleaning than commercial blast cleaning (SSPC-SP 6/NACE No. 3) but less than white metal blast cleaning (SSPC-SP 5/NACE No. 1). It shouid be used when a high degree of blast cleaning is required. The primary functions of blast cleaning before coating are (a) to remove material from the surface that can cause early failure of the coating and (b) to obtain a suitable surface profile (roughness) to enhance the adhesion of the new coating system. The hierarchy of blasting standards is as follows: white metal blast cleaning, near-white metal blast cleaning, commercial blast cleaning, industrial blast cleaning, and brush-off blast cleaning. A2 MAINTENANCE COATING WORK: When this stan- dard is used in maintenance coating work, specific instructions should be provided on the extent of surface to be blast cleaned or spot blast cleaned to this degree of cleanliness. In these cases, this degree of cleaning applies to the entire specified ASTM International (ASTM), 100 Barr Harbor Drive, West Coshohocken, PA 19428-2959. 4 542 SSPC-SP 10/NACE No. 2 January 1, 2007 area. For example, if all weld seams are to be cleaned in a maintenance operation, this degree of cleaning applies to 100 percent of all weld seams. If the entire structure is to be prepared, this degree of cleaning applies to 100 percent of the entire structure. SSPC-PA Guide 49 provides a description of accepted practices for retaining old sound coating, removing unsound coating, feathering, and spot cleaning. A3 REFERENCE PHOTOGRAPHS AND COMPARA- TORS: SSPC-VIS 1 provides color photographs for the various grades of surface cleaning as a function of the initial condition of the steel. The photographsASP 10, B SP 10, C SP 10, D SP 10, G, SP 10, G2 SP 10, and G3 SP 10 depict surfaces cleaned to near-white metal. Other available reference photographs and comparators are described in Section 11 of SSPC-SP COM. A4 SURFACE IMPERFECTIONS: Surface imperfections can cause premature coating failure when the service is severe. Coatings tend to pull away from sharp edges and projections, leaving little or no coating to protect the underlying steel. Other features that are difficult to cover and protect properly include crevices, weld porosities, laminations, etc. The high cost of the methods to remedy surface imperfections (such as edge rounding and weld spatter removal) should be weighed against the costs of a potential coating failure. Poorly adhering contaminants, such as weld slag residues, loose weld spatter, and some minor surface laminations, may be removed during the biast cleaning operation. Other surface defects (steel laminations, weld porosities, or deep corrosion pits) may not be evident until the surface cleaning has been completed. Repair of such surface defects should be planned properly because the timing of the repairs may occur before, during, or after the biast cleaning operation. Section 4.4 of SSPC-SP COM and NACE Standard SP017810 contain addi- tional information on surface imperfections. A5 WET ABRASIVE BLAST CLEANING: Steel that is wet abrasive blast cleaned may rust rapidiy. Clean water shou Id be used for rinsing. It may be necessary to add inhibitors to the water or apply them to the surface immediately after blast cleaning to temporarily prevent rust formation. The use of inhibitors or the application of coating over slight discoloration should be in accordance with the requirements of the coating manufacturer. CAUTION: Some inhibitive treatments may interfere with the performance of certain coating systems. A7 SURFACE PROFILE: Surface profile is the rough- ness of the surface that results from abrasive blast cleaning. The profile height is dependent on the size, shape, type, and hardness of the abrasive, particle velocity and angle of impact, hardness of the surface, amount of abrasive recycling, and the proper maintenance of working mixtures of grit and/or shot. The allowable minimum/maximum height of profile is usuatly dependent on the thicknessof the coating to be applied. Large particle-sized abrasives (particularly metallic) can produce a surface profile that may be too high to be adequately covered by a single thin-film coat. Accordingly, the use of larger abrasives should be avoided in these cases. However, larger abrasives may be needed for thick-film coatings or to facilitate removal of thick coatings, heavy mill scale, or rust. If control ofsurface profile (minimum/maximum) isdeemed to be significantto coating performance, itshould be addressed in the procurement documents (project specification). Typical surface profile heights achieved with commercial abrasive media are shown in Table 6 of SSPC-SP COM. Surface profile should be measured in accordance with NACE Standard RP0287" or ASTM D 4417.12 A8 FILM THICKNESS: It is essential that ample coating be applied after blast cteaning to adequately cover the peaks of the surface profile. The dry-film thickness of the coating above the peaks of the profiie should equal the thickness known to be needed for the desired protection. If the dry-film thickness overthe peaks is inadequate, premature rust-through or coating failure will occur. To ensure that coating thicknesses are properly measured, the procedures in SSPC-PA213 should be used. A9 CHEMICAL CONTAMINATION: Steel contaminated with soluble salts (e.g., chlorides and sulfates) develops rust- back rapidly at intermediate and high levels of humidity. These soluble salts can be present on the steel surface prior to blast cleaning as a result of atmospheric contamination. In addition, contaminants can be deposited on the steel surtace during blast cleaning if the abrasive is contaminated. Therefore, rust- back can be minimized by removing these salts from the steel surtace and eliminating sources of recontamination during and after blast cleaning. Wet methods of removal are described in SSPC-SP 12/NACE No. 5.14 Identification of the contaminants along with their concentrations may be obtained from laboratory and field tests as described in SSPC-Guide 15.15 A6 ABRASIVE SELECTION: Types of inetallic and nonmetallic abrasives arediscussed in SSPC-SP COM. Biasting abrasives may become embedded in, or leave residues on, the surface of the steel during cleaning. While such embedment or residues are normally not detrimental, care should be taken to ensure that the abrasive is free from detrimental amounts of water-sofuble, solvent-soluble, acid-soluble, or other soluble contaminants (particularly if the cleaned steel is to be used in an immersion environment). Criteria for selecting and evaluating abrasives are in SSPC-AB 1, SSPC-AB 2, and SSPC-AB 3. A10 RUST BACK: Rust-back (rerusting) occurs when freshly cleaned steel is exposed to moisture, contamination, or a corrosive atmosphere. The time interval between blast cleaning and rust-back varies greatly from one environment to another. Under mild ambient conditions, if chemical contami- nation (see Paragraph A9) is not present, it is best to blast clean and coat a surface on the same day. Severe conditions may require a more expeditious coating application to avoid contamination from fallout. Chemical contamination should be removed prior to coating. 5 543 SSPC-SP 10/NACE No. 2 January 1, 2007 A11 DEW POINT: Moisture condenses on any surface that is colder than the dew point of the surrounding air. It is therefore recommended that the temperature of the steel surface be at least 3°C (5 °F) above the dew point during dry blast cleaning operations. It is advisable to visually inspect for moisture and periodically check the surface temperature and dew point during blast cleaning operations and to avoid the application of coating over a damp surface. 544