13 City Council (07/14/03)MINUTES OF THE REGULAR MEETING OF THE CITY COUNCIL
July 14, 2003
The City Council of the City of Paris met in regular session, Monday, July 14,
2003, 6:00 P.M. at Paris Junior College, Applied Technology Building, Room
1206, 2400 Clarksville Street, Paris, Texas. Mayor Curtis Fendley called the
meeting to order with the following Council Members present: Jim Bell, Jay
Guest, Joe E. McCarthy, Francine Neeley, and Willie Weekly. Also present
were City Manager Michael E. Malone, City Attorney Larry W. Schenk, and
City Clerk Mattie Cunningham.
Invocation was given by Richard Hart with the Christian Fellowship Church.
Mayor Fendley announced that the City Council had been furnished minutes
of previous meetings and asked if there were any corrections or additions.
There being none, a motion was made by Councilman Guest, seconded by
Councilman Bell, for approval of the minutes. The motion carried 6 ayes, 0
nays.
City Manager Malone advised that the City Council had been furnished with
the minutes of the Paris Economic Development Corporation for June 5, 2003,
and June 16, 2003, with no action being required. The City Manager further
advised that Mr. Gary Vest, Director of Economic Development/Chamber of
Commerce CEO, was present and was going to give the quarterly report for the
Paris Economic Development Corporation.
Mr. Vest came forward presenting the Program of Work and budget for the
Paris Economic Development Corporation. He said this is their annual
program of work with the budget.
Mr. Vest said it is an exciting time to be a part of the Economic Development
Corporation. This last year has been a very trying year, but also an exciting
time. He said they have seen changes in the economic development profession
in the last year, but they have a lot of things going on at PEDC.
Mr. Vest said they are moving ahead on the Northwest Industrial Park and hope
Regular City Council Meeting
July 14,2003
Page 2
to see their first tenant by the first of the year. They will need the city's full
cooperation on getting the infrastructure in and getting plats approved, and as
soon as the engineers get done, they will see that first tenant.
Mr. Vest advised that there are a lot of things that affect economic
development. He discussed changes at the state level he felt were positive in
that Jeff Mosley has been named Executive Director of Economic Development
reporting directly to the Governor. The Department of Economic Development
is not longer an agency and is now part of the Governor's Office.
Mr. Vest said that the Texas Enterprise Fund was established, putting 295
million dollars in a state fund to offer incentives to industries to move to Texas.
The Enterprise Program has been restructured and expanded to make it easier
to access by the cities.
Mr. Vest said there was a significant rewrite of the Development Corporation
Act which governs the 4A Corporation, which is the type corporation we have.
The definition of the types of programs that we can participate in has expanded.
Mr. Vest felt that this change would help the Paris Economic Development
Corporation.
Mr. Vest advised that they were still operating under four primary goals. Those
goals are retention and expansion of existing industries; recruitment of new
primary employers; start-up business and small business development; and
infrastructure / training. Mr. Vest advised that their Program of Work is
located at the back of the PEDC budget. Regarding the revenue statement, he
said he anticipates the cash position at the year end to be $528,000.00, and he
anticipates receiving about $930,000.00 in revenues for the next year. Mr.
Vest said they also have the revenues in the amount of $384,000.00 coming in
from Paris Packaging for their bond issue. He said they will have a total
resource of $1.8 million dollars for the coming year. Mr. Vest advised that,
taking into account the completion of the Hearne Street expansion, debt
service, and the final incentive payment to TCIM, he feels that PEDC will have
Regular City Council Meeting
July 14,2003
Page 3
$769,000.00 available for new projects this year. Mr. Vest concluded his
report and there were no questions.
The City Manager reported that the minutes for the Paris Public Library
Advisory Board, Main Street Advisory Board, Housing Authority of the City
of Paris, and the Paris-Lamar County Board of Health had been furnished with
no action being required
The Minutes of the Traffic Commission had also been presented with the
recommendation of placing a stop sign on 5th Street S.W. at West Sherman
Street stopping south-bound traffic.
ORDINANCE NO. 2003-030
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS,
PARIS, TEXAS, PROVIDING THAT THE CODE OF ORDINANCES OF
THE CITY OF PARIS BE AMENDED BY REVISING THE TRAFFIC
CONTROL MAP ADOPTED IN PARAGRAPH (b) OF SECTION 31-65 OF
SAID CODE; PROVIDING FOR PLACING A STOP SIGN ON 5TM STREET
S.W. AT SHERMAN STREET STOPPING SOUTH-BOUND TRAFFIC; AND
PROVIDING FOR A PENALTY NOT TO EXCEED $200.00; MAKING
OTHER FINDINGS, WAS PRESENTED.
A motion was made by Councilman Bell, seconded by Councilman Weekly, for
adoption of the ordinance. The motion carried 6 ayes, 0 nays.
Mayor Fendley announced that the next item on the agenda was the Final Plat
of River Oaks Subdivision, being located in the 300 Block of Aikin Drive.
This item had been tabled at the last meeting and a motion to bring it from the
table was in order.
A motion was made by Mayor Pro Tem McCarthy, seconded by Councilman
Guest, to bring from the table the Final Plat of River Oaks. The motion carried
Regular City Council Meeting
July 14,2003
Page 4
6 ayes, 0 nays.
Steve Methven, Chief Building Official, advised that Mr. Ross should have
brought in a bond along with his contract, but Mr. Methven had not seen either.
City Attorney Schenk advised that he picked up a form to substitute a
certificate of deposit, and they were going to go ahead and do that even though
the ordinance does not provide for a CD. The City Attorney said apparently
CD's have been allowed in the past.
Shawn Napier advised that Brad Hutchison is preparing the contract that was
spoken of last week, and the contract did not get finished. He thought that was
the hold up. Mr. Bray advised that there were a few additions that the City
Attorney wanted to add to the agreement and Brad had not finished.
Councilman Bell made a motion, seconded by Councilwoman Neeley, that the
Final Plat of River Oaks Subdivision be approved tonight, subject to Mr. Ross
delivering his surety bond or a signed Certificate of Deposit by 3:00 P.M.
tomorrow, July 15, 2003, to the City Attorney' s office. Failure to do so would
deny the Final Plat. The motion carried 6 ayes, 0 nays.
ORDINANCE NO. 2003-031
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS,
PARIS, TEXAS, DENYING TXU GAS COMPANY'S REQUEST TO
CHANGE RATES INSIDE THE CITY LIMITS OF THE CITY OF PARIS, AS
PART OF THE COMPANY'S STATEWIDE GAS UTILITY SYSTEMS;
PROVIDING A REQUIREMENT FOR A PROMPT REIMBURSEMENT OF
COSTS INCURRED BY THE CITY; FINDING THAT THE MEETING AT
WHICH THIS ORDINANCE IS PASSED IS OPEN TO THE PUBLIC AS
REQUIRED BY LAW; PROVIDING AN EFFECTIVE DATE; AND
PROVIDING FOR NOTICE OF THIS ORDINANCE TO TXU GAS
COMPANY, WAS PRESENTED.
