Loading...
07-U Award Bid for Water LinesDRAFT F:ALICEkRESWORK\CURRENT\Elev Water Storage related water lines Award Bid Res January 7, 2003 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, AWARDING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR THE CONSTRUCTION OF THE WATER LINES ASSOCIATED WITH THE CONSTRUCTION OF A NEW ELEVATED WATER STORAGE TANK - BONHAM STREET; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the 9th day of December, 2002, in Resolution No. 2002-178, approve the advertisement for bids for furnishing plant, labor, materials, and equipment and for performing all work required for the water lines associated with the "Elevated Water Storage Tank - Bonham Street Project," which bids were received until 3:00 o'clock p.m., Thursday, the 9th day of January, 2003; and, WHEREAS, the best bid for such construction was made by ., Texas, and it should be awarded the bid for the same; and, of WHEREAS, the form of the contract for such construction project, attached hereto as Exhibit A, should, in all things, be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble to this resolution are hereby in all things approved. Section 2. That the bid of for construction of the associated water lines for the "Elevated Water Storage Tank - Bonham Street Project," in the amount of $ ., be, and the same is hereby, accepted and let conditioned upon said contractor meeting all of the terms and specifications included in the bid documents. Section 3. That the form of the contract with Exhibit A, be, and the same is hereby, approved. , attached hereto as Section 4. That the Mayor be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, the contract with _, upon the terms and conditions and in the form shown in Exhibit A, attached hereto. Section 5. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this 13th day of January, 2003. ATTEST: Michael J. Pfiester, Mayor Mattie Cunningham, City Clerk APPROVED AS TO FORM: Larry W. Schenk, City Attorney NOTICE TO CONTRACTORS Sealed bids addressed to the City of Paris, 150 SE 1st Street, Paris, Texas 75460, will be received at Office of the City Clerk until 3:00 P.M., Thursday, January 9, 2003 for: 24" RCCP WATER TRANSMISSION LINE BID NO. 82.49 At such time bids will be publicly opened and read aloud. The work consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of a 24" RCCP Water Transmission Line for the City of Paris. Plans and Specifications are on file and may be examined at the office of the Engineer, Bucher, Willis and Ratliff Corporation, Engineers, Planners & Architects, 601 Shelley Drive, Suite 202, Tyler, Texas 75701-9439 or the City of Paris Engineering Department, 150 S.E. 1st Street Paris, Texas 75460. Questions concerning the Plans and Specifications for this project should be directed to Bucher, Willis & Ratliff Corporation, Dallas, Texas at 903/581-7844; Fax 903/581-0178. Plans and Contract Documents may be obtained from the Engineer or the City of Paris Engineering Department. A deposit of $50.00 will be required for each set of Plans and Contract Documents obtained. General Contractors may obtain two (2) sets and Sub- Contractors may obtain one (1) set. The deposit will be returned to the contractor if Bidding Documents are returned in clean, unmarked and usable condition within fourteen (14) calendar days after the opening of the Bids. No refunds after fourteen (14) days are obligatory. A contractor can have plans mailed to their place of business C.O.D. Plans also will be available at the following locations FOR REVIEW ONLY at no cost to the contractor. Bucher, Willis & Ratliff, Corporation Architects, Planners and Engineers 601 Shelley Drive, Suite 202 Tyler, Texas 75701-9439 Phone: 903/581-7844 Fax: 903/581-0178 City of Paris, Shawn Napier, City Engineer 150 SE 1st Street Paris, Texas 75460 Phone: 903/784-9292 Fax: 903/784-1798 Paris, Texas 24" RCCP Water Transmission Line NC-1 Notice to Contractors NOTICE TO CONTRACTORS F. W. Dodge 1341 West Mockingbird Ln., #200E Dallas, Texas 75247 Phone:214/630-6111 Fax: 214/688-5005 A. G. C. of Tyler 1820 Shiloh Road, Suite 1001 Tyler, Texas 75703 Phone: 903/534-4793 Fax: 903/534-4971 A.G.C. of Dallas 11101 Stemmons Freeway, Suite 101 Dallas, Texas 75229 Phone: 972/484-2030 Fax: 972/494-1442 Each Proposal shall be accompanied by either a cashier's check, a certified check, or an acceptable bid bond in a amount of not less than five percent (5%) of the total amount of the bid, made payable without conditions to "City of Paris, Texas". Contract time required to complete the work for this project has been established at three hundred (300) calendar days. After that period, liquidated damages of five hundred dollars ($500.00) per day of delay will be assessed until work is substantially complete. The City reserves the right to accept the bid which, in its judgment is the lowest responsible bid; to reject any or all bids; and to waive irregularities or informalities in any bid submitted. Bids received after the specified time of closing will be returned unopened. Conditional or qualified bids will not be accepted. A pre-bid conference will be held at 1:30 P.M., Monday, January 6th, 2003 in the City of Paris City Council Chambers located at 135 S.E. 1st Street. Paris, Texas. CITY OF PARIS, TEXAS Michael E. Malone, City Manager PUBLISH: THE PARIS NEWS PARIS, TEXAS PUBLICATION DATES: Sunday, December 22, 2002 Sunday, December 29, 2002 Paris, Texas 24" RCCP Water Transmission Line NC-2 Notice to Contractors