Loading...
06-H Lost Water StudyDRAFT G:WttorneyW.ICE~6WO~CURRENT\Watu Lost 6lntly- Acttpt Prop.wptl March 6, 2002 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, ACCEPTING THE PROPOSAL OF CARTER & BURGESS, PROFESSIONAL ENGINEERS, FOR PROFESSIONAL ENGINEERING SERVICES RELATED TO THE PERFORMANCE OF A WATER LOST AND UNACCOUNTED FOR STUDY IN THE CITY'S WATER ACCOUNTING AND OPERATING SYSTEM; AUTHORIZING THE CITY MANAGER TO NEGOTIATE AND EXECUTE A PROFESSIONAL ENGINEERING SERVICES CONTRACT WITH CARTER & BURGESS FOR SUCH STUDY; MAHING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARINGAN EFFECTIVE DATE. WHEREAS, in order to maintain the integrity of the City's water system, to control the loss of water through said system, and to otherwise ensure efficient and effective water service, it is necessary for the City to perform a water lost and unaccounted for study in the City's water accounting and operating system; and, WHEREAS, the City Manager has previously requested authority from the City Council to solicit proposals from qualified professional consultants to perform said water lost and unaccounted for study; and, WHEREAS, the City Council, by adoption of Resolution No. 2001-175, passed and approved the l Oth day of December, 2001, authorized the City Manager and the City Finance director to request proposals for professional engineering services related to the aforesaid study; and, WHEREAS, as aresultofthe solicitation of said proposals, and the review of same, the City Manager, City Engineer, and City Finance Director have determined that the engineering firm of Carter & Burgess, Professional Engineers, have presented the best proposal far the performance of said studies; and, WHEREAS, the City Council desires to acceptthe aforesaid proposal of Carter & Burgess, Professional Engineers, and authorize the City Manager to negotiate and execute a professional engineering services contract with Carter & Burgess for the performance of said study, subject to the review of said contract by the City Attorney; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble to this resolution are hereby in all things approved. Section 2. That the proposal of Carter & Burgess, Professional Engineers, attached hereto as Exhibit A and for all purposes incorporated herein, for the performance of a water lost and unaccounted for study in the City's water accounting and operating systems, be, and the same is hereby, accepted. Section 3. That the City Manager be, and he is hereby, authorized and directed to negotiate and execute, on behalf of the City of Paris, a professional engineering services contract with Carter & Burgess, Professional Engineers, far the performance of the aforesaid study, under the terms and conditions and in a form approved by the City Attorney. Section 4. That the cost of performance of said professional engineering services shall be paid from funds available from the City's waterwarks and sewer system revenue bonds. Section 5. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this l lth day of March, 2002. Michael J. Pfiester, Mayor ATTEST: Thomas E. Haynes, Assistant City Clerk APPROVED AS TO FORM: Larry W. Schenk, City Attorney 1 ~ 1 I~ b P-M.Powws'- i~ I Cartera~Burgess February 22, 2002 r Mr. Shown Napier, PE City Engineer The (iry af Paris 150 SE 1 st Paris, Texas 75460 xtmlv` D FEB 2 2 2002 City of Paris Engineering RE: Request for Proposal to perform a Comprehensive Water Distribution System Audit Dear Mr. Napier: 7950 Elm6rook Dri~e Dallas, Texas 75247-4925 Phone. 214.638.0145 Fax: 214_638.0447 www.ch.mm We are pleased ro present this letter of interest for the Lomprehensive Water Distributian System Audit project. (arter & Burgess offers a team of highly qualified individuals with the experience to manage and perform the seruices required far this project. The (arter 8 Burgess Team has diredly-related projed ezperience in all aspeds of the work required for this project by having completed similar projects, some of which are detailed in the attached proposal. The team membeis will be dedicated to the City of Poris for the duration of this prajed. As you review our proposal, we will present the benefits in chaasing the (arter & Burgess Team for this important project. Some of these benefits include: • The proposed Project Manager, Dr. AI Petrosek, PE has worked on many flow metering projects in his 35 years of practice, providing the City wiih a fruly ezperienced Project Manager. • The Carter & Burgess Team understands the needs of the City af Paris and the requirements of this particular project which is critiml in the development of the final pwject scope. • The farter 8 Burgess Team has in-depth experience in water distribution system wark. • farter & Burgess is located in close proximiry ta Paris and can 6e on site in approzimately two hours. We trust that yau will find this propasal provides the information necessary for the evaluation process ond expresses aur enthusiasm, knowledge, experience, and availabiliry of resources for this praject. We are excited about this project and loak farward to working with the City of Paris. ff additional information is required, please da nat hesitate ro calL Sincerely, Carter & Burgess, Inc. Albert C. Petrasek, Jr, PhD, PE ; Vice President Projed Manager ACP/dmV021 S11 Carter & Bvrges;, Inc Carler 8 Burgess 4rchiiecfs/Engineer., Inc. Carrer & Borgess Consultants, !nc C8B Architects/Enginee's, Inc. :&B ArchiteUS/Engineers, PC. C8d Ne,adq Inc. Nison & Luird Architeds/Engineers . PC. Proposal Comprehensive Water Distribution System Auclit ~ 1 1 1 1 1 1 1 1 1 1 Contents Section 1 Benefits 2 Section 2 Firm Overview 3 Section 3 Relevant Project Experience 6 Section 4 Project Team 13 Section 5 Project Understanding Fr Project Approach 15 Section 6 References 21 Appendix Resumes of Key Personnel Carter-Burgess Proposal Comprehensive Water Distribution System Audit Section 1 Benefits farter & Burgess, Inc. appreciates the opportuniry ta present our proposal ta the City of Paris ta provide ronsultant services for a Comprehensive Water Distribution System Audit of the Ciry. We feel that we have assembled a team of well- qualified engineers, fi nancial experts, and inspedors to insure the Ciry of Paris receives services that will meet their needs. As Carter 8 Burgess is considered for this audit, we feel that there are benefits that we mn provide the Ciry of Paris that makeusthefirmtochoose. Some of these benefits are listed below: * The proposed Project Manager, Dr. AI Petrasek, PE has worked on many flow metering projects in his 35 yeors of pradice, providing the City with a truly experienced ProjectManager. * The Carter & Burgess Team understands the needs af the firy of Paris and the requiremenis of this particular project. This understanding is critical in the develapment af the final prqjed scope, since that is the bestwayto assure thatthe Ciry receives the services needed for this projed. * Larter 8 Burgess has more iesources to offer the City of Paris. Our firm has over 1,800 employees in Texas and over 1,000 in the Metroplex. We are the largest engineering firm in Texas and the D/FW Metroplex. This strong base of engineering and management talent provides your Ciry with resources it deserues. * Carter & Burgess is a true multidisciplinory firm offering a broad range of services. We can support the (iry of Paris in a number of program oreas as indicated below: • Water Resources Engineering • Civil Engineering • Mechaniml Engineering • Eledrical Engineering • Structural Engineering • Transportatian Engineering • FinonceandAccounting • Management • Architecture • LandscapeArchitedure * We are lomted in dose proximityb Paris and mn be on site in approximatelytwo hours. Carterl:Burgess * The (arfer & Burgess Team has experienced persannel in leak detection assigned to this project. This ezperience will be important in developing the final set af solutions required for this projed. * Larry Shaw, CPA who is leading the management consulting portion of this project, has many years of experience in water utiliry billing, metering, customer service, ond management. This is a vital companent of the projed, and the Carter 8 Burgess Team provides the best financial/management ronsulting resources availabletothefiry. * The Carter & Burgess Team has in-depth ezperience in water distribution system work - we know how to perform this projed. * Lin lindsey will direct the field work far this project. Mr. Lindsey is ezperienced in all aspeds of water utility construction and field wark advities. He is a valuable resource for the (iry of Paris. * Tam Beam, PE has been performing leak detection work for decades, ond his participation in the project assures the Gryof Paristhat the leakdetection acfivifies will be performed efficiently ond accurotely. Proposa/ Comprehensive Water Distribution System Audit ~ Section 2 Firm Overview Carter & Burgess Carter & Burgess, Inc. wasfounded in 1939 in FortWorfh, Texas as a unique partnership beiween childhood friends. One was a civi l engineei. The ather was a landsmpe archited. Today, Carter & Burgess, Inc. is a full-service, multi- disciplined cansulting firm offering planning, engineering, architedure, surveying, mnstruction managementand related services with over 2,500 employees i n 36 offices across the nation. The firm has maintained an office in Dallas since 1960. lacal personnel resources in our Dallas and Fort Worth offices indude more than 1,115 piofessional, techniml, and support staff members. From the beginning, cooperation among mized design disciplines set the stage for what has become on often- imitated way of doing business - offering camplete services from one compony. While others moytry and pull together a partnership for the duration of a projed, Carter 8 Burgess mn seamlessly integrate each and every in-house discipline asnecessory. Thisdepthoftenenablesustoassistyauwithout the need for additional consultants. Industry Recognition Design professionals at Carter 8 Burgess maintain the talent and ingenuiry necessary to mntrol projed costs while meeting strict schedules. Some 85 percent of our work is repeat business from clients. On several occasians we have been the proud recipient of distinguished acknowledgmentsfor our effarts. Engineering News Record magazine * 30"in a list of top 500 U.S. design firms (April 2001) * 141hinalistoftop20WaterTransmissionLinesfirms(Apri12001) * 10'h in a list of top 25 Sanitary/Srorm Sewers firms (April 2001) * 10' in a list of top 100 Pure Design firms (April 2001) Building Design 8 Construction magazine * 7th in a survey of 300 A/E/C firms for volume of work completed in the commercial, institutianol, and industriol projedmarkets (Ju1y2001) ~u... Consulting-Specifying Engineer magazine ` +t l Om in a list of top 100 firms engaged in mechaniml and electrical design (August 2000) Carter lZurgess Proposa/ Comprehensive Water Distribution System Auclit Services Offered Carter & Burgess'staff provides mmprehensive planning, design, constructian monagement, and management consulting services for a wide range of projects critim) to municipalities. In addition, our firm utilizesstote-of-the- art computer capabilities to support these planning and designefforts. Dixuuionsofthespecificareasafprafeuional services which might 6e of interest ro you are provided below. Water System (arter & Burgess has successfully completed a wide ronge of planning and design projeds in water infrastructure. Our design professionals have a proven trock record an bath small and large multidiscipline projeds including water supply, treatment, storage and distribution. Specificservices affered bythe Carter & Burgesswater design group indude the foilowing: Planning and Studies * Water Supply and Utilization Studies * WaterQualiryAuessments +t Water Master Planning * FacilityPlanningandDesignReporis * Pilot-scaleTestingandEvaluotion * Conduding Tracer Studies * PermittingondRegulatory Approvols ir Pipeline Alignment Studies * EnvironmentollmpadAnalyses Water System Design Services * Steady-stateComputerModeling * Surge Modeling and (ontrol * forrosion Assessment and (ontrol * Elevated and Graund Storage Tank Design * Pump Station Design * Water Treatment Plant Design * WaterTransmission Main Design * Water System (ontrols and Telemetry * Preparationof08MManuals * Facility Start-Up and Training Carter :Burgess Utility Management Consulting Carter & Burgess' Management fonsulting Services are multidisciplinary, integrating oll disciplines of monagement induding finance, information systems, administration, engineering, and operations and maintenance. Our staff offers strong technical competence by rombining industry ezperien<e from public warks, utilityand finance departments with senior consultants fwm "Big 5" accaunting and consulting firms. Our approach is to add value to your overalloperations. Managementconsultingseruicesoffered 6y(arter&Burgessindude thefollowing: Operations Management * DiagnasticReviewVManagementAudits * Organizational and Staffing * ProcessRe-Engineering * Benchmarking PerfarmanceMeasurements MergedRegionalization * Outsourcing * Continuous Improvement * Training Financial Management * Financial Planning and Analysis * financiaiModeling * Pricing of Services/ Rate Studies * (ostMeasurements * Capital Recovery fees * (onservation Programs * GASB 34 fompliance Information Technology * System Planning and Procurement * Web-BasedApplicotions * Systems Infegration 4 Proposal Comprehensive Water Distribution System Audit Severn Trent Pipeline Services Pitameter Water Services is now part of Severn Trent Pipeline Services (STPS), an international service and engineering firm. Their seruices are direded toward accurate collection and analysis of information regarding water and sewer systems. Their use diversified methodalogies, innovative techniques, and specialized equipment. Pitometer Water Services, STPS has been providing professional engineering services to the woter industry since 1896. PitometerWater Services, STPS employs a broadly trained staff of professionals with demonstrated experience in their specialized fields. Over the firm's long history, Pitometer Water