Regular City Council Meeting
July 14,2003
Page 5
A motion was made by Councilman Bell, seconded by Guest for adoption of
the ordinance. The motion carried 6 ayes, 0 nays,
FRANCHISE ORDINANCE
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS,
PARIS, TEXAS, GRANTING TO DENNIS NELMS, DBA CITY CAB
COMPANY, A FRANCHISE TO USE THE PUBLIC STREETS, ALLEYS,
AND HIGHWAYS OF THE CITY OF PARIS FOR THE PURPOSE OF
TRANSPORTING PASSENGERS FOR HIRE IN MOTOR VEHICLES FOR
A PERIOD OF ONE (1) YEAR, BEGINNING AUGUST 10, 2003, AND
ENDING AUGUST 9, 2004, UPON THE TERMS AND CONDITIONS
HEREINAFTER PRESCRIBED; PROVIDING FOR THE PAYMENT OF A
TAX FOR SUCH PRIVILEGE AND USE OF SUCH STREETS, ALLEYS,
AND HIGHWAYS; PROVIDING FOR THE TERMINATION OF SUCH
GRANT UPON SPECIFIED CONDITIONS; PROVIDING FOR TAXICAB
STANDS FOR USE OF SAID GRANTEE; PROVIDING FOR PUBLIC
LIABILITY INSURANCE ON THE MOTOR VEHICLES AND EQUIPMENT
OF SAID GRANTEE; PROVIDING FOR THE SUPERVISION OF SAID
BUSINESS AND INSPECTION OF ITS VEHICULAR EQUIPMENT BY THE
OFFICIALS OF THE CITY OF PARIS; AND PROVIDING AN EFFECTIVE
DATE, WAS PRESENTED.
A motion was made by Mayor Pro Tem McCarthy, seconded by Councilman
Bell, for approval of the ordinance on first reading. The motion carried 6 ayes,
0 nays.
FRANCHISE ORDINANCE
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF PARIS,
PARIS, TEXAS, GRANTING TO STEVE B. RAINEY AND WENDY L.
RAINEY, DBA YELLOW CAB COMPANY, A FRANCHISE TO USE THE
PUBLIC STREETS, ALLEYS, AND HIGHWAYS OF THE CITY OF PARIS
Regular City Council Meeting
July 14,2003
Page 6
FOR THE PURPOSE OF TRANSPORTING PASSENGERS FOR HIRE IN
MOTOR VEHICLES FOR A PERIOD OF ONE (1) YEAR, BEGINNING
AUGUST 10, 2003, AN ENDING AUGUST 9, 2004, UPON THE TERMS
AND CONDITIONS HEREINAFTER PRESCRIBED; PROVIDING FOR THE
PAYMENT OF A TAX FOR SUCH PRIVILEGE AND USE OF SUCH
STREETS, ALLEYS, AND HIGHWAYS; PROVIDING FOR THE
TERMINATION OF SUCH GRANT UPON SPECIFIED CONDITIONS;
PROVIDING FOR TAXICAB STANDS FOR USE OF SAID GRANTEE;
PROVIDING FOR PUBLIC LIABILITY INSURANCE ON THE MOTOR
VEHICLES AND EQUIPMENT OF SAID GRANTEE; PROVIDING FOR
THE SUPERVISION OF SAID BUSINESS AND INSPECTION OF ITS
VEHICULAR EQUIPMENT BY THE OFFICIALS OF THE CITY OF PARIS;
AND PROVIDING AN EFFECTIVE DATE, WAS PRESENTED.
A motion was made by Councilwoman Neeley, seconded by Councilman
Weekly, for approval of the ordinance on first reading. The motion carried 6
ayes, 0 nays.
Resolution No. 2003-113, authorizing the execution of the First Amendment
to the Tax Abatement Agreement between the City of Paris and H-W
Commercial Warehouse, Inc., dated April 13, 2003, 1998, assigned to Paris
Warehouse 107, Inc., on February 8, 1999; making other findings and
provisions related to the subject; and declaring an effective date, was presented.
A motion was made by Councilman Bell, seconded by Councilwoman Neeley,
for approval of the resolution. The motion carried 6 ayes, 0 nays.
Resolution No. 2003-114, accepting the Gang Resistance Education and
Training (G.R.E.A.T.) Program Grant in the total amount of $41,040.00,
requiring no matching funds from the City of Paris, was presented. A motion
was made by Mayor Pro Tem McCarthy, seconded by Councilman Bell, for
approval of the resolution. The motion carried 6 ayes, 0 nays.
Resolution No. 2003-115, ratifying and approving an Intergovernmental
Regular City Council Meeting
July 14,2003
Page 7
Agreement with Paris Independent School District for Provision of Juvenile
Justice Resource Officer Services to all PISD campuses during 2002-2003;
making other findings and provisions related to the subject, and providing an
effective date, was presented. A motion was made by Councilwoman Neeley,
seconded by Councilman Bell, for approval of the resolution. The motion
carried 6 ayes, 0 nays.
Resolution No. 2003-116, approving and authorizing an Intergovernmental
Agreement with Paris Independent School District for Provision of Juvenile
Justice Resource Officer Services to all PISD campuses during 2003-2004;
making other findings and provisions related to the subject, and providing an
effective date, was presented. A motion was made by Mayor Pro Tem
McCarthy, seconded by Councilwoman Neeley, for approval of the resolution.
The motion carried 6 ayes, 0 nays.
Resolution No. 2003-117, approving and authorizing the Mayor to execute and
the City Clerk to attest to an agreement for the extension of an Alternative
Sewer Collector Line on behalf of the Downtown Investment Group pursuant
to Ordinance No. 2003-027; making other findings and provisions related to the
subject; and declaring an effective date was presented. A motion was made by
Councilman Guest, seconded by Mayor Pro Tem McCarthy, for approval of the
resolution. The motion carried 6 ayes, 0 nays.
Resolution No. 2003-118, approving the plans and specifications for the 2003
city street HMAC Overlay Program; authorizing the advertisement for bids and
said construction; making other findings and provisions related to the subject;
and declaring an effective date, was presented. A motion was made by
Councilwoman Neeley, seconded by Councilman Guest, for approval of the
resolution. The motion carried 6 ayes, 0 nays.
Resolution No. 2003-119, accepting the proposal of LaRue Ford Tractor
Company for a New Model TN6547 PTO HP Diesel Tractor, a 32 LA New
Holland front end loader, and a 6' rotary cutter in the amount of $21,695.00,
Regular City Council Meeting
July 14,2003
Page 8
was presented.
Tommy Haynes, Director of Community Development, came forward
explaining that they had requested four informal bids for a tractor, shredder and
loader to clean and mow lots. Mr. Haynes has been asked by a number of
people to determine the cost of purchasing equipment. There is $26,000 in an
account that can be used for the purchase. If the equipment is purchased then
the city will own the tractor and can mow again next year. City Manager
Malone explained that the account was for payment for services to have
someone to do the mowing and Mr. Haynes wants to divert the money to
purchase a piece of equipment in order to have something when they finish.
City personnel will be mowing and the prisoners will assist the city. Mr.
Haynes said that the city gets 8 to 10 prisoners a day, and they are involved in
cleaning lots all over the city. The city buys them a lunch, provides
transportation for them and sends them back to Bonham. This has been an
ongoing process for years and has saved the city untold thousands of dollars.
After further discussion, a motion was made by Mayor Pro Tem McCarthy,
seconded by Councilman Guest, for approval of the resolution. The motion
carried 6 ayes, 0 nays.
Resolution No. 2003-120, authorizing the approval and acceptance of a
permanent utility easement on property belonging to Barney W. Bray II! and
Josh A. Bray, beginning at the Southeast Corner of the Bray property in the
North right-of-way line of FM Highway No. 150'/, along said right-of-way line
a distance of approximately 2521 feet, for the construction ora water line, was
presented. A motion was made by Councilman Bell, seconded by Councilman
Weekly, for approval of the resolution. The motion carried 6 ayes, 0 nays.
