06-H Lost Water StudyDRAFT
G:WttorneyW.ICE~6WO~CURRENT\Watu Lost 6lntly- Acttpt Prop.wptl
March 6, 2002
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS,
PARIS, TEXAS, ACCEPTING THE PROPOSAL OF CARTER & BURGESS,
PROFESSIONAL ENGINEERS, FOR PROFESSIONAL ENGINEERING
SERVICES RELATED TO THE PERFORMANCE OF A WATER LOST
AND UNACCOUNTED FOR STUDY IN THE CITY'S WATER
ACCOUNTING AND OPERATING SYSTEM; AUTHORIZING THE CITY
MANAGER TO NEGOTIATE AND EXECUTE A PROFESSIONAL
ENGINEERING SERVICES CONTRACT WITH CARTER & BURGESS
FOR SUCH STUDY; MAHING OTHER FINDINGS AND PROVISIONS
RELATED TO THE SUBJECT; AND DECLARINGAN EFFECTIVE DATE.
WHEREAS, in order to maintain the integrity of the City's water system, to control the loss
of water through said system, and to otherwise ensure efficient and effective water service, it is
necessary for the City to perform a water lost and unaccounted for study in the City's water
accounting and operating system; and,
WHEREAS, the City Manager has previously requested authority from the City Council to
solicit proposals from qualified professional consultants to perform said water lost and unaccounted
for study; and,
WHEREAS, the City Council, by adoption of Resolution No. 2001-175, passed and
approved the l Oth day of December, 2001, authorized the City Manager and the City Finance director
to request proposals for professional engineering services related to the aforesaid study; and,
WHEREAS, as aresultofthe solicitation of said proposals, and the review of same, the City
Manager, City Engineer, and City Finance Director have determined that the engineering firm of
Carter & Burgess, Professional Engineers, have presented the best proposal far the performance of
said studies; and,
WHEREAS, the City Council desires to acceptthe aforesaid proposal of Carter & Burgess,
Professional Engineers, and authorize the City Manager to negotiate and execute a professional
engineering services contract with Carter & Burgess for the performance of said study, subject to the
review of said contract by the City Attorney; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS,
TEXAS:
Section 1. That the findings set out in the preamble to this resolution are hereby in all things
approved.
Section 2. That the proposal of Carter & Burgess, Professional Engineers, attached hereto
as Exhibit A and for all purposes incorporated herein, for the performance of a water lost and
unaccounted for study in the City's water accounting and operating systems, be, and the same is
hereby, accepted.
Section 3. That the City Manager be, and he is hereby, authorized and directed to negotiate
and execute, on behalf of the City of Paris, a professional engineering services contract with Carter
& Burgess, Professional Engineers, far the performance of the aforesaid study, under the terms and
conditions and in a form approved by the City Attorney.
Section 4. That the cost of performance of said professional engineering services shall be
paid from funds available from the City's waterwarks and sewer system revenue bonds.
Section 5. That this resolution shall be effective from and after its date of passage.
PASSED AND APPROVED this l lth day of March, 2002.
Michael J. Pfiester, Mayor
ATTEST:
Thomas E. Haynes, Assistant City Clerk
APPROVED AS TO FORM:
Larry W. Schenk, City Attorney
1
~
1
I~
b
P-M.Powws'-
i~
I
Cartera~Burgess
February 22, 2002
r
Mr. Shown Napier, PE
City Engineer
The (iry af Paris
150 SE 1 st
Paris, Texas 75460
xtmlv` D
FEB 2 2 2002
City of Paris
Engineering
RE: Request for Proposal to perform a Comprehensive Water Distribution System Audit
Dear Mr. Napier:
7950 Elm6rook Dri~e
Dallas, Texas 75247-4925
Phone. 214.638.0145
Fax: 214_638.0447
www.ch.mm
We are pleased ro present this letter of interest for the Lomprehensive Water Distributian System Audit project. (arter & Burgess
offers a team of highly qualified individuals with the experience to manage and perform the seruices required far this project.
The (arter 8 Burgess Team has diredly-related projed ezperience in all aspeds of the work required for this project by having
completed similar projects, some of which are detailed in the attached proposal. The team membeis will be dedicated to the City
of Poris for the duration of this prajed.
As you review our proposal, we will present the benefits in chaasing the (arter & Burgess Team for this important project. Some
of these benefits include:
• The proposed Project Manager, Dr. AI Petrosek, PE has worked on many flow metering projects in his 35 years of
practice, providing the City wiih a fruly ezperienced Project Manager.
• The Carter & Burgess Team understands the needs of the City af Paris and the requirements of this particular project
which is critiml in the development of the final pwject scope.
• The farter 8 Burgess Team has in-depth experience in water distribution system wark.
• farter & Burgess is located in close proximiry ta Paris and can 6e on site in approzimately two hours.
We trust that yau will find this propasal provides the information necessary for the evaluation process ond expresses aur
enthusiasm, knowledge, experience, and availabiliry of resources for this praject. We are excited about this project and loak
farward to working with the City of Paris. ff additional information is required, please da nat hesitate ro calL
Sincerely,
Carter & Burgess, Inc.
Albert C. Petrasek, Jr, PhD, PE ;
Vice President
Projed Manager
ACP/dmV021 S11
Carter & Bvrges;, Inc Carler 8 Burgess 4rchiiecfs/Engineer., Inc. Carrer & Borgess Consultants, !nc C8B Architects/Enginee's, Inc.
:&B ArchiteUS/Engineers, PC. C8d Ne,adq Inc. Nison & Luird Architeds/Engineers . PC.
Proposal
Comprehensive Water Distribution System Auclit
~
1
1
1
1
1
1
1
1
1
1
Contents
Section 1
Benefits 2
Section 2
Firm Overview 3
Section 3
Relevant Project Experience 6
Section 4
Project Team 13
Section 5
Project Understanding Fr Project Approach 15
Section 6
References 21
Appendix
Resumes of Key Personnel
Carter-Burgess
Proposal
Comprehensive Water Distribution System Audit
Section 1
Benefits
farter & Burgess, Inc. appreciates the opportuniry ta present
our proposal ta the City of Paris ta provide ronsultant services
for a Comprehensive Water Distribution System Audit of the
Ciry. We feel that we have assembled a team of well-
qualified engineers, fi nancial experts, and inspedors to insure
the Ciry of Paris receives services that will meet their needs.
As Carter 8 Burgess is considered for this audit, we feel that
there are benefits that we mn provide the Ciry of Paris that
makeusthefirmtochoose. Some of these benefits are listed
below:
* The proposed Project Manager, Dr. AI Petrasek, PE
has worked on many flow metering projects in his 35
yeors of pradice, providing the City with a truly
experienced ProjectManager.
* The Carter & Burgess Team understands the needs af
the firy of Paris and the requiremenis of this particular
project. This understanding is critical in the
develapment af the final prqjed scope, since that is the
bestwayto assure thatthe Ciry receives the services
needed for this projed.
* Larter 8 Burgess has more iesources to offer the City
of Paris. Our firm has over 1,800 employees in Texas
and over 1,000 in the Metroplex. We are the largest
engineering firm in Texas and the D/FW Metroplex.
This strong base of engineering and management
talent provides your Ciry with resources it deserues.
* Carter & Burgess is a true multidisciplinory firm
offering a broad range of services. We can support
the (iry of Paris in a number of program oreas as
indicated below:
• Water Resources Engineering
• Civil Engineering
• Mechaniml Engineering
• Eledrical Engineering
• Structural Engineering
• Transportatian Engineering
• FinonceandAccounting
• Management
• Architecture
• LandscapeArchitedure
* We are lomted in dose proximityb Paris and mn be
on site in approximatelytwo hours.
Carterl:Burgess
* The (arfer & Burgess Team has experienced persannel
in leak detection assigned to this project. This
ezperience will be important in developing the final
set af solutions required for this projed.
* Larry Shaw, CPA who is leading the management
consulting portion of this project, has many years of
experience in water utiliry billing, metering, customer
service, ond management. This is a vital companent
of the projed, and the Carter 8 Burgess Team provides
the best financial/management ronsulting resources
availabletothefiry.
* The Carter & Burgess Team has in-depth ezperience in
water distribution system work - we know how to
perform this projed.
* Lin lindsey will direct the field work far this project.
Mr. Lindsey is ezperienced in all aspeds of water utility
construction and field wark advities. He is a valuable
resource for the (iry of Paris.
* Tam Beam, PE has been performing leak detection
work for decades, ond his participation in the project
assures the Gryof Paristhat the leakdetection acfivifies
will be performed efficiently ond accurotely.
Proposa/
Comprehensive Water Distribution System Audit
~
Section 2
Firm Overview
Carter & Burgess
Carter & Burgess, Inc. wasfounded in 1939 in FortWorfh,
Texas as a unique partnership beiween childhood friends.
One was a civi l engineei. The ather was a landsmpe archited.
Today, Carter & Burgess, Inc. is a full-service, multi-
disciplined cansulting firm offering planning, engineering,
architedure, surveying, mnstruction managementand related
services with over 2,500 employees i n 36 offices across the
nation. The firm has maintained an office in Dallas since
1960. lacal personnel resources in our Dallas and Fort
Worth offices indude more than 1,115 piofessional,
techniml, and support staff members.
From the beginning, cooperation among mized design
disciplines set the stage for what has become on often-
imitated way of doing business - offering camplete services
from one compony. While others moytry and pull together
a partnership for the duration of a projed, Carter 8 Burgess
mn seamlessly integrate each and every in-house discipline
asnecessory. Thisdepthoftenenablesustoassistyauwithout
the need for additional consultants.
Industry Recognition
Design professionals at Carter 8 Burgess maintain the talent
and ingenuiry necessary to mntrol projed costs while meeting
strict schedules. Some 85 percent of our work is repeat
business from clients. On several occasians we have been
the proud recipient of distinguished acknowledgmentsfor
our effarts.
Engineering News Record magazine
* 30"in a list of top 500 U.S. design firms (April 2001)
* 141hinalistoftop20WaterTransmissionLinesfirms(Apri12001)
* 10'h in a list of top 25 Sanitary/Srorm Sewers firms (April 2001)
* 10' in a list of top 100 Pure Design firms (April 2001)
Building Design 8 Construction magazine
* 7th in a survey of 300 A/E/C firms for volume of work completed in the
commercial, institutianol, and industriol projedmarkets (Ju1y2001)
~u... Consulting-Specifying Engineer magazine
` +t l Om in a list of top 100 firms engaged in mechaniml and electrical design
(August 2000)
Carter lZurgess
Proposa/
Comprehensive Water Distribution System Auclit
Services Offered
Carter & Burgess'staff provides mmprehensive planning,
design, constructian monagement, and management
consulting services for a wide range of projects critim) to
municipalities. In addition, our firm utilizesstote-of-the-
art computer capabilities to support these planning and
designefforts. Dixuuionsofthespecificareasafprafeuional
services which might 6e of interest ro you are provided below.
Water System
(arter & Burgess has successfully completed a wide ronge of
planning and design projeds in water infrastructure. Our
design professionals have a proven trock record an bath
small and large multidiscipline projeds including water
supply, treatment, storage and distribution. Specificservices
affered bythe Carter & Burgesswater design group indude
the foilowing:
Planning and Studies
* Water Supply and Utilization Studies
* WaterQualiryAuessments
+t Water Master Planning
* FacilityPlanningandDesignReporis
* Pilot-scaleTestingandEvaluotion
* Conduding Tracer Studies
* PermittingondRegulatory Approvols
ir Pipeline Alignment Studies
* EnvironmentollmpadAnalyses
Water System Design Services
* Steady-stateComputerModeling
* Surge Modeling and (ontrol
* forrosion Assessment and (ontrol
* Elevated and Graund Storage Tank Design
* Pump Station Design
* Water Treatment Plant Design
* WaterTransmission Main Design
* Water System (ontrols and Telemetry
* Preparationof08MManuals
* Facility Start-Up and Training
Carter :Burgess
Utility Management
Consulting
Carter & Burgess' Management fonsulting Services are
multidisciplinary, integrating oll disciplines of monagement
induding finance, information systems, administration,
engineering, and operations and maintenance. Our staff
offers strong technical competence by rombining industry
ezperien<e from public warks, utilityand finance departments
with senior consultants fwm "Big 5" accaunting and
consulting firms. Our approach is to add value to your
overalloperations. Managementconsultingseruicesoffered
6y(arter&Burgessindude thefollowing:
Operations Management
* DiagnasticReviewVManagementAudits
* Organizational and Staffing
* ProcessRe-Engineering
* Benchmarking
PerfarmanceMeasurements
MergedRegionalization
* Outsourcing
* Continuous Improvement
* Training
Financial Management
*
Financial Planning and Analysis
*
financiaiModeling
*
Pricing of Services/ Rate Studies
*
(ostMeasurements
*
Capital Recovery fees
*
(onservation Programs
*
GASB 34 fompliance
Information Technology
* System Planning and Procurement
* Web-BasedApplicotions
* Systems Infegration
4
Proposal
Comprehensive Water Distribution System Audit
Severn Trent
Pipeline Services
Pitameter Water Services is now part of Severn Trent Pipeline
Services (STPS), an international service and engineering
firm. Their seruices are direded toward accurate collection
and analysis of information regarding water and sewer
systems. Their use diversified methodalogies, innovative
techniques, and specialized equipment.