Services, STPS's staff have developed numerous improvements in the methods used to colled and analyze system data. Withafficeslomtedstmtegimllyacross fheUnitedStates,theirprojedmanagersare ezperienced, dedicated individuals who have "come up through the ranks" as field technicians and are tharoughly familiar with day to day operational procedures. In addition ta their considerable technical ezpertise, a complete engineering and techniml office staff backs each praject manaqer. Pitometer Woter Services, STPS has the philosophy, experienced personnel and equipment that are unequaled intheindustry. ThisisevidencedbythefadthatPitometer Water Services, STPS has performed more than 500 projecrs in 32 countries. Our reputation for qualirywork is supported by the high degree of repeat clienh that they have had over the years. Pitometer Water Services, STPS has built a reputotian on providing quality pipeline services to loml communities in a manner that makes doing business easy. This combination of qualiry, service, regulatoryknowledge and local focus is the reason they have been around for mare than a century. As a result, STPS has become the industry leader in locol waterdistribution solutions. Carter Surgess 5 Proposa/ Comprehensive Water Distribution System Auclit Section 3 Relevant Project Experience The Carter & Burgess staff have been responsible for the planning, design, and management of a wide variety of projects. These projeds have been performed ocross not onlyTexas,butaraundthenation. Representativeprojeds are provided below. Weatherford Water Purification Plant Treated Water Flow Metering Evaluation Weatherford, Texas The City ofWeatherford water departmentemployees noticed the City had an unacceptablyhigh percentage of unacrounted far treoted water. The Ciry hired Larter & Burgess, Inc. ta investigate the possi6le causes far this unaccounted for water. The City had more than 15 percent of its water supply unaccounted far. Normal lass is around 10 perceM, while a 5 percent loss is considered good. The ciry's water plant produces 8 million gallons of water per day. (arter 8 Burgess engineers decided the woter may not be leaving the system, but that it was not accounted for in the process. Engineers calibrated the water meters and looked at the accounting system. Hurst Water Distribution System Master Plan Hurst, Texas Carier & Burgess, Inc. prepared a Water Distribution System Master Plan forthe Gtyof Huatwhich included computerized modeling of the firy's water system, a written report, software acquisition and training for Hurst Public Works staff. Theprojectwasperformedtoevoluateewstingsystems and plan for future expansion and growth of the distri bution system. The Liry of Hurst is more thon 90 percent built-out and dces not anticipate ezpansion of its current boundaries. The projed focused on operational issues such as energy efficienry, redudion of peaking charges for purchosed water and qualiry issues resulting from mixing well water ond surface water. A GIS system was linked to the hydraulic modeling sohware Cybernet, ta assist visualizing patterns and trends in water use and compare the outcome of several design scenarias. Our GIS staH developed digitized data of water lines and complete attributing for all features. The projedwas performed in hvo parts. Part One involved generalized camputer modeling of the Hurst Water Distribution System in order to analyze the system's operational efficienry and determine the most cost-effedive system enhancements. This phase included data colledion from water system maps, topographic maps, land use maps, previous water distribution system master plans, water-use studies, population figures and as-builtconstrudion plans. Next, water usages were analyzed; ond a model was created for evaluating the system. A future system model was developed to reflect projected system changes in configuration, operatians and water demand. Our engineers then seleded various operatianal scenarios for anolysis by computer madeling and then prepared a report which outlinedtheresultsoftheanalysis. Designated Public Works staff were hained on the detoils of the water system modeling an an ongoing basis throughout the development of the study. Training for basic manipulation of the data in the system was also provided. Part Twa of the projed required Carter 8 Burgess to oddress the (iry's abiliry to meet current and proposed state ond federal water qualiry regulations, and conduct a park irrigationstudy. Regulatory issues evaluated included Lead and Copper Rule, Surface WaterTreatmenf Rule, Information Colledion Rule, Disinfedion and Disinfection By-product Rule, and Enhanced Surface Water Treatment Rule. Forthe park irrigation study, alternative sources of irrigation were investigated for three [iry of Hurst parks. Engineers investigated treated wastewater effluent and local water well supplies as potential sources of i rrigation, reviewed the potential availabiliry ofsuch sources, and prepared a report Carter ::Burgess 6 Proposal Comprehensive Water Distribution System Audit ~ of the costs, potential regulatory ramifimtions, and a rost/ benefit analysis for each of the three City parks. Rowlett Water System 1 mprovements/ Elevated Tank Rowlett, Texas (arter 8 Burgess completed a number of projects as part of a major improvement of the Rowlett woter system. The facilities included a new 1-MG elevated tank, 8 miles of 12- to 24-inch water lines, telemetry system improvements and renovation of an existing 0.75-M6 elevoted tank. The Rowlett Raad Pump Station included design of a 2-MG ground storage tank, 24-inch water main, yard piping, hydropneumatic tank, drainage system and connedions to ezisting facilities. The water lines are lacated primarily in developed parts of the ciry, requiring utiliry caardination and construdion sequencing to minimize impads during construdion. The projed also induded the develapment of a computer model of the Lity's water distribution system demand projections for a 30-year design periad ta assess tuture water demands. Carter & Burgess also performed an evaluation of the existing water distribution system capaciry and pressures. Cedar Crest Pumping Station Dallas, Texas Carter 8 Burgess designed the 130-MGD Cedar Crest Pump Station which consists of a 96-inch diameter suction line, and 64-inch and 42-inch diameter discharge lines. The Cedar Crest Station serves two pressure planes in the Ury of Dallas, the Sauth High and Trinity Heights distribution systems. The pump station's initial pumping capociry consisted of three 8-M6D single-speed pumps and 1wo dual- speed pumps (30 MGD each ot low speed and 42 MGD each at highspeed). Cnrter & Burgess also designed and provided wimess testing of iwo 42-inch Venturi meters and three 18- inch Venturi meters. A SCADA data acquisition system was designed in order to allow remote pump station operations. landsmping to meet the City of Dallas landscape Ordinance was also provided. Carter:-Burgess This project required innovative design elements related to the site plan develapment, architedural treatments and landscaping in order to allow this high-mpociry pump statian, located an only 1.5 acres, to blend inta the adjacent residential neighborhaod which consisted of a church, residences and a golf course. The construdion administration of this projed induded balancing the ronstmdion activities while minimizing the disruption to the surrounding community. Projed adivities alsa induded surface and subsurface investigations, analysisofdesign altematives, pump station hydraulic design, surge analysis, struduwl design requirements based on specific site and sail candi6ons, pump station ronfigumtians, securiry systems design, resident construction administration services, ond eledrical/ instrumentotion, mechanical design, architedural design, and smoke detedion and removal system design. Circle T Ranch Fidelity Water Master Meter ft Water Line Along SH 114 Fort Worth, Texas Hillwood Development Corparatian officials plan ro supply Fidelity Investments at Circle T Ran<h with water from the City of Fort Worth. Carter & Burgessemployees designed the masterwater meter and water line olong Texas SH 114 that will bring the water 6om the city of Fort Warth into the planned community. Proposa/ Comprehensive Water Distribution System Audit t The master meter measures the flow of water through the 1 2-inch pipelines. Theprojedwillincludeabout700feet of line alang Tezas SH 114 and about 2,300 feet of water line inside the development. ThemastermeterusesaS(ADA System, which transmits signals from the master meter to the ciry of FortWarth ro inform water department emplayees oftheamountofwaterflowingthroughthewaterlines. The SCAUA system transmits to the central faciliry informatian conceming chlorine residual, temperature, pressure and flow. Lake Fork Pipeline Dallas, Texas Carter & Burgess is designing 26 miles of 108-inch raw water transmission line for Dallas Water Utilities. The line has a hydraulic capaciryof 216 M6D and will run from the lake fork Pump Station on the western shore of Lake Fork to the viciniry of the Iron Bridge Pump Station on the west shore of lake Tawakoni. The scope of services includes hydraulic design, alignment selection, right-of-way document preparation and acquisition services, surge analysis and on-site construction representation. Lake Palestine Water Utilization and Pipeline Alignment Project Dallas, Texas Larter & Burgess performed detailed utilization and alignment studies to develop preliminary plans for a 120- MGD rawwater intake and pump station at Lake Palestine, more than 85 miles of 84-inch raw water pipeline and associated appurtenances from lake Palestine to Dallas, and the 300-MGD Southeast Dal los Water Treatment Plant, the pipeline's terminus. The assignment involved preparation of preliminary hydraulic designs, alternate route Carter :.Burgess studies and site seledion for the water treatment plant and the rawwater intake/ pump station; alternate route studies far conveyance facilities; selection of final olignmentforthe raw water pipeline; right-of-waysurveys; preparatian ofcostestimotesforsystem construdion, operation and maintenance; and preparatian of a milestone schedule far implementing the development of Lake Palestine as a water supply source for the Ciry of Dallas. Carter & Burgess is alsa part of a team preparing final geometric alignment and easement dacuments for right-of-way acquisition of over 180 parcels over the 85- mile projed length. Lake Tawakoni Pipelines Dallas, Texas In addition to upgrading the Iron Bridge Pump Statian, CaRer & Burgess was responsible for performing candition assessments far the ezisting 15 miles of parallel 72- and 84-inch water tronsmissian mains from Lake Towakani to the Tawakoni Balancing Reservair. The staff performed physical inspections of the interior of both lines and the evaluation of various alternatives for lang-term cleaning of the pipelines. The pipeline cleaning aptions included continuous chemical disinfedion with liquid chlorine and hypochlorite, periadic shock chlorinatian, and mechanical ("pigging") cleaning methods. The importance of the pipeline deaning mnnot be over stated, since a rapid increase in pipeline roughness accurs if chlorination is terminated. The increase in frictian, which results in lower C-values, dramatimlly increases pawer costs for pumping. The projed alsa included extensive hydraulic analysis of the existing pipelines, performing surge analysis on the li nes, revising the design ofthe surge protedion equipment, and camputer modeling ofthe lines in conjundion with the Iron 8 Proposa/ Comprehensive Water Distribution System Auclit Bridge and lake Fark Pump Stations. Services provided on this projed included hydraulic analysis and design, surge analysis and design, physical inspections, computer nelwork modeling, and analysis af C-value protection and biofilm confrol. Puerto Rico North Coast Superaquaduct Pipeline San Juan, Puerto Rico Carter 8 Burgess participated in the design of 50-miles of 12-inch water transmission main to deliver treated water across the island of Puerto Rico. This project included an alignment study through developed areas and rural areas along a major divided highway. Corter&Burgesswosalso responsible for preparation of plan and profile sheets and detail sheets, which included highwoy crossings and construction along extremelysieep terrain. Southside 11 Water Transmission Main Fort Worth, Texas Carfer 8 Burgess provided surveying and engineering servicesforthisprojed,whichincluded atotalofbmilesof pipeline of 35-inch ond 48-inch water transmission main. Survey tasks included setting controls, alignment and topographic surveys, and preparafion of right-of-woy and easementdocuments. The line conveys water from the near narth side of Fort Worth north to new developing areas. The water line crosses severol creeks, ezisting roads and ezisting utilities. Design of the line included a hydraulic model and alternative route studies to determine the most cost-effective raute, detailed design, preparation of construction plans and specifications, advertising and bidding servicesandconstrudionmanagementservices. Theprojed involued construction sequencing and phasing to accommodate the improvement of a 2-lane counry rood to a 4-lane divided tharoughfare. Carter i-Burgess Fort Worth Northside II Water Transmission Main Design Fort Worth, Texas (ader & Burgess provided surveying and engineering services for 6.5 miles oF 48- and 36-inch diameter woter tronsmission main. The water line ronveyswater from the near north side of fart Worth, north to new developing areas. The water line crosses severol creeks, existing roads and utilities. The projed alsa induded designing a 24-inch Venturi meter station, yard piping and meter vault to meter flaw being pumped from the North Beach Street Pump Station inta the Northside II Pressure Plane. Construdion daumenis were prepared in phases in order ta ezpedite construction since rights-of-way for same seUions of the new pipeline were more readily available. The survey for the water line induded setting control from USGS monuments, alignment and