Resolution No. 2003-121, reappointing Mike Dunn to the Paris Economic
Development Corporation for a term of three years, was presented. A motion
was made by Councilman Guest, seconded by Councilwoman Neeley, for
approval of the resolution. The motion carried 6 ayes, 0 nays.
Regular City Council Meeting
July 14,2003
Page 9
Resolution No. 2003-122, authorizing the sale of a 7.104 acre tract of Lake
Crook property; which has been declared surplus by Resolution No. 91-108, to
Mr. David R. Robinson in the amount of $750.00 was presented. A motion
was made by Mayor Pro Tem McCarthy, seconded by Councilman Weekly, for
approval of the resolution. The motion carried 6 ayes, 0 nays.
Mayor Fendley announced that the next item on the agenda was discussion and
possible action on the City's current policy regarding projects constructed on
the basis of work by the day, including direction to staff regarding same.
Mayor Fendley said he asked that this be placed on the agenda and it is
primarily work that is being done in the water and sewer development and,
looking at city policy, there may be things that the Council has addressed
before. He said that the city bids out anything more than $25,000.00 with
exceptions, one of those exceptions being day work. Mayor Fendley stated that
the statutes talk about things that are emergency issues or danger to life and
health. Mayor Fendley said his main concern is the cost in the multi hundreds
of thousand of dollars on some of the individual projects and the city is doing
some of those on day work now. The staff feels that maybe that is saving
money, but as a Council, they need to address this issue so they will feel
comfortable with that, or they don't feel comfortable with that and they may
want to direct city staff to do it differently. Mayor Fendley advised that he has
asked staff to make comments and there are some people in the audience that
would like to comment and then Council Members can make recommendations.
Shawn Napier, City Engineer, explained that the legal sheets he passed
contained a list of all projects that had been bid since 1998. The small sheet
of paper shows contract price by year. Mr. Napier explained that these are the
totals for projects that have been bid for each year. He said that in 1998 there
was $523,298.17 expended, which is a total for six contracts. He said there
were six contracts in 1998 for a total of $523,298.17. In 1999, there were
seven contracts for a total of $276,975.00. In the year 2000 there were 33
contracts for a total of $2.7 million; and in 2001, there were 21 contracts for a
total of $2.4 million. In 2002, there were 12 contracts for a total of $4.1 million
Regular City Council Meeting
July 14,2003
Page 10
and this year to date, there have been nine contracts for just under three million
dollars. Mr. Napier explained that a total of nine million dollars from the sale
of certificates of obligation is in the Water and Sewer Fund and, of that amount,
four million dollars is for two projects; the overhead 2.5 million gallon water
storage tank and the 24 inch water line to that tank.
Mr. Napier also passed out typical procedures for bidding and for day work and
he discussed them as follows:
°
Discussion by City Council authorizing the project. These are projects
that the City Council may come up with. Mr. Napier said he was aware
that the city gets complaints for doing day work. They also get a lot of
complaints from Public Works because they received a lot of telephone
calls regarding sewer stops on a certain sewer or a water line and a lot of
rusty water complaints. Mr. Napier said a lot of the projects are set up
as far ahead as a future budget year. Those we could be talking about
now for next year. You have a lot of time to bid larger projects.
Engineering Department prepares plans and specifications and presents
to City Manager for presentation to City Council. This is only done on
small scale projects due to the limited staff that the Engineering
Department has. Most plans and specifications are done by consulting
engineers. They are either chosen out-right or selected by proposals. It
takes about two months to do requests for proposals and select a
consultant.
o
Mr. Napier said once the Council selects the engineer they prepare plans
and specifications, bring them back to the City Council, a resolution is
approved for the plans and specifications and authorizing advertisement
for bids. This takes a minimum of one month from the project being
authorized, but will probably take longer due to the fact that plans and
specifications must be completed.
o
o
o
Regular City Council Meeting
July 14,2003
Page 11
Advertisement is done by department heads through the City Clerk.
Legal notices are published twice on Sundays with first publication at
least 14 day prior to letting of the bids.
Bids are received by the Director of Finance at bid opening. Department
heads tabulate bids, and the bid documents and tabulations are turned
over to the City Clerk.
The department head writes a memo to the City Manager and City
Council making recommendations for award of the bid. This typically
happens the month after plans and specifications are approved to go out
for bids. The City Council awards the bids and the projects began.
Any change orders required must be approved by Resolution of the City
Council.
Mr. Napier advised that there is a minimum of five council appearances for any
one project. The cost of the actual work (with day work or contract job) is
about the same. Where you are costing the city more money, is the cost of
hiring a consulting engineer to prepare plans and specifications, which is
typically 8% to 12% of the estimated contract cost. Mr. Napier said
Mobilization and Bid Bonds are normally in the contracts but they are not in
day work contracts. He said that Mayor Fendley may have a better idea than
him what a typical bid bond would be. Work by the day does not have a mark
up on the material cost as most of the materials are provided by the city.
Mr. Napier said that there are several things that can happen in the bid
procedure. He said that if you carry over past 90 days or if something goes
wrong, the contract prices could go up. There are all types of bid delays and
there is also the fact that city staff is affected every time you have a contract it
affects the City Attorney's office because they review all contracts along with
the proposals for engineers and the bid bonds and insurance. Mr. Napier said
several things can happen in the bid procedure which would result in contract
Regular City Council Meeting
July 14,2003
Page 12
prices going up when you carry over past 90 days. There are all types of bid
delays. City Staff is affected every time there is a contract, especially the City
Attorney's office which reviews all contracts, proposals, bid bonds and
insurance for engineers.
Mr. Napier explained that most of the day work projects come from other city
departments, especially Public Works. These projects are too large for Public
Works to do or they are too busy. Typically day work is handled in the
Engineering Department. They get the complaints and they discuss each of the
problems and the way to solve the problem. They pick the best economical
solution and try to look into the future to see how this can affect something else
that goes on in the future. They do a quick work plan in order to come up with
a material list. Mr. Napier said there is not much to water lines and they can
use standards for that. He said that sewer lines are different because you have
to set grades for sewer line and they do that on a program called sewer CAD.
Mr. Napier said once they have the plan they do a bid take off on that. They get
the bid list to Gayle Echols at the Warehouse, she faxes that to two or three
vendors that the city normally uses, and they come back with bids on each one
of these projects and they normally go with the cheapest one, unless there is a
long delay in getting the materials. He said they only bid out the materials.
Mr. Napier said the water line and water tower projects were not done in house
because they required a water system analysis and the city did not have the
staff to do that analysis. The city selected Bucher, Willis & Ratliff from Tyler
to do these two projects together because of the water analysis. The
engineering fee was 6%. He said there are areas that can be combined so the
cost will be less.
Mr. Napier said that the 24th Street Drainage Project goes to the other extent.
The city was required to get a permit from the Corp of Engineers. The city is
not in the process of getting easements. The engineering costs will be from
15% to 25% of the total project due to these factors.
Regular City Council Meeting
July 14,2003
Page 13
Councilwoman Neeley asked for an example of day work. Mr. Napier said
right now they are doing a water line replacement on the project on 12th Street
NW between Graham and Bonham Street and a short stretch on Houston Street
because of the rusty water complaints. The crew just moved off of 3rd Street
SW where they were resolving rusty water complaints on four and one-half to
five blocks. Mr. Napier said they just finished putting in the water and sewer
lines at the Sports Complex. Those are plans that Terry Townsend had done
by Mark Spencer and they did a take off on that and designed the water and
sewer on that plan and then had a contractor come in and put it in.
