Loading...
05-E Stillhouse Rd Impr ProjDRAFT J:\Attorney\LISA\Resolutions\CiJRRENT\Stillhouse Road - Eng Serv Cont 2 Res.wpd August 9, 2002 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, ACCEPTING THE PROPOSAL OF HAYTER ENGINEERING FOR ENGINEERING SERVICES FOR THE STILLHOUSE ROAD IMPROVEMENT PROJECT; AUTHORIZING AN ENGINEERING SERVICES CONTRACT; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the l lth day of March, 2002, in Resolution No. 2002-058, authorize an engineering services contract with Hayter Engineering for preliminary work for the realignment of Stillhouse Road; and, WHEREAS, such alignment study has been completed, and the City of Paris is in need of engineering services for the right-of-way acquisition, design, and construction phases ofthe Stillhouse Road Improvement Project; and, WHEREAS, Hayter Engineering has made a proposal to perform such services, and the City Council finds and determines that said proposal is acceptable and Hayter Engineering should be awarded an engineering services contract for the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble to this resolution are hereby in all things approved. Section 2. That the proposal of Hayter Engineering, attached hereto as Exhibit A, be, and the same is hereby, accepted. Section 3. That the City Manager be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, an engineering services contract with Hayter Engineering, under the terms and conditions and in a form approved by the City Attorney, for the right-of-way acquisition, design, and construction phases of the Stillhouse Road Improvement Project. Section 4. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this 12th day of August, 2002. Michael J. Pfiester, Mayor ATTEST: Mattie Cunningham, City Clerk APPROVED AS TO FORM: Larry W. Schenk, City Attorney HAYTER ENGINEERING, INC. CONSULTANTS PLANNERS ENGINEERS August 2, 2002 Mr. Shawn Napier, P.E. City Engineer City of Paris P.O. Box 9037 Paris, TX 75460 Re: Proposal for Engineering Services Stillhouse Road Improvements Deaz Shawn: 4445 S.E. LOOP 286 PARIS,TEXAS 75460 P 03) 785-0303 X (903) 785-0308 We appreciate your selection of our firm to provide a proposal for engineering services for the right- of-way acquisition, design, and construction phases for the improvement of Stilihouse Road from Clement Road to Loop 286. Under previous contract we have completed an alignment study for this project. The project length is about 2,000 feet, and the proposed right-of-way width would be 70 feet. Major reconstruction or relocation of 2 box culverts will be required, along with storm sewer in some areas. Coordination with TxDOT will be necessary at Loop 286, and with various utilities along the project route. 14 parcels have been initially identified for acquisition. The proposed pavement section would be of concrete, with curb and gutter, with the precise width yet to be determined. We propose to provide the £ollowing services: 1. Right-of-Way Acquisition Phase - a) Consult with City as required to define right-of-way needs. b) Furnish a registered professional surveyor and supporting staff to provide on the grroimd surveys and prepare feld notes for each acquisition (14 estimated). c) Set monumentation for easements. 2. Desiqn Surve s Phase - a) During the alignment study, aerial topography was obtained. The design suil,eys phase would include limited topographic surveying necessary to obtain culvert flowlines, sewer depths, and similar data to supplemenf the aerial photography. 3. Desi¢n Phase - a) Provide a geotechnical investigation for pavement design purposes. b) Design the project, including grading, drainage, limited routine water or sewer relocations and pavement section. Provide contract documents for review by legal counsel, technical specifications, and an estimate of probable cost. c) Review completed drawings and specifications with City and TxDOT representatives, and submit to TDLR for accessibility review if required. 4. BfddinQ Phase - a) Prepare necessary advertisement forbids, reproduce drawings and specifications for bidding purposes, and distribute bidding documents to contractors requesting same. b) Consult with Owner as to questions which may arise during the bidding process, and issue addenda as required. c) Attend the bid opening and assist in tabulation of the bids and recommendation of award. 