topographic surveys, and preparation of right-of-woy and easementdacuments. All field notes were reduced and plotted using Intergraph sohware and hardware. Design of the pipeline included a detoi led transient analysis, access roods, alternative route studies to determine the most mst- effedive route, detailed design, preparation of construction plans and spe<ifications, advertising ond bidding services, and construction managementservices. East Canyon Microfiltration Water Treatment Plant Summit County, Utah (arter 8 Burgess is providing consulting services as District Engineer to develop and implement master plans. Providing ongoing engineering seruices to find and develop water sources, such as wells, springs ond surface waters (in an 9 Proposa/ Comprehensive Water Distribution System Audit area which has a moratorium imposed by the State Engineer); and to provide mast cost effedive infrastrudure for the transportation distribution and storage of this water to lands that do not have water. EastCanyonWoterlineis port of ihese services. Providing engineering services for design and constructian management of 72,000 feet of 30-inch diameter ductile iron high pressure (in excess of 465 psi) waterline. A Booster Station and Intake Strudure were alsa part of the projed. Providing engineering services for design and construdion management for 6.5 mgd pump station and intake strudure, ezpandable to 22 mgd, to pump water more than 1,100 feet vertically6om East Canyon Reservoir ta Snyderville Basin. Microfiltration WaterTreatment Plant. Praviding engineering services for design and construction of 22 millian gallons per day water treatment plant. The first phase being 6.5 million gallons perday. Dallas Water Utilities Eastern System Drought Implementation Plan Dallas, Texas The projed included the ezpansion of the ezisting 230 MGD raw water pump station to a firm capaciry af 310 MGD, and the design and construdion of the 241 MGD Lake fork Pump Station and 108-inch rawwotertransmission main. The drought conditions implementation plan developed population forecasts and per capita demands to determine total system demands through 2050. These demands were compared with demands developed by regression- extrapolation onalysis in order to determine the final demands used for planning. Costestimateswereprepored to connect Lake Fork into the DWU system including the Lake Fork pump station and transmission line. Additionally, six long range water supply alternatives were evaluated for ronneding Lake Palestine, George Parkhouse Carter :.Burgess No. 2, and Marvin C. Nichols No.1 to the Dallas system. Planning level construdion cost estimates and 0&M cost estimates were developed for each of the six alternatives. The total system corn were in the range of 5750 million, and induded new pump stations, a new surface water treatment plant, and over 100 miles of lorge-diameter iransmission lines. Total improvements for the pump station are estimated to be S14 million in three constructian contracts. Four new 68 MGD pumping units and 4,500 NP matars will be installed, olang with discharge and header piping. The instrumentation and controls at the faciliry are being upgraded bemuse the faciliry will be remately operoted from the East Side Water Treatment Plant after the installation of a new SCADA system. Iron Bridge Pump Station Renovation ~r Upgrades Dallas, Texas The Iron Bridge Pump Statian, ariginally construded in 1964 on Tawakoni Lake, has an existing capocity of approximately 220 MGD. It is a significant component in the Ciry of Dallas' raw water supply system, possessing nearly one third of the City's raw water pumping capaciry. (arter 8 Burgess is providing renovations ond upgrodes to increase pumping mpociry to 310 MGD, improve system reliability, extend the life of the faci liry for another 30 years and provide the capabi lity of a totally remotely operated stati on through the use of a S(ADA system. The initial phase of the projed involved preparation of a desiqn report that included condition assessments and upgrade recommendations for all structural, civil, mechanical, eledrical and architedural romponents of the pump station. Key recommendations included re- configuration of four ezisting 40-MGD pumping units, installation offour new 65-MGD pumping unih, replacing piping and valves, intake screens, sluice gates and all eledrical, instrumentation and controls. This phase also included providing internal inspedions and surge analysis 10 Proposal Comprehensive Water Distribution System Audit ~ for 11 miles of paralle) 84-inch ond 72-inch raw woter transmission mains from the Iron Bridge Pump Station to the Interim Balancing Reservoir. The second phase of the projed involves design and final plan preparatian for all recommended impravemenh with an estimated construdion cost of Sl 4.7 million. Carter & Burgess will also provide construction phase services that will include witness testing ofventuri meters and pumping units. Alsoincludedarefinalplanreviewandmodifications to the Lake Fork Pipeline Projed, cansisting of approzimately 22 miles of 84-inch water transmission main. SAWS Evaluation and Assessment of Operations San Antonio, Texas Carfer & Burgess provided a comprehensive evaluation ond assessment of water and wastewater operations for the San Antonio Water System (SAWS) as part of their Continuous ImprovementProgram. WorkingdirectlyfortheBoardof Directors, our scope included the analysis of general and administrative adivities and related costs, benchmarking and an analysis and recammendations on organization and staffing. The onalysiz of general and administrative activities was accomplished primarily through a 6enchmarking effort of peer utilities. Our appraach resulted in both an intemal performance gap analysis (i.e. management expectations vs. actual resulh) and an external perfarmance gap analysis with the peer utilities. Carter 8 Burgess utilizedacustomprogramtoassistwiththeintemal Carter Surgess and external comparisons and train SAWS personnel in its use for future studies. The findings of these analyses will be used to identify opportunities for improvements at SAWS. Carter & Burgess utilized our wstom program to perform analysis of staffing and organization activities to assist in romparing staffing levels at peer utility agencies. During the benchmarking task, Carter 8 Burgess defined the staffing and organization data needed from the peer utilities. Using the data from peer utilities ond our knawledge and experience ofthe water industry, we rompared and evaluated the staffing levels and organization strudure of SAWS needed to perform its mre business and to achieve its strategic plan initiatives. SAWS Information Technology Strategic Plan San Antonio, Texas Carter 8 Burgess is preparing a strategic infarmation technology plan identifying the vision and recommendatians for technology for the future. Theplanentailsevaluationaf the current systems in information management, technolagy andautamation. A specific outsourcing study is also being performed. Currently, SAWS is operating multiple operating system platforms including mainframe, Uniz and Navell netwark servers. In oddition to these platforms, most informatian management applications are not integrated, nor is operational data readily occessible from the existing supervisory control and data ocquisition (SCADA) system. As such, the information technologystrategic plan will identify platforms and applications which will fit business fundions and meet the future user needs. Retail fr Wholesale Water Rate Development Little Rock and North Little Rock, Arkansas The (ities of Little Rock and Nodh Little Rock are in the processofinergingtheirwaterufiliryoperations. Carter& Burgess is performing a cost of service water mte study including evaluation of the need for impact fees and an Proposal Comprehensive Water Distribution System Audit ~ updnting of its ancillary fees and chorges. This includes estahlishing financial and service policies for the merged utility. An evaluation of each city's distribution system is alsa being performed with the results being incorporated into the initial pricing structure for the merged utiliry operation. The goal is development of a unified rate strudure equalized over a seven to ten year period. Dallas Water Utilities Retail Water Rate Study Dallas, Texas Carter 8 Burgess is preparing a rate studyfor retail water service. Thisincludesrevenuerequirementsandallocation of cost to all customer classes. In addition, this projed includes a depreciation analysis of infrastructure assets to review the useful lives of oll of the departmenYs assets for water and sewec Carter & Burgess is also developing mst oi service and design of water supply standby charges. City of Longview Meter Accuracy Tests Longview, Texas Sevem Trent Pipeline Services conduded o studyofsix meters. Velociry prafiles were taken and measured at eoch location. The flow was measured at three di$ereni Bow rates to determine performance flow of each meter. Twenry-four hour flow measurements were also made at each location. City of Corpus Christi Meter Accuracy Tests Corpus Christi, Texas Severn Trent Pipeline Services conduded a study of four meters. Velociryprofilesweretakenandmeasuredateach location. The flow was measured ot three different flow ratestodetermineperformanceflowofeachmeter. Twenry- four hour flow measurements were also made at each location. Carter i-Burgess 12 3 3 P,roposa/ Comprehensive Water Distribution System Audit Project Team Carter 8 Burgess has assembled a team of highlyexperienced professionals for this praject. Their roles and reporting responsibilities are shawn in the organizatian chart below. The Carter & Burgess Team is orgonized araund o Projed Manager who will hove dired respansibiliry for the day-to- dayadivities of the ProjedTeam and ensure that all resources ore allocated to the team as required to meet the projed demands. Hewillalsobethemainpointofcontadforthe Ciry of Paris throughout the entire projed. The Project Manager will be supported by senior professionals with eztensive expertise and experience in their respedive area and will repart diredly to the Projed Manager. An organizationol chart depiding the Cader & Burgess Team isshownbelow. Briefqualificatiansofourteammembers are provided an the following pages, and full resumes of these and additional personnel are included in the Appendix of this submittal. We are pleased to present Dc Albert Petrasek, Jr, PE as the Proiect Manager for the City of Paris' Comprehensive Water Distribution System Audit. Dr.Petrasekhasover30 years ofexperience in the planning, design, and operotion of civil ond environmental engineering prajects. These prajects indude water treatment and distributian, water and wastewater master planning, wostewater colledion and treatment, water reuse, process design, municipal solid waste, hazardous waste, Superfund adivities, air pollution rontrol, wetlands and general environmental services. He has held positions with gavernment agencies and consulting firms and serued an the graduate foculty at universities in Texas and elsewhere. Ron Hayes, PE will be responsible for Engineering Services required for this projed. Mr. Hayes has over 20 years of ezperience in civil engineering consulting with 1 - Carter & Burgess, Inc. 2- Sevem Trent Pipeline Services CarterSurgess Proposal Comprehensive Water Distribution System Auclit responsihility far planning and management af civi) and environmental engineering projech. Mr. Hayes has extensive experience in the preparation of plans, specifications and estimates far water, wastewater, drainage and paving projeds. LarryShaw, CPA will be respansible for Financial Services for this projed. Mr. Shaw has mare than 30 years of ezperience specializing in management ronsulting related to public infrastrocture induding water, wastewater, solid waste and storm water. He specializes in financial planning and analysis, financial modeling, asset management, information systems technology, aperations management, organizatianal analysis, performance meosurement and benchmarking. Mr. Shaw has performed more thon 100 related financial analyses of utilities including rate studies, financial modeling, and review of impad ond special fees. Mr. Shaw formedy direded KPM6 Peat Marwick LLP's consulting sennces to government owned util ities from 1980 through 1995. Before joining KPMG in 1980, Mr. Shaw was employed at a major metropolitan woter and wastewater utility as a Special Projeds Manoger and as the Assistant Directar af Business where he supervised all accounting, finance, rate, meter, infarmation system, customer service and budget adivities. Since,1980, Mr. Shaw has completed an average of 40 hours per year of trainingfausing on governmentand utiliryseruices, covering the fundians of financial management, infarmation systems and operations management. Ne has been an active participant in AWWA adivities since 1915. Lin Lindsey will be responsible for Field Work for this project. Mr. Lindsey has over 35 years of extensive ezperience in construction inspedion and qualirycontrol for a wide range of projeds including water ond wastewater, utilities, roadways, airports, Flood control and large mixed- uselanddevelopments. Hisexperienceincludesprojedfield inspedion supervision, contradadministration and projed coordination. Hehasalsabeenresponsibleforconstrudion testing and monthly estimate verification. Carter :Burgess Tom Bean, PE will provide Leak Detedion Services for this projed. Mr. Bean joined Sevem Trent Pipeline Services (STPS) in 1969 and has hands-an field and management experience in water distribution systems, district measurements, hydraulic field tesiing, hydraulic modeling studies, water qualiryanolysis, ond master planning projecrs. Mr. Bean is responsible for field data ocquisition, overall data analysis, report preparation, budget control, and overall dota and repart qualiry for all projects being performed by STPS in the Southern Distrid. 