Loading...
18 2900 Pine Bluff Final PlatMEMORANDUM TO: Mayor and City Council Planning and Zoning Commission FROM: Shawn Napier, P.E. City Engineer DATE: October 1, 2002 . S.~BJECT: Final Plat of City Block 259, Lots 14 A through F I have reviewed the final plat of the above referenced addition. It appears that the plat complies with the City of Paris subdivision regulations with the following exceptions and/or additions. Label the finished floor elevations on each lot. The title block in the top left comer needs to show the total acreage to be divided and 31st St. should be changed to 30th St. The lots shall be numbered 14 and ordered using letters B through F accordingly (i.e. 14B, 14C, etc.). All references in the field notes must be changed to match the new lot designation. In the field notes in paragraph five, change 30th N.W. to 30th N.E. The sewer line shall be constructed prior to acceptance of the final plat or a Guarantee of Construction shall be completed in the amount of $11,500.00 per Ordinance No. 1315 Section xm. Guarantee of Construction. A one-year maintenance bond is required after completion of all infrastructure improvements per Ordinance No. 1315 Section IV (11) or Section XIlI. I recommend approval of the preliminary plat upon completion of the above items. Sincerely, ~hawn'NaP[¢r,~.E. City Engineer CCi Michael E. Malone, City Manager Larry W. Schenk, City Attorney Steve Methven, Building Official