5. Construction Phase - a) Consult with Owner and advise Owner as provided in the construction contract. Review periodic contractor payment requests, prepare change orders, and provide liaison with other government agencies, as required. b) Review and act on shop drawings and materials submittals provided by the Contractor. c) Make visits to the site at intervals appropriate to the various stages of construction. Daily observation would be provided by the City. Our project team would include Reeves Hayter, P.E., as principal in charge. Kenneth Jones, P.E., R.P.L.S. would direct the surveying activities, and either Reeves Hayter or Michael Donnan, P.E., would serve as project engineer. Resumes for these persons are attached. A timeline for the proposed project is attached, which is ananged to accommodate the construction phase during drier months of the year. Fees for various phases of the work are anticipated to be as follows: l.a. Right-of-Way Acquisition Hourly l.b. and l.c. Rigltt-of-Way Acquisition $18,500.00 2. Design Surveys $3,400.00 3.a. Design $4,000.00 3.6. and 3.c. Design $31,386.00 4. Bidding $5,900.00 5. Construction $19,630.00 Please let me know if you have any questions. Sincerely, HA R ENGINEERING, INC. ~ R. Reeves Hayter, P.E. President Enclosures Stillhouse Road Preliminary Timeline ! Authorization to Proceed Right-of-Wai. Surveys Right-oC-Way Acquisition ~ Design Surve}•s Design and Approvals Advertisc for Bids 7 7 Construction Phase Open to Traffic - - 4 R. Reeves Hayter, P.E., R.P.L.S. President, Hayter Engineering, Inc. Education B.S.E. Civil Engineering Duke University, 1971 Registrations Professional Engineer, 1976, Texas Professional Engineer, 1976, Oklahoma Professiona] Engineer, 1976, Missouri Professional Engineer, 1976, Arkansas Professional Engineer, 1976, New Mexico Professional Engineer, 1976, Louisiana Registered Professional Land Surveyor, 1980, Texas Memberships National Society of Professional Engineers Texas Society of Professional Engineers, State Director American Society of Civil Engineers Water Environment Federation American Water Works Association Southem Building Code Congress Experiences Mr. Hayter has some 29 years experience in surveying, consulting, planning, design, testing, construction review, operations and environmental reviews for a broad cross-section of civil works. Prior to his association with Hayter Engineering, he served as an assistant City engineer and as project representative for an ENR 500 engineering design firm. Mr. Hayter became associated with Hayter Engineering in 1976, and, since 1986, has served as President of the firm. Among his prior projects are: COMMERCIAL/INSTITUTIONAL DEVELOPMENT o Applebee's Restaurant, Paris, Texas o Lamar Crossing Shopping Center, Paris, Texas o Kennedy Ford-Lincoln Dealership, Paris, Texas o Coinmerce High School, Commerce, Texas o Burger King, Bonhani, Texas 0 Mirabeau Square Shopping Ccnfer, P1ris, Texas STREETS ROADS - SIDEWALKS o Urban Renewal, St. Joseph, Missouri o Airpark Avenue, Greenville EDC 0 7th Southwest Project, City ofParis o Pine Mill Road Improvements, Lamar County, Texas o Oak Creek Addition, Phase VII, Paris, Texas o Townwood Estates, Paris, Texas o Pecan Street Extension, City of Bonham, Texas o City of Clarksville, 1992 TDHCA Street Improvements o Silo Road, Bonham, Texas BRIDGES o Mustang Creek, City of Deport o Pig Branch, City of Bonham o BRINSAP, approximately 800 bridges in Missouri and Texas DRAINAGE PLANNING AND DESIGN o Master Drainage Plan, City of Paris, Texas o Comprehensive Plan - Stormwater Drainage, City of Bonham, Texas o Master Drainage Plan, City of DeKalb, Texas o Master Drainage Plan, Stillhouse Estates, Paris, Texas o Master Drainage Plan, City of Reno, Texas o Drainage Facilities Design, Mirabeau Center Project, City of Paris o Drainage Facilities Desio , Pine Mill Road Project, City of Paris o Plum Street Stormwater Detention Basin, City of Paris ' AIRPORT DEVELOPMENT PROJECTS o Commerce Municipal Airport-Runway and apron improvements. o Cox Field, Paris, Texas - T-Hangar Aprons o Cox Field, Paris, Texas - Taxiway Design o Jones Field, Bonham, Texas - Aviation easements, airport layout planning o Cox Field, Paris, Texas - Rumvay and taxiway reconstruction, navaids, lighting