Pitometer Water Services, STPS has been providing
professional engineering services to the woter industry since
1896. PitometerWater Services, STPS employs a broadly
trained staff of professionals with demonstrated experience
in their specialized fields. Over the firm's long history,
Pitometer Water Services, STPS's staff have developed
numerous improvements in the methods used to colled and
analyze system data. Withafficeslomtedstmtegimllyacross
fheUnitedStates,theirprojedmanagersare ezperienced,
dedicated individuals who have "come up through the ranks"
as field technicians and are tharoughly familiar with day to
day operational procedures. In addition ta their
considerable technical ezpertise, a complete engineering and
techniml office staff backs each praject manaqer.
Pitometer Woter Services, STPS has the philosophy,
experienced personnel and equipment that are unequaled
intheindustry. ThisisevidencedbythefadthatPitometer
Water Services, STPS has performed more than 500 projecrs
in 32 countries. Our reputation for qualirywork is supported
by the high degree of repeat clienh that they have had over
the years.
Pitometer Water Services, STPS has built a reputotian on
providing quality pipeline services to loml communities in a
manner that makes doing business easy. This combination
of qualiry, service, regulatoryknowledge and local focus is
the reason they have been around for mare than a century.
As a result, STPS has become the industry leader in locol
waterdistribution solutions.
Carter Surgess
5
Proposa/
Comprehensive Water Distribution System Auclit
Section 3
Relevant Project Experience
The Carter & Burgess staff have been responsible for the
planning, design, and management of a wide variety of
projects. These projeds have been performed ocross not
onlyTexas,butaraundthenation. Representativeprojeds
are provided below.
Weatherford Water
Purification Plant
Treated Water Flow
Metering Evaluation
Weatherford, Texas
The City ofWeatherford water departmentemployees noticed
the City had an unacceptablyhigh percentage of unacrounted
far treoted water. The Ciry hired Larter & Burgess, Inc. ta
investigate the possi6le causes far this unaccounted for water.
The City had more than 15 percent of its water supply
unaccounted far. Normal lass is around 10 perceM, while a
5 percent loss is considered good. The ciry's water plant
produces 8 million gallons of water per day. (arter 8
Burgess engineers decided the woter may not be leaving the
system, but that it was not accounted for in the process.
Engineers calibrated the water meters and looked at the
accounting system.
Hurst Water
Distribution System
Master Plan
Hurst, Texas
Carier & Burgess, Inc. prepared a Water Distribution System
Master Plan forthe Gtyof Huatwhich included computerized
modeling of the firy's water system, a written report,
software acquisition and training for Hurst Public Works
staff. Theprojectwasperformedtoevoluateewstingsystems
and plan for future expansion and growth of the distri bution
system. The Liry of Hurst is more thon 90 percent built-out
and dces not anticipate ezpansion of its current boundaries.
The projed focused on operational issues such as energy
efficienry, redudion of peaking charges for purchosed water
and qualiry issues resulting from mixing well water ond
surface water. A GIS system was linked to the hydraulic
modeling sohware Cybernet, ta assist visualizing patterns
and trends in water use and compare the outcome of several
design scenarias. Our GIS staH developed digitized data of
water lines and complete attributing for all features.
The projedwas performed in hvo parts. Part One involved
generalized camputer modeling of the Hurst Water
Distribution System in order to analyze the system's
operational efficienry and determine the most cost-effedive
system enhancements. This phase included data colledion
from water system maps, topographic maps, land use maps,
previous water distribution system master plans, water-use
studies, population figures and as-builtconstrudion plans.
Next, water usages were analyzed; ond a model was created
for evaluating the system. A future system model was
developed to reflect projected system changes in
configuration, operatians and water demand. Our engineers
then seleded various operatianal scenarios for anolysis by
computer madeling and then prepared a report which
outlinedtheresultsoftheanalysis. Designated Public Works
staff were hained on the detoils of the water system modeling
an an ongoing basis throughout the development of the
study. Training for basic manipulation of the data in the
system was also provided.
Part Twa of the projed required Carter 8 Burgess to oddress
the (iry's abiliry to meet current and proposed state ond
federal water qualiry regulations, and conduct a park
irrigationstudy. Regulatory issues evaluated included Lead
and Copper Rule, Surface WaterTreatmenf Rule, Information
Colledion Rule, Disinfedion and Disinfection By-product
Rule, and Enhanced Surface Water Treatment Rule. Forthe
park irrigation study, alternative sources of irrigation were
investigated for three [iry of Hurst parks. Engineers
investigated treated wastewater effluent and local water
well supplies as potential sources of i rrigation, reviewed the
potential availabiliry ofsuch sources, and prepared a report
Carter ::Burgess
6
Proposal
Comprehensive Water Distribution System Audit
~
of the costs, potential regulatory ramifimtions, and a rost/
benefit analysis for each of the three City parks.
Rowlett Water System
1 mprovements/
Elevated Tank
Rowlett, Texas
(arter 8 Burgess completed a number of projects as part of
a major improvement of the Rowlett woter system. The
facilities included a new 1-MG elevated tank, 8 miles of
12- to 24-inch water lines, telemetry system improvements
and renovation of an existing 0.75-M6 elevoted tank. The
Rowlett Raad Pump Station included design of a 2-MG
ground storage tank, 24-inch water main, yard piping,
hydropneumatic tank, drainage system and connedions to
ezisting facilities. The water lines are lacated primarily in
developed parts of the ciry, requiring utiliry caardination
and construdion sequencing to minimize impads during
construdion. The projed also induded the develapment of a
computer model of the Lity's water distribution system
demand projections for a 30-year design periad ta assess
tuture water demands. Carter & Burgess also performed an
evaluation of the existing water distribution system capaciry
and pressures.
Cedar Crest Pumping
Station
Dallas, Texas
Carter 8 Burgess designed the 130-MGD Cedar Crest Pump
Station which consists of a 96-inch diameter suction line,
and 64-inch and 42-inch diameter discharge lines. The
Cedar Crest Station serves two pressure planes in the Ury of
Dallas, the Sauth High and Trinity Heights distribution
systems. The pump station's initial pumping capociry
consisted of three 8-M6D single-speed pumps and 1wo dual-
speed pumps (30 MGD each ot low speed and 42 MGD each
at highspeed). Cnrter & Burgess also designed and provided
wimess testing of iwo 42-inch Venturi meters and three 18-
inch Venturi meters. A SCADA data acquisition system was
designed in order to allow remote pump station operations.
landsmping to meet the City of Dallas landscape Ordinance
was also provided.
Carter:-Burgess
This project required innovative design elements related to
the site plan develapment, architedural treatments and
landscaping in order to allow this high-mpociry pump
statian, located an only 1.5 acres, to blend inta the adjacent
residential neighborhaod which consisted of a church,
residences and a golf course. The construdion administration
of this projed induded balancing the ronstmdion activities
while minimizing the disruption to the surrounding
community. Projed adivities alsa induded surface and
subsurface investigations, analysisofdesign altematives,
pump station hydraulic design, surge analysis, struduwl
design requirements based on specific site and sail candi6ons,
pump station ronfigumtians, securiry systems design, resident
construction administration services, ond eledrical/
instrumentotion, mechanical design, architedural design,
and smoke detedion and removal system design.
Circle T Ranch Fidelity
Water Master Meter ft
Water Line Along
SH 114
Fort Worth, Texas
Hillwood Development Corparatian officials plan ro supply
Fidelity Investments at Circle T Ran<h with water from the
City of Fort Worth.
Carter & Burgessemployees designed the masterwater meter
and water line olong Texas SH 114 that will bring the
water 6om the city of Fort Warth into the planned community.
Proposa/
Comprehensive Water Distribution System Audit
t
The master meter measures the flow of water through the
1 2-inch pipelines. Theprojedwillincludeabout700feet
of line alang Tezas SH 114 and about 2,300 feet of water
line inside the development. ThemastermeterusesaS(ADA
System, which transmits signals from the master meter to
the ciry of FortWarth ro inform water department emplayees
oftheamountofwaterflowingthroughthewaterlines. The
SCAUA system transmits to the central faciliry informatian
conceming chlorine residual, temperature, pressure and flow.
Lake Fork Pipeline
Dallas, Texas
Carter & Burgess is designing 26 miles of 108-inch raw
water transmission line for Dallas Water Utilities. The line
has a hydraulic capaciryof 216 M6D and will run from the
lake fork Pump Station on the western shore of Lake Fork
to the viciniry of the Iron Bridge Pump Station on the west
shore of lake Tawakoni. The scope of services includes
hydraulic design, alignment selection, right-of-way
document preparation and acquisition services, surge
analysis and on-site construction representation.
Lake Palestine Water
Utilization and Pipeline
Alignment Project
Dallas, Texas
Larter & Burgess performed detailed utilization and
alignment studies to develop preliminary plans for a 120-
MGD rawwater intake and pump station at Lake Palestine,
more than 85 miles of 84-inch raw water pipeline and
associated appurtenances from lake Palestine to Dallas,
and the 300-MGD Southeast Dal los Water Treatment Plant,
the pipeline's terminus. The assignment involved
preparation of preliminary hydraulic designs, alternate route
Carter :.Burgess
studies and site
seledion for the water
treatment plant and
the rawwater intake/
pump station;
alternate route studies
far conveyance
facilities; selection of
final olignmentforthe
raw water pipeline;
right-of-waysurveys; preparatian ofcostestimotesforsystem
construdion, operation and maintenance; and preparatian
of a milestone schedule far implementing the development
of Lake Palestine as a water supply source for the Ciry of
Dallas. Carter & Burgess is alsa part of a team preparing
final geometric alignment and easement dacuments for
right-of-way acquisition of over 180 parcels over the 85-
mile projed length.
Lake Tawakoni
Pipelines
Dallas, Texas
In addition to upgrading the Iron Bridge Pump Statian,
CaRer & Burgess was responsible for performing candition
assessments far the ezisting 15 miles of parallel 72- and
84-inch water tronsmissian mains from Lake Towakani to
the Tawakoni Balancing Reservair. The staff performed
physical inspections of the interior of both lines and the
evaluation of various alternatives for lang-term cleaning of
the pipelines. The pipeline cleaning aptions included
continuous chemical disinfedion with liquid chlorine and
hypochlorite, periadic shock chlorinatian, and mechanical
("pigging") cleaning methods. The importance of the
pipeline deaning mnnot be over stated, since a rapid increase
in pipeline roughness accurs if chlorination is terminated.
The increase in frictian, which results in lower C-values,
dramatimlly increases pawer costs for pumping.
The projed alsa included extensive hydraulic analysis of the
existing pipelines, performing surge analysis on the li nes,
revising the design ofthe surge protedion equipment, and
camputer modeling ofthe lines in conjundion with the Iron
8
Proposa/
Comprehensive Water Distribution System Auclit
Bridge and lake Fark Pump Stations. Services provided on
this projed included hydraulic analysis and design, surge
analysis and design, physical inspections, computer nelwork
modeling, and analysis af C-value protection and biofilm
confrol.
Puerto Rico North
Coast Superaquaduct
Pipeline
San Juan, Puerto Rico
Carter 8 Burgess participated in the design of 50-miles of
12-inch water transmission main to deliver treated water
across the island of Puerto Rico. This project included an
alignment study through developed areas and rural areas
along a major divided highway. Corter&Burgesswosalso
responsible for preparation of plan and profile sheets and
detail sheets, which included highwoy crossings and
construction along extremelysieep terrain.
Southside 11 Water
Transmission Main
Fort Worth, Texas
Carfer 8 Burgess provided surveying and engineering
servicesforthisprojed,whichincluded atotalofbmilesof
pipeline of 35-inch ond 48-inch water transmission main.
Survey tasks included setting controls, alignment and
topographic surveys, and preparafion of right-of-woy and
easementdocuments. The line conveys water from the near
narth side of Fort Worth north to new developing areas.
The water line crosses severol creeks, ezisting roads and
ezisting utilities. Design of the line included a hydraulic
model and alternative route studies to determine the most
cost-effective raute, detailed design, preparation of
construction plans and specifications, advertising and bidding
servicesandconstrudionmanagementservices. Theprojed
involued construction sequencing and phasing to
accommodate the improvement of a 2-lane counry rood to
a 4-lane divided tharoughfare.
Carter i-Burgess
Fort Worth Northside II
Water Transmission
Main Design
Fort Worth, Texas
(ader & Burgess provided surveying and engineering
services for 6.5 miles oF 48- and 36-inch diameter woter
tronsmission main. The water line ronveyswater from the
near north side of fart
Worth, north to new
developing areas. The
water line crosses
severol creeks, existing
roads and utilities. The
projed alsa induded
designing a 24-inch
Venturi meter station,
yard piping and meter
vault to meter flaw
being pumped from the North Beach Street Pump Station
inta the Northside II Pressure Plane. Construdion daumenis
were prepared in phases in order ta ezpedite construction
since rights-of-way for same seUions of the new pipeline
were more readily available. The survey for the water line
induded setting control from USGS monuments, alignment
and topographic surveys, and preparation of right-of-woy
and easementdacuments. All field notes were reduced and
plotted using Intergraph sohware and hardware. Design of
the pipeline included a detoi led transient analysis, access
roods, alternative route studies to determine the most mst-
effedive route, detailed design, preparation of construction
plans and spe<ifications, advertising ond bidding services,
and construction managementservices.