14 Proposa/ Comprehensive Water Distribution System Audit Section 5 Project Understanding & Approach Project Understanding Background The Ciry of Paris, Texas is located in nartheastTezas in lamar County, os indicated in Figure 1. The ciry is in the geographimlcenterofthemunryandisapproximotely 16 miles south of the Red River. Paris is 90 miles southwest of Tezarkono, and 105 miles northeast of Dalias. The papulation of Paris is 25,898 based on the 2000 Census data. The historical papulation data for Paris and Lamar Counry are presented in Figure 2. Lamar (ounty experienced ropid growth through 1920, and then ezperienced declining papulation until 1960, at which time a steady population increase began again. the major objedive of this projed is to identi{ythe sources of the unbilled water. In order to incorporate the results of this project inta the on-going rate study, the time frame for completing this projed is two to three months. The Ciry's distribution system is shown as a simplified schematic diagram in Figure 3: The system mrrentiy has 9,900 billed accounts, and provides water to 174 meters thatarelwo-inchesorlarger. Additionally,theLamarCounry Water Supply Corporation is a relatively lorge customer of the Ciry of Paris. The residentiaVcommercial custamers average daily consumption was 2.6 million gallons during thepreviausyear. Foracitywithapopulationof25,898, this is equal to a per mpita mnsumption of 100 gpcd, which is very reasonable. Unbilled, or unaccounted for, water can be the result of a number of different fadars induding: The population of Paris has been steadily growing. The trend analysis indicatesthat Paris has added approximately 187 people per year since 1850. This normally translates to approzimately 60 new houses per year. Much of the growth can be attributed to the steady inHuz of manufaduring intotheCityofParis. The(iryhasseverallargeemployers including Campbell Soup, Kimberly-Clark, Sara Lee, ond Turner International Piping. Additionally, the health care industryis a large employer in the City. The Ciry experienced o major fire in 1916, and all of the downtown area was reportedly lost. The CBD wos reconstruded, and most of the water lines in the central portion ofthe cirywere construded during the 1920's. Project Background The Ciry is wrrendy experiencing an unacceptably high amount of unbilled water in the drinking water system, and Carteri-Burgess * Customersthatarenatmetered: • Parks • Water main flushing • Fire protection • Consiruction • Streetwashing • Cityi«igafion * Leakage in the system +t Inacaratemeters * Inaccurate billing software * Meters that have been pulled and replaced with jumpers 15 Proposal Comprehensive Water Distribution System Audit I * Metea that are too large for the appliwtion and do not read at low consumption levels To determine the source of the unbilled water in the system, several important areas of the utiliry operation need to be evaluated. Theseareasareidentifiedinthefollowingitems: rt An evaluation of the installation and accurary of various meters installed in the City's system must be performed. * Investigate and estimate the amount of unbilled water used bythe Ciryand other customers. * The existing billing saftware should be examined to canfirm thatthere are no under-billed accaunts. * Thepossibleleakageinthesystemmustbeevaluated to determine the eztent of the problem, and to identi{y, in so far as possible, the areas with most of the leaks. * Determine the feasibiliry af ineter replacements to reduce the amount of unbilled water in the system. Project Approach Problem Identification The firyof Paris produces approximately 12 to 15 M6D of water on on average day. The typical consumption for residentiaVrommercial uses is reported to be 2.6 MGD. Therefore about 10 to 12 MGD of water is being supplied to major customers. The first adion should be to confirm that the meters far the major cusromers are reasonably accurate. The Grystaff has a number of these metersthat are routinely colibrated as partofthe normal operations; therefore, this portion of the projed should proceed rapidly. Additionally, the master meter's (the 42-inch meter) calibration needs to be wnfirmed, since that is the basis for much of the dotn that have been gathered. Checking Carter nBurgess calibration of the master meter appears to be reasonably straight forward, and the volumetric procedure described helow will be used. Flow Meter installation The (arter 8 BurgessTeam will visitthe meters identified by Cirystaff andevaluatetheinstallatian. The evaluation will be conduded for the following reasons: * To determine if ihe installation of the meter mn have an adverse impact on the accuracy, and * Toevaluatethelocotianandinstallationforsubsequent in situ mlibration. The Team wil I document the canditions at each meter location by preparing a field sketch ofthe instailation and o6taining digital phatographs. Installation Errors The most common errors in installing flow meters are: * Lacating the meter in a position where it dces not flow full. * Failing to provide the upstream and dawnstream conditions necessory to minimize turbulence in the meter. 16 Proposal Comprehensive Water Distribution System Audit I * Allawing air to enter the process flow, resulting in metering error. * Failuretoproperlygroundtheinsfruments,resulting in induced errar in the eledronic components. * Installingameterthatisover-sizedfortheflawtobe measured. * Installing the meter in a location that makes future maintenance impossible. Meter Accuracy The accuracy of flow meters is a common problem encountered in the water industry. The science that deals with accuracy in measurements is metrology, and there have been numeraus books written on the issues associated with o6taini ng measurements that are both accurote and precise. In the United States, the Notional Institute of Science and Technology (NIST), which used to be known as the National Bureau of Standards, is the organization that is charged withsupportingmetralogyatthenationalscale. Therefore, in a purest sense, all measurements should be traceabie to NIST. Error in Flow metering systems is introduced byeach element used in the flow measuring process. (onsider a venturi tube system that consists of the venturi tube, the differential pressure transmitter, and the indicator/recorder. Each of the three devices has some intemal error that cantributes to the overall error of the measured flow. It is important to realize that these errors ore multiplimtive, not additive. In Situ Meter Calibration Several techniques can be used to perform in situ meter calibration, or to check the accuracy of ineters that are currently in service. The techniques that are most applicable to the Ciry of Paris' praject are dismssed in the following paragraphs. Carter i-Burgess Volumetric Calibration The volumetric calibration method consists of timing the increase or decreose in water volume in a tank or basin of knowngeometry. Thetechniquerequiresthatthegeometry of the volumetric tank be well-known, that the chonge in water surface elevation can be determined relatively accurately, and that the time between differentelevations mn be measured with reasonable accurary. When perfarmed rorrectly, valumetric mlibrotion is among the most accurote methods for calibrating flow meters. The method is ohen referred to as the "bucket and stop wotch" procedure, which is descriptive terminalogy, but does not indicate the relative complexiry of the procedure. The pracedure involves the measurement of three separate parameters: the volume of the tonk, the change in water surface elevation, and the time. For the procedure to be accurate, all three measurements must be preformed with reasonable accurary. Tracer Dilution Method The tracer dilution method of in situ calibration consistsof odding a known amount of the tracer to the process flow and determining the concentratian in the process flow downstreamafthemetertobecalibrated. Figure4shows o typical tracer dilution set up, and the equipment requirements are minimal. A calibrated container for the tracer is required to confirm the rote atwhich the metering pumpisaddingthetracertatheprocessflow. Theremust6e iwa taps in place, one through which to add the tracer, and the ather from which to col led the downstream sample. The flow in process is calculated from the following simple equation: q x _ (O+q) x C, where q is the flow rate of the tracer, C, is the concentration of the tmcer in the tracer solution container, 0 is the process flow rate, and Cz is the concentration of the tracer in the downstream wmple. 17 Proposal Comprehensive Water Distribution System Audit ~ As an example, for a tmcer concentration, of 50,000 mg/L, and a trocer flow rate of 0.01 gpm, and a downstream tracer concentration of 5.0 mg/l, the process flow rate is calculated as, 0.05 x 50,000 =(Q + 0.05) x 5.0 500=5Q+0.05 0 =100.01 gpm Theseledionofthetraceriscritical. Thetracercannatread with any of the ather compounds i n the process flow for the procedure to be accurate. Additianally,itisdesirobletouse a tracer that is not present in the process flow, because the need for o bockground sample upstream of the point of traceraddition iseliminoted. Mizing in fhe pipeline is imporfant. The basic assumptian is thatthe tracer will be uniformly mixed with the process flow so that the downstream tracer roncentmtion measured is on occurate indication ofthe adual downstream concentration. The rate of tracer oddition must be known with good accurary for this method to be used. The rate of tracer addition is usually determined bytiming the draw down in the calibrated tracer cantainer. for this reason a groduated rylinder is usually used as the container. The metering pump must pump at a constant rate, therefore, multiple volume readings are token on the mlibrated container. Transfer Standard The use of a transfer standard to calibrate flow meters is relatively common place; however, it is important to document that the transfer standard is properly mlibrated. Transfer standards used for flow meter calibration usually include either clamp-on ultrasonic meters or pitat tubes. If used mrredly, either instrument can function adequatelyas a transfer standnrd. A rypical transfer standard installation isshown in Figure 5. It is important that the recommendations for proving an undisturbed flow path both upstream and downstream of Carter -Burgess the transfer standord be fol lowed. Additional Iy, the transfer standard should 6e calibrated before gaing to the field, and after being used in the field. For pitat tubes, the assumptian that the averoge flow in the pipe is being measured is impodant. Pipes exhibit a parabolic velocity profile, and multiple measurements are required to obtain accurote results. Aker evaluating each meter's installatian, the Corter 8 Burgess Team will use the in situ calibration procedure that is mast appropriate for each meter. Leak Detection The location of leaks in the distribution system can be very challenging. One of the most common ways to locate leaks is to use geophones and listen for leaks in the system. This procedure is generally quite precise, and it will pravide some relative indication of the size of the leak. However, the procedure is best employed when the approximate location of the leak is known. For a distribution system wide study the ezclusive use af sonic detection methods is generally cost prohibitive. Fortunately, there are some steps that con be taken to narrow down the areasto be investigated. In most cities the night- time water consumptian for residentiaVcommercial uses is quitesmall,especiallybetween2amond4am. Duringthis ti me, portions of the distribution system can be isolated and water elevations in the elevated tanks monitoied. falling water elevotions are an indication of possible leoks. 18 Proposal Comnrehensive Water Distribution System Audit Depending on the size of the elevated tank, a very large leak may be required to permit detedion bythis method. For instonce, a rypical 500,000-gallon elevated tank has a bowl with a 55-foot diameter. The bowl volume is 17,111 gallons per foot, and if a one-faot draw down is needed in a rivo-hour time, the minimum leakage rate that can be deteded is 150 gpm. For a 1 MG elevoted tank with a 70- foot diameter bowl, the minimum leak detedion rate would 6e 250 gpm. An alternative method is to iwlate porfions of the distribution system and pressure test the system with a portable pump and water storage tank. The pump can be conneded diredly to the outlet on anyfire hydrant, and the leakage measured reasonable preciselywith a conventional water meter. Once the areas with high leakage potential have been identified, sonic leak detedion methods will be employed to confirm the locations of mojor leaks. Review Of Billing Procedures The Carter & Burgess management cansulting staff will review the ezisting billing system with the abjedives af: * IdentityinginadiveaccauntsthatoreaUuallyactive. * Determiningthesmallusers. * Identifying the large users, and checking the meter size. * Identifying duplicate ocrounts. * Identifying unbilled customers, and determining how to colled revenue. Additionally, the metered revenues, meter routes, meter schedules, etc. will be carefully reviewed and evaluated, and farter 8 Burgess will prepare recommendations on improvements to the system. Meter and Billing Activities Review * Determinetheeztentofandreasonsforunaccounted for water. • Gather dato on "noncustomer" metered/non- metered flows to occount for uses nat billed to customers such as main flushing, fire usage, sewer deoning, hydrant testing, and other municipal adivity usage. • Compare customer metered consumption with purchased woteramounts on a monthly, quarterly, and annual basis noting any changes in comparative data during peak and non-peak periods. • Determine the remaining unaccounted for water amaunt afrer considering estimates of the known uses noted above. • Consider sedioning-off selected portions of the distribution system for more detailed analysis of unacrounted for water if warwnted bythe obove analysis. * Review the procedures and processes of managing meter adivities. Gather data on: - metered cansumptian by customer class - meter sizes by customer class - meter routes and number of ineters per route - rypes and oge of ineters bysize currently active in the system Review data ond evaluate meter replacement poliry, route efficienry, effediveness of ineters by rype and brand, ond repair versus reploce policy. Provide a costand benefit evaluation ofa scheduled replacementand resizing program. Review capabilities of the current u61iry billing system and the interface tothe meter readingsystem. ! Carter.