Loading...
04 Final Plat River Oaks Sub MEMORANDUM TO: Mayor and City Council Planning and Zoning Commission FROM: Shawn Napier, ~ City Engineer ~! ~ DATE: July 3, 2003 SUBJECT: Final Plat of River Oaks Subdivision I have reviewed the final plat of the above referenced addition. It appears that the plat complies with the City of Paris subdivision regulations with the following exceptions and/or additions. 1. Label lot 5 on the north side of Aikin Drive as being in Block B. 2. Provide a drainage easement along the south edge of lots 4, 5 & 6 of block C and lots 5, 6 & 7 of block D. The easement width will be the remaining width between the southern subdivision boundary and the southern boundary line of lots 4 & 5 of block C and lots 5 & 6 of Block D. 3. A one-year maintenance bond is required after completion of all infrastructure improvements per Ordinance No. 1315 Section IV (11) or Section XIII. 4. Submit a certificate of all taxes and fees paid from the Lamar County Appraisal District and a $25.00 filling fee. 5. The water and sewer lines shall be constructed prior to acceptance of the final plat or a Guarantee of Construction shall be completed in the amount of $75,000.00 per Ordinance No. 1315 Section XIII. Guarantee of Construction. 6. The off-site utility easements for the 8-inch sewer line must be filed prior to the filling of the final plat. I recommend approval of the final plat upon completion of the above items. cc: Michael E. Malone, City Manager Larry W. Schenk, City Attorney Steve Methven, Building Official Mack Ross Brandon Chancy, P.E., Chancy Engineering