East Canyon
Microfiltration Water
Treatment Plant
Summit County, Utah
(arter 8 Burgess is providing consulting services as District
Engineer to develop and implement master plans. Providing
ongoing engineering seruices to find and develop water
sources, such as wells, springs ond surface waters (in an
9
Proposa/
Comprehensive Water Distribution System Audit
area which has a moratorium imposed by the State
Engineer); and to provide mast cost effedive infrastrudure
for the transportation distribution and storage of this water
to lands that do not have water. EastCanyonWoterlineis
port of ihese services. Providing engineering services for
design and constructian management of 72,000 feet of
30-inch diameter ductile iron high pressure (in excess of
465 psi) waterline.
A Booster Station and Intake Strudure were alsa part of the
projed. Providing engineering services for design and
construdion management for 6.5 mgd pump station and
intake strudure, ezpandable to 22 mgd, to pump water
more than 1,100 feet vertically6om East Canyon Reservoir
ta Snyderville Basin.
Microfiltration WaterTreatment Plant. Praviding engineering
services for design and construction of 22 millian gallons
per day water treatment plant. The first phase being 6.5
million gallons perday.
Dallas Water Utilities
Eastern System
Drought
Implementation Plan
Dallas, Texas
The projed included the ezpansion of the ezisting 230 MGD
raw water pump station to a firm capaciry af 310 MGD, and
the design and construdion of the 241 MGD Lake fork
Pump Station and 108-inch rawwotertransmission main.
The drought conditions implementation plan developed
population forecasts and per capita demands to determine
total system demands through 2050. These demands were
compared with demands developed by regression-
extrapolation onalysis in order to determine the final
demands used for planning. Costestimateswereprepored
to connect Lake Fork into the DWU system including the
Lake Fork pump station and transmission line.
Additionally, six long range water supply alternatives were
evaluated for ronneding Lake Palestine, George Parkhouse
Carter :.Burgess
No. 2, and Marvin C. Nichols No.1 to the Dallas system.
Planning level construdion cost estimates and 0&M cost
estimates were developed for each of the six alternatives.
The total system corn were in the range of 5750 million,
and induded new pump stations, a new surface water
treatment plant, and over 100 miles of lorge-diameter
iransmission lines.
Total improvements for the pump station are estimated to
be S14 million in three constructian contracts. Four new
68 MGD pumping units and 4,500 NP matars will be
installed, olang with discharge and header piping. The
instrumentation and controls at the faciliry are being
upgraded bemuse the faciliry will be remately operoted
from the East Side Water Treatment Plant after the installation
of a new SCADA system.
Iron Bridge Pump
Station Renovation ~r
Upgrades
Dallas, Texas
The Iron Bridge Pump Statian, ariginally construded in
1964 on Tawakoni Lake, has an existing capocity of
approximately 220 MGD. It is a significant component in
the Ciry of Dallas' raw water supply system, possessing nearly
one third of the City's raw water pumping capaciry. (arter
8 Burgess is providing renovations ond upgrodes to increase
pumping mpociry to 310 MGD, improve system reliability,
extend the life of the faci liry for another 30 years and provide
the capabi lity of a totally remotely operated stati on through
the use of a S(ADA system.
The initial phase of the projed involved preparation of a
desiqn report that included condition assessments and
upgrade recommendations for all structural, civil,
mechanical, eledrical and architedural romponents of the
pump station. Key recommendations included re-
configuration of four ezisting 40-MGD pumping units,
installation offour new 65-MGD pumping unih, replacing
piping and valves, intake screens, sluice gates and all
eledrical, instrumentation and controls. This phase also
included providing internal inspedions and surge analysis
10
Proposal
Comprehensive Water Distribution System Audit
~
for 11 miles of paralle) 84-inch ond 72-inch raw woter
transmission mains from the Iron Bridge Pump Station to
the Interim Balancing Reservoir.
The second phase of the projed involves design and final
plan preparatian for all recommended impravemenh with
an estimated construdion cost of Sl 4.7 million. Carter &
Burgess will also provide construction phase services that
will include witness testing ofventuri meters and pumping
units. Alsoincludedarefinalplanreviewandmodifications
to the Lake Fork Pipeline Projed, cansisting of approzimately
22 miles of 84-inch water transmission main.
SAWS Evaluation and
Assessment of
Operations
San Antonio, Texas
Carfer & Burgess provided a comprehensive evaluation ond
assessment of water and wastewater operations for the San
Antonio Water System (SAWS) as part of their Continuous
ImprovementProgram. WorkingdirectlyfortheBoardof
Directors, our scope included the analysis of general and
administrative adivities and related costs, benchmarking
and an analysis and recammendations on organization
and staffing. The onalysiz of general and administrative
activities was accomplished primarily through a
6enchmarking effort of peer utilities. Our appraach resulted
in both an intemal performance gap analysis (i.e.
management expectations vs. actual resulh) and an external
perfarmance gap analysis with the peer utilities. Carter 8
Burgess utilizedacustomprogramtoassistwiththeintemal
Carter Surgess
and external comparisons and train SAWS personnel in its
use for future studies. The findings of these analyses will be
used to identify opportunities for improvements at SAWS.
Carter & Burgess utilized our wstom program to perform
analysis of staffing and organization activities to assist in
romparing staffing levels at peer utility agencies. During the
benchmarking task, Carter 8 Burgess defined the staffing
and organization data needed from the peer utilities. Using
the data from peer utilities ond our knawledge and
experience ofthe water industry, we rompared and evaluated
the staffing levels and organization strudure of SAWS
needed to perform its mre business and to achieve its strategic
plan initiatives.
SAWS Information
Technology Strategic
Plan
San Antonio, Texas
Carter 8 Burgess is preparing a strategic infarmation
technology plan identifying the vision and recommendatians
for technology for the future. Theplanentailsevaluationaf
the current systems in information management, technolagy
andautamation. A specific outsourcing study is also being
performed. Currently, SAWS is operating multiple operating
system platforms including mainframe, Uniz and Navell
netwark servers. In oddition to these platforms, most
informatian management applications are not integrated,
nor is operational data readily occessible from the existing
supervisory control and data ocquisition (SCADA) system.
As such, the information technologystrategic plan will identify
platforms and applications which will fit business fundions
and meet the future user needs.
Retail fr Wholesale
Water Rate
Development
Little Rock and North Little
Rock, Arkansas
The (ities of Little Rock and Nodh Little Rock are in the
processofinergingtheirwaterufiliryoperations. Carter&
Burgess is performing a cost of service water mte study
including evaluation of the need for impact fees and an
Proposal
Comprehensive Water Distribution System Audit
~
updnting of its ancillary fees and chorges. This includes
estahlishing financial and service policies for the merged
utility. An evaluation of each city's distribution system is
alsa being performed with the results being incorporated
into the initial pricing structure for the merged utiliry
operation. The goal is development of a unified rate strudure
equalized over a seven to ten year period.
Dallas Water Utilities
Retail Water Rate
Study
Dallas, Texas
Carter 8 Burgess is preparing a rate studyfor retail water
service. Thisincludesrevenuerequirementsandallocation
of cost to all customer classes. In addition, this projed
includes a depreciation analysis of infrastructure assets to
review the useful lives of oll of the departmenYs assets for
water and sewec Carter & Burgess is also developing mst
oi service and design of water supply standby charges.
City of Longview Meter
Accuracy Tests
Longview, Texas
Sevem Trent Pipeline Services conduded o studyofsix meters.
Velociry prafiles were taken and measured at eoch location.
The flow was measured at three di$ereni Bow rates to
determine performance flow of each meter. Twenry-four
hour flow measurements were also made at each location.
City of Corpus Christi
Meter Accuracy Tests
Corpus Christi, Texas
Severn Trent Pipeline Services conduded a study of four
meters. Velociryprofilesweretakenandmeasuredateach
location. The flow was measured ot three different flow
ratestodetermineperformanceflowofeachmeter. Twenry-
four hour flow measurements were also made at each
location.
Carter i-Burgess
12
3
3
P,roposa/
Comprehensive Water Distribution System Audit
Project Team
Carter 8 Burgess has assembled a team of highlyexperienced
professionals for this praject. Their roles and reporting
responsibilities are shawn in the organizatian chart below.
The Carter & Burgess Team is orgonized araund o Projed
Manager who will hove dired respansibiliry for the day-to-
dayadivities of the ProjedTeam and ensure that all resources
ore allocated to the team as required to meet the projed
demands. Hewillalsobethemainpointofcontadforthe
Ciry of Paris throughout the entire projed. The Project
Manager will be supported by senior professionals with
eztensive expertise and experience in their respedive area
and will repart diredly to the Projed Manager.
An organizationol chart depiding the Cader & Burgess Team
isshownbelow. Briefqualificatiansofourteammembers
are provided an the following pages, and full resumes of
these and additional personnel are included in the Appendix
of this submittal.
We are pleased to present Dc Albert Petrasek, Jr, PE as
the Proiect Manager for the City of Paris' Comprehensive
Water Distribution System Audit. Dr.Petrasekhasover30
years ofexperience in the planning, design, and operotion
of civil ond environmental engineering prajects. These
prajects indude water treatment and distributian, water and
wastewater master planning, wostewater colledion and
treatment, water reuse, process design, municipal solid
waste, hazardous waste, Superfund adivities, air pollution
rontrol, wetlands and general environmental services. He
has held positions with gavernment agencies and consulting
firms and serued an the graduate foculty at universities in
Texas and elsewhere.
Ron Hayes, PE will be responsible for Engineering
Services required for this projed. Mr. Hayes has over 20
years of ezperience in civil engineering consulting with
1 - Carter & Burgess, Inc.
2- Sevem Trent Pipeline Services
CarterSurgess
Proposal
Comprehensive Water Distribution System Auclit
responsihility far planning and management af civi) and
environmental engineering projech. Mr. Hayes has extensive
experience in the preparation of plans, specifications and
estimates far water, wastewater, drainage and paving
projeds.
LarryShaw, CPA will be respansible for Financial Services
for this projed. Mr. Shaw has mare than 30 years of
ezperience specializing in management ronsulting related
to public infrastrocture induding water, wastewater, solid
waste and storm water. He specializes in financial planning
and analysis, financial modeling, asset management,
information systems technology, aperations management,
organizatianal analysis, performance meosurement and
benchmarking. Mr. Shaw has performed more thon 100
related financial analyses of utilities including rate studies,
financial modeling, and review of impad ond special fees.
Mr. Shaw formedy direded KPM6 Peat Marwick LLP's
consulting sennces to government owned util ities from 1980
through 1995. Before joining KPMG in 1980, Mr. Shaw
was employed at a major metropolitan woter and
wastewater utility as a Special Projeds Manoger and as the
Assistant Directar af Business where he supervised all
accounting, finance, rate, meter, infarmation system,
customer service and budget adivities. Since,1980, Mr.
Shaw has completed an average of 40 hours per year of
trainingfausing on governmentand utiliryseruices, covering
the fundians of financial management, infarmation systems
and operations management. Ne has been an active
participant in AWWA adivities since 1915.
Lin Lindsey will be responsible for Field Work for this
project. Mr. Lindsey has over 35 years of extensive
ezperience in construction inspedion and qualirycontrol for
a wide range of projeds including water ond wastewater,
utilities, roadways, airports, Flood control and large mixed-
uselanddevelopments. Hisexperienceincludesprojedfield
inspedion supervision, contradadministration and projed
coordination. Hehasalsabeenresponsibleforconstrudion
testing and monthly estimate verification.
Carter :Burgess
Tom Bean, PE will provide Leak Detedion Services for
this projed. Mr. Bean joined Sevem Trent Pipeline Services
(STPS) in 1969 and has hands-an field and management
experience in water distribution systems, district
measurements, hydraulic field tesiing, hydraulic modeling
studies, water qualiryanolysis, ond master planning projecrs.
Mr. Bean is responsible for field data ocquisition, overall
data analysis, report preparation, budget control, and overall
dota and repart qualiry for all projects being performed by
STPS in the Southern Distrid.
14
Proposa/
Comprehensive Water Distribution System Audit
Section 5
Project Understanding
& Approach
Project
Understanding
Background
The Ciry of Paris, Texas is located in nartheastTezas in lamar
County, os indicated in Figure 1. The ciry is in the
geographimlcenterofthemunryandisapproximotely 16
miles south of the Red River. Paris is 90 miles southwest of
Tezarkono, and 105 miles northeast of Dalias.
The papulation of Paris is 25,898 based on the 2000
Census data. The historical papulation data for Paris and
Lamar Counry are presented in Figure 2. Lamar (ounty
experienced ropid growth through 1920, and then
ezperienced declining papulation until 1960, at which time
a steady population increase began again.
the major objedive of this projed is to identi{ythe sources of
the unbilled water. In order to incorporate the results of this
project inta the on-going rate study, the time frame for
completing this projed is two to three months.
