20-DISCUSS AND TAKE ACTION ON CONSTRUCTION OF CERTAIN STREET, UTILITY AND SIDEWALK PROJECTS FOR 2013Item No. 20 nze�no�andum TO: Mayor & City Council FROM: John Godwin, City Manager SUBJECT: 2013 CAPITAL PROJECTS DATE: January 18, 2013 BACKGROLJND: We have been working since November with staff and KSA to develop a list of projects to be completed this winter and spring, what we have been calling "Year 0", since it will precede the 10-year CIP now being developed. We specifically looked at projects that were of a high need, that were scattered about the city, and were of various types. In addition, in evaluating utility projects, we identified those that could be done in-house with a new construction crew we assembled. STATUS OF ISSUE: We agreed to a recommended list on January 17, and also completed cost estimates on a1121 projects. The attached list includes five water and one sewer projects, all of which will be done in-house. The sewer work, on Oak between 8t" and 9th SE, also includes some drainage work where two residential properties suffer periodic flooding. We have included all of the sidewalks on Bonham and in front of the YWCA building that were part of our grant application last fall, plus added a small segment on Grand in front of the Salvation Army, and one block of 7`h between Bonham and Grand. We also included eight road resurfacing projects and three reconstructions projects — 24`h SE, 6�h SE, and Collegiate. Work on Collegiate will include paving a parking lot for the Trail de Paris, and work on Graham will include several blocks of replacement sidewalk. There are many other street projects we could have done, but there are few in town that do not have water and/or sewer lines underneath them that need to be replaced first. Finally, we have included reconstructing a parking lot on Collegiate. Water and wastewater projects can begin immediately. We plan to bid concrete work almost as quickly and get work started in March. Asphalt work typically should not begin until April due to temperature concerns, so those projects will be at the end. Altogether there will likely be five different construction contracts awarded. Engineering will be provided by three different engineers (two recommended contracts are elsewhere on this agenda). Because this is a significant investment into our city's infrastructure, and hopefully the precursor of many more such projects, the council may want to consider having some sort of ground- breaking ceremony for one or more of these projects. BUDGET: Funds are available in 2012-13 budget. RECOMMENDATION: Approve recommended Year 0 projects. � � ¢� � �y ;; g� .. . � z � � sl. _ .. . _ _ e . s -a �a , al �.,,.8' �a 7 � � y �. .e ��� � 4 F ey 2 , '' ? 6����� ���� �a��a ��������°���ur� Irn��°������t� liUAfER IMPRC?VEMEi�iS 24th SE c�7i Big 5andy Creel< Crassing (W1) $ Along railroad near Turner ind�astries jUVJ_} $ f3elmont, Fairfax, 9.2th �JE, Yu "131:h N[ (V1/3) $ South of Jacicson @ Trail de Paris {W4) $ Water line by health depar�trnenk (6th SW} $ WA5iEW�TER INiPRC.?VLMEi11�'S Oal< frorn Sth to 9th (51j (with sorne drainage) $ 511�EWALI<5 YWCA & west of plaza (Bonham, Grand) $ 7th NW, Bonham to Grand $ Salvatior7 Army (Grar7d) $ Sl"REEi' IiViPP2C31lCi�/I�IU1'S: RECC`JiVS�C�RUCTlUI� 24th, Poll< to College � 6th SE, Clarksuille to Lamar $ Coilegiate, cree!< to Clarl<sville $ STI2EEi IMPRC)VEM�i!liS: RE-5Ut�F�iC� 17th NE, Lamar to Pine Bluff $ 17th N€, Pine Slu#ff to Loo� _ 5 E. Sherman, S. Church to 3rd SE $ 7th NW, Graham to Bonham $ 7th SW, Grand to Washin�ton $ 24th NW, Bonham to Graham $ Graham, 1st NW to 34th NW (sideevail<to 11th) $ N. Collegiate, Lamar to Loop $ PARIQNG 15, 000 55,000 16,763 45,000 3,750 11,025 195,000 8,000 5,600 416,000 104,000 94Q,OQ0 18,000 90,000 __ 10,000 34,000 35,000 19,000 361,000 143,000 Collegiate Lofi $ 70,Q00 TOTAL YEAR ,�0,� PRf�JECi5 $ 2,595,138 z� �� ` �