Councilman Guest asked what kind of a number would it be for a typical 4 or
5 block rusty water leak repair. Mr. Napier said about $20.00 a foot with
everything included. There again, not having bid those specific items out in a
while, it would be roughly $20,000.00 to $25,000.00. Mr. Napier said they try
to use them on the projects where there is not much involved in it, such as
engineering cost and those are what we normally do in house or day work. Mr.
Napier said he went back to 1980, where the city was doing day work where a
contractor submitted prices like for a 3-man crew, a 3-man crew with a
backhoe, all different prices. Prices for any material or any piece of equipment
that they might have, they submit either a price by the hour or a price by the
day. Mr. Napier said they have not had a contractor to come in and make an
update or a change in that for a year and one-half and there is only one change
since he has been with the city and he has been with the city almost two years.
Gene Anderson, Director of Finance, came forward stating that he had a
handout to go along with that, and what he has been asked to do is explain the
mechanics and how the day labor is actually paid for, so he pulled one out and
it was for June of last year. Mr. Anderson said that in terms of paper work and
the terms of the day labor itself, which you see on the top page is the payment
voucher that each day labor job that is going on, an inspector from the
Engineering Department will bring this in toward the end of the day. This
project, as an example, was being supervised by Jack Rater. He was the one
on site, watching the project being done and signing off that the work had
Regular City Council Meeting
July 14,2003
Page 14
actually been done. The next page is the invoice which addresses the issue that
Councilman Guest was talking about in terms of pricing and you can see by
this particular job, there was a one man crew with a backhoe for one-half hour.
It reached a combination of crews and there is a price out there, and that was
submitted along with the payment voucher. The next document is a purchase
requisition that is required to be filled out in order to generate the check and
the last page is a copy of the check that was actually generated. Mr. Anderson
said these are brought in on a daily basis and the checks are generated on a
daily basis and paid out on a daily basis. Mr. Anderson said he went back and
pulled samples for two months and in June of last year, there were 41 checks
written that were day labor checks for various contractors and the year before
that, June of 2001, there were 45 checks written, and that appears to be typical.
Mayor Fendley questioned the hourly rate for this three-man crew at $85.00 an
hour and asked if we get other rates. Mr. Napier said all the contractors submit
their list for what they charge and each one is a little different, but they
typically don't vary more than five to ten dollars and usually they round up to
equal or the $5.00 amount. Mr. Napier said at one time, he knew they tried to
do a standard for that, but what you get into there is there are so many pieces
of equipment and so many ways they operate that it becomes a nightmare just
to try to figure out what would be a good charge for a good piece of equipment.
Councilman Guest asked Mr. Anderson what the total cost of the Clement Road
Project was. Mr. Anderson said he could not tell without looking the figures
up. Councilman Guest wanted to know if it was one of the $20,000.00
projects. Mr. Napier advised that this one was definitely over $20,000.00. Mr.
Napier advised that a lot of the time the water line projects may run or normally
run anywhere between $10,000.00 and $50,000.00. He advised that some of
the sewer projects may run about the same, but right now, the city has a sewer
project going that is pretty much a replacement type job. They are replacing
lines that are currently feeding into a lift station and on that project just the
pipe alone is going to be pretty expensive because it is an 18 inch sewer line
and the material cost runs that up real quick. The labor in putting it in does not
Regular City Council Meeting
July 14,2003
Page 15
change the cost, it is always the material cost that runs it up quite a bit. Mr.
Napier said this particular one has some places where it is 18 to 19 feet deep
so it is a slow go. City Manager Malone reminded the Council that the city is
bidding the material through the purchasing department. Mayor Fendley said
that the labor on a job on this could run several hundred thousands of dollars
he would assume. Mr. Napier advised that this particular project started at
Stillhouse Road, just inside the loop at the creek area the manhole there, they
went down to the road where it dead ends where Bobby Smallwood's mother
lives. They went down the east side of that road all the way down to Clement
Road, and went to Clement Road all the way up to Main Street. Mr. Guest
advised Mr. Anderson that he asked him for something that he already had.
Councilwoman Neeley wanted to know where he found that information.
Councilman Guest advised that Mr. Bray had provided the information.
Councilman Bell informed the City Council that he has been provided a copy
oflhe invoice going back in the year 2000 and after reviewing the invoice, the
total cost for that day was $27,902.50 with 88.5 hours for one catapillar, two
other pieces of equipment 87.5 hours, another piece of equipment 17 hours, a
6 man crew with backhoe 82.5 hours. Councilman Bell said this was a day
work project from what he understood. This information has been requested
and it looks to him, if the city can do 88 hours in a 24 hour period, we have
ourselves something going. Councilman Bell said the next one, again on a day
project, the hours vastly exceed anything to be accomplished in an 8 hour day,
the date on this one is October 24, 2000.
City Attorney Schenk said he might have an explanation. He handed out
Sections 75 through 79 of the City Charter. He explained that Section 75
provides that certain contracts are specifically excepted from the requirements
for competitive bidding, including work done by the city and paid for by the
day as work progresses. He said he put that in there so the Council can also
refer to a section out of the State Law, Section 252.001 Local Government
Code, Competitive Requirements for Certain Purchases, that is the language
that stipulates the requirement that before the city enters into a contract
Regular City Council Meeting
July 14,2003
Page 16
requiring an expenditure of more than $25,000.00, the city must comply with
the competitive bid process; however, in the next page under Section 252.022,
General Exemptions, there are exemptions to that requirement, which exempts
completely from the chapter various procurements and under number five, a
procurement for work that is performed and paid for by the day as the work
progresses is exempted. City Attorney Schenk advised that he had highlighted
some language on the previous page where it talked about the governing body
of the municipality electing to have this chapter supersede the charter, so that
if you see that language at the top and then go over to the next document that
he has included, they will see Resolution No. 99-081, whereby the city did
exactly that as of July 1, 1999, and that is an important date that he would
touch on later. He said the city opted to assume the requirements of Chapter
252 in lieu of the limits of the Charter and that is why our $1,000.00 limits set
out in the Charter have been raised to $25,000.00 because the State Law allows
the city to make that option. City Attorney Schenk stated that the reason he
pointed those things out is he wanted to give them a connection to the next one
ofthe~questions that he was asked. Sometime within the first year he was the
City Attorney he was asked to talk about this issue of work by the day, and at
that time, his advice was that the essence of work by the day (and he has a
couple of Attorney General's Opinions to support that), is you do not have a
formal contract that each contractor performs that work on a daily basis and is
paid on a daily basis. City Attorney Schenk said he may have been the first one
to clarify that specific requirement regarding daily pay. He said he did not
know what the time frame was for the materials that you have now, but he
believed once he advised the department appropriately when they inquired, and
from that point forward, the city of Paris has been paying on a daily pay basis
for all the projects. Mr. Schenk said that he did not remember the time frame
when he gave the advice, but Mr. Anderson would have to say how long the
city has been making those payments on a daily basis. City Attorney Schenk
said that the other thing that he wanted to make the Council aware of was this
July 1 policy adopted by resolution. In his research on the issue he encountered
this resolution as well, and this resolution that would put a limit on the city in
terms of the numbers of days in a given month that the city would do work by
Regular City Council Meeting
July 14,2003
Page 17
the day. City Attorney Schenk said he was not aware of this policy. This
policy was presented by the City Attorney who was the Acting City Attorney
at the time because the city was between City Attorney' s. This did not show
up in the City Attorney' s data base because it was prepared on the Acting City
Attorney's equipment and ours did not track through the computer what was
done. This policy would be problematic with regard to some of the work that
was done and the questions that have been asked about some of the projects,
as referenced in the City Council minutes, that he has also provided the
Council, of June 27, 2000. The first page shows the date and who was on the
Council at the time. The next page indicates a quotation by former City
Engineer Earl Smith where he is setting out some projects this Council inquired
about, those being a sewer outfall line, Clement Road, and talked about some
EPA work. On the next page of those minutes, Mr. Smith is advising the
Council that those projects would be done by the day and sets out his reasons
why. City Attorney Schenk said that the conclusion he could reach is that
several of the Council Members who adopted this other policy that he pointed
out to the City Council, likewise were there for Mr. Smith's discussion,
indicating the prior Council was aware thelwork was being done by work by the
day.