=Burgess 19 ~ Proposal Comnrehensive Water Distribution System Audit • Evaluate current meter reading and billing processes for efficienry and seruice level to customers. k Summarize the above analysis and suggest recommended actionsfor improvement in metering and billing adivities. Project Execution Location of Work Eifort The Carter & BurgessTeam will perform all of the workfor this projed in the Dallas office or in the Ciry of Paris. Project StafFing The individuals identified an the organization chart are arrent employees of Carter & Burgess and Sevem Trent Pipeline Services, and they are supported by an additional 340 people in the Carter & Burgess Dallas office. City of Paris Participation Carter 8 Burgess believes that having dients participate uctively in projects is beneficial tothe dient. One of the best ways to have dients participate is to conduct periodic workshops on specific topics. For this particular projed, threeorfourworkshopsmnbeconducted. Eachworkshop would bethree to five hourz in length and could be conduded ineitherPorisorDallas. Possibleworkshaptopicsinclude: * Reviewofinetermlibrationresults ♦r Evaluationofbillingsofiware - results and recommendations • leakageinthesystem -resultsanddiscussion * Studyrecommendationsandcondusions Carter -Burgess 20 - - - - - - - - - - . . _ ~ ~ ud Y rr w w w w r YI r Figure 1- Map of Texas ounty Figure 2- Population for Lamar County and Paris, Texas 60,000 50,000 40,000 c 0 3 30,000 a 0 a 20,000 10,000 Q ~ Lamar County A ! ` , . , . . , ~ . • r . • . . , ~ , ; . ~ . • I ~ , , ~ . , . , r" . i. , , . , , , . ' Paris ~ ■ y = 187.39x - 346379 RZ = 0.9758 1840 1860 1880 1900 1920 1940 Year 1960 1980 2000 2020 _ _ _ _ ` - _ ~ - - - r ~ ~ r r r Y V ~ vi Y {J 6d L/ V V u u V u V Figure 3- City of Paris Ground Storage/Distribution Process Flow Diagram Treated Water `I Y Y Y`i Y Y`I Id Y Y Y Id Y ri U+1 Y 1i w w Y Y Gi ii 0 ii ri fi 0 fi bi n Figure 4- Tracer Dilution Method for Meter Calibration Gl+q ~ Downstream Sample Flow t Meter Calibrated Container with Tracer Metering Pump P q Upstream sample, T if required ~ ~ - - - - - - - r . . . . . r r r r r w rr Irr IYa " w Y Yd " Y Figure 5- Typical Application for a Transfer Standard 0 ~ ~ Q ~ ~ ~ ~ ~ ~ 1 ~ ~ ~ I ~ ~ ' ! 1 1 Proposa/ Comprehensive Water Distribution System Audit Section 6 References The Carter &Burgess Team maintains an excellent working tit DaleFisler relationship with numerous municipal and public clients. Ciry of Fort Worth The best measure of past performance is that of our references 1000 Throckmorton by our clients. We encourage you to contod our references Fort Worth, TX 76102 below to discuss our firm's and team members' past and (817) 871 _g ppp ongaing performance. Projects: Northside II Water Transmission Main Southside II Water Transmission Main Carter ft Burgess TeamMember: AlbertPetrasek,lr,PhD,PE * lenniferCottingham * MelissaKauth Dallas Water Utilities San Antonia Water System Purchasing Depariment 2121 Main St., Suite 300 1001 E. Market Street Dallas, TX 15201 San Antonio, TX 78298 (214) 948-4563 (210) 508-0433 Projech. Lake Fork Pipeline Projects: SA WS Eval. and Assess. of Operations Lake Tawakoni Pipeline SAWS IT Strotegic Plan Team Members: Albert Pehasek, Jr, PhD, PE Team Member Larry Shaw, CPA Ron Hayes, PE Lin Lindsey Severn Trent * TerraceStewart PipeIIIIe Services Dallas Water Uti lities 1500 Marilla 4AN * Mike Brawn Dallas, TX 75201 Ciry of Longuiew (214) 610-3144 P 0 Bax 1952 Team Member Albert Petrasek, Jr, PhD, PE Longview, TX 75606 (903) 759-1053 * Charlie Stringer, P.E. Projech. Longuiew, Texas Meter Accurary Tests Dallas Water Utilities Team Member Tom Bean, PE 2121 Main St., Suite 300 Dallas, TX 75201 * Frank Rodriguez (214) 948-4578 CiryofCorpusChristi Project.• Lake Pales6ne Water U6lization and 1201 Leopard Pipeline Alignment Corpus Christi,lX 78401 Team Member. Albert Pehasek, Jr, PhD, PE (361) 861-1214 Project Corpus Chris6, Texas MeterAccurary Tests Team Member Tom Bean, PE Carter-Burgess 21 ! r ~ ~ ~ ~ ~ ~ ' a ~ ~ ~ ~ ~ a ~ ~ ~ ~ ~ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ] Proposal Comnrehensive Water Distribution System Audit Appendix Resumes of Key Personnel Carter Surgess zz ALBERT PETRASEK, Jr, PhD, PE Project Manager Carter £t Burgess, Inc. Education Ph.D., CiviVEnvironmental Eng,191` Texas A&M University College Station M.S., Civil Engineering,1970 Texas A8M Universiry College Station B.S., Civil Engineering,1967 Texas A&M University College Station Professional Registration Registered Professional Engineer 1976, iX, 39168 1999, OK,19452 ~ Professional Experience ~ Dr. Petrasek has over 30 years of experience in planning, design, construdion, and operation of engineering warks. He has heen an engineer for over 52,000,000,000 in construdion in the United States and Mexico. Dr. Petrasek worked as the chief of in-house ~ pilot and demonstration scale research for the U. S. EPA's Office of Research and Development, Cincinnati, Ohio for several years. ~ In that position, Dr. Petrasek had responsibiliry for the Agenry's research program far instrumentation and controls, and a significant amount of work was conduded evaluating different rypes of flow meters, and establishing standards and criteria for the 9 corred installotion and operation of the instruments. 3 Dr. Petrasek has extensive experience in the design of ineter instollations, and in the operating and maintenance issues associated 3 with metering. Dr. Petrasek is a former employee of Dallas Water Utilities, and he hnd operational responsi6ility of the I Department's R&D facilities, which hos 15 magnetic flow meters, ten turbine meters,l5 orfice meters, and four venturi meters. I Relevant Project Experience 3 • Design, Construdion, and Operation of Flow Test Stond, Projed Manager, U. S. EPA, (incinnati, Ohio. This projed inciuded the ~ design, construction, and operotion of a flow test stand to calihrate flow meters. The test stand included a water recirculation loop, high-speed diverter valves, pumps, water storage fanks, gravimetric water tonk, and scales. The unit wos designed to ~ operate on water Flow meters with a maximum size of eight-inches and provide NIST traceable accurary to 0.05 percent. The ~ high accurary is required to verift meters with a stated accurary of 0.5 percent. ~ ' ~ ~ ' ! . ALBERT PETRASEK, Jr, PhD, PE Page 2 ~ , • Development of National Standards for the Installation of Eledromagneti4 flow Meters, Projed manager, U. S. EPA, Cincinnati, Ohio. The projed included the development of national standards for the instollotion of eledromagnetic rype flow meters or oll ~ sizes. The projed was conducted by the U. S. EPA and the National Institute af Standards and Technology (previously the a Nss). ■ • Development of Notionol Standards for the Instollotion of Venturi Tubes ond Venturi Noales , Project monoger, U. S. EPA, ' fincinnati, Ohio. The projed included the develapment of national standards for the installotion of venturi tube and venturi noale rype flow meters or oll sizes. The projed was conduded by the U. S. EPA und the Notional Institute of Stondords ond ■ Technology (previously the NBS). ' • Development of National Standards for the Installution af Parshall Flumes and Palmer-Bowlus Flumes, Project manager, U. S. ! EPA, fincinnati, Ohio. The projed included the development of nationol standords for the installation of Parshall Flumes and 3 palmer-Bowlus Flumes or all sizes. The projed was conducted by the U. S. EPA and the National Institute of Standards and Technology (previously the NBS). ~ ~ • Water and Wastewater Master Plan, Edinburg, Texas, Principal-in-Charge far a Wostewater Moster Plan for the Ciry of Edinburg and its eztraterritorial jurisdidion, including several colonias. This Master Plan will guide the City's development in water and ~ wastewater for the next twenry years. Total planning area cavered 136 square miles. The following areas of concern are being ' studied i„ order to evaluate and make recommendations for the Ciys infrastrudure: - Analyze cu«ent waste water system and future demands 31 - Evaluate existing wastewater colledion facilities - Evaluate existing wastewater treatment facilities ~ - Analyze current wostewater system and flow records ~ - Evaluate existing pumping and treatment facilities - Development of water nnd wostewoter hydraulic models ~ 2 As a toal for evaluoting these concerns, o Geographic Information System (GIS) for the City wos developed concurrently with an overall Capital Improvement Plan (CIP). financial requirements associated with the CIP were identified as well as potential ~ funding sources. In oddition, several lift stations were eliminated because of the analysis. 1 3 i ~ ~ ~ i Raw Water Pump Station and Transmission line, Ciry of Palestine, Texas, Principal-In-fharge for the design of a 15 MGD raw water pump statian and 11 miles of 36-inch raw water transmission main. The projed includes improvements to an existing intake strudure, a new eledrical and chlorine diozide building, stand-by generator sets, the pump station, and the transmission main. Services being provided include right-of-way acquisition, surveying, preparation of a design report, design, surge anolysis, construdion administratian, and construction inspection. Estimated construdion cam are S 8 million. Raw Water Pump Station and Tronsmission Line, Kinder Morgan; Quality Control for this projed that includes 27-miles of transmission moin, a baloncing reservoir, and o new raw water pump station. Design flow for the projed in southeast Oklahoma is 5 MGD and the estimated projed costs are S10 million. ~ a a ~ ~ ALBERT PETRASEK, Jr, PhD, PE Page 3 ~ ~ . Iron Bridge Raw Water Pump Station Renovations, Dallas, Texas, Project Diredor for the renovation of the 240 MGD raw water S pump statian. Project included the mechanical, eledrical, instrumentation ond controls, and structural components. Estimated ~ construction cost of $21 million. ' • Lake Fork Raw Water Transmission Line, Dallas, Texos Project Diredor for the design and construction administration of 26 ~ miles of 108-inch raw woter transmission moin. Line will run from the Lake Fork Pump Station, on the western shore of Lake Fork, to the Iron Bridge Pump Station on the western shore of Lake Tawakoni. Estimoted construction cost is $111 million. ~ The first sedion, which is 39,000 LF, is under construction for a contrad amount of $27 million. 3 • lake Fork Pump Station, Dallas, Texas Prepared design and cost estimates for the 216 MGD pump station with a conneded 3 load of 24,000 HP. Prepared computer simulations of 26 miles of 108-inch line,l5 miles of 72-inch line, and 15 miles of 3 84-inch line with 14 pumping units in iwo different pump stutions. Estimated construdion cost of 527 million. 11 • Shorecrest 48-Inch Water Main, Dallas Water Utilities Principal-In-charge for the design of 4,000 LF of 48-inch woter main ~ located on the north end of Love field in Dallas, Tx. The main conneded into the yard piping at the Bachman Water Treatment Plant. The construdion cost was 5920,000. 3 ~ • Lake Tawakoni Transmission lines; Dallas, Texas; Projetl Diredor for ihe condition assessment, surge analysis, and surge protedion upgrading to 15 miles of 72-inch and 15 miles of 84-inch raw water transmission main. 1 • Iron Bridge Raw Water Pump Station No. 2, Dallas, Texos; Project Diredor for the preliminary design of the 300 MGD raw ~ water pump station. Services provided included surveying, preparation of preliminary plans, cost estimates, and computer ~ simulation of system hydraulics. Estimated construction cost is S25 million. 3 • Woter Treatment Plant, (iry of Donna, Texas; Principal-In-Charge for the design of a new 6 MGD surface water treatment plont. 3 Faciliry included raw water intake strudures, reador-clarifiers, filters, clearwell storage, and high seruice pumping. Disinfection for (T is with chlorine diozide followed by chlorination. Estimated construction costs of 55,300,000. 7 31 • long Range Woter Supply Plan for Dallas Water Utilities; Principol-In-Lharge. This project developed an implementatian program for the eastern portion of the (iry of Dallas system under drought conditions. The project had total estimated capital 3 cosis of $500,000,000 and included o new 100 MGD surface wnter treatment plant, improvements to an ezisting 176 MGD 3 pump station, the construdion of a new 100 MGD pump station, and the construdion of over 100 miles of 72 ond 84-inch transmission lines. ` ~ ~ • Benbrook Water Treatment Plant Expansion, Texos, Project Manager, projed included the expansion from 5.0 MGD to 11.0 MGD. The treatment facilities included new rapid mixing basins, flocculation basins, clarifiers, and filters; additionally, ~ improvements were designed to the ironsfer pump stafion, high service pumps, ond insirumentation und control sysfem. 3 (onstrudian cost af 52,500,000 i if A a ~ ALBERT PETRASEK, Jr, PhD, PE Page 4 ■ ~ • Water Transmission line, Dollas, Texas; Projed Engineer, Projed included the design of 11 miles of 96-inch RCCP water ~ tronsmission line from the East Side Water Treatment Plant to Jim Miller Reservoir. fonstrudion cost of 524,000,000. ~ • Woter Transmissian Line, Dallas, Texas; Project Engineer; Projed for Dallas Water Utilities included the design and construdion ■ management af 17 miles of 84-inch transmission line from Jim Miller Pump Stotion to the Beltwood Reservoir. Construdion ~ cost was 527,000,000. ~ • CISCO - Woter Plant, (onfidential Clieni, Australia, Projed Manager; preparation of cost estimates and preliminary design of ' o reverse osmosis woter treatment faciliry for a DOD contrador. Project included the evaluation of existing weil field as a source of supply, and design of modifications to existing facilities to accommodate the new treatment processes. ~ • Design of Woter Meter Stotions for Dallas Water Utilities. Projed includes the designs for three metering stations; Hackberry, ~ Elm Fork, and lameson; that provide water metering service for DWU customer cities. Estimated project cost 54,500,000. ~ ' • Water Supply for the City of Mansfield. Design of well, ground storage, and booster pumps for the city. ~ • Safe Drinking Water Ad Studies, lone Star Army Ammunition Plant and Red River Army Ammunition Depot Tezarkana, Tezas; ' Projed Monager; Safe Drinking Water Ad studies for the 3.0-MGD surface water treatment plant, including Q study and complionce evaluation. 