The Ciry's distribution system is shown as a simplified
schematic diagram in Figure 3: The system mrrentiy has
9,900 billed accounts, and provides water to 174 meters
thatarelwo-inchesorlarger. Additionally,theLamarCounry
Water Supply Corporation is a relatively lorge customer of
the Ciry of Paris. The residentiaVcommercial custamers
average daily consumption was 2.6 million gallons during
thepreviausyear. Foracitywithapopulationof25,898,
this is equal to a per mpita mnsumption of 100 gpcd,
which is very reasonable.
Unbilled, or unaccounted for, water can be the result of a
number of different fadars induding:
The population of Paris has been steadily growing. The
trend analysis indicatesthat Paris has added approximately
187 people per year since 1850. This normally translates
to approzimately 60 new houses per year. Much of the
growth can be attributed to the steady inHuz of manufaduring
intotheCityofParis. The(iryhasseverallargeemployers
including Campbell Soup, Kimberly-Clark, Sara Lee, ond
Turner International Piping. Additionally, the health care
industryis a large employer in the City.
The Ciry experienced o major fire in 1916, and all of the
downtown area was reportedly lost. The CBD wos
reconstruded, and most of the water lines in the central
portion ofthe cirywere construded during the 1920's.
Project Background
The Ciry is wrrendy experiencing an unacceptably high
amount of unbilled water in the drinking water system, and
Carteri-Burgess
* Customersthatarenatmetered:
• Parks
• Water main flushing
• Fire protection
• Consiruction
• Streetwashing
• Cityi«igafion
* Leakage in the system
+t Inacaratemeters
* Inaccurate billing software
* Meters that have been pulled and replaced with
jumpers
15
Proposal
Comprehensive Water Distribution System Audit
I
* Metea that are too large for the appliwtion and do
not read at low consumption levels
To determine the source of the unbilled water in the system,
several important areas of the utiliry operation need to be
evaluated. Theseareasareidentifiedinthefollowingitems:
rt An evaluation of the installation and accurary of
various meters installed in the City's system must be
performed.
* Investigate and estimate the amount of unbilled water
used bythe Ciryand other customers.
* The existing billing saftware should be examined to
canfirm thatthere are no under-billed accaunts.
* Thepossibleleakageinthesystemmustbeevaluated
to determine the eztent of the problem, and to identi{y,
in so far as possible, the areas with most of the leaks.
* Determine the feasibiliry af ineter replacements to
reduce the amount of unbilled water in the system.
Project Approach
Problem Identification
The firyof Paris produces approximately 12 to 15 M6D of
water on on average day. The typical consumption for
residentiaVrommercial uses is reported to be 2.6 MGD.
Therefore about 10 to 12 MGD of water is being supplied to
major customers. The first adion should be to confirm that
the meters far the major cusromers are reasonably accurate.
The Grystaff has a number of these metersthat are routinely
colibrated as partofthe normal operations; therefore, this
portion of the projed should proceed rapidly.
Additionally, the master meter's (the 42-inch meter)
calibration needs to be wnfirmed, since that is the basis for
much of the dotn that have been gathered. Checking
Carter nBurgess
calibration of the master meter appears to be reasonably
straight forward, and the volumetric procedure described
helow will be used.
Flow Meter installation
The (arter 8 BurgessTeam will visitthe meters identified by
Cirystaff andevaluatetheinstallatian. The evaluation will
be conduded for the following reasons:
* To determine if ihe installation of the meter mn have
an adverse impact on the accuracy, and
* Toevaluatethelocotianandinstallationforsubsequent
in situ mlibration.
The Team wil I document the canditions at each meter location
by preparing a field sketch ofthe instailation and o6taining
digital phatographs.
Installation Errors
The most common errors in installing flow meters are:
* Lacating the meter in a position where it dces not flow
full.
* Failing to provide the upstream and dawnstream
conditions necessory to minimize turbulence in the
meter.
16
Proposal
Comprehensive Water Distribution System Audit
I
* Allawing air to enter the process flow, resulting in
metering error.
* Failuretoproperlygroundtheinsfruments,resulting
in induced errar in the eledronic components.
* Installingameterthatisover-sizedfortheflawtobe
measured.
* Installing the meter in a location that makes future
maintenance impossible.
Meter Accuracy
The accuracy of flow meters is a common problem
encountered in the water industry. The science that deals
with accuracy in measurements is metrology, and there have
been numeraus books written on the issues associated with
o6taini ng measurements that are both accurote and precise.
In the United States, the Notional Institute of Science and
Technology (NIST), which used to be known as the National
Bureau of Standards, is the organization that is charged
withsupportingmetralogyatthenationalscale. Therefore,
in a purest sense, all measurements should be traceabie to
NIST.
Error in Flow metering systems is introduced byeach element
used in the flow measuring process. (onsider a venturi tube
system that consists of the venturi tube, the differential
pressure transmitter, and the indicator/recorder. Each of
the three devices has some intemal error that cantributes to
the overall error of the measured flow. It is important to
realize that these errors ore multiplimtive, not additive.
In Situ Meter
Calibration
Several techniques can be used to perform in situ meter
calibration, or to check the accuracy of ineters that are
currently in service. The techniques that are most applicable
to the Ciry of Paris' praject are dismssed in the following
paragraphs.
Carter i-Burgess
Volumetric Calibration
The volumetric calibration method consists of timing the
increase or decreose in water volume in a tank or basin of
knowngeometry. Thetechniquerequiresthatthegeometry
of the volumetric tank be well-known, that the chonge in
water surface elevation can be determined relatively
accurately, and that the time between differentelevations
mn be measured with reasonable accurary.
When perfarmed rorrectly, valumetric mlibrotion is among
the most accurote methods for calibrating flow meters. The
method is ohen referred to as the "bucket and stop wotch"
procedure, which is descriptive terminalogy, but does not
indicate the relative complexiry of the procedure. The
pracedure involves the measurement of three separate
parameters: the volume of the tonk, the change in water
surface elevation, and the time. For the procedure to be
accurate, all three measurements must be preformed with
reasonable accurary.
Tracer Dilution Method
The tracer dilution method of in situ calibration consistsof
odding a known amount of the tracer to the process flow
and determining the concentratian in the process flow
downstreamafthemetertobecalibrated. Figure4shows
o typical tracer dilution set up, and the equipment
requirements are minimal. A calibrated container for the
tracer is required to confirm the rote atwhich the metering
pumpisaddingthetracertatheprocessflow. Theremust6e
iwa taps in place, one through which to add the tracer, and
the ather from which to col led the downstream sample.
The flow in process is calculated from the following simple
equation:
q x _ (O+q) x C,
where q is the flow rate of the tracer, C, is the concentration
of the tmcer in the tracer solution container, 0 is the process
flow rate, and Cz is the concentration of the tracer in the
downstream wmple.
17
Proposal
Comprehensive Water Distribution System Audit
~
As an example, for a tmcer concentration, of 50,000
mg/L, and a trocer flow rate of 0.01 gpm, and a
downstream tracer concentration of 5.0 mg/l, the process
flow rate is calculated as,
0.05 x 50,000 =(Q + 0.05) x 5.0
500=5Q+0.05
0 =100.01 gpm
Theseledionofthetraceriscritical. Thetracercannatread
with any of the ather compounds i n the process flow for the
procedure to be accurate. Additianally,itisdesirobletouse
a tracer that is not present in the process flow, because the
need for o bockground sample upstream of the point of
traceraddition iseliminoted.
Mizing in fhe pipeline is imporfant. The basic assumptian is
thatthe tracer will be uniformly mixed with the process flow
so that the downstream tracer roncentmtion measured is on
occurate indication ofthe adual downstream concentration.
The rate of tracer oddition must be known with good accurary
for this method to be used. The rate of tracer addition is
usually determined bytiming the draw down in the calibrated
tracer cantainer. for this reason a groduated rylinder is
usually used as the container. The metering pump must
pump at a constant rate, therefore, multiple volume readings
are token on the mlibrated container.
Transfer Standard
The use of a transfer standard to calibrate flow meters is
relatively common place; however, it is important to
document that the transfer standard is properly mlibrated.
Transfer standards used for flow meter calibration usually
include either clamp-on ultrasonic meters or pitat tubes. If
used mrredly, either instrument can function adequatelyas
a transfer standnrd. A rypical transfer standard installation
isshown in Figure 5.
It is important that the recommendations for proving an
undisturbed flow path both upstream and downstream of
Carter -Burgess
the transfer standord be fol lowed. Additional Iy, the transfer
standard should 6e calibrated before gaing to the field, and
after being used in the field.
For pitat tubes, the assumptian that the averoge flow in the
pipe is being measured is impodant. Pipes exhibit a
parabolic velocity profile, and multiple measurements are
required to obtain accurote results.
Aker evaluating each meter's installatian, the Corter 8
Burgess Team will use the in situ calibration procedure that
is mast appropriate for each meter.
Leak Detection
The location of leaks in the distribution system can be very
challenging. One of the most common ways to locate leaks
is to use geophones and listen for leaks in the system. This
procedure is generally quite precise, and it will pravide
some relative indication of the size of the leak. However,
the procedure is best employed when the approximate
location of the leak is known. For a distribution system
wide study the ezclusive use af sonic detection methods is
generally cost prohibitive.
Fortunately, there are some steps that con be taken to narrow
down the areasto be investigated. In most cities the night-
time water consumptian for residentiaVcommercial uses is
quitesmall,especiallybetween2amond4am. Duringthis
ti me, portions of the distribution system can be isolated and
water elevations in the elevated tanks monitoied. falling
water elevotions are an indication of possible leoks.
18
Proposal
Comnrehensive Water Distribution System Audit
Depending on the size of the elevated tank, a very large
leak may be required to permit detedion bythis method.
For instonce, a rypical 500,000-gallon elevated tank has
a bowl with a 55-foot diameter. The bowl volume is 17,111
gallons per foot, and if a one-faot draw down is needed in
a rivo-hour time, the minimum leakage rate that can be
deteded is 150 gpm. For a 1 MG elevoted tank with a 70-
foot diameter bowl, the minimum leak detedion rate would
6e 250 gpm.
An alternative method is to iwlate porfions of the distribution
system and pressure test the system with a portable pump
and water storage tank. The pump can be conneded diredly
to the outlet on anyfire hydrant, and the leakage measured
reasonable preciselywith a conventional water meter.
Once the areas with high leakage potential have been
identified, sonic leak detedion methods will be employed to
confirm the locations of mojor leaks.
Review Of Billing
Procedures
The Carter & Burgess management cansulting staff will
review the ezisting billing system with the abjedives af:
* IdentityinginadiveaccauntsthatoreaUuallyactive.
* Determiningthesmallusers.
* Identifying the large users, and checking the meter
size.
* Identifying duplicate ocrounts.
* Identifying unbilled customers, and determining how
to colled revenue.
Additionally, the metered revenues, meter routes, meter
schedules, etc. will be carefully reviewed and evaluated,
and farter 8 Burgess will prepare recommendations on
improvements to the system.
Meter and Billing
Activities Review
* Determinetheeztentofandreasonsforunaccounted
for water.
• Gather dato on "noncustomer" metered/non-
metered flows to occount for uses nat billed to
customers such as main flushing, fire usage, sewer
deoning, hydrant testing, and other municipal
adivity usage.
• Compare customer metered consumption with
purchased woteramounts on a monthly, quarterly,
and annual basis noting any changes in
comparative data during peak and non-peak
periods.
• Determine the remaining unaccounted for water
amaunt afrer considering estimates of the known
uses noted above.
• Consider sedioning-off selected portions of the
distribution system for more detailed analysis of
unacrounted for water if warwnted bythe obove
analysis.
* Review the procedures and processes of managing
meter adivities.
Gather data on:
- metered cansumptian by customer class
- meter sizes by customer class
- meter routes and number of ineters per route
- rypes and oge of ineters bysize currently active in
the system
Review data ond evaluate meter replacement poliry,
route efficienry, effediveness of ineters by rype and
brand, ond repair versus reploce policy.
Provide a costand benefit evaluation ofa scheduled
replacementand resizing program.
Review capabilities of the current u61iry billing
system and the interface tothe meter readingsystem.
!
Carter.=Burgess 19
~
Proposal
Comnrehensive Water Distribution System Audit
• Evaluate current meter reading and billing
processes for efficienry and seruice level to
customers.
k Summarize the above analysis and suggest
recommended actionsfor improvement in metering
and billing adivities.
Project Execution
Location of Work Eifort
The Carter & BurgessTeam will perform all of the workfor
this projed in the Dallas office or in the Ciry of Paris.
Project StafFing
The individuals identified an the organization chart are
arrent employees of Carter & Burgess and Sevem Trent
Pipeline Services, and they are supported by an additional
340 people in the Carter & Burgess Dallas office.