Councilman Bell asked if there was a resolution passed approving this. City
Attorney Schenk advised that one has not been located. Councilman Bell
asked for a common summation of what you just said. Councilman Bell asked
Mr. Schenk if he said that the city has been in violation in the past of both the
Charter and State Law that has been corrected since you came on board. You
have clarified that. City Attorney Schenk said he has not done any study or
research to determine how work by the day was paid and what time frame was
used in the past. City Manager Malone advised that in the past they had only
followed the legal advice that staff has had from various City Attorneys;
therefore, anytime that work was done it was done with the advice of Council
and of our attorney. Mr. Bell said that these time sheets show that the city is
not paying by the day. You cannot have 88 hours in a day. City Manager
Malone advised that they thought they were operating within the perimeters
Regular City Council Meeting
July 14,2003
Page 18
based on the legal advise at the time and the methodology that was going on.
He said as time went on questions were asked and the new attorneys came on
board. City Attorney Schenk stated that the way he understood it, and the way
it was presented on the agenda, if we are doing this process now correctly, the
question is do we want to continue doing work by the day and he felt that is
certainly a policy that the Council will have to decide, along with what projects
and under what circumstances they do it by. Councilman Bell said he would
like to go into it further, and Mayor Fendley asked if there was anyone who
would like to speak regarding this matter.
Barney Bray III, 3230 Mahaffey, came forward passing out a handout for the
City Council. Mr. Bray said the front page is his equipment rental rates and
on the next page the Council would see the figure of $16,338.54, which was
overtime money the city paid for the transmission line going north of the city.
Mr. Bray asked, if this is true day rate, working by the day, how can there be
any overtime. He said the Federal Statute states you pay overtime after 40
hours a week. Mr. Bray stated that when people give you equipment rates, you
do not pay overtime on equipment rates. He also stated that their obligations
as city fathers and the people that work here, is to get the cheapest and best
price if you are going to work by the day. Mr. Bray said if the City Council
would look on the next page they would see where the gentlemen's machines
are making $75.00 an hour on October 9, 2000. He asked the Council to look
at the next page on October 24, 2000, all of sudden the machines are making
$85.00 an hour. Mr. Bray said that in 2000 and 2001 he doubted that the city
employees got in excess of a 3 or 4% raise, if they got a raise, and here the city
is giving someone who is working for us about a 13% raise in the middle of a
job, in the middle of the year, and increasing his other rates. Mr. Bray pointed
out at the bottom of the invoice was a charge of $11,425.01 for overtime
money. Mr. Bray assumed that the city paid this invoice. He said he did not
understand why this is a day rate, how there is any overtime money based on
Federal Statutes and based on the quotation that this is what is worked for by
the hour. Mr. Bray said that, regardless of day rate, it is our financial
obligation to this community and citizens to get the cheapest and best price for
Regular City Council Meeting
July 14,2003
Page 19
our work, and also, to pay that way. Mr. Bray said there were other sheets that
backup where they paid overtime money all during this job. He said if the city
is paying overtime money, and it has to be over 40 hours a week, somewhere
someone has a problem.
Councilwoman Neeley asked if this was all on one job, and Mr. Bray said this
is on one project.
Mr. Bray advised that he is also showing overtime on the job on Clement Road.
Mr. Bray said there was a quotation for 36 inch sewer pipe on the next page.
The city purchased 36 inch vylon pipe for that job and there is an invoice where
the city paid $47.85 a foot for that pipe. Mr. Bray said he called one of the
suppliers, Diamond Plastics, who makes big sewer pipe. He was told that the
company who made vylon pipe had closed its plant. He said Diamond Plastics
quoted $36.00 a foot for 500 feet of pipe. He said the best estimate that they
could get when they went through these jobs folders on all these invoices they
came up with around 13,533 feet and the city paid $47.85 a foot and could have
paid $36.00 a foot. He said there is a tab sheet on the back of this handout
showing the difference in money on this material alone is $160,366.00. Mr.
Bray advised that they are out there looking out for the best interest of the
citizens of Paris. The city should not have gotten one price on this job. He
said if this pipe company that makes this other pipe meets the same specs, and
the supply company said they do, then why didn't the city get a quote from
them. Mr. Bray said this is regardless of day rate or whatever you want to talk
about. Mr. Bray said he is talking about the money that belongs to the citizens
of the town, and the city does not even get a second bid, but we don't have
money to do these projects, but here we spend $160,000.00 more than we had
to for this project.
Mr. Bray advised that the if city had bid this project out, he would have, and
any contractor would have had to meet the ATSM specs for the 36 inch pipe.
Mr. Bray said they are not limited to who could bid on a project and they are
not having to restrain the trade situation by saying that we are not going to buy
Regular City Council Meeting
July 14,2003
Page 20
from pipe Company A we are just going to buy it from Vycon. He advised that
he could not bid this other pipe and been competitive on the job project. He
would have lost. There is no way he could have bid using the high price pipe.
Mr. Bray said it is no different from day rate when you have legitimate
contractors that gives rates that are cheaper than what you are paying the
contractor and the same contractor seems to be doing all these, what he calls
clean jobs. Mr. Bray said when he got a raise on this hourly rate, Mr.
Heuberger did not get a raise, so why did the city give this guy a raise. He is
working for the city too, and now the city is going to pay one person more
money and give him a raise and we are not going to pay this other contractor
who is working and give him a raise. Mr. Bray advised that what he is saying,
regardless of day rate questions, he thinks there are some real questions about
our financial responsibility to the citizens and tax money.
City Attorney Schenk said he was confused on the pipe issue because it was his
understanding that they competitively bid that project. Mr. Bray said there is
no bid in the file on the second bid. Mr. Bray advised that the pipe company
that his supplier called when he told him the price if they purchased 8,000 or
more feet and the pipe company asked if he meant that job up in Paris, Texas,
that they did not get to make a proposal on. City Attorney Schenk said he
understood that the city advertised and sought bids on pipe. Mr. Bray said they
told his supply company that the city would not take a proposal from them.
City Attorney Schenk said it may be that we bid pipe and do not take informal
proposals, but the city does allow competitive bidding in that process. Mr.
Bray said he did not believe that happened in that case. Mr. Bray said this
needs to be looked into and also why the same people are doing the bulk of the
city's day work on all these clean jobs.