1 • Water Storage and Pumping Facilities, Highland Park, Texas; Projed Manager; design of 1,500,000-gallon Gillon Avenue ~ ground storage reservoir and booster pump station, including chlorine storage, handling, feeding and leak detedion ~ equipment. ConsTruction cost $1,500,000. • Red Oak Water Treatment Plant, Red Oak, Texas Projed Monager; sanitary survey and preliminary design for Red Oak 2 Reservoir and preliminary design of 30-MGD treatment plant. Estimated construdion costs of $45,000,000. • Ozone/UV Disinfedion Studies; Projed Engineer; performed evaluation of combined azone/UV disinfedion as an alternative to ~ chlorination. The process was found to be significantly improved over the use of either process individually. 3 • Ozonation Studies; Projed Engineer; performed evaluation of ozone contactor design ~ • Projed wos performed for the U. S. EPA and included counter-current bu6ble diffusers, packed columns, ond continuous-flow a sti«ed tank readors. ~ • D/FW Airport Booster Pumps, D/FW Internationol Airport, Texas, Projed Manager; addition of 10-MGD booster pumps at ~ 0/FW's East ond West Pump Stations. i ~ ~ a 0 ~ ALBERT PETRASEK, Jr, PhD, PE Page 5 a 2 • Comprehensive Developmentol Moster Plan for the [iry af Orange, Tezas; Projed ManagedEngineer. Projed included the 3 development of a Comprehensive Developmental Plan for this city of 23,000 in southeast Tezas. Work performed included the ~ preparation of land use plans master plans for water, wastewater, and municipal solid wastes; mapping of the city; and development of the ciry GIS. ~ ~ • Water and Wastewoter Master Plans for the Liry of Wilmer, Texas; Projed Manoger/Engineer. Project included the preparation of both woter and wastewater master plans for this ciry of 5,000. Planning period was through the year 2020. ~ • Utility Master Planning, Lone Star Army Ammunition Plant, Texarkana, Texas; Principal-in-Chorge; preparation of Facility Plan ~ for this industrial complex of over 40 square miles in north eost Tezas. Work included water distribution system, wastewater collectian system, the water treatment plant, the wastewater treatment plant, and performing a leak detection study on the distribution system.. 3 ~ • Bexar Lounry Water System Planning, San Antonio, Tezas; Projed Monager; development of Emergency Water Plan. Projed included developing the prototype emergenry water plan for the forps of Engineers for San Antonio, Texas, which has 101 ~ water puNeyors, all using the Edwards Aquifer as the source of supply. 9 ] ~ ~ 3 ~ ~ 3 ~ ~ i 31 7 31 ~ ~ i a ~ 4 ■ ~ RON HAYES, PE Civil Engineer ~ ' Carter Ft Burgess, Inc. ~ Education ~ B.S., fivil Engineering, 1980 ~ Old Dominion University f~ Professional Registration Registered Professional Engineer ~ 1985, TX, 58807 ~ Organizations 3 Ameriron Sociery of Civil Engineers Texas Natural Resource Conservotion Commission ~ ~ Professional Experience Mr. Hayes hos aver 20 years of experience in civil engineering consulting with responsibiliry for planning and management of civil ' and environmental engineering projeds. Mr. Hayes has eztensive experience in the preparation of plans, specifications and estimotes for water, wastewater, drainage ond paving projeds. ! ~ Relevant Project Experience ~ . Iron Bridge Pump Station Preliminary Design, TX; Projed Engineer. Design of 22-mile, 108-inch diameter raw wnter ' transmission pipeline from Lake Fork to Lake Tawakoni. _ • lake Fark Pipeline, Dallas, TX; Project Engineer. Project consisted of designing 26-miles of 108-inch diometer raw water transmission pipeline from Lake Fork to Lake Tawakoni in east Texas. The design included pfeliminary hydroulic design of a a future Lake Fork Pump Station, surge anolysis for the transmission system, final plans and specifications for the pipeline, 2 permitting by the Corps of Engineers and TXDOT, conducting environmental and archeological surveys. Estimated construdion ! cost of 590,000,000. 3 • North Park Public Utility District, Horris [ounry, TX; Projed Engineec Provided services to distrid induding design and i preporation of technical specifications ond contrad documents for water, wastewoter, paving and drainage improvements. Services included construdion oversight, progress payment review, state agenry submittals and fund applications. i • Water and Wastewater Design for Unserved Areas, Dallas, TX; Projed Engineer. Preliminary design and evaluation for 710 ~ unserved areas in Dallas. Design oversight for 19,200 linear feet of B-inch wastewater main and 8,400 linear feet of 16-inch , woter main under first unserved area ronstrodiom mntmct. a s s a RON HAYES, PE Page 2 r . Harris Lounry Municipal Utiliry District No. 13, Ha«is founry, TX; Projed Engineer. Provided services to Distrid including design and preparatian of technical specifications and contrad documents for water, wastewater, poving and drainage improvements. Services included construdion oversight, progress payment review, state agenry submittals and fund applications. . Polk Street, DeSoto, TX; Projed Engineer. Provided design of 3,200 linear feet of 24-inch woter main and 2,300 linear feet of 8- ond 10-inch wastewater main. Design included 270 lineor feet of aerial «ossing with five pier supports. ~ ~ I LARRY SHAW, CPA 2 Finan6ial Consultant I Carter fr Burgess, Inc. ~ Education ~ M.S., Business Administration, Trinity Universiry,1964 _ B.S., Accounting, Bradley University,1962 ~ Registrations Certified Public Accountant 3 Affiliations/Organizations 1 . Significant contributians made ta the revision of the Water Rate Manual edition af 1981. 3 . Developed and served as on instrudor for the Financiol Manogement Seminar offered by the AWWA over a ten year period, beginning in the 1980s. ~ . Assisted in the development and editing of the initial Water Utility Capital Finoncing Manual and performed a qualiry ~ review an the first revision. . Managed the first revision of the Water Utiliry Accounting Manual during the 1990's. 7 . Served as the chairperson and/or os o member on various AWWA committees since 1975 including the Water Rates ~ fommittee, the Accounting Committee and the Accounting, finance and Management Controls Committee. ~ Professional Experience Mr. Shaw has more than 30 years of experience specializing in management consulting related to public infrastrudure including ~ water, wastewater, salid waste and storm water. He specializes in financiol planning and analysis, financial modeling, osset 3 management, informatian systems technolagy, operations management, organizational analysis, performance measurement and benchmarking. Mr. Shaw has performed more than 100 related financial onolyses of utilities including rate studies, financiol ' modeling, and review of impad and special fees. Mr. Show formerly direded KPMG Peat Marwick LLP's consulting services to 3 government owned utilities from 1980 thraugh 1995. Before jaining KPMG in 1980, Mr. Show was employed ot a major metropalitan water ond wostewater utiliry as a Special Projeds Manoger and as the Assistant Diredor of Business where he a supervised all accounting, finonce, rote, meter, information system, customer service and budget uctivities. Since, 1980, Mr. 3 Shaw has completed an average of 40 hours per year of training focusing on government and utility services, covering the fundions of financial management, informotion systems and operations manogement. He iias been an adive participant in I AWWA adivities since 1975. 1 Operations Management Project Experience ~ . SAWS Evaluation and Assessment of Water & Wastewater Operotions, San Antonio, TX; Project Manager. Providing a comprehensive evaluotion and assessment of wuter and wastewater operations for the San Antonio Water System (SAWS) ~ as part of their Continuous Improvement Program. Working diredly for the Boord of Diretlors, scope includes the analysis ~ of general and administrative adivities and related costs, benchmarking and an anolysis and recommendations on organization and stoffing. 3 7 3 11 ~ ~ ~ LARRY SHAW, CPA a Page 2 ~ • San Antonio Water System (SAWS) Strategic Planning, San Antonio, Texas Projed Director. Carter & Buigess is providing assistance to the senior manogement of the San Antonio Water System (SAWS) to develop their strategic plan. Carter 8 ~ Burgess is initially reviewing previous strategic planning efforts as well as interviewing senior management ond seled staff to ~ determine what has been implemented and if not, why and how could it be done differently. A Board Plunning Poliry is being developed in conjundion with SAWS CEO for approval by the Board of Trustees that will guide the planning process. A ~ process will be identified in the first phase and implemented in a subsequent facilitated pracess. ~ . Utiliry Manogement Audits/Diagnostics. Various Locations cited below; Projed Manager. Performed management audits m and diagnostic reviews to identify issues and problem areas for management to improve their operations and their support ~ fundions of accounting, finance, purchasing, personnel, informotion systems, metering, and custamer service. Projeds have been performed at water, wostewater, solid waste and/or storm water utilities in Dallas, San Antonio, Austin, EI Pnso, a forpus (hristi, Shreveport, Bossier Ciry (lA), St. Louis, Woshington, D.C. ond Miomi. Benchmorking was a process ~ frequendy used in the diagnostit review. ~ . Dallas Water Utilities Rate Analyses Training, Dallos, Texos; Projed Manager. Provided training related to the pricing ~ process including Financial Management Context, Revenue Requirements, Cost Allocation, Rate Design and Ancillary Charges, and Pricing Water and Wastewater services. ~ ~ . Regional Wastewater Utility Joint Venture, TX; Projed Manoger. Aduised rivo River Authorities engaged in a joint venture to provide wholesale wastewoter service on a regional basis about the financial ond manogement pradices appropriate to ~ employ in developing the new regional entity. Z • Son Antonio Water System (SAWS) Storm Woter Manogement Plan; San Antanio, TX; Senior Management Consultant. 3 Developed a customer-billing database for storm water utilizing land doto infaimation was developed fram the eexor ~ Appraisal Distrid (BAD) for its 250,000+ customers. Working with the BAD's ARVINFO GIS and four independent custamer datobases ta compile the storm woter customer database, they designed the database and rate strudure and assisted SAWS 2 with requirement definitions for modifying its existing customer information and billing system. ~ . Utiliry Process Improvement, Various Locations; TX; Projed Manager. Prepared accounting procedure monuals, extension ~ policies, property unitization manuals and indired cost studies to assist management in operating iheir accounting and 2 financial fundions at several utilities including San Antonio, Shreveport, Bossier (iry and Miomi-Dade. a . Integrated Monogement Programs. Son Antonio, A. Projed Manoger. Provided assistonce to monogement in a multi-yeor effort to build the institutional framework for the San Antonio wastewater utiliry to prepare itself for substantiol changes in ~ its operations and service needs and a major capital improvement program. ~ Strategic Planning, Kansas Ciry, KS; Projed Manager. Assisted in developing n strategic business plan focused an a • expansion of services and its service area for an eledric and water utiliry in Kansas. a ~ ~ ~ ~ ~ LARRV SHAW, CPA Page 3 ~ ~ . Regionalization of Tampa Bay Water, Tampa Bay, FL; Management Consultant. Participated in a state mandated study ta develop a regionul water supply utiliry for three counties and three city utilities in the Tampa Bay, Florida area. Work ~ involved condition assessment of facilities with an engineering firm, the development of the initial cost based pricing ~ strudure, the assignment of value to facilities donated by each member government and the develapment of inember contracrs with the regional utility. ~ ~ . Privatization Evaluations; Senior Management Consultant. Evaluated the approprioteness of privatizing all ar a portion of utiliry operations for utilities in Tezas, lauisiana, Distrid of Columbia, Florida ond Ohio. a . Utiliry System Eunluation, Son Antonio, TX; Projed Monager. Managed a projed, with the ossistonce of fwo engineering ~ firms, to assess the condition af u wnter and wastewater system owned and operated by a developer for potential purchase ~ by the Liry of San Antonia. ~ Information Technology Project Experience a . San Antonio Water System (SAWS) IT Master Plan, San Antonio, Texas; Projed Diredor. Carter 8 Burgess project team members managed the development of a strategic IT plan identifying the vision and recommendatians for technology for a the future. Entails evaluotion of the current systems in informotion manogement, technology and automation. A specific ~ outsourcing study is also being performed. ~ . DWU Information Technology System Development 8 Implementation, Dallas, TX; Projed Manager. Managed the design, ~ package seledion and implementation of a customer accounting ond billing system for the Dallas Water Utilities incorporating water, wastewater, solid waste and storm water services. Performed an organizational assessment to reflect $ the changes needed to accommodate and obtain moximum benefit from the designed billing system to be implemented ~ within iwelue months. 