Loading...
14-K CO#1&2 24" RCCP WaterLineDRAFT F:XAttorneyXALICEXRESWORK\CURRENTX24 Inch Waterline Change Order Res.wpd February 5, 2004 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING AND AUTHORIZING CHANGE ORDER NO. 1 AND CHANGE ORDER NO. 2 TO CONTRACT FOR THE 24" RCCP WATER TRANSMISSION LINE; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the 13th day of January, 2003, in Resolution No. 2003-021, award the contract for the "24" RCCP Water Transmission Line Project" to Buster Paving, a Division of APAC-Texas, Inc.; and, WHEREAS, the City Engineer, Shawn Napier, acting as project engineer, recommends the amendment of the contract for said project to procure the professional services of Hanson Concrete, Inc.; to procure the professional services of TDW Services, Inc.; to furnish an 18" cut- in valve; and to procure contractor labor and equipment, all of which are related to the water main break in September 2003, and to additionally install a storm sewer cleanout; install a 12" SDR-35 and connections; furnish and install inlets with grates; and purchase flowable fill; all of which are covered by the allowance for construction contingency, and providing for no increase in the contract price; and, WHEREAS, the forms of Change Order No. 1 and Change Order No. 2, attached hereto as Exhibits A and B, respectively, should, in all things, be approved, and the Mayor should be authorized to execute the same; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble of this resolution are hereby in all things approved. Section 2. That the form of Change Order No. 1 to Contract for the "24" RCCP Water Transmission Line Project," attached hereto as Exhibit A, to procure the professional services of Hanson Concrete, Inc.; to procure the professional services of TDW Services, Inc.; to furnish an 18" cut-in valve; and to procure contractor labor and equipment, all of which are related to the water main break in September 2003 and which are covered by the allowance for construction contingency, and providing for no increase in the contract price, be, and the same is hereby, approved. Section 3. That the form of Change Order No. 2 to the Contract for the "24" RCCP Water Transmission Line Project," attached hereto as Exhibit B, to install a storm sewer cleanout; install a 12" SDR-35 and connections; furnish and install inlets with grates, and purchase flowable fill; which are covered by the allowance for construction contingency, and providing for no increase in the contract price, be, and the same is hereby, approved. Section 4. That the Mayor be, and he is hereby, authorized and directed to execute, on behalf of the City of Paris, said Change Order No. 1 and Change Order No. 2, upon the terms and conditions and in the forms shown in Exhibit A and Exhibit B, respectively, attached hereto. Section 5. That this resolution shall be effective from and after the date of passage. PASSED AND APPROVED this 9th day of February, 2004. Curtis Fendley, Mayor ATTEST: Mattie Cunningham, City Clerk APPROVED AS TO FORM: Larry W. Schenk, City Attorney CHANGE ORDER NO. 1 PROJECT NAME: 24" RCCP WATER TRANSMISSION LINE DATE: 15-Sep-03 CONTRACTOR: BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. PROJECT NO.: 2002140 ADDRESS: P.O. BOX 278 PARIS BID NO.: 82.49 BRASHEAR, TEXAS 75420 ITEM ITEM UNIT OF CONTRACT ADDITION/ REVISED UNIT CONTRACT NO, DESCRIPTION MEASURE QUANTITY' (DEDUCT) QUANTITY PRICE ADD//DEDUCT) 2010-E 18" PVC Water LineI LF 150.00 (30.00) 120.00 $46.20 ($1,386.00'~ Furnish & Install 2022-F 18" Cut-in Valve (24" RCCP) EA 2.00 (2.00) 0.00 $19,789.00 ($39,578.00 Allowance for 800 Construction Contingency LS 1.00 (0.48) 0,52 $100,000.00 t$47,974.0~ Professional Services of 5001A Hanson Concrete Products. Inc. LS 0,00 1.00 1.00 $3,600.00 $3,600.00 Professional Services of Professional Services of 5001C TDW Services~ Inc. (Emergency) LS 0.00 1.00 1.00 $44,301.00 $44,301.00 Contractor Labor & Equipment 5001D for Eme~ency Services LS 0.00 1.00 1.00 $20,290.00 $20,290.00 Furnish 2022-F 18" Cut-in Valve (24" RCCP) EA 0.00 2.00 2.00 $5,472.30 $10,944.60 TOTAL CONTRACT iNCREASE / {DECREASE) $0.00 Original Contract Total Total Amount of Previous Change Orders Total Amount of this Change Order NEW CONTRACT TOTAL $1,834,517.60 $0.00 $0.00,, $1,834,517.60 Odginal Contract Time (Calendar Days) Total Amount of Previous Change Orders Total Amount of this Chan~le Order NEW CONTRACT TIME (CALENDAR DAYS) 300 0 45 345 Document will become a supplemen~/)~ c~,n~ctand all provisions will apply hereto. This RECOMMENDED ( Ci~ Engineer ' ~__ Date / C~ ~ger ' ~ Date EXHIBIT PAGEIOFI CHANGE ORDER NO. 2 PROJECT NAME: 24" RCCP WATER TRANSMISSION LINE DATE: 30-Jan-04 CONTRACTOR: BUSTER PAVING, A DIVISION OF APAC-TEXAS, INC. PROJECT NO.: 2002140 ADDRESS: P.O. BOX 278 PARIS BID NO.: 82.49 BRASHEAE, TEXAS 75420 PHONE NO.: (903) 885-0006 ITEM I ITEI~I UNIT OF CONTRACT ADDITION/ REVISED UNIT CONTRACT NO.I DESCRIPTION MEASURE QUANTITY (DEDUCT) QUANTITY PRICE ADD/(DEDUCT) Allowance for CO#1 800 Construction Contingency LS 0.520259 (0.098700) 0.421559 $100,000.00 ($9.870.00) Furnish & install 5002A Storm Sewer Cleanout EA 0.00 2.00 2.00 $330.00 $660.00 Furnish & Install 12" SDR-35 5002B PVC Storm Pipe and Connections LF 0.00 498.00 498.00 $5.00 $2,490.00 5002C Furnish & Install Grate Inlets EA 0.00 3.00 3.00 $700.00 $2,100.00 5002D Flowable Fill CY 0.00 60.00 00.00 $77.00 $4,620.00 TOTAL CONTRACT INCREASE I IDECREASEI $0.06 Original Contract Total Total Amount of Previous Change Orders Total Amount of this Chan(~e Order NEW CONTRACT TOTAL $1,834,517.60 $0.00 $0.00 $1,834,517,60 Original Contract Time (Calendar Days) 300 ToI]I mount or i rouiou[ c noo Or,or[ Tota~ Amount of this Chan e Order 10 NEW CONTRACT TIME (CALENDAR DAYS) 355 all /I/,/ /// RECOMMENDED ///'L // FORAPPROVAL:/<;f t'~.~.~ ~.~ City Engln'-" - ' eer ACCEPTED: Cor~ractor provisions will apply hereto. Date APPROVED: Mayor Date EXHIBIT