Loading...
2233 RES CITY COUNCIL ESTABLISHED CITY ENGINEER AS PROJECT ENGINEER AND MANAGER OF INFILTRATION/INFLOW PHASE II OF PROJECT NO C-48-1148RESOLUTION N0. 2233 WHEREAS, the City Council of the City of Paris did heretofore establish the City Engineer of the City of Paris as Project Engineer and manager of Infiltration/Inflow Fhase II of Project No. C-48-1148; and, WHEREAS, upon the resignation of the City Engineer, John Buss has been appointed project manager of said project; and, WHEREAS, in order to accomplish such tasks, it has been necessary for the project manager to procure the services of Babb Engineering, Inc, to provide professional services upon the terms and conditions and in the form attached hereto as Exhibit "A"; and, WHEREAS, it is deemed to be in the best interest of the City of Paris that such services be contracted for; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, that the Mayor of the City of Paris, Joe Graham, be, and he is hereby authorized and directed to execute on behalf of the City Council of the City of Paris, the profes- sional services contract in the form of Exhibit "A" attached hereto. Passed and adopted this 13th day of December, 1982. O's, 'CL" oe Graham, Mayor ATTEST: " w'~ J McCollum, Acting City Clerk APPROVED AS TO FORM: T. K. Hayn s, City Attorney Exhibit "A" Small Services Contract for provision of Sewer Design Field Survey for Step II Design Froject #C-48-1248 The term "sewer design field survey" as used above, refers to the collection and compiling of physical data, to establish the accurate location of pertinent topographic features as well as other physical features which.are required to correlate sewer design with actual field conditions. The information collected may include but is not limited to the following. 1) Topography, surface conditions, details of paving to be disturbed, underground structures or other unusual obstruc- tions, and insofar as possible soil conditions. 2) Details of existing utilities with which a proposed sewer may connect or interfere. 3) Locations of streets, alleys, streams or other surface features. A. The proposer will nrovide the followina, services: 1) Al1 elevations will be on USGS datum. 2) Third order temporary construction benchmarks on 1,500 + foot intervals along proposed sewer lines. 3) Install h" 0 X 18" iron markers (or suitable substitute) with flaciged guard stakes at angle points, points of line intersec- tions, center lines of streets, roads, highways, and fences. Record angles of intersections with same. Such markers to be referenced located to at least two visible reference points. 4) Develop field data in connection with railroad and highway crossinas. 5) 6Vhere requested by City, the Proposer will perform a complete topographic survey for 25' each side of the sewer base line at 50 foot intervals and any mid points where the surface may have sudden changes due to creeks, ditches, streets, railroads, highways, etc. All ground elevations to be the nearest 0.10 foot. 6) Reference all sewer base lines where they cross existing.fences by centerline station, distance to nearest cross fence or corner marker and give angle of sewer base line with property line. 7) Furnish engineer one complete copy of all survey field notes. 8) Proposer realizes timeliness of completion is of importance and agrees to make a reasonable effort to complete work within the time schedule requested. Proposer's agreement with the City of Paris will also be governed by the following conditions: B. General 1) Al1 work performed shall be in sufficient detail to define the work involved explicitly and to keep the professional responsi- bility for its accuracy and completeness with the Proposer. 2) Payment for 5ervices to be made within 30 days of client's receipt of invoice price of acceptable work. The lOg retained balance to be payable upon City acceptance of completeness of work and within 30 days of receipt of final notes. Payment for services later than that set forth herein shall bear interest at 12$ per annum. 3) Ownership of all documents produced shall be the property of the City of Paris, Texas. 4) This arrangement may be terminated by either party upon 10 days written notice to the other. In such an event, you shall furnish to us all project work calculations, documents, data, drawings and sketches, developed to date of termination, and we shall pay to you, all of your allowable cost to the date of termination. The pro rata portion of your fee shall be allowed unless termination is based on unnrofessional or inability to timely and comgetently perform. 5) Your contact person is John Buss, Project Engineer. C. Pricing The Proposer shall furnish the above services for the following rates. 3 Man Field Crew. . . . . . $50.00 per hour All Materials, Supplies, and other Direct Costs. Cost plus 150 In the event the amount of work is increased, the additional work shall be paid for at an equivalent unit rate. PROPOSER: Firm: By Date CITY OF PARIS By Date ATTEST: H. C. Greene, City Clerk APPROVED AS TO FORM: T. K. Haynes, City Attorney