Loading...
08 Paris Ind Park PlatMEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council ?lanning and Z0nmg C0mmim0n Shawn Napi~. City Enginee~j~ ~ December 30, 2003 Northwest Paris Industrial Park I have reviewed the preliminary plat of the above referenced addition. It appears that the preliminary plat complies with the City of Paris subdivision regulations with the following exception. 1. Show the Right-of-Way (ROW) and roadway width for all streets on the preliminary plat. 2. The storm sewer pipes in Park St. and channel across lot 14 is temporary until lot 14 is developed. The pipes and channel will probably need to be rerouted when lot 14 is developed. The options for the future drainage system will be; concrete pipes or a low flow concrete channel draining the storm sewer pipes under Park St. to the proposed pond North of lot 14. A drainage easement will need to be done by separate instrument for the final location of the drainage system chosen. 3. Define the lots that will be done with phase one of the project (lots 1, 5, 6, 14 & pond) show all others as future. Change the lot configuration and add blocks depending on the phasing of the park infrastructure construction. 4. Assign the pond a block and lot. 5. Add the lot that was just recently purchased on the master plat. 6. Show the current zoning on each lot. 7. Provide the offsite easements for the water and sewer lines outside of the proposed phase one that will be final platted. 8. Additional fire hydrants will be needed on some of the lots depending on the building configuration. These water lines and fire hydrants shall be in an easement dedicated to the City of Paris. I recommend approval of the preliminary plat upon completion of the above items. Michael E. Malone, City Manager Larry W. Schcmk, City Attorney Steve Methven, Building Official Adams Consulting Engineers, Inc. ~oo/~oo ~