City of Paris
Participation
Carter 8 Burgess believes that having dients participate
uctively in projects is beneficial tothe dient. One of the best
ways to have dients participate is to conduct periodic
workshops on specific topics. For this particular projed,
threeorfourworkshopsmnbeconducted. Eachworkshop
would bethree to five hourz in length and could be conduded
ineitherPorisorDallas. Possibleworkshaptopicsinclude:
* Reviewofinetermlibrationresults
♦r Evaluationofbillingsofiware -
results and recommendations
• leakageinthesystem -resultsanddiscussion
* Studyrecommendationsandcondusions
Carter -Burgess
20
- - - - - - - - - - . . _ ~ ~ ud Y rr w w w w r YI r
Figure 1- Map of Texas
ounty
Figure 2- Population for Lamar County and Paris, Texas
60,000
50,000
40,000
c
0
3 30,000
a
0
a
20,000
10,000
Q
~
Lamar County A !
`
,
.
,
.
. ,
~ . • r . •
. .
, ~ , ;
. ~
. • I
~
, ,
~ .
, . , r"
. i.
,
,
.
,
,
,
. ' Paris
~
■
y = 187.39x - 346379
RZ = 0.9758
1840 1860 1880 1900 1920 1940
Year
1960 1980 2000 2020
_ _ _ _ ` - _ ~ - - - r ~ ~ r r r Y V ~ vi Y {J 6d L/ V V u u V u V
Figure 3- City of Paris
Ground Storage/Distribution Process Flow Diagram
Treated Water
`I Y Y Y`i Y Y`I Id Y Y Y Id Y ri U+1 Y 1i w w Y Y Gi ii 0 ii ri fi 0 fi bi n
Figure 4- Tracer Dilution Method for Meter Calibration
Gl+q
~
Downstream
Sample Flow
t Meter
Calibrated
Container
with Tracer
Metering
Pump P
q Upstream sample,
T if required
~
~
- - - - - - - r . . . . . r r r r r w rr Irr IYa " w Y Yd " Y
Figure 5- Typical Application for a Transfer Standard
0
~
~
Q
~
~
~
~
~
~
1
~
~
~
I
~
~
'
!
1
1
Proposa/
Comprehensive Water Distribution System Audit
Section 6
References
The Carter &Burgess Team maintains an excellent working
tit DaleFisler
relationship with numerous municipal and public clients.
Ciry of Fort Worth
The best measure of past performance is that of our references
1000 Throckmorton
by our clients. We encourage you to contod our references
Fort Worth, TX 76102
below to discuss our firm's and team members' past and
(817) 871 _g ppp
ongaing performance.
Projects: Northside II Water Transmission Main
Southside II Water Transmission Main
Carter ft Burgess
TeamMember: AlbertPetrasek,lr,PhD,PE
* lenniferCottingham
* MelissaKauth
Dallas Water Utilities
San Antonia Water System Purchasing Depariment
2121 Main St., Suite 300
1001 E. Market Street
Dallas, TX 15201
San Antonio, TX 78298
(214) 948-4563
(210) 508-0433
Projech. Lake Fork Pipeline
Projects: SA WS Eval. and Assess. of Operations
Lake Tawakoni Pipeline
SAWS IT Strotegic Plan
Team Members: Albert Pehasek, Jr, PhD, PE
Team Member Larry Shaw, CPA
Ron Hayes, PE
Lin Lindsey
Severn Trent
* TerraceStewart
PipeIIIIe Services
Dallas Water Uti lities
1500 Marilla 4AN
* Mike Brawn
Dallas, TX 75201
Ciry of Longuiew
(214) 610-3144
P 0 Bax 1952
Team Member Albert Petrasek, Jr, PhD, PE
Longview, TX 75606
(903) 759-1053
* Charlie Stringer, P.E.
Projech. Longuiew, Texas Meter Accurary Tests
Dallas Water Utilities
Team Member Tom Bean, PE
2121 Main St., Suite 300
Dallas, TX 75201
* Frank Rodriguez
(214) 948-4578
CiryofCorpusChristi
Project.• Lake Pales6ne Water U6lization and
1201 Leopard
Pipeline Alignment
Corpus Christi,lX 78401
Team Member. Albert Pehasek, Jr, PhD, PE
(361) 861-1214
Project Corpus Chris6, Texas MeterAccurary Tests
Team Member Tom Bean, PE
Carter-Burgess
21
!
r
~
~
~
~
~
~
'
a
~
~
~
~
~
a
~
~
~
~
~
~
:
~
~
~
~
~
~
~
~
]
Proposal
Comnrehensive Water Distribution System Audit
Appendix
Resumes of Key Personnel
Carter Surgess
zz
ALBERT PETRASEK, Jr, PhD, PE
Project Manager
Carter £t Burgess, Inc.
Education
Ph.D., CiviVEnvironmental Eng,191`
Texas A&M University College Station
M.S., Civil Engineering,1970
Texas A8M Universiry College Station
B.S., Civil Engineering,1967
Texas A&M University College Station
Professional Registration
Registered Professional Engineer
1976, iX, 39168
1999, OK,19452
~ Professional Experience
~ Dr. Petrasek has over 30 years of experience in planning, design, construdion, and operation of engineering warks. He has heen an
engineer for over 52,000,000,000 in construdion in the United States and Mexico. Dr. Petrasek worked as the chief of in-house
~ pilot and demonstration scale research for the U. S. EPA's Office of Research and Development, Cincinnati, Ohio for several years.
~ In that position, Dr. Petrasek had responsibiliry for the Agenry's research program far instrumentation and controls, and a
significant amount of work was conduded evaluating different rypes of flow meters, and establishing standards and criteria for the
9 corred installotion and operation of the instruments.
3 Dr. Petrasek has extensive experience in the design of ineter instollations, and in the operating and maintenance issues associated
3 with metering. Dr. Petrasek is a former employee of Dallas Water Utilities, and he hnd operational responsi6ility of the
I Department's R&D facilities, which hos 15 magnetic flow meters, ten turbine meters,l5 orfice meters, and four venturi meters.
I Relevant Project Experience
3 • Design, Construdion, and Operation of Flow Test Stond, Projed Manager, U. S. EPA, (incinnati, Ohio. This projed inciuded the
~ design, construction, and operotion of a flow test stand to calihrate flow meters. The test stand included a water recirculation
loop, high-speed diverter valves, pumps, water storage fanks, gravimetric water tonk, and scales. The unit wos designed to
~ operate on water Flow meters with a maximum size of eight-inches and provide NIST traceable accurary to 0.05 percent. The
~ high accurary is required to verift meters with a stated accurary of 0.5 percent.
~
'
~
~
'
!
. ALBERT PETRASEK, Jr, PhD, PE
Page 2
~
, • Development of National Standards for the Installation of Eledromagneti4 flow Meters, Projed manager, U. S. EPA, Cincinnati,
Ohio. The projed included the development of national standards for the instollotion of eledromagnetic rype flow meters or oll
~ sizes. The projed was conducted by the U. S. EPA and the National Institute af Standards and Technology (previously the
a Nss).
■ • Development of Notionol Standards for the Instollotion of Venturi Tubes ond Venturi Noales , Project monoger, U. S. EPA,
' fincinnati, Ohio. The projed included the develapment of national standards for the installotion of venturi tube and venturi
noale rype flow meters or oll sizes. The projed was conduded by the U. S. EPA und the Notional Institute of Stondords ond
■ Technology (previously the NBS).
' • Development of National Standards for the Installution af Parshall Flumes and Palmer-Bowlus Flumes, Project manager, U. S.
! EPA, fincinnati, Ohio. The projed included the development of nationol standords for the installation of Parshall Flumes and
3 palmer-Bowlus Flumes or all sizes. The projed was conducted by the U. S. EPA and the National Institute of Standards and
Technology (previously the NBS).
~
~ • Water and Wastewater Master Plan, Edinburg, Texas, Principal-in-Charge far a Wostewater Moster Plan for the Ciry of Edinburg
and its eztraterritorial jurisdidion, including several colonias. This Master Plan will guide the City's development in water and
~ wastewater for the next twenry years. Total planning area cavered 136 square miles. The following areas of concern are being
' studied i„ order to evaluate and make recommendations for the Ciys infrastrudure:
- Analyze cu«ent waste water system and future demands
31 - Evaluate existing wastewater colledion facilities
- Evaluate existing wastewater treatment facilities
~ - Analyze current wostewater system and flow records
~ - Evaluate existing pumping and treatment facilities
- Development of water nnd wostewoter hydraulic models
~
2 As a toal for evaluoting these concerns, o Geographic Information System (GIS) for the City wos developed concurrently with an
overall Capital Improvement Plan (CIP). financial requirements associated with the CIP were identified as well as potential
~ funding sources. In oddition, several lift stations were eliminated because of the analysis.
1
3
i
~
~
~
i
Raw Water Pump Station and Transmission line, Ciry of Palestine, Texas, Principal-In-fharge for the design of a 15 MGD raw
water pump statian and 11 miles of 36-inch raw water transmission main. The projed includes improvements to an existing
intake strudure, a new eledrical and chlorine diozide building, stand-by generator sets, the pump station, and the
transmission main. Services being provided include right-of-way acquisition, surveying, preparation of a design report, design,
surge anolysis, construdion administratian, and construction inspection. Estimated construdion cam are S 8 million.
Raw Water Pump Station and Tronsmission Line, Kinder Morgan; Quality Control for this projed that includes 27-miles of
transmission moin, a baloncing reservoir, and o new raw water pump station. Design flow for the projed in southeast
Oklahoma is 5 MGD and the estimated projed costs are S10 million.
~
a
a
~
~ ALBERT PETRASEK, Jr, PhD, PE
Page 3
~
~ . Iron Bridge Raw Water Pump Station Renovations, Dallas, Texas, Project Diredor for the renovation of the 240 MGD raw water
S pump statian. Project included the mechanical, eledrical, instrumentation ond controls, and structural components. Estimated
~ construction cost of $21 million.
' • Lake Fork Raw Water Transmission Line, Dallas, Texos Project Diredor for the design and construction administration of 26
~ miles of 108-inch raw woter transmission moin. Line will run from the Lake Fork Pump Station, on the western shore of Lake
Fork, to the Iron Bridge Pump Station on the western shore of Lake Tawakoni. Estimoted construction cost is $111 million.
~ The first sedion, which is 39,000 LF, is under construction for a contrad amount of $27 million.
3 • lake Fork Pump Station, Dallas, Texas Prepared design and cost estimates for the 216 MGD pump station with a conneded
3 load of 24,000 HP. Prepared computer simulations of 26 miles of 108-inch line,l5 miles of 72-inch line, and 15 miles of
3 84-inch line with 14 pumping units in iwo different pump stutions. Estimated construdion cost of 527 million.
11 • Shorecrest 48-Inch Water Main, Dallas Water Utilities Principal-In-charge for the design of 4,000 LF of 48-inch woter main
~ located on the north end of Love field in Dallas, Tx. The main conneded into the yard piping at the Bachman Water Treatment
Plant. The construdion cost was 5920,000.
3
~ • Lake Tawakoni Transmission lines; Dallas, Texas; Projetl Diredor for ihe condition assessment, surge analysis, and surge
protedion upgrading to 15 miles of 72-inch and 15 miles of 84-inch raw water transmission main.
1
• Iron Bridge Raw Water Pump Station No. 2, Dallas, Texos; Project Diredor for the preliminary design of the 300 MGD raw
~ water pump station. Services provided included surveying, preparation of preliminary plans, cost estimates, and computer
~ simulation of system hydraulics. Estimated construction cost is S25 million.
3 • Woter Treatment Plant, (iry of Donna, Texas; Principal-In-Charge for the design of a new 6 MGD surface water treatment plont.
3 Faciliry included raw water intake strudures, reador-clarifiers, filters, clearwell storage, and high seruice pumping. Disinfection
for (T is with chlorine diozide followed by chlorination. Estimated construction costs of 55,300,000.
7
31 • long Range Woter Supply Plan for Dallas Water Utilities; Principol-In-Lharge. This project developed an implementatian
program for the eastern portion of the (iry of Dallas system under drought conditions. The project had total estimated capital
3 cosis of $500,000,000 and included o new 100 MGD surface wnter treatment plant, improvements to an ezisting 176 MGD
3 pump station, the construdion of a new 100 MGD pump station, and the construdion of over 100 miles of 72 ond 84-inch
transmission lines. `
~
~ • Benbrook Water Treatment Plant Expansion, Texos, Project Manager, projed included the expansion from 5.0 MGD to 11.0
MGD. The treatment facilities included new rapid mixing basins, flocculation basins, clarifiers, and filters; additionally,
~ improvements were designed to the ironsfer pump stafion, high service pumps, ond insirumentation und control sysfem.
3 (onstrudian cost af 52,500,000
i
if
A
a
~ ALBERT PETRASEK, Jr, PhD, PE
Page 4
■
~ • Water Transmission line, Dollas, Texas; Projed Engineer, Projed included the design of 11 miles of 96-inch RCCP water
~ tronsmission line from the East Side Water Treatment Plant to Jim Miller Reservoir. fonstrudion cost of 524,000,000.
~ • Woter Transmissian Line, Dallas, Texas; Project Engineer; Projed for Dallas Water Utilities included the design and construdion
■ management af 17 miles of 84-inch transmission line from Jim Miller Pump Stotion to the Beltwood Reservoir. Construdion
~ cost was 527,000,000.