Mr. Bray said that on the Civic Center, the city can bid out the dirt work,
fences, bathrooms, electrical, but the city does not bid out the utility work and
he did not understand that. Mr. Bray said he went up and asked when he saw
them working on the water line and he asked if he could bid on the sewer pipe
and the reply was no, they had made arrangements. He said that the water line
Regular City Council Meeting
July 14,2003
Page 21
that they tied on to was given by him to the Civic Center from up there in front
of the high school, but he is not good enough to even give a proposal to lay
down a water line there for the city, but he can give that other line flee. He did
not think that is right. It is legally wrong and he felt it was ethically and
morally wrong, just like not having a pipe price and paying a person $20.00
more for a track machine than he asked to get paid. If you have two of them on
a job that is $40.00 an hour or $400.00 and at that rate, we are burning up
hundred dollar bills. Mr. Bray said he did not think that anyone sitting around
this table would not get a second price in the process of buying a new car, that
wouldn't check around and get another price. He did not think that any of them
would pay that much more money for the same product, especially when it is
not your money, it is public money. Mr. Bray said whether it is legally wrong,
he thinks it is ethically and morally wrong for the city fathers not to be taking
care of this business, and if you were out here in the business sector doing this
work, you would want to know to.
Mr. Bray said he can go all over Northeast Texas and bid jobs anywhere from
one hundred to three or four hundred thousand dollars, and when you see these
jobs running seven and eight hundred thousand dollars in Paris, and we don't
even bid them out, the city does not even get a pipe price and save a
$160,000.00. The city does not pick up a phone and try to save our city some
money. He felt that something is wrong with what we are doing. Mr. Bray said
there is not a citizen in this town that has to pay a higher water bill and more
taxes that appreciates the city not looking into those issue. Mr. Bray said these
are not his records, they are the city's records. Again Mr. Bray said that if the
city paid the overtime, which the city did with this contractor a number of
times, there is no way you are doing day rates anywhere you owe anybody
overtime because there is no way to get 40 hours in a 24 hour a day and that is
a Federal Statute; that is how you pay overtime money. He felt the city has a
real issue and the person either owes money back or something else on those
things.
Councilwoman Neeley said she would like to see the discussion of the City
Regular City Council Meeting
July 14,2003
Page 22
Council that adopted this resolution in 1999.
City Attorney Schenk said, if he recalls, he read some of the minutes when they
were looking for the resolution. For example, it was the same discussion of the
one opting the state law, so there were two or three different procurement
issues that were apparently being looked at during that time. Mayor Fendley
said the only thing they were changing was going from the thousand dollars to
the twenty-five thousand dollars in that resolution. Councilwoman Neeley
asked if there was some reason that they voted to do that, or was it some
process to get to that to make that big jump from a thousand dollar purchase to
the twenty-five thousand dollar purchase before having to bid an item out.
City Attorney Schenk said it was to stay within the state statutes. He said that
the number has been raised since the City Charter was written. Under the state
statutes it went to ten thousand, fifteen thousand and then to twenty-five
thousand dollars. City Attorney Schenk said the City Council has amended the
state procurement statutes, which allowed City Councils to opt into the state's
upper limit by adopting the resolution. Instead of revising the charter, the
legislation allows an easier route for councils to follow.
Councilwoman Neeley wanted to know if that was when the City of Paris
started day work or was the city already doing day work. City Manger Malone
advised that the city has always done day work. City Attorney Schenk said that
was why he pointed out that from the City Charter, which allows the city to do
day work. Mayor Fendley said he did not have a problem with day work, but
he did have a personal problem with it being the size of the day work the city
is doing, and they may be paying it correctly on a day to day basis, but when
you are looking at an $800,000.00 job, that should be bid out in his estimation.
He said that the City Engineer should be able to look at that and have
specifications that he knows that job should come in between $600,000.00 and
$650,000.00 and if the bids are out, he should tell the City Council and they
could throw those bids out. He said that when the Council does not have any
competitive bidding, they do not know what that is. The Mayor said it is a
perception issue and it does not look good when you don't have anything to
measure that to.
Regular City Council Meeting
July 14,2003
Page 23
Councilwoman Neeley said that these papers are for 2000-2001. She asked if
there are any projects of this size currently. Mayor Fendley said he thought the
Civic Center project was that size. City Engineer Napier advised that the Civic
Center project has been completed. Mayor Fendley said any projects over
$25,000.00. City Attorney Schenk said it is the segment that is the issue and
it depends on how you add the project together to get whatever total that they
have.
Mr. Napier said it depends on how you lump projects together. A lot of the
time they do not do individual bids on rust water problems. Instead they write
where they are currently working for that day on a sheet to keep from having
thousands of bid items and payment vouchers for that day. He said they have
certain areas of the city set up like quadrants similar to the city's setup for
water and sewer. He advised that these jobs for placing water and sewer lines
could be for two blocks or it could be up to ten or twelve blocks. The job
depends on where the problems are located and right now they have a sewer
line project that has over 1800 feet of sewer line and it is 18 inch pipe. The job
is getting built.
Mayor Fendley wanted to know why the city would pay overtime on work by
the day. City Attorney Schenk said he had one suggestion - that it may be that
Mr. Bray is referring to the FLSA statute that obligates the employer to pay
overtime when employees exceed 40 hours, and he is wondering if there was
a rate that a particular contractor gave us if the work was within a time frame.
He said it could be referred to as overtime but it can also be referred as extra
hours or after hours work, if that work is to be in the evening. Mayor Fendley
said there is not a contract for that. City Attorney Schenk said that he did not
know if that could be a different rate. Councilman Bell stated that you cannot
work people overtime when they are working them just one day at a time and
paying that day for the work, especially when you are paying them daily, you
cannot work them over the weekend. The City Attorney replied that he
Regular City Council Meeting
July 14,2003
Page 24
understood that, but he has seen circumstances where contractors will have a
rate that the work is between 7:00 and 6:00, especially, work being done by the
state.
City Manager Malone stated it could be difficult to run down answers to these
questions. He pointed out the Council that, in terms of the size of these
contracts, the city was running into a deadline from the EPA in doing this
sewer work which was estimated by consulting engineers at something over 8
to 9 million dollars. He said that the city has done the work a lot cheaper than
that estimate, whatever the figure was. The magnitude of some of those
projects was great. He said that had the city not done the sewer outfall line
work by the day and had gone out for a consulting engineer, the city might not
have made the deadline. The city could have paid that much in fines. City
Manager Malone said he was not saying that mistakes were not made, and
maybe some of these issues that have been raised are correct, because he does
not know, and they have not had the option to go back and look at the records.
Councilman Bell asked Mr. Bray about the information that he had given the
City Council, and some of this comes from three projects. He wanted to know
how he brought his attention to those three and how many others have we got
that we could be looking at, and does the Council need to request that data from
staffas opposed to having it cost in excess of $1,900.00 to get this information,
which is clearly straight out of city records and it appears to him to believe that
they have some serious violations. They have a lot of things happening here
that he does not see any correct answers from the staff s standpoint. He said
that in fairness to Mr. Napier, the projects that they are looking at were before
he came to the city. Councilman Bell said he did not see how you can pay
overtime and no one can adequately explain that to him. He said that is going
to take some real legal work Mr. Schenk. Mr. Schenk said they will have to
research this. Councilman Bell said he could not see how come we pay $85.00
an hour for a machine when we can hire that machine by quote ~given to the
city at $65.00", that man at $85.00 an hour should not even be working for the
city anywhere. He said that can't be explained to me and he will be interested
Regular City Council Meeting
July 14,2003
Page 25
to see if it could be. He couldn't understand the cost of the pipe when the city
is paying 50% premiums on that one job and paying a 30% premium on the
cost of labor and the city is saving a 6% to 8% premium on city engineer work
based on the information that you have. Mr. Napier said it was anywhere from
8% to 12% on engineering and then the bid bond. Councilman Bell said we are
paying out 50% more to save 12%. He said that somewhere, this does not
compute and his concern is do we have other projects; how do we get to the
bottom of this; and where is the bottom, and then why.
