09-CHANGE ORDER #1 AND AUTHORIZE FINAL PAYMENT AND CLOSE CONTRACT WITH BRAY CONSTRUCTIONSubmittal Date:
10-30-2012
Council Date:
11-12-2012
CITY COUNCIL AGENDA ITEM BRIEFING SHEET
Originating Department:
Engineering, Planning
& Development
RECOMMENDED MOTION:
Presented By:
Shawn Napier, P.E. Directar of
Engineering, Planning &
Agenda ltem No.:
�
Approve change order # 1 in the amount of $570.00, authorize final payment in the amount of $5,791.95
and close the contract with B. Bray Construction for the CDBG #729599 Sewer System Manhole
Improvements project.
POLICY ISSUE�S�:
Contract
BACKGROUND:
This project replaced or added 15 manholes in South Central Paris. This was the second phase of a
project to fix sewer problems in South Central Paris. The first phase replaced a sewer line in the 1100
Block of W. Sherman St. down to W. Washington St. and in 800 and 900 Blocks of SE 6`h St. at a cost
of $85,213.00.
The money for this project came through a grant from a Community Development Block Grant (CDBG)
from the Texas Department Agriculture in the amount of $250,000 and required a 20% match ($50,000)
from the City of Paris.
Staff recommends approving change order #1 in the amount of $570.00, this will increase the contract
amount from $115,269.00 to $115,839.00, making the final payment amount of $5,791.95 to B. Bray
Construction and closing the contract.
BOARD�COMMISSION RECOMMENDATION:
EXHIBITS:
Change Order #1
ACTION:
� Financial Report
❑ Department Report
� Presentation
❑ Public Hearing
FISCAL NOTES:
� Minute Order
❑ Resolution
❑ Ordinance
❑ Other
BUDGET INFO: TDRA Grant
Expense
Budgeted Amt.
YTD Actual
Acct. Name
Acct. Number
$115,869.00
$300,000.00
$110,047.05
Comm. Dev. Block Grant-Sewer
25-0353-40-00
City of Paris r� � Revised 2/04/08
J
� � i
Texas Department of Agriculture
Construction Contract Change Order
Owner �comraaor �o�aucy): Contract For tPro�ecc descr�at�or,�: � Region 5
City of Paris Manhole Rehabilitation TxCDBG Contract
P.O. Box 9037 I No.729599
Paris, TX 754fi1 � Project Location: Paris, TX Firnal ge Order No. 1 and
C011t�8Ct0�: (Name S Address) i E(1g1�@eC: (Name & Address)
B. Bray Construction Co., Inc. � Hayter Engineering, Inc.
P.O. Box 6365 i 4445 SE Loop 286
Pa�is, TX 75461 Paris, TX 75460
Owner is requesting TDA review to determine eligibility of change order expenses.
Changes to Existins� Line Items {Items from original bid or added in previous change
order on
Item Item Description Current Unit
No. Quant+
9 Customer service cleanout 4 EA
10 Eccentric reducer � �
13 4" Fernco SS connector 4 EA
item Item Description
No.
Unit
• � f�
.r �+
.� ��
1
1
1
(Items without a unit price in the original bid)
sch separate documentation if necessary):
Chan e in Contract Price
Original Contract Price:
Previous Change Order(s}
No. to No.
!'`nntrar.t PriCe PTIO� t0
this Chan e Order
Net Increase of
this Change Orde�
$115,269.00
$0.00
$115,269.00
$57�.00
in I Change in
(+/-1 Contract Price
Unit Unit Price I Change in
Ouantitv (+!-
Chanae in Contract Time
Original Contract Time;
Net Change From Previous
Chan e Orders
Contract Time Prior to
this Change Order
Net Increase/Decrease of
this Change Order
so.00
Change in
mtract Price
90 days
m
Contract Price With all `'v""°`'` ""'° .."'. ""
A roved Chan e Orders $1.15,839.00 A roved Chan e 90
Cumulative % Chan e in Contract Price: 0.5%
Notice: * Generally, a cumulative change in the contrad price in excess of 25% cannot be approved.
* Reimbursement of costs submitted in this change order are subject to approval by the Department.
See 7xCDBG Project Implementation Manual Section 5.2.5.
��
R2�inn• 5
Grant Recipisn� City of Paris
JUSTIFICATION FOR CHANGE
1. Effect of this change on scope of work:
2. Effect on operation and maintenance costs:
i ContfaCt No.: 729by9
Order No. 1 and Final
� Increase Decrease
3. Will this Change Order change the number of beneficiaries or
TxCDBG contract Performance Statement?
If yes, please attach Performance Statement modification request.
4. Has this change created new circumshances or environmentai
cond�ions which may affect the project's impact, such as cancealed or
unexpected condi6ons discovered during actuai construction?
If "Yes", is an Environmental Re-assessment required?
5. Is the TCEQ clearance still valid?
6. Are other TxCDBG contractual special condition clearance sbll
valid� (if no, specify)'
7. If new items are inctuded that were not included in the compea
bid have the prices been determined to be reasonable?
APPROVED by Grant Recipient (Required):
To receive an
,........
, � THOMA3 I.EE PRIATT
,� •� �92767 � � �' �
ad Sig ) ' ��
� -.�!CENS�c,�• ' ��s
1:�`�- --�Ga.
of
ACC ED: �
r
By: �
�
CONTRACTO (Auttwrized Signature}
Date: 9/13/12
matian bel�w:
Email address
Z012 7XCD9G Project Implementation Manual SECTION A__Cha�ter 6 Procurement Procedures