~ • CISCO - Woter Plant, (onfidential Clieni, Australia, Projed Manager; preparation of cost estimates and preliminary design of
' o reverse osmosis woter treatment faciliry for a DOD contrador. Project included the evaluation of existing weil field as a
source of supply, and design of modifications to existing facilities to accommodate the new treatment processes.
~
• Design of Woter Meter Stotions for Dallas Water Utilities. Projed includes the designs for three metering stations; Hackberry,
~ Elm Fork, and lameson; that provide water metering service for DWU customer cities. Estimated project cost 54,500,000.
~
' • Water Supply for the City of Mansfield. Design of well, ground storage, and booster pumps for the city.
~ • Safe Drinking Water Ad Studies, lone Star Army Ammunition Plant and Red River Army Ammunition Depot Tezarkana, Tezas;
' Projed Monager; Safe Drinking Water Ad studies for the 3.0-MGD surface water treatment plant, including Q study and
complionce evaluation.
1
• Water Storage and Pumping Facilities, Highland Park, Texas; Projed Manager; design of 1,500,000-gallon Gillon Avenue
~ ground storage reservoir and booster pump station, including chlorine storage, handling, feeding and leak detedion
~ equipment. ConsTruction cost $1,500,000.
• Red Oak Water Treatment Plant, Red Oak, Texas Projed Monager; sanitary survey and preliminary design for Red Oak
2 Reservoir and preliminary design of 30-MGD treatment plant. Estimated construdion costs of $45,000,000.
• Ozone/UV Disinfedion Studies; Projed Engineer; performed evaluation of combined azone/UV disinfedion as an alternative to
~ chlorination. The process was found to be significantly improved over the use of either process individually.
3 • Ozonation Studies; Projed Engineer; performed evaluation of ozone contactor design
~
• Projed wos performed for the U. S. EPA and included counter-current bu6ble diffusers, packed columns, ond continuous-flow
a sti«ed tank readors.
~ • D/FW Airport Booster Pumps, D/FW Internationol Airport, Texas, Projed Manager; addition of 10-MGD booster pumps at
~ 0/FW's East ond West Pump Stations.
i
~
~
a
0
~ ALBERT PETRASEK, Jr, PhD, PE
Page 5
a
2 • Comprehensive Developmentol Moster Plan for the [iry af Orange, Tezas; Projed ManagedEngineer. Projed included the
3 development of a Comprehensive Developmental Plan for this city of 23,000 in southeast Tezas. Work performed included the
~ preparation of land use plans master plans for water, wastewater, and municipal solid wastes; mapping of the city; and
development of the ciry GIS.
~
~ • Water and Wastewoter Master Plans for the Liry of Wilmer, Texas; Projed Manoger/Engineer. Project included the preparation
of both woter and wastewater master plans for this ciry of 5,000. Planning period was through the year 2020.
~
• Utility Master Planning, Lone Star Army Ammunition Plant, Texarkana, Texas; Principal-in-Chorge; preparation of Facility Plan
~ for this industrial complex of over 40 square miles in north eost Tezas. Work included water distribution system, wastewater
collectian system, the water treatment plant, the wastewater treatment plant, and performing a leak detection study on the
distribution system..
3
~ • Bexar Lounry Water System Planning, San Antonio, Tezas; Projed Monager; development of Emergency Water Plan. Projed
included developing the prototype emergenry water plan for the forps of Engineers for San Antonio, Texas, which has 101
~ water puNeyors, all using the Edwards Aquifer as the source of supply.
9
]
~
~
3
~
~
3
~
~
i
31
7
31
~
~
i
a
~
4
■
~ RON HAYES, PE
Civil Engineer ~
' Carter Ft Burgess, Inc.
~
Education
~ B.S., fivil Engineering, 1980
~ Old Dominion University
f~ Professional Registration
Registered Professional Engineer
~ 1985, TX, 58807
~ Organizations
3 Ameriron Sociery of Civil Engineers
Texas Natural Resource Conservotion Commission
~
~ Professional Experience
Mr. Hayes hos aver 20 years of experience in civil engineering consulting with responsibiliry for planning and management of civil
' and environmental engineering projeds. Mr. Hayes has eztensive experience in the preparation of plans, specifications and
estimotes for water, wastewater, drainage ond paving projeds.
!
~ Relevant Project Experience
~ . Iron Bridge Pump Station Preliminary Design, TX; Projed Engineer. Design of 22-mile, 108-inch diameter raw wnter
' transmission pipeline from Lake Fork to Lake Tawakoni.
_ • lake Fark Pipeline, Dallas, TX; Project Engineer. Project consisted of designing 26-miles of 108-inch diometer raw water
transmission pipeline from Lake Fork to Lake Tawakoni in east Texas. The design included pfeliminary hydroulic design of a
a
future Lake Fork Pump Station, surge anolysis for the transmission system, final plans and specifications for the pipeline,
2 permitting by the Corps of Engineers and TXDOT, conducting environmental and archeological surveys. Estimated construdion
! cost of 590,000,000.
3 • North Park Public Utility District, Horris [ounry, TX; Projed Engineec Provided services to distrid induding design and
i preporation of technical specifications ond contrad documents for water, wastewoter, paving and drainage improvements.
Services included construdion oversight, progress payment review, state agenry submittals and fund applications.
i
• Water and Wastewater Design for Unserved Areas, Dallas, TX; Projed Engineer. Preliminary design and evaluation for 710
~ unserved areas in Dallas. Design oversight for 19,200 linear feet of B-inch wastewater main and 8,400 linear feet of 16-inch
, woter main under first unserved area ronstrodiom mntmct.
a
s
s
a
RON HAYES, PE
Page 2
r
. Harris Lounry Municipal Utiliry District No. 13, Ha«is founry, TX; Projed Engineer. Provided services to Distrid including
design and preparatian of technical specifications and contrad documents for water, wastewater, poving and drainage
improvements. Services included construdion oversight, progress payment review, state agenry submittals and fund
applications.
. Polk Street, DeSoto, TX; Projed Engineer. Provided design of 3,200 linear feet of 24-inch woter main and 2,300 linear feet of
8- ond 10-inch wastewater main. Design included 270 lineor feet of aerial «ossing with five pier supports.
~
~
I LARRY SHAW, CPA
2 Finan6ial Consultant
I Carter fr Burgess, Inc.
~ Education
~ M.S., Business Administration, Trinity Universiry,1964
_ B.S., Accounting, Bradley University,1962
~ Registrations
Certified Public Accountant
3 Affiliations/Organizations
1 . Significant contributians made ta the revision of the Water Rate Manual edition af 1981.
3 . Developed and served as on instrudor for the Financiol Manogement Seminar offered by the AWWA over a ten year period,
beginning in the 1980s.
~ . Assisted in the development and editing of the initial Water Utility Capital Finoncing Manual and performed a qualiry
~ review an the first revision.
. Managed the first revision of the Water Utiliry Accounting Manual during the 1990's.
7 . Served as the chairperson and/or os o member on various AWWA committees since 1975 including the Water Rates
~ fommittee, the Accounting Committee and the Accounting, finance and Management Controls Committee.
~ Professional Experience
Mr. Shaw has more than 30 years of experience specializing in management consulting related to public infrastrudure including
~ water, wastewater, salid waste and storm water. He specializes in financiol planning and analysis, financial modeling, osset
3 management, informatian systems technolagy, operations management, organizational analysis, performance measurement and
benchmarking. Mr. Shaw has performed more than 100 related financial onolyses of utilities including rate studies, financiol
' modeling, and review of impad and special fees. Mr. Show formerly direded KPMG Peat Marwick LLP's consulting services to
3 government owned utilities from 1980 thraugh 1995. Before jaining KPMG in 1980, Mr. Show was employed ot a major
metropalitan water ond wostewater utiliry as a Special Projeds Manoger and as the Assistant Diredor of Business where he
a supervised all accounting, finonce, rote, meter, information system, customer service and budget uctivities. Since, 1980, Mr.
3 Shaw has completed an average of 40 hours per year of training focusing on government and utility services, covering the
fundions of financial management, informotion systems and operations manogement. He iias been an adive participant in
I AWWA adivities since 1975.
1 Operations Management Project Experience
~ . SAWS Evaluation and Assessment of Water & Wastewater Operotions, San Antonio, TX; Project Manager. Providing a
comprehensive evaluotion and assessment of wuter and wastewater operations for the San Antonio Water System (SAWS)
~ as part of their Continuous Improvement Program. Working diredly for the Boord of Diretlors, scope includes the analysis
~ of general and administrative adivities and related costs, benchmarking and an anolysis and recommendations on
organization and stoffing.
3
7
3
11
~
~
~ LARRY SHAW, CPA
a Page 2
~ • San Antonio Water System (SAWS) Strategic Planning, San Antonio, Texas Projed Director. Carter & Buigess is providing
assistance to the senior manogement of the San Antonio Water System (SAWS) to develop their strategic plan. Carter 8
~ Burgess is initially reviewing previous strategic planning efforts as well as interviewing senior management ond seled staff to
~ determine what has been implemented and if not, why and how could it be done differently. A Board Plunning Poliry is
being developed in conjundion with SAWS CEO for approval by the Board of Trustees that will guide the planning process. A
~ process will be identified in the first phase and implemented in a subsequent facilitated pracess.
~ . Utiliry Manogement Audits/Diagnostics. Various Locations cited below; Projed Manager. Performed management audits
m and diagnostic reviews to identify issues and problem areas for management to improve their operations and their support
~ fundions of accounting, finance, purchasing, personnel, informotion systems, metering, and custamer service. Projeds have
been performed at water, wostewater, solid waste and/or storm water utilities in Dallas, San Antonio, Austin, EI Pnso,
a forpus (hristi, Shreveport, Bossier Ciry (lA), St. Louis, Woshington, D.C. ond Miomi. Benchmorking was a process
~ frequendy used in the diagnostit review.
~ . Dallas Water Utilities Rate Analyses Training, Dallos, Texos; Projed Manager. Provided training related to the pricing
~ process including Financial Management Context, Revenue Requirements, Cost Allocation, Rate Design and Ancillary
Charges, and Pricing Water and Wastewater services.
~
~ . Regional Wastewater Utility Joint Venture, TX; Projed Manoger. Aduised rivo River Authorities engaged in a joint venture to
provide wholesale wastewoter service on a regional basis about the financial ond manogement pradices appropriate to
~ employ in developing the new regional entity.
Z • Son Antonio Water System (SAWS) Storm Woter Manogement Plan; San Antanio, TX; Senior Management Consultant.
3 Developed a customer-billing database for storm water utilizing land doto infaimation was developed fram the eexor
~ Appraisal Distrid (BAD) for its 250,000+ customers. Working with the BAD's ARVINFO GIS and four independent custamer
datobases ta compile the storm woter customer database, they designed the database and rate strudure and assisted SAWS
2 with requirement definitions for modifying its existing customer information and billing system.
~ . Utiliry Process Improvement, Various Locations; TX; Projed Manager. Prepared accounting procedure monuals, extension
~ policies, property unitization manuals and indired cost studies to assist management in operating iheir accounting and
2 financial fundions at several utilities including San Antonio, Shreveport, Bossier (iry and Miomi-Dade.
a . Integrated Monogement Programs. Son Antonio, A. Projed Manoger. Provided assistonce to monogement in a multi-yeor
effort to build the institutional framework for the San Antonio wastewater utiliry to prepare itself for substantiol changes in
~ its operations and service needs and a major capital improvement program.
~ Strategic Planning, Kansas Ciry, KS; Projed Manager. Assisted in developing n strategic business plan focused an
a • expansion of services and its service area for an eledric and water utiliry in Kansas.
a
~
~
~
~
~ LARRV SHAW, CPA
Page 3
~
~ . Regionalization of Tampa Bay Water, Tampa Bay, FL; Management Consultant. Participated in a state mandated study ta
develop a regionul water supply utiliry for three counties and three city utilities in the Tampa Bay, Florida area. Work
~ involved condition assessment of facilities with an engineering firm, the development of the initial cost based pricing
~ strudure, the assignment of value to facilities donated by each member government and the develapment of inember
contracrs with the regional utility.
~
~ . Privatization Evaluations; Senior Management Consultant. Evaluated the approprioteness of privatizing all ar a portion of
utiliry operations for utilities in Tezas, lauisiana, Distrid of Columbia, Florida ond Ohio.
a . Utiliry System Eunluation, Son Antonio, TX; Projed Monager. Managed a projed, with the ossistonce of fwo engineering
~ firms, to assess the condition af u wnter and wastewater system owned and operated by a developer for potential purchase
~ by the Liry of San Antonia.
~ Information Technology Project Experience
a . San Antonio Water System (SAWS) IT Master Plan, San Antonio, Texas; Projed Diredor. Carter 8 Burgess project team
members managed the development of a strategic IT plan identifying the vision and recommendatians for technology for
a the future. Entails evaluotion of the current systems in informotion manogement, technology and automation. A specific
~ outsourcing study is also being performed.
~ . DWU Information Technology System Development 8 Implementation, Dallas, TX; Projed Manager. Managed the design,
~ package seledion and implementation of a customer accounting ond billing system for the Dallas Water Utilities
incorporating water, wastewater, solid waste and storm water services. Performed an organizational assessment to reflect
$ the changes needed to accommodate and obtain moximum benefit from the designed billing system to be implemented
~ within iwelue months.