improvements; airport layout plan WATER FACILITIES o LCWSD 1998-99 Improvements, Elevated Storage and Transmission Mains o Water Treatment Facilities, City of Cooper, Texas e 4 Million gallon Center Street Storage, City of Paris o Elevated storage facilities, City of Bonhain 0 Elevated sYorage facilities, Lamar County Water Supply District o Deep water well, City of Trenton, Texas o Deep water well, City of Wolfe City, Texas ~ o Comprehensive Water Supply Plan, City of Reno o Dam rehabilitation, Big Creek Reservoir, City of Cooper WASTEWATER FACILITIES o Wastewater Treatment Facility Expansion, City of Bonham o Wastewater Treatment Facility, City of Tioga, Texas o Stoimwater Equalization Basin, City of Commerce o Wastewater Chlorination/Dechlorination Facilities, City of Paris 0 15" Powder Creek Interceptor Facilities, City of Bonham o Wastewater Collection System Rehabilitation, City of Trenton o Class A Autothermal Sludge Digestion Facilities, City of Paris 7 Kenneth R. Jones, P.E., R.P.L.S. Hayter Engineering, Inc. Education B.S. Civil Engineering A.A.S. Management Registrations Texas A&M University, 1957 Grayson College, 1974 Professional Engineer - 1965, Texas (23771) Registered Professional Land Surveyor -1980, Texas (3332) Professional Sanitarian - 1994, Texas (3070) Memberships Texas Society of Professional Surveyors Ezperiences Mr. Jones has over 45 years engineering experience in transportation planning, design, construction and surveying. Prior to joining Hayter Engineering, Inc., Mr. Jones served as construction engineer, design engineer, planning engineer, resident engineer and District Director of Transportation Planning and Development, totaling 36 years 5 months with the Texas Department of Transportation. He later served with a Tyler, Texas consulting firm, performing land surveying and similar projects. At Hayter Engineering, Inc. he is project manager for all surveying projects, including land surveying, design surveys, construction layout, title research, property description, utility locating and other surveying related assignments. Among his prior projects are: SURVEYING o Boundary survey and fieid notes for 6 miles of Texas Midland Railroad right-of-way. o US 271- Paris to Mt. Pleasant (TxDOT/Dannenbaum Engineering) design surveys, ground control for aerial photogrammetry, ownership research, existing right-of-way location, utility locations, deed research: o SH 276 widening (TxDOT/Dannenbaum Engineering) groimd control for aerial photogrammetry, ownership research, eaisting right-of-way location, and utility locations. o Easement Location Surveys - Southwestern Bell Telephaie, Lamar County, Texas, Bonham, Fannin County, Texas o Right-of way, easement, and design sun,eys for Silo Road Improvements, Bonham, Fannin County, Texas o Boundary surveys, platting, topographic and utility surveys for detention pond Site, City of Paris, Lamar County, Texas I o Easement Surveys, Texas Utilities - Lamar, Red River, Fannin, Henderson and Hunt counties o Topographic engineering surveys, Front Street paving and drainage, Trinidad, Texas o Boundary Survey and field notes - Stephens/Hales- Fannin County o Boundary Survey and field notes - Lawyers Title Company - Fannin County o Boundary Survey and field notes - Jack Besteman - Lamaz County o Boundary Survey and field notes - First Baptist Church, Roxton, Texas o Boundary Survey and field notes - Caunco Development Gommerce, Texas o Boundary Survey and field notes - Meadow Brook Cemetery, Lamaz County o Boundary Survey and field notes - Rex Johnson, Lamar County o Boundary Survey and field notes - Commerce Industrial Foundation Commerce, Texas o Boundary Survey and field notes - Lamar Power Partners/Panda Energy, Lamar County ROAD WAY DESIGN o F.M. Hwy 902, Grayson County, Texas - New Location Projects o F.M. Hwy 120, Grayson County, Texas - New Location Projects o F.M. Hwy 1417, Grayson County, Texas - New Location Projects o F.M. Hwy 901, Grayson County, Texas - New Location Projects o F.M. Hwy 3357, Franklin County, Texas - New Location Projects o Interstate Awy 30, Franklin County, Texas - Rehab Projects DEVELOPMENT OF RIGHT-OF-WAY o Twelve projects in Grayson County, Texas, including FM 1417, FM 131, FM 120, FM 902, US 82, FM 901 and FM 1397 TRANSPORTATION PLANNING o Developed Long Range Plan, Grayson County, Texas o Developed Long Range Pian, Red River County, Texas o Developed Statewide Program for Traffic Data/With Projections, Texas BRINSAP o Coordinated On-System Bridge Inspection in Dallas, Cass and Marion Counties, Texas in 1994. o Inspected 88 On-System Bridges in Bowie County in 1996. 