3 . Informatian Technology System Development 8 Implementation, Various Locations, TX; Management Consultant. Provided a technicol ossistance ond quoliry ossurance reviews for similar customer system projeds in Tucson, Honolulu, Cincinnnti, Columbus, Trenton, Miami, Winnipeg, San Antonio nnd the Sam Nouston Eledric Cooperative. ~ a . Informotion Technology System Development, Son Antonio, A. Project Monager. Monoged the design, development ond implementation of financial planning, fized assets, p[ojed tracking and inuentory systems nt a metropolitan wastewater a utility in Texos. a Evaluation of Billing System's Development, San Antonio, TX; Projed Monager. Monoged the evaluotion of o custom ~ • designed and developed utility billing system for a water, wastewater and storm water utiliry in process of development by ~ another firm. Recommended abandonment of the project and restarting the projed using standard and proven system development methodalagies. Performed similor engogements at another water utility and at a gas utiliry. ~ ~ F] a x ~ LARRY SHAW, CPA Page 4 ~ . Design, Selection & Implementation of Financial System, Shreveport, tA; Projed Manuger. Managed the design, package seledian and implementation of a complete finoncial system for the Ciry of Shreveport, Louisiana. Performed similar ~ projects for four other cities in Texas ond one in Louisiuna. . Information Systems Master Plan, Cincinnati, OH; Infarmation Technology Cansultant. Provided technical ossistance and ~ quolity assurance reviews for development of a long-range strategic computerization plon for the Cincinnati Water Works. ~ . Utiliry Billing System, Dallas, TX; Projed Manager. Monaged the design, packoge seledion and implementation of a 3 customer accounting and billing system for the Dollas Water Utilities incorporoting water, wastewater, solid wuste and storm water services. Performed an organizational ossessment to reflect the changes needed to accommodate and obtain ~ moximum 6enefit from the designed billing system to be implemented with fifteen months. ~ . Assisted in the development of similar utility 6illing systems projects in Cincinnati, Tucson, Honolulu, Miami, Trenton, ~ Columbus and Winnipeg. ~ Financial Management Project Experience ~ . Fort Smith Woter and Wastewater Pricing Strudure, Ft. Smith, AR; Projed Manager. Develaped and implemented a water ~ and wastewater cost based pricing strudure for Fort Smith, Arkansas on a regional utiliry basis from the owned customer basis used historically. Worked with a customer advisary group composed of retail and wholesale customers during the ~ entire study. ~ . Hot Springs Water and Wastewoter Pricing Strudure, Hot Springs, AR; Project Manager. (urrently developing a cost based 2 water and wastewater pricing strudure on a regional basis for retail and wholesale customers of Hot Springs, Arkansas. The 3 ciry currently has a non-mst based pricing stmdure. 71 . Water Rate Study and Distribution System Assessment (Merger of Little Rock and North little Rock Water Utility Systems); ~ Little RocWNorth Little Rock, AR; Senior Management Consultant. Performing o cost of service water rate study including evaluation of the need for impad fees and an updnting of its ancillary fees and charges. This includes establishing financiol ~ and service policies for the merged utiliry. An evaluation of each citys distribution system is also being performed with the results being incorporated into ihe initial pricing siructure for the merged utiliry operation. The goal is development of o 3 unified rote strudure equalized over a seven to ten yeor period. ~ ~ . Dallas Water Utilities (DWU) Water and Retoil Rate Study, Dollas, TX; Projed Manager. Prepared retail rates study, induding o depreciation analysis of infrastrudure assets and development of water supply. ~ . Wood founry Water and Wastewoter Pricing Strudure, Wood Counry, OH; Projed Monager. Developed and implemented a ~ single cost based pricing strudure for water and wastewater service for the Wood [ounry, Ohio utiliry with di$erent rates in ~ each of twenty-two different service oreas. ~ ~ ~ ~ a LARRY SHAW, CPA Page 5 . Financing Capital Improvement Programs in 25 states. Developed feosibility plans to finance major capitnl improvement ~ programs and formulated supporting financial policies and procedures at numerous water and wastewater utilities in over ~ 25 states. These studies generally included developing rates, impact fees and fees for ancillary services. Testified us an expert witness on water and wastewater rate litigation in Texas, Florida ond Ohia. ~ ~ . Wholesale Seruice Cantrods, Various Locations, TX; Projed Manager. Developed contrads far service to wholesale water and wastewater customers ond reviewed seruice contrad performance to assure compliance with provisions. ~ ~ . Water and Sewer Rate Study, [iry of Whitehouse, Tezas. Developed revenue requirements in order to complete Water and Sewer Rate Study. Also designed proposed rate strudures. ~ ~ . Houston MUD Annexation Analysis, Houston, TX; Management fonsultont. Participated in a projed to assess the operational and financial condition of over sixty water and wastewater utility districts for potential annexation by the City of # Houston. ~ . Brazos River Autharity Water Pricing Strudure, Austin,lX; Projed Monager. Developed and implemented a single cost based pricing strudure for water supply service provided by the Brazos River Authority in Texas from a customer-by- ~ customer approach formerly used with over fihy customers. ~ . financial Modeling, U.S. cities; Projed Manager. Prepured models to perform financial planning and cost of service ~ analysis and trained employees in their use at numerous water and wostewater utilities. 3 ~ ~ ~ ~ ~ ~ ~ a a ~ a ~ ~ 13 pi ALLEN MULLINS, CPA pi Financial Consultant I ~ Carter Fr Burgess, Inc. ~ Education M.B.A., Accounting,1980, University of Tezas at Arlington ~ B.A., liberol Arts,1974, Union Universiiy ~ Professional Registration G~ Certified Public Accountant, Tezas :3 Professional Experience a Mr. Mullins hos 26 years of ezperience in providing manogement ond finonciol services to stote and locol governments, speciol distrids, and utilities. He hos manoged a wide rnnge of consulting assignments covering cost-of-service pricing studies, 3 organizational analysis, accounting and financial models, nnd informatian technology projeds. His projeds include business and a IS strotegies, effediveness ond efficienry studies, and outsourcing studies. ~ Mr. Mullins was a Senior Manager in the National Utilities Consulting Pradice at KPMG Peat Marwick LIP. Mr. Mullins wos ~ Assistant Diredor of Utilities for the City of Arlington, Texos. His responsibilities included budget, financial planning, utility billing, customer services, meter reading, meter services, properry management, and operotions research. He has also served os a Diredor of Finance for the Ciry of Hurst, Texas, where he wos responsible for the accounting, budgeting, utiliry billing, data 2 processing, purchosing and persannel divisions. 3 Mr. Mullins is a member of the American Water Works Association, where he has porticipoted on the Information System nnd 3 Services [ommittee, and adive in the Government Finance OHicers Associotion and the American Institute of Certified Public Accountants. Mr. Mullins has co-authored articles on financinl and work-order management, including: "The (hanging Role of 3 Financial Management in Utilities" in Proceedings of WEFTEC '95, "System Develapment Charges: Implementation, 3 Administration and Accounting" in the A.W.W.A. Proceedings,1992, and "Computerized Wark Management: Worth Inuestigating" for Public Works Jaurnal. ~ ~ Financial Management project experience includes: ~ • GASB 34 Implementation, Temple, TX; Senior (onsultant. Developed implementation strategy to obtoin compliance with the new occounting standards for the Ciry of Temple. The projed included analysis of the appropriote copital accounting ~ methods for the Ciry's infrostrodure mtegories. 3 • GASB 34 issues, various lacations, Projed Monager. Developed an analysis of the new standards and made presentations to 3 professional organizations to assist various entities in the development of an implementation strategy to comply with the 3 new accounting stondnrds. The presentations were made the Texas Public Works Association, Tezas Municipal Utilities Association, Tezas Municipal League, Special Distrids of South Colifornia, and projed included analysis of the appropriate 2 mpitol accounting methods for the Ciys infrastrocture categories. ~ 7 i ~ 4 ~ ALLEN MULLINS, CPA ~ Page 2 0 • Water Rate Study and Distri6ution System Assessment (Merger of Little Rock and North little Rock Water Utility Systems); ~ little Rock/North Little Rock, AR; Senior Management fonsultant. Performing a cost of service water rate study including evaluation of the need for impact fees ond an updating of its ancillary fees ond charges. This includes establishing financial ~ and service policies for the merged utiliry. An evaluation of each city's distribution system is also being performed with the ~ results being incorparated into the initiol pricing structure for the merged utiliry operation. The goal is development of a unified rate strudure equalized over a seven ta ten year period. ~ ~ • Fort Smith Water and Wastewater Pricing Strudure, Ft. Smith, AR; Senior Consultant. Developed and implemented a water and wastewater cost based pricing strudure on a regional utiliry bosis from the owner/ customer basis used historically. *l Wofked with a customer advisory group camposed of retoil and wholesale customers during the entire study. ~ • Arkansas Parks Program Management, Little Rock, AR; Senior Consultani. In conjundion with the Progrom Management ~ Services of the $180 million fIP, provided consulting related to Fixed Capital Asset Determination for GASB 34 Compliance. ~ • Hot Springs Water and Wostewoter Pricing Structure, Hat Springs, AR; Praject Manager. CurrenTly developing a cost based 7 water and wastewater pricing strudure on o regional basis for retail and wholesale customers of Hot Springs, Arkansas. The A ciry currently has a non-cost based pricing strudure. ~ • Dnllas Water Utilities (DWU) Retail Woter Rate Study, Dallas,lX; Projed Managei. Preparing rotes study for retail water service, including a depreciation analysis of infrastrudure assets and development af water supply. ~ ~ • Utility Rate Analysis for Metrapolitan Government of Nashville and Davidson Counry, Department of Wuter and Seweroge, Nashville, TN; Projed Manager. Managed a financial analysis and prospedive financial impact study related to a revenue ~ hond tiebt refunding for the Department. Manoged wholesale wastewater, wastewater surcharge studies for the Department. ~ • Water and Sewer Rate Study, (iry of Whitehouse, Texas; - Developed revenue requifements in order to complete Water and ~ Sewer Rate Study. Also designed proposed rate strudures. ~ . Utiliry Rate Study, Allen, A. Projed Manager. Performed cast of service water and wastewater rate study. Exomined ~ revenue requirements and designed rates. 3 . Utiliry Rate Study; lewisville, TX; Projed Manager. Performed water and wastewater rate study. Ezomined revenue 12 requirements and designed rotes. 1 • Utiliry Rate Study; Fort Worth, TX; Projed Manager. As a member of a team prepared water and wholesale wastewater rote 3 studies. ~ Acton MUD Woter Rate Study; Granbury, A. Projed Manager. Developed cost of service rate study and designed water rates. rJ ~ 0 +t! _ ~ ALLEN MULLINS, CPA ~ Page 3 ~ • Impad fee DevelopmenF, Project Manager. Developed impad fees and system development charges for Moui Board of Water ~ Supply, NI; Lewisville, TX; Garland, TX; Grand Prairie, TX; Wood (aunty, OH; ond the dulf Coast Water Authority (Texas City), TX. ~ 3 . North American Development Bank (NADB), San Antonio, TX; Praject Manager far Rates. Managed the development of water and sewer rates for Romo, Tezas as a part of the funding requirements for the NADB. ~ ~ • Brazos River Authority, R. Indired Cast Analysis; Project Manager. Revised the indirect tost methodology for the Authority to opply general ond administrative casts to specific projeds ond services provided to customers. ~ ~ • Brazos River Authoriry, TX; Financial Modeling; Project Manager. Developed integrated financial models for 6udget, indirect cost, and system rates. ~ • Brazos River Authoriry, Financial Analysis. Project Manager. Provided rate litigation support services, intluding cost of ~ service analysis for woter and hydroeledric utilities. ~ •[ounry of Maui Board of Water Supply, Wailuku, Hawaii; Project Manager. Managed the development of System Development ~ Charges for the Board including performance of a water cost of service study, impact fee study, financial planning and ~ development of a financiol model. ~ .