3 . Informatian Technology System Development 8 Implementation, Various Locations, TX; Management Consultant. Provided
a technicol ossistance ond quoliry ossurance reviews for similar customer system projeds in Tucson, Honolulu, Cincinnnti,
Columbus, Trenton, Miami, Winnipeg, San Antonio nnd the Sam Nouston Eledric Cooperative.
~
a . Informotion Technology System Development, Son Antonio, A. Project Monager. Monoged the design, development ond
implementation of financial planning, fized assets, p[ojed tracking and inuentory systems nt a metropolitan wastewater
a utility in Texos.
a Evaluation of Billing System's Development, San Antonio, TX; Projed Monager. Monoged the evaluotion of o custom
~ • designed and developed utility billing system for a water, wastewater and storm water utiliry in process of development by
~ another firm. Recommended abandonment of the project and restarting the projed using standard and proven system
development methodalagies. Performed similor engogements at another water utility and at a gas utiliry.
~
~
F]
a
x
~
LARRY SHAW, CPA
Page 4
~
. Design, Selection & Implementation of Financial System, Shreveport, tA; Projed Manuger. Managed the design, package
seledian and implementation of a complete finoncial system for the Ciry of Shreveport, Louisiana. Performed similar
~ projects for four other cities in Texas ond one in Louisiuna.
. Information Systems Master Plan, Cincinnati, OH; Infarmation Technology Cansultant. Provided technical ossistance and
~ quolity assurance reviews for development of a long-range strategic computerization plon for the Cincinnati Water Works.
~ . Utiliry Billing System, Dallas, TX; Projed Manager. Monaged the design, packoge seledion and implementation of a
3 customer accounting and billing system for the Dollas Water Utilities incorporoting water, wastewater, solid wuste and
storm water services. Performed an organizational ossessment to reflect the changes needed to accommodate and obtain
~ moximum 6enefit from the designed billing system to be implemented with fifteen months.
~
. Assisted in the development of similar utility 6illing systems projects in Cincinnati, Tucson, Honolulu, Miami, Trenton,
~ Columbus and Winnipeg.
~ Financial Management Project Experience
~ . Fort Smith Woter and Wastewater Pricing Strudure, Ft. Smith, AR; Projed Manager. Develaped and implemented a water
~ and wastewater cost based pricing strudure for Fort Smith, Arkansas on a regional utiliry basis from the owned customer
basis used historically. Worked with a customer advisary group composed of retail and wholesale customers during the
~ entire study.
~ . Hot Springs Water and Wastewoter Pricing Strudure, Hot Springs, AR; Project Manager. (urrently developing a cost based
2 water and wastewater pricing strudure on a regional basis for retail and wholesale customers of Hot Springs, Arkansas. The
3 ciry currently has a non-mst based pricing stmdure.
71 . Water Rate Study and Distribution System Assessment (Merger of Little Rock and North little Rock Water Utility Systems);
~ Little RocWNorth Little Rock, AR; Senior Management Consultant. Performing o cost of service water rate study including
evaluation of the need for impad fees and an updnting of its ancillary fees and charges. This includes establishing financiol
~ and service policies for the merged utiliry. An evaluation of each citys distribution system is also being performed with the
results being incorporated into ihe initial pricing siructure for the merged utiliry operation. The goal is development of o
3 unified rote strudure equalized over a seven to ten yeor period.
~
~ . Dallas Water Utilities (DWU) Water and Retoil Rate Study, Dollas, TX; Projed Manager. Prepared retail rates study,
induding o depreciation analysis of infrastrudure assets and development of water supply.
~
. Wood founry Water and Wastewoter Pricing Strudure, Wood Counry, OH; Projed Monager. Developed and implemented a
~ single cost based pricing strudure for water and wastewater service for the Wood [ounry, Ohio utiliry with di$erent rates in
~ each of twenty-two different service oreas.
~
~
~
~
a LARRY SHAW, CPA
Page 5
. Financing Capital Improvement Programs in 25 states. Developed feosibility plans to finance major capitnl improvement
~ programs and formulated supporting financial policies and procedures at numerous water and wastewater utilities in over
~ 25 states. These studies generally included developing rates, impact fees and fees for ancillary services. Testified us an
expert witness on water and wastewater rate litigation in Texas, Florida ond Ohia.
~
~ . Wholesale Seruice Cantrods, Various Locations, TX; Projed Manager. Developed contrads far service to wholesale water
and wastewater customers ond reviewed seruice contrad performance to assure compliance with provisions.
~
~ . Water and Sewer Rate Study, [iry of Whitehouse, Tezas. Developed revenue requirements in order to complete Water and
Sewer Rate Study. Also designed proposed rate strudures.
~
~ . Houston MUD Annexation Analysis, Houston, TX; Management fonsultont. Participated in a projed to assess the
operational and financial condition of over sixty water and wastewater utility districts for potential annexation by the City of
# Houston.
~
. Brazos River Autharity Water Pricing Strudure, Austin,lX; Projed Monager. Developed and implemented a single cost
based pricing strudure for water supply service provided by the Brazos River Authority in Texas from a customer-by-
~ customer approach formerly used with over fihy customers.
~ . financial Modeling, U.S. cities; Projed Manager. Prepured models to perform financial planning and cost of service
~ analysis and trained employees in their use at numerous water and wostewater utilities.
3
~
~
~
~
~
~
~
a
a
~
a
~
~
13
pi
ALLEN MULLINS, CPA
pi
Financial Consultant
I ~
Carter Fr Burgess, Inc.
~
Education
M.B.A., Accounting,1980, University of Tezas at Arlington
~
B.A., liberol Arts,1974, Union Universiiy
~
Professional Registration
G~
Certified Public Accountant, Tezas
:3 Professional Experience
a Mr. Mullins hos 26 years of ezperience in providing manogement ond finonciol services to stote and locol governments, speciol
distrids, and utilities. He hos manoged a wide rnnge of consulting assignments covering cost-of-service pricing studies,
3 organizational analysis, accounting and financial models, nnd informatian technology projeds. His projeds include business and
a IS strotegies, effediveness ond efficienry studies, and outsourcing studies.
~ Mr. Mullins was a Senior Manager in the National Utilities Consulting Pradice at KPMG Peat Marwick LIP. Mr. Mullins wos
~ Assistant Diredor of Utilities for the City of Arlington, Texos. His responsibilities included budget, financial planning, utility
billing, customer services, meter reading, meter services, properry management, and operotions research. He has also served os
a Diredor of Finance for the Ciry of Hurst, Texas, where he wos responsible for the accounting, budgeting, utiliry billing, data
2 processing, purchosing and persannel divisions.
3 Mr. Mullins is a member of the American Water Works Association, where he has porticipoted on the Information System nnd
3 Services [ommittee, and adive in the Government Finance OHicers Associotion and the American Institute of Certified Public
Accountants. Mr. Mullins has co-authored articles on financinl and work-order management, including: "The (hanging Role of
3 Financial Management in Utilities" in Proceedings of WEFTEC '95, "System Develapment Charges: Implementation,
3 Administration and Accounting" in the A.W.W.A. Proceedings,1992, and "Computerized Wark Management: Worth Inuestigating"
for Public Works Jaurnal.
~
~ Financial Management project experience includes:
~ • GASB 34 Implementation, Temple, TX; Senior (onsultant. Developed implementation strategy to obtoin compliance with the
new occounting standards for the Ciry of Temple. The projed included analysis of the appropriote copital accounting
~ methods for the Ciry's infrostrodure mtegories.
3
• GASB 34 issues, various lacations, Projed Monager. Developed an analysis of the new standards and made presentations to
3 professional organizations to assist various entities in the development of an implementation strategy to comply with the
3 new accounting stondnrds. The presentations were made the Texas Public Works Association, Tezas Municipal Utilities
Association, Tezas Municipal League, Special Distrids of South Colifornia, and projed included analysis of the appropriate
2 mpitol accounting methods for the Ciys infrastrocture categories.
~
7
i
~
4
~ ALLEN MULLINS, CPA
~ Page 2
0 • Water Rate Study and Distri6ution System Assessment (Merger of Little Rock and North little Rock Water Utility Systems);
~ little Rock/North Little Rock, AR; Senior Management fonsultant. Performing a cost of service water rate study including
evaluation of the need for impact fees ond an updating of its ancillary fees ond charges. This includes establishing financial
~ and service policies for the merged utiliry. An evaluation of each city's distribution system is also being performed with the
~ results being incorparated into the initiol pricing structure for the merged utiliry operation. The goal is development of a
unified rate strudure equalized over a seven ta ten year period.
~
~ • Fort Smith Water and Wastewater Pricing Strudure, Ft. Smith, AR; Senior Consultant. Developed and implemented a water
and wastewater cost based pricing strudure on a regional utiliry bosis from the owner/ customer basis used historically.
*l Wofked with a customer advisory group camposed of retoil and wholesale customers during the entire study.
~ • Arkansas Parks Program Management, Little Rock, AR; Senior Consultani. In conjundion with the Progrom Management
~ Services of the $180 million fIP, provided consulting related to Fixed Capital Asset Determination for GASB 34 Compliance.
~ • Hot Springs Water and Wostewoter Pricing Structure, Hat Springs, AR; Praject Manager. CurrenTly developing a cost based
7 water and wastewater pricing strudure on o regional basis for retail and wholesale customers of Hot Springs, Arkansas. The
A ciry currently has a non-cost based pricing strudure.
~ • Dnllas Water Utilities (DWU) Retail Woter Rate Study, Dallas,lX; Projed Managei. Preparing rotes study for retail water
service, including a depreciation analysis of infrastrudure assets and development af water supply.
~
~ • Utility Rate Analysis for Metrapolitan Government of Nashville and Davidson Counry, Department of Wuter and Seweroge,
Nashville, TN; Projed Manager. Managed a financial analysis and prospedive financial impact study related to a revenue
~ hond tiebt refunding for the Department. Manoged wholesale wastewater, wastewater surcharge studies for the Department.
~
• Water and Sewer Rate Study, (iry of Whitehouse, Texas; - Developed revenue requifements in order to complete Water and
~ Sewer Rate Study. Also designed proposed rate strudures.
~ . Utiliry Rate Study, Allen, A. Projed Manager. Performed cast of service water and wastewater rate study. Exomined
~ revenue requirements and designed rates.
3 . Utiliry Rate Study; lewisville, TX; Projed Manager. Performed water and wastewater rate study. Ezomined revenue
12 requirements and designed rotes.
1
• Utiliry Rate Study; Fort Worth, TX; Projed Manager. As a member of a team prepared water and wholesale wastewater rote
3 studies.
~ Acton MUD Woter Rate Study; Granbury, A. Projed Manager. Developed cost of service rate study and designed water rates.
rJ
~
0
+t! _
~ ALLEN MULLINS, CPA
~ Page 3
~ • Impad fee DevelopmenF, Project Manager. Developed impad fees and system development charges for Moui Board of Water
~ Supply, NI; Lewisville, TX; Garland, TX; Grand Prairie, TX; Wood (aunty, OH; ond the dulf Coast Water Authority (Texas City),
TX.
~
3 . North American Development Bank (NADB), San Antonio, TX; Praject Manager far Rates. Managed the development of water
and sewer rates for Romo, Tezas as a part of the funding requirements for the NADB.
~
~ • Brazos River Authority, R. Indired Cast Analysis; Project Manager. Revised the indirect tost methodology for the Authority to
opply general ond administrative casts to specific projeds ond services provided to customers.
~
~ • Brazos River Authoriry, TX; Financial Modeling; Project Manager. Developed integrated financial models for 6udget, indirect
cost, and system rates.
~
• Brazos River Authoriry, Financial Analysis. Project Manager. Provided rate litigation support services, intluding cost of
~ service analysis for woter and hydroeledric utilities.
~
•[ounry of Maui Board of Water Supply, Wailuku, Hawaii; Project Manager. Managed the development of System Development
~ Charges for the Board including performance of a water cost of service study, impact fee study, financial planning and
~ development of a financiol model.
~ .(hacon Creek Flood Mitigation Study/Financial Plan, Ciry of Laredo, Texas; Project Manager for Financial portion of
~ Engineering projed. Assisted the City of Laredo in identifying funding sources. Developed software tool enobling the Ciry to
perform queries and lomte the most viable sources.
~
~ •[iry of Dallas NPDES MSF Storm Water Reapplication, Dallas, Texas. Project Manager. Reviewed the cu«ent pricing structure
ond suggested revisions needed to accommodate changing conditions since rates were implemented. Additionally, reviewed
~ storm water costs for the previous five years and revenue needs for the next five years.
• Irving Stormwater Utiliry, Iruing, R. Senior Manager. Developed a rate model for recovering the cost of NPDES storm water
~
~ permit and general storm water management costs and applied that cost of service to parcel data from the Dallas County
~ Appraisol Distrid to estoblish the basic rate strudure customer classes. This projed was established in accordance with
Sedion 402 of ihe Tezos Local Government Code. (onsideration was given to billing system limitations and impiementation
~ issues.