9 MISCELLANEOUS DESIGN o Slope Failure Repair for Wal-Mart Distribution Center, Palestine, Texas o Street, Drainage and Sanitary Sewer Plans, Oak Hurst Place Subdivision, Tyler, Texas o Parking Lot Plans for Butler Publishing Co., Tyler, Texas o Drainage, Street and Parking Lot Design for High School, Lampasas, Texas o Drainage Study, Reports, and Expert Witness for Genesis Producing Company. , 10 Michael J. Donnan, P.E. Hayter Edgineering, Inc. Education B.S.C.E., Civil Engineering, Virginia Military Institute, 1980 Registrations Professional Engineer, 1988, Texas Memberships National Society of Professional Engineers Texas Society of Professional Engineers American Society of Professional Engineers Experiences Mr. Donnan has some 19 yeazs experience in consulting, planning, design, conshuction review, bridge inspection, operations and environmental reviews for a wide range of civil works. Prior to his association with Hayter Engineering, Inc., he served as an officer in the U.S. Army Corps of Engineers. Mr. Donnan became associated with Hayter Engineering, Inc. in 1983, and, since 1988 has served as a Project Manager. Among his prior projects are: STREET AND ROAD PAVING o Paving and Drainage Improvements, City of Avery, Texas o Paving and Drainage Improvements, City of Deport, Texas o Paving and Drainage Improvements, City of DeKalb, Texas o Paving and Drainage Improvements, City of Roxton, Texas o Paving and Drainage Improvements, City of Cooper, Texas o Paving and Drainage Improvements, Meadow Addition, City of DeKalb, Texas DRAINAGE PLANrIING AND DESIGN o Master Drainage Plan, City of Edgewood, Texas o Master Drainage Plan, City of Point, Texas WATER FACILITIES 0 1998-99 LCWSD Water Improvements - Pumping Facilities o Water Treatmeiit and Pumping Facilities, City oFEmory, Texas o Deep Water Well, Lake Fork Water Supply Corporation, Texas 11 o Deep Water Well, City of Alba, Texas o Water Transmission Main, City of Alba, Texas o Booster Pumping Facility and 1 Million Ground Storage Tank, Lamar County Water Supply District, Texas 0 36" Raw Water Transmission Main, City of Paris, Texas o Water Treatment Plant Improvements, City of Bonham, Texas 0 150,000 Gallon Elevated Tank, City of Blossom, Texas 0 150,000 Gallon Elevated Tank, City of Emory, Texas 0 75,000 Gallon Elevated Tank and Transmission Main, City of Arp, Texas o Raw Water Pump Station, City of Edgewood, Texas o Raw Water Transmission main, City of Edgewood, Texas % o Water Distribution System Improvements, City of Deport, Texas o Water Distribution System Improvements, City of Farmersville, Texas o Water Distribution System Improvements, City of Emory, Texas o Water Distribution System Improvements, City of Reno, Texas o Deep Water Well, Hickory Creek S.U.D. o Master Plan, Golden Water Supply Corporation o Deep Water Well, Golden WSC, Texas o Pump Station Improvements, Lamar County Water Supply Dish-ict o Water Treatment and Pumping Facilities, City of Point, Texas WASTEWATER FACILITIES o Wastewater Treatment Facility Expansion, City of Emory, Texas o Wastewater Treatment Facilities Improvement, City of Point, Texas o South Wastewater Interceptor Replacement, City of Bonham, Texas o Wastewater Collection System Improvements, City of Trenton, Texas o Wastewater Collection System Improvements, City of DeKalb, Texas o Southwest Interceptor and Lift Station, City of Cooper, Texas o Wastewater Collection Replacement Lines S.E. Lift Station, City of Paris, Texas o Stormwater Holding Pond, City of Commerce, Texas o Wastewater Collection System Improvements, City of Deport, Texas o Wastewater Collection System Improvements, City of Blossom, Texas o Wastewater Collection System Improvements, City of Emory, Texas o Wastewater Collection System Improvements, City of Cooper, Texas o Wastewater Collection System Improvements and Lift Station, City of Edgewood, Texas o Wastewafer Lift Stations, City of Emory o Manhole Rehabilitation, City of DeKalb o Wastewater Treatment Pacilities, City of East Tawakoni 12