(hacon Creek Flood Mitigation Study/Financial Plan, Ciry of Laredo, Texas; Project Manager for Financial portion of ~ Engineering projed. Assisted the City of Laredo in identifying funding sources. Developed software tool enobling the Ciry to perform queries and lomte the most viable sources. ~ ~ •[iry of Dallas NPDES MSF Storm Water Reapplication, Dallas, Texas. Project Manager. Reviewed the cu«ent pricing structure ond suggested revisions needed to accommodate changing conditions since rates were implemented. Additionally, reviewed ~ storm water costs for the previous five years and revenue needs for the next five years. • Irving Stormwater Utiliry, Iruing, R. Senior Manager. Developed a rate model for recovering the cost of NPDES storm water ~ ~ permit and general storm water management costs and applied that cost of service to parcel data from the Dallas County ~ Appraisol Distrid to estoblish the basic rate strudure customer classes. This projed was established in accordance with Sedion 402 of ihe Tezos Local Government Code. (onsideration was given to billing system limitations and impiementation ~ issues. ~ • Plano Storm Water Utiliry Study, Plano, R. Project Manoger. Development of residential and commercial storm water fees ~ far implementation of the [ity's storm water utiliry, including billing system support and verificotion of impervious cover for 9 vorious commerciai customer classes. This projed was established in accordance with Sedion 402 of the Texas Local Government Code. ~ 31 ~ 7 ~ ~ ALLEN MULLINS, CPA A Page 4 p Operations Management project experience includes: A ~ • SAWS Evaluation and Assessment of Water & Wastewater Operations, San Antonio, TX; Management Consultant. Providing a ~ comprehensive evaluation and assessment of water ond wnstewater operations for the San Antonio Water System (SAWS) as pad of their Continuous Improvement Program. Working diredly for the Board af Diredors, scope includes the analysis of ~ general and adminisirative adivities and related cosis, benchmarking and an analysis and recommendatians on organization and staffing. A 0 • Dallas (DWU) Management Audit and [ustomer Information Sysiem Analysis; Dollas,lX; Management Consultant. Served as a manogement consultant for a monagement audit of the Ciry's woter and sewer operotion and for the evaluation and ~ seledion of a new Customer Information System for the utiliry billing fundions. ~ • San Antonio Water System (SAWS) Storm Water Management Plan; San Antonio, TX; Senior Management Consultant. . T e ~ projed included development af an interim rate strudure, a final tiered rate strudure and an implementation plan for a new ~ storm water utility to provide revenues as a part of the City's Storm Water Management Plan, needed to meet the requirements of the EPA storm woter regulations. Developed a customer-billing database for storm water utilizing land data :31 information wos developed from the Bezar Appraisal Distrid (BAD) for its 250,000+ customers. ~ Metropolitan Water District of Southern (olifornia MWD, los Angeles, CA; Projed Manager. Managed a diagnostic review of ~ • the rate development, financial planning, and financial palicies of the Metropolitan Water District of Southern falifornia. ~ . Counry of Maui Board of Water Supply, Wailuku, Hawaii; Projed Manoger. Managed o diagnostic review of the Counry of Maui, Board of Water Supply including management, finance, accounting, customer billing, engineering and field operations ~ fundions. DI • Suez fities, Egypt - Wastewater (U.S.A.I.D1Suez [anal Authoriry/Ministry of Housing), Cairo, Egypt; Management ~ Consultant. Provided assistance to management in o multi-year effort to build the institutional framework for reorganizing the municipal utilities along the Suez Canal, Egypt. ~ ~ . Dallas (DWU) Storm Water Utiliry Development; Dallas, TX; Projed Mannger. Managed financial fundions and the organizational development of storm water utiliry. The projed induded rate and customer doss development. ~ ~ . Dallas Water Utilities (DWU) Analyses Training, Dallas, TX; Projed Manager. Provided training related to the pricing pro(ens including Financial Management Context, revenue requirements, cost allocation, rate design and ancillary changes, p' ' g 0 water and wastewater seNices. ~ . Dallas Department of Housing and Neighborhood Services, Dallas, TX; Projed Manager. Performed a management audii to 0 assess the service delivery, staffing, and organizational needs of the Department. 0 G1 ~ 3 a ALLEN MULLINS, CPA Page 5 ~ ~ • San Jose Water fompany, San Jose, fA; Projed Manager. Managed development of the requirements definition for San lose Water (ompany and participated in similar projeds for water and wastewoter utilities customer infarmation systems for ~ several major cities. ~ Information Technology project experience includes: ~ ~ • San Antonia Water System (SAWS) Strategic IT Plan, Snn Antonio, Texas; Projed Manager. Carter & Burgess projed team members monaged the development of n strategic IT plan identi{ying the vision and recommendations for technology for the future. Entails evaluation af the cu«ent systems in information management, X technology ond automation. A specific outsourcing study is also being perfarmed. 21 • San Antonio Water System (SAWS) CIS Assessment; Son Antonio, iX; Management Consultant. Performed an evaluation of ~ the SAWS customer information system (f15) development project being performed by onother consulting firm. This included evaluoting the progress of the system's development in relation to the plan for the development process being used ond ~ manogement of the projed. The evaluation concluded that o nan-standord development process wos being used, and that ~ the work was nat praperly monitored. Also, the other consultanYs project manager was not using a detailed work plan to monitor either the client tnsks or the consultant tasks to perform the projed. The evaluation projed team concluded that the ~ custom system development projed could not succeed ond that the work dane to date would not be useful and should be abandoned. ~ ~ • Fixed Asset Study for the Miami-Dade Water and Sewer Department, Miami, fL; Financial Analysis. Performed a study of the Deportment's fixed asset accounting needs and made recommendations for system requirements related to the retirement units ond levels of service mmponent detail needed to manoge the DepartmenYs fixed assets. ~ • Accounting System Evaluatian ond Selection, Monioe, LA; Project Manager. Managed accounting system sofiwore D-1 requirements definition and package seledion for the Ciry of Monroe, louisiana. Also, managed an evaluation of ond ~ developed solutions including software requirements definition for a starm water pump station monitoring system for the Ciry. p~ pi • Storm water Manitoring System; Monrce, LA; ProjedManager. Managed an evaluation of and develaped solutions including soNwore requirements definition for a storm water pump station monitoring system far Monroe, louisiana. ~ ~ • Michigan Department of Transportation. The project included the analysis and reengineering of budgeting, payroll, financial planning, occounts payo6le, financiol reporting, and accouniing information systems. 8 Q • Michigan Accounting and Information Network Projed, Lonsing, MI. Participated in the implementation of a state-wide financial accounting and purchasing system for the State of Michigan. Served an agenry aduocate team assisting three state n agencies with their deportmental implementation: Department of Transportotion, Commerce Depariment, and State Police. 9 0 n ~ 7 ~ ALLEN MULLINS, CPA ~ Page 6 ~ • Son Jose Water Company Information System Development, San Jose, fA; Project Manager. Managed development of requirements definition for San Jose Water Company ond participated in similar projecrs for water and wastewater utilities ~ customer information systems for severol major cities. ~ • Mississippi DOT Accounting System Implementation, Monagement Consultont. Padicipated in the system testing phase of ~ the accounting system implementation for ihe Mississippi Depodment of Transportation. Test focus wos on ihe procurement ~ and 6udgeting modules. ~ • Miami-Dade Water and Sewer Department, Miami, FL; Manoger. Managed business process redesign projed for various ~ customer seruice fundions. The redesigned business processes were used as the basis for the customer information system requirements definition for the seledion and acquisition of o new customer information system. ~ ~ ~ ~ ~ al ~ ~ v~ ~ ~ ~ ~ a a a n e a 0 a ~ ~ ~ ~ LIN LINDSEY Inspector ! ~ Carter Ft Burgess, Inc. ~ ~ Education A.S., Farm & Ranch Management ~ Cooke County College ~ Professional Registration A National Institute of (edified Eng. Technicians 2000, VA 31 Professional Euperience IN Mr. lindsey has over 35 years of extensive experience in construdion inspedion and qualiry control for o wide range of projects ~ including water and wastewater, utilities, roadways, airports, flood control and large mixed-use land developments. His experience includes projed field inspedion supeNision, contrad administration and projed coordination. He has also been responsible for 8 construdion testing and monthly estimate verification. A Relevant Project Experience IN • [edar [rest Water Pump Stotion, Dallas, R. (onstruction Obseruer. Inspedion of a booster pump statian with ultimate Pi pumping copaciry of 130 MGD, seNing two different pressure planes, and yard piping ranging up to 96 inches in diameter. I • Circle T Ranch Ground Storage TanWPump Station and Waterline, Westlnke, TX; Senior Construction Inspedor. Pravided ~ inspection and construdion administrntian for 10 miles of 16- and 20-inch water pipeline, pump station, and ground storage ~ tank. $1 • Lake Fork Pump Stotion, Dallas, TX; Senior Construdion Inspedar. Providing oversight and superuision of inspedion teams for 01 Segment 1, a 10-mile sedion of 108-inch RL(P water trunsmission line. p] • lake Palestine Pipeline ROW, Dallas, TX; Projed Loordinator. Coardinated the obtaining af rights-of entry for 42 miles of 84" ~ water pipeline. B • Las [olinas Construction Management Services, Las Colinas, A. (onstrudion Observer. Provided inspedion seroices for ~ construdion of utilities including water, sewer, storm sewer, private utilities, grading, drainage and paving for 1.5 miles of Las Colinos Boulevard and (oiwell eoulevard. 13 ~ ~ 13 ~J LIN LINDSEY Page 2 . Vista Ridge Development, Lewisville, TX; Construdion Observer. Pravided construdion management including contrador oversighi, payment requests, controdor meetings, agenry coardination with TxDOT, ciry and others, and inspection of infrastrudure for o 2,000-acre mixed-use development, including 25 miles of water lines, 35 miles of sewer lines, dry utilities, roodways and bridges, ond approximotely 2 miles of levees and flood control channel. . Vista Ridge Water 8 Sewer Master Plan & Design, Lewisuille, TX; Construdion Observer. Inspedion of a 20-MGD sewage lih station with 35-foot deep wet/dry pit, 2.5 miles of force main and 8 miles af 18" to 36" gravity sewer, ond an 850-cfs storm water pump station and intake structure. • Weatherford Water Purificotion Plant Improvements, Weatherford, R. Senior Lonstruction Inspedor. Provided oversight of construdion inspedion and administration for expanding and renovating the treatment works, lagoons, and force main. • Euless Woter Treatment Plqnt, Euless, TX; fonstruction Observer. Inspection of all plant facilities including yard piping. • Mabeluale Booster Pump Station, Little Rock, AR; Senior Inspedor. Inspeded construdion of water storage reseruoir and pump station for ciry of Little Rock. Coordinated with Ciry staff. . Mobelvole Water System, Englond, AR; Senior Inspedor. Inspeded woter system, including laying of 6" and B" woter lines and construdion of 60,000 gallon storage tank. Responsi6le for oversight of all traffic control. . Pork Ridge Boulevard and Utilities, Irving, R. Senior Inspedor. Provided inspedion and contractor oversight far construdion of utilities including water, sewer, storm sewer, and privote utilities grading, drainage and paving far 1.5 miles of new 4-lane divided thoroughfore. Responsible for oversight of all traffic control. (oordinated with city sta$. . Richland Chambers/fort Worth Transmission Line, Navarro Counry, R. Inspedor. Inspeded a 10-mile section of 96" RffP water transmission line being construded to conuey raw water to the (iry of Fort Worih. • The Bollpark in Arlington, Arlington, TX; (onstrudion Observer. Installation af site drainage, water and sewer facilities. TOM BEAN, PE Leak Detection Severn Trent Pipeline Services Education B.S. fivil Engineering, Valporaiso University, 1969 Professional Registration Registered Professionol Engineer - TX, IN Professional Experience Mr. Bean joined Severn Trent Pipeline Services (STPS) in 1969 and has hands-on field and management experience in water distribution systems, distrid meosurements, hydraulic field testing, hydraulic modeling studies, water qualiry analysis, and moster planning projeds. Mr. Bean is responsible for field data acquisition, overall data anolysis, report preparation, budget control, and overall data and report quoliry for all projects being performed by STPS in the Southern District. Relevant Project Experience [iry of Charleston, South Larolina Water Master Plan. Mr. Bean develaped and calibrated model of system, and recommended o capital improvemenis program to meet projeded growth. . Ciry of Saginaw, Michigan Water System Model Master Plan. Mr. Bean anolyzed and developed water consumption figures based upon population density and developed and calib[ated the woter model. Recommendations for current and future water system improvements were incorporated into ihe city's water system cnpital improvemenis plan. . Ciry of Augusta, Georgia Water Distribution System Model. Mr. Bean was responsible for constructing a model of the water distri6ution system. The model was used to make recammendations to eliminate large pressure variations in Central Business District by determining the correct downstream settings of all pressure reducing values. The calibrated model was also used ta condud studies on the movement of pressure zone boundaries ond to size and place odditional storage. . Shemyo Air Force Base, Shemya, Alaska Water Distribution System Analysis. Mr. Beon participated as team member in conduding pump efficienry tests, loss of head tests, and cansumption measurements. . Edmond, Oklahoma Water Distribution Master Plan. Mr. Bean constructed and calibrated a model of the water distribution system. The model was used to make recommendations for the location of additianal sources of supply to the system. The model was also used to size reinforcements for future grovrth in the system. . Broken Bow, Oklahoma (omputer Model. Mr. Bean canstruded and calibrated a model of the water distribution system. The model was used to condud a surge analysis of the entire system by others. TOM BEAN, PE Page 2 . Oklahoma City, Oklahomo Water Distribution Master Plon. Mr. Bean construded and calibrated a model of the woter distribution system. Recommendations for current and future water system improvements were incorporated into the ciry's water system copital improvements plan. . Guthrie, Oklahoma Water Distribution Master Plan. Mr. Bean construded and calibrated a model of the water distribution system. Recommendations for current and future water system improvements were incorporated into the ciry's water system capital improvements plan. The model was also used to realign a pressure boundary on the west side af the distribution system including a new booster pump station.