~ • Plano Storm Water Utiliry Study, Plano, R. Project Manoger. Development of residential and commercial storm water fees
~ far implementation of the [ity's storm water utiliry, including billing system support and verificotion of impervious cover for
9 vorious commerciai customer classes. This projed was established in accordance with Sedion 402 of the Texas Local
Government Code.
~
31
~
7
~
~ ALLEN MULLINS, CPA
A Page 4
p Operations Management project experience includes:
A
~ • SAWS Evaluation and Assessment of Water & Wastewater Operations, San Antonio, TX; Management Consultant. Providing a
~ comprehensive evaluation and assessment of water ond wnstewater operations for the San Antonio Water System (SAWS) as
pad of their Continuous Improvement Program. Working diredly for the Board af Diredors, scope includes the analysis of
~ general and adminisirative adivities and related cosis, benchmarking and an analysis and recommendatians on organization
and staffing.
A
0 • Dallas (DWU) Management Audit and [ustomer Information Sysiem Analysis; Dollas,lX; Management Consultant. Served as
a manogement consultant for a monagement audit of the Ciry's woter and sewer operotion and for the evaluation and
~ seledion of a new Customer Information System for the utiliry billing fundions.
~
• San Antonio Water System (SAWS) Storm Water Management Plan; San Antonio, TX; Senior Management Consultant. . T e
~ projed included development af an interim rate strudure, a final tiered rate strudure and an implementation plan for a new
~ storm water utility to provide revenues as a part of the City's Storm Water Management Plan, needed to meet the
requirements of the EPA storm woter regulations. Developed a customer-billing database for storm water utilizing land data
:31 information wos developed from the Bezar Appraisal Distrid (BAD) for its 250,000+ customers.
~ Metropolitan Water District of Southern (olifornia MWD, los Angeles, CA; Projed Manager. Managed a diagnostic review of
~ • the rate development, financial planning, and financial palicies of the Metropolitan Water District of Southern falifornia.
~ . Counry of Maui Board of Water Supply, Wailuku, Hawaii; Projed Manoger. Managed o diagnostic review of the Counry of
Maui, Board of Water Supply including management, finance, accounting, customer billing, engineering and field operations
~ fundions.
DI • Suez fities, Egypt - Wastewater (U.S.A.I.D1Suez [anal Authoriry/Ministry of Housing), Cairo, Egypt; Management
~ Consultant. Provided assistance to management in o multi-year effort to build the institutional framework for reorganizing
the municipal utilities along the Suez Canal, Egypt.
~
~ . Dallas (DWU) Storm Water Utiliry Development; Dallas, TX; Projed Mannger. Managed financial fundions and the
organizational development of storm water utiliry. The projed induded rate and customer doss development.
~
~ . Dallas Water Utilities (DWU) Analyses Training, Dallas, TX; Projed Manager. Provided training related to the pricing pro(ens
including Financial Management Context, revenue requirements, cost allocation, rate design and ancillary changes, p' ' g
0 water and wastewater seNices.
~ . Dallas Department of Housing and Neighborhood Services, Dallas, TX; Projed Manager. Performed a management audii to
0 assess the service delivery, staffing, and organizational needs of the Department.
0
G1
~
3
a ALLEN MULLINS, CPA
Page 5
~
~ • San Jose Water fompany, San Jose, fA; Projed Manager. Managed development of the requirements definition for San lose
Water (ompany and participated in similar projeds for water and wastewoter utilities customer infarmation systems for
~ several major cities.
~ Information Technology project experience includes:
~
~ • San Antonia Water System (SAWS) Strategic IT Plan, Snn Antonio, Texas; Projed Manager.
Carter & Burgess projed team members monaged the development of n strategic IT plan identi{ying the vision and
recommendations for technology for the future. Entails evaluation af the cu«ent systems in information management,
X technology ond automation. A specific outsourcing study is also being perfarmed.
21 • San Antonio Water System (SAWS) CIS Assessment; Son Antonio, iX; Management Consultant. Performed an evaluation of
~ the SAWS customer information system (f15) development project being performed by onother consulting firm. This included
evaluoting the progress of the system's development in relation to the plan for the development process being used ond
~ manogement of the projed. The evaluation concluded that o nan-standord development process wos being used, and that
~ the work was nat praperly monitored. Also, the other consultanYs project manager was not using a detailed work plan to
monitor either the client tnsks or the consultant tasks to perform the projed. The evaluation projed team concluded that the
~ custom system development projed could not succeed ond that the work dane to date would not be useful and should be
abandoned.
~
~ • Fixed Asset Study for the Miami-Dade Water and Sewer Department, Miami, fL; Financial Analysis. Performed a study of the
Deportment's fixed asset accounting needs and made recommendations for system requirements related to the retirement
units ond levels of service mmponent detail needed to manoge the DepartmenYs fixed assets.
~
• Accounting System Evaluatian ond Selection, Monioe, LA; Project Manager. Managed accounting system sofiwore
D-1 requirements definition and package seledion for the Ciry of Monroe, louisiana. Also, managed an evaluation of ond
~ developed solutions including software requirements definition for a starm water pump station monitoring system for the
Ciry.
p~
pi • Storm water Manitoring System; Monrce, LA; ProjedManager. Managed an evaluation of and develaped solutions including
soNwore requirements definition for a storm water pump station monitoring system far Monroe, louisiana.
~
~ • Michigan Department of Transportation. The project included the analysis and reengineering of budgeting, payroll, financial
planning, occounts payo6le, financiol reporting, and accouniing information systems.
8
Q • Michigan Accounting and Information Network Projed, Lonsing, MI. Participated in the implementation of a state-wide
financial accounting and purchasing system for the State of Michigan. Served an agenry aduocate team assisting three state
n agencies with their deportmental implementation: Department of Transportotion, Commerce Depariment, and State Police.
9
0
n
~
7
~ ALLEN MULLINS, CPA
~ Page 6
~ • Son Jose Water Company Information System Development, San Jose, fA; Project Manager. Managed development of
requirements definition for San Jose Water Company ond participated in similar projecrs for water and wastewater utilities
~ customer information systems for severol major cities.
~ • Mississippi DOT Accounting System Implementation, Monagement Consultont. Padicipated in the system testing phase of
~ the accounting system implementation for ihe Mississippi Depodment of Transportation. Test focus wos on ihe procurement
~ and 6udgeting modules.
~ • Miami-Dade Water and Sewer Department, Miami, FL; Manoger. Managed business process redesign projed for various
~ customer seruice fundions. The redesigned business processes were used as the basis for the customer information system
requirements definition for the seledion and acquisition of o new customer information system.
~
~
~
~
~
al
~
~
v~
~
~
~
~
a
a
a
n
e
a
0
a
~
~
~
~ LIN LINDSEY
Inspector !
~ Carter Ft Burgess, Inc.
~
~ Education
A.S., Farm & Ranch Management
~ Cooke County College
~ Professional Registration
A National Institute of (edified Eng. Technicians
2000, VA
31 Professional Euperience
IN Mr. lindsey has over 35 years of extensive experience in construdion inspedion and qualiry control for o wide range of projects
~ including water and wastewater, utilities, roadways, airports, flood control and large mixed-use land developments. His experience
includes projed field inspedion supeNision, contrad administration and projed coordination. He has also been responsible for
8 construdion testing and monthly estimate verification.
A Relevant Project Experience
IN • [edar [rest Water Pump Stotion, Dallas, R. (onstruction Obseruer. Inspedion of a booster pump statian with ultimate
Pi pumping copaciry of 130 MGD, seNing two different pressure planes, and yard piping ranging up to 96 inches in diameter.
I • Circle T Ranch Ground Storage TanWPump Station and Waterline, Westlnke, TX; Senior Construction Inspedor. Pravided
~ inspection and construdion administrntian for 10 miles of 16- and 20-inch water pipeline, pump station, and ground storage
~ tank.
$1 • Lake Fork Pump Stotion, Dallas, TX; Senior Construdion Inspedar. Providing oversight and superuision of inspedion teams for
01 Segment 1, a 10-mile sedion of 108-inch RL(P water trunsmission line.
p] • lake Palestine Pipeline ROW, Dallas, TX; Projed Loordinator. Coardinated the obtaining af rights-of entry for 42 miles of 84"
~ water pipeline.
B • Las [olinas Construction Management Services, Las Colinas, A. (onstrudion Observer. Provided inspedion seroices for
~ construdion of utilities including water, sewer, storm sewer, private utilities, grading, drainage and paving for 1.5 miles of Las
Colinos Boulevard and (oiwell eoulevard.
13
~
~
13
~J
LIN LINDSEY
Page 2
. Vista Ridge Development, Lewisville, TX; Construdion Observer. Pravided construdion management including contrador
oversighi, payment requests, controdor meetings, agenry coardination with TxDOT, ciry and others, and inspection of
infrastrudure for o 2,000-acre mixed-use development, including 25 miles of water lines, 35 miles of sewer lines, dry utilities,
roodways and bridges, ond approximotely 2 miles of levees and flood control channel.
. Vista Ridge Water 8 Sewer Master Plan & Design, Lewisuille, TX; Construdion Observer. Inspedion of a 20-MGD sewage lih
station with 35-foot deep wet/dry pit, 2.5 miles of force main and 8 miles af 18" to 36" gravity sewer, ond an 850-cfs storm
water pump station and intake structure.
• Weatherford Water Purificotion Plant Improvements, Weatherford, R. Senior Lonstruction Inspedor. Provided oversight of
construdion inspedion and administration for expanding and renovating the treatment works, lagoons, and force main.
• Euless Woter Treatment Plqnt, Euless, TX; fonstruction Observer. Inspection of all plant facilities including yard piping.
• Mabeluale Booster Pump Station, Little Rock, AR; Senior Inspedor. Inspeded construdion of water storage reseruoir and pump
station for ciry of Little Rock. Coordinated with Ciry staff.
. Mobelvole Water System, Englond, AR; Senior Inspedor. Inspeded woter system, including laying of 6" and B" woter lines and
construdion of 60,000 gallon storage tank. Responsi6le for oversight of all traffic control.
. Pork Ridge Boulevard and Utilities, Irving, R. Senior Inspedor. Provided inspedion and contractor oversight far construdion of
utilities including water, sewer, storm sewer, and privote utilities grading, drainage and paving far 1.5 miles of new 4-lane
divided thoroughfore. Responsible for oversight of all traffic control. (oordinated with city sta$.
. Richland Chambers/fort Worth Transmission Line, Navarro Counry, R. Inspedor. Inspeded a 10-mile section of 96" RffP
water transmission line being construded to conuey raw water to the (iry of Fort Worih.
• The Bollpark in Arlington, Arlington, TX; (onstrudion Observer. Installation af site drainage, water and sewer facilities.
TOM BEAN, PE
Leak Detection
Severn Trent Pipeline Services
Education
B.S. fivil Engineering, Valporaiso University, 1969
Professional Registration
Registered Professionol Engineer - TX, IN
Professional Experience
Mr. Bean joined Severn Trent Pipeline Services (STPS) in 1969 and has hands-on field and management experience in water
distribution systems, distrid meosurements, hydraulic field testing, hydraulic modeling studies, water qualiry analysis, and moster
planning projeds. Mr. Bean is responsible for field data acquisition, overall data anolysis, report preparation, budget control, and
overall data and report quoliry for all projects being performed by STPS in the Southern District.
Relevant Project Experience
[iry of Charleston, South Larolina Water Master Plan. Mr. Bean develaped and calibrated model of system, and recommended
o capital improvemenis program to meet projeded growth.
. Ciry of Saginaw, Michigan Water System Model Master Plan. Mr. Bean anolyzed and developed water consumption figures
based upon population density and developed and calib[ated the woter model. Recommendations for current and future water
system improvements were incorporated into ihe city's water system cnpital improvemenis plan.
. Ciry of Augusta, Georgia Water Distribution System Model. Mr. Bean was responsible for constructing a model of the water
distri6ution system. The model was used to make recammendations to eliminate large pressure variations in Central Business
District by determining the correct downstream settings of all pressure reducing values. The calibrated model was also used ta
condud studies on the movement of pressure zone boundaries ond to size and place odditional storage.
. Shemyo Air Force Base, Shemya, Alaska Water Distribution System Analysis. Mr. Beon participated as team member in
conduding pump efficienry tests, loss of head tests, and cansumption measurements.
. Edmond, Oklahoma Water Distribution Master Plan. Mr. Bean constructed and calibrated a model of the water distribution
system. The model was used to make recommendations for the location of additianal sources of supply to the system. The
model was also used to size reinforcements for future grovrth in the system.
. Broken Bow, Oklahoma (omputer Model. Mr. Bean canstruded and calibrated a model of the water distribution system. The
model was used to condud a surge analysis of the entire system by others.
TOM BEAN, PE
Page 2
. Oklahoma City, Oklahomo Water Distribution Master Plon. Mr. Bean construded and calibrated a model of the woter
distribution system. Recommendations for current and future water system improvements were incorporated into the ciry's
water system copital improvements plan.
. Guthrie, Oklahoma Water Distribution Master Plan. Mr. Bean construded and calibrated a model of the water distribution
system. Recommendations for current and future water system improvements were incorporated into the ciry's water system
capital improvements plan. The model was also used to realign a pressure boundary on the west side af the distribution
system including a new booster pump station.