Councilwoman Neeley said she would like to see something current.
Councilman Bell asked what was the last project completed. Mr. Napier said
4th S.E. and the Civic Center. Councilman Bell asked if they could request as
a Council to have the same open record information.
Councilman Bell said it was his understanding that this information was
originally requested on May 29, 2003, and data is still outstanding. City
Attorney Schenk said that the information that was requested was not requested
by Mr. Bray. Councilman Bell said it was Beverly Walters who was the
requester. City Attorney Schenk said that particular request was going to
require a great deal of time to pull the records together and the statutes allows
the city to request a deposit to defray the cost of providing that information.
To do that, staff had to estimate the work that was done by each respective
department and what the cost would be. The City Attorney advised that the
city has provided all of the Engineering Department information, and at the
same time, the Finance Department had a couple of people out and they were
the ones to research those records. He said going through the checks will be
labor intensive.
Mr. Anderson came forward advising that there are a number of projects that
extended over a number of years and they wanted copies of checks and all of
those bank statements had to be gone through and copies made. He said he has
been short staffed with people out on maternity leave and illness, which makes
it almost impossible for him to find time to pull someone off regular duties to
Regular City Council Meeting
July 14,2003
Page 26
work on these things. Mr. Anderson advised that he had one person who has
already worked 60 hours on this project and that the person was only three-
quarters of the way through. City Attorney Schenk advised that the city has
indicated a date of July 18, 2003. Mr. Anderson said he was not sure they will
be able to meet that date. Councilman Bell asked what statute allows you to
drag that out. The City Attorney advised Councilman Bell that he did not
believe the city is dragging it out, he was saying that they have met the
requirements of the statute with regard to producing the documents. The
statute provides for a reasonable time to provide the documents. Part of the
process was to go through and estimate the cost and someone had to go through
and give the estimated cost of the record request, which took part of the time,
and the city has provided all of the information that is available from the
Engineering Department and in turn, credited the cost against the deposit for
that charge and the remainder of the charge is subject to change depending on
how the balance of the process goes.
Mayor Fendley said the City Council would like a list of current day work that
is in excess of $25,000.00. Councilman Bell said he would like to have a
complete printout of the Civic Center Project to see what that is. He was not
wanting the checks, but rather the day sheets. Councilman Bell went back to
the question of how overtime can be paid on day work and why is the city
paying $85.00 an hour instead of $65.00. Councilman Bell said that Buddy
Heuburger came in here for information and told him that his backhoe was
$50.00 an hour. He did not know if Mr. Heuburger's equipment was a piece
of junk or his doesn't work as well, but whatever it is, his is $50.00, and that
makes the problem even worse if it works.
Councilman Guest said this goes back to state law, and state law is quite liberal
and it is almost impossible to break state law because it provides numerous
exceptions, and one of those exceptions is procurement for work performed by
the day as the work progresses. He said we may not be breaking the law, but
in his mind we are certainly breaking the spirit of the law by paying day work
on million-dollar projects. He said that just does not make any business sense
Regular City Council Meeting
July 14,2003
Page 27
and that the process is just stupid - not a good process in his opinion.
Mayor Fendley advised that this Council needs to address how they want to go
forward with the day work. He felt that if it is an emergency or a matter of
health or the job is under the $25,000.00, or you may want to say $50.000.00,
that day work was acceptable. He did not feel it should be upped much more
because you really have to remember you are dealing with taxpayers money and
you are responsible for the taxpayers interest. They need to be sure they are
getting the best thing for their money. Mayor Fendley said that if the city has
proper planning procedures in place, you know what jobs are coming up, you
know what needs to be done, and then you should be able to schedule your
time.
Councilman Bell wanted to know what it would do to the city if they stopped
day work tonight. Mr. Napier said it would stop every project but one or two.
Mr. Napier said they were currently doing manhole replacements and clean-out
replacements. They have a crew doing water line replacements. Councilman
Bell wanted to know what contractors were working these projects. Mr.
Napier said that Harrison, Walker & Harper are doing manhole replacements,
sewer clean-outs and on occasions some sewer lines. Buddy Heuberger is
mainly doing water lines but he also does sewer lines. Chip Jenkins and
Brown mainly do sewer, but they also do water lines. The Harrison, Walker &
Harper crew is more familiar with sewer. Therefore, they stick with primarily
sewer lines. Mr. Napier said that Freddy Smith has just finished with the First
State Bank Project (the bar) for the city and he has done a few other jobs for the
city.
Mayor Fendley asked if Harrison, Walker & Harper are doing the manhole
replacements and if they bid at the beginning of the year saying they will do
each manhole for a certain price. Mr. Napier said they bid it out by the crew.
Mayor Fendley asked if there was a variance in manholes. Mr. Napier said
there are 4 foot, 5 foot, and 6 foot diameter manholes. Councilman Guest said
there is a matrix for that, this is not rocket science, this is manholes. Mayor
Regular City Council Meeting
July 14,2003
Page 28
Fendley stated that if you know that you are going to have 50 manholes that
you are going to replace this year you should be planning for that. Mr. Napier
said they do have one manhole that is almost rocket science, it is the whole
northwest side of Paris is pretty much flows through this manhole south of
Campbell Soup on the Loop where they have two twenty-seven inch water
lines, a 10 inch force main and an 8 inch line from Campbell Soup. Campbell
Soup is primarily forcing steam through there hot water and the force main
kicks on every 10 minutes, and there again, you have a 27 inch pipe pouring
almost one-half full most of the time. Mr. Napier said the reason they found it
was the cone section has collapsed about three feet. He said this is like
excavating, certain excavators do certain things; the bigger the excavator the
deeper the reach. Mr. Napier said it is a cost wise thing but it is also more of
an efficient type thing.
Councilman Bell asked Mr. Napier if these excavators that you price are equal
and stated that it is his understanding that they are. Mr. Napier said he would
have to go back and look at each individual price. Mr. Napier said that the one
that Buddy Heuberger has is an old one and he did not think it has quite the
reach. Councilman Bell wanted to know who else Mr. Napier has prices for.
Mr. Napier replied Mr. Bray and Mr. Smith. Councilman Bell asked whether
we had prices from Hilliard for this equipment. Mr. Napier did not think so,
but he has the concrete contract. Mr. Napier said when he took this job there
were three people doing day work, and those crews are still doing work. Mr.
Napier said since he has been with the city Mr. Bray has inquired about it
sometimes and the same school that he has given tonight he has given to him
before. Not inquiring about doing day work, but inquiring about looking into
day work and they have done some of that and checked on certain areas. Mr.
Napier said he has not had time to check into the project in the past before.
Councilman Guest asked when they were doing day work in the past, does the
city ever do a project at a price not to exceed a limit, or put the cap on the cost
ora project if the bids do not exceed a certain number. City Attorney Schenk
advised that is to be paid by the day. If you have contracted on that basis, you
Regular City Council Meeting
July 14,2003
Page 29
have violated the requirements. Councilman Guest said when the city hires
these people by the day, the city is not really intending to work them and hire
someone else. That has not been our intention, or we haven't exhibited that as
our intention. So, when we say we want to do a job that is a thousand feet, for
so many dollars a foot, not to exceed ~x" amount. City Attorney Schenk said
he has seen that may have happened by default. He has seen where cities have
allowed certain contractors to qualify as work by the day contractors. They will
provide their experience, indicate equipment available, and state the type
projects they do, almost like a proposal; they give their work by the day pricing
and then they are qualified to be on the list along with the others to do the
particular work that is being done. That work is allocated to the qualified
contractor.
Councilman Guest brought up a point about two pieces of equipment on the
job, who makes that judgement and who monitors these jobs. Mr. Napier said
the city inspectors do the inspections. He is not there the whole time but what
we have is the three crews that are working. We work three crews because we
have three field inspectors. Each one of those inspectors have one crew that
they work with and occasionally they will do another job such as subdivision
jobs like another phase of The Hills going in. The person doing that is Mr.
Jenkins, so, he let the same inspector inspect both projects, who is Dave
Daniels. Councilman Bell said he understands that Mr. Daniels has a business
relationship with Mr. Jenkins and while he is inspecting his work, he is also
drawing rent from Mr. Jenkins and that is with the knowledge of the City
Attorney. The City Attorney said he did not have any substantial knowledge
of that allegation. Councilman Bell asked City Manager Malone if he was
aware of that. City Manager Malone said he had heard that allegation and he
thought Earl Smith said something about that. Councilman Bell said if that
allegation is true, it makes the city look even worse and he is sure hoping that
the allegation is totally untrue and without any merit and he was praying for
that because it looks bad when you add that on to the top of this. The cost of
machinery, wasted dollars on pipe, overtime that the city can't overtime and
this to him does not look good at all under any circumstance. Councilman Bell
Regular City Council Meeting
July 14,2003
Page 30
said he hopes that city staff can provide the City Council some things. City
Manager Malone advised the Council that the inspector does not set the price.
Councilman Bell said he did not say he did, but he was saying that the
inspector may have a relationship where is drawing money back from that same
contractor that he is inspecting. Things do not look good, he does not care how
valid that relationship could be, you do not send an inspector out who is
representing the City of Paris people and tell him that while he is making
money from that contractor, he is checking that contractor' s work. Councilman
Bell said he would like for that rumor and allegation to be disapproved as soon
as possible, sworn statements from someone saying that is not true or
something.
Mayor Fendley summarized that city staff should make a list of current work
by the day jobs over $25,000.00, details of the water and sewer lines at the
Sports Complex, list of overtime paid for work by the day, pricing on the pipe
that was questioned, information on the inspector responsible for Mr. Jenkin' s
work. Once the information is gather they should report back to City Council.
Mayor Fendley wanted to know what the City Council wants to do going
forward. Councilwoman Neeley asked if they could wait until they get this
information. City Attorney Schenk asked the Mayor if he would like for the
staff to prepare a policy and bring it back to the City Council. Councilman
Bell asked Mr. Schenk if they need to write an ordinance or a resolution. It
seems that two prior resolutions have been overlooked. City Attorney Schenk
said he would rather see the city put these kind of documents out and identify
some of them in a form for the start ora procurement policy. If it is in manual
form it would be available for all procurement and to everyone.
Mayor Fendley asked if Council wanted to freeze any day work for new
projects over $25,000.00 until they have a chance to look at all of the
information.
A motion was made by Councilman Bell, seconded by Mayor Pro Tem
Regular City Council Meeting
July 14,2003
Page 31
McCarthy, that the City of Paris not start any new day work that exceeds
$25,000.00 for the total project until the policy has been adopted; and that staff
be instructed to look at the cost of all items of labor and material and get the
best price or fire the contractors on any existing work; and that the City
Attorney be instructed to work with the City Manager on a new policy
ordinance, or what ever is necessary to stop this for the future; and set down the
specifics of what can and what cannot be done. The motion carried 6 ayes, 0
nays.
City Attorney Schenk presented the following petitions for rezoning: Rev.
Henry Starks, Lot 18, City Block 259, from a One-Family Dwelling District No.
2, to a Multiple Family One zoning; Gary Ensey, Lots 6 & 7 Block E of the
East Suburban Estates Addition from Agricultural District to Multiple Family
One District.
Mayor Fendley referred the petitions to the Planning and Zoning Commission
for their study and recommendation at their meeting scheduled for August 4,
2003, and before the City Council August 7, 2003.
Gene Anderson, Director of Finance, came forward to discuss the quarterly
financial report. He explained to new Council Members that he gives them
information on the key operating funds. Mr. Anderson said he usually states
the cash position and in the main operating fund, that being the General Fund,
at the end of June 30, 2003, there was $5,968,581.00 in cash and investments.
He advised that they normally like to keep a minimum of two months of
operating cash balance, three is preferable, but two is minimum, which is
$3,578,293.00 and three months operating funds is $5,367,440.00. He said the
city was just about where he thinks it needs to be.
He said in the Water and Sewer Fund we have discussed that in detail and at
the end of June the city was $1,699,000.00 in the hole. The City Council has
already taken action to try to rectify that with the adoption of the rates. The
other primary operating funds currently are construction funds, which is money
Regular City Council Meeting
July 14,2003
Page 32
provided by various bond issues. There is a Water and Wastewater issue from
2000 that the city has $5,384,933.00 in with projections on going.
Mr. Anderson said the Tax and Revenue 2000 Series Construction Bond fund
has a current balance of $3,232,447.00 and there is the Certificate of
Obligations 2002 Series, the Police and Court Building Project, which has a
current balance of $4,558,762.00. Mr. Anderson advise that if the City Council
wanted to look at that at a later time, he has given the exact information for the
previous so they could do a comparison from year to year.
Mr. Anderson said he pointed out the key revenues, budget verses actual, for
both this year and the prior year on the second page of the report.
Mr. Anderson said the third page, he has the budget versus the actual on the
expenditure side for each of the city departments. He listed the year-to-date
actual and the percent expended as of June 30, 2003, and the previous year.
Mr. Anderson said the final pages shows how many people have been hired,
fired, and are currently employed as previously requested by Councilman
McCarthy.
Kent Klinkerman, EMS Administrator, came forward and presented the second
quarter report for the Emergency Medical Service and gave the City Council a
handout showing that the projected nine month cash credits was supposed to
be one million fifty thousand dollars and they have exceeded that by
$208,050.00, which is an increase of 19.8%. He said the expenses were
supposed to be $1,235,249.00 and they exceeded that by $131,700.00 or about
10.7% over the projected budget. He said the top box of the handout shows
that the increased revenue exceed the increased expenses by $76,349.80.
Mr. Napier came forward advising that in November they had received a
preliminary report of the Lost Water Study and since then they have been
making repairs based on the report. The report shows that approximately 4.5
Regular City Council Meeting
July 14,2003
Page 33
billion gallons of water were treated in 2001 and there was a 17% water loss.
Mr. Napier said they hired Carter and Burgess to investigate and they found
that a lot was associated with line leaks. Mr. Napier asked Council to turn to
the last page and look at the lower left hand portion of the bottom. This shows
that meters losses were 17%, pipe line leaks were 75%, the others were more
or less minor.
Mayor Pro Tem McCarthy asked where the water that is flushed from hydrants
fit into this, and Herb Campbell advised that would be in un-billed. Mr.
Napier advised that they would find that on Page 4 of the report. Mr. Napier
asked the Council to turn Mr. Campbell's memo as it addresses this matter in
the first paragraph.
Councilwoman Neeley wanted to know if this is something that they are
working on correcting. Mr. Napier said they repair the leaks as they find them;
otherwise, they have the rusty water complaints that they are replacing.
There being no further business, a motion was made by Mayor Pro Tem
McCarthy, seconded by Councilwoman Neeley, to adjourn the meeting. The
motion carried 6 ayes, 0 nays.