Loading...
05-G City Hall RenovationDRAFT F:kAttorney\LisakResolutions\CURRENT\City Hall - Auth Advertising.wpd December 11, 2003 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS, APPROVING PLANS AND SPECIFICATIONS FOR THE REHABILITATION AND RECONSTRUCTION OF THE CITY HALL AND CENTRAL FIRE STATION BUILDING; AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR SAID CONSTRUCTION; AUTHORIZING A PERSONAL SERVICES AGREEMENT WITH JERRY L. HANING FOR CONSTRUCTION MANAGEMENT SERVICES; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Paris did heretofore, on the 28th day of February, 2000, in Ordinance No. 2000-012, authorize the issuance of City of Paris, Texas, Combination Tax and Revenue Certificates of Obligation, Series 2000, to, among other things, improve and renovate the City Hall and Central Fire Station building, together with renovation of that portion of that building which houses the Central Fire Station into City Council chambers, offices and related facilities; and, WHEREAS, in furtherance of this project, the City did heretofore select Denny Architects, Inc. to provide architectural services for the rehabilitation and reconstruction of the City Hall and adjacent Old Fire Station; and, WHEREAS, plans and specifications have been prepared by Denny Architects, Inc., with the title being given thereto of the "Rehabilitation and Reconstruction of the City Hall and Adjacent Old Fire Station Project," which plans and specifications are recommended for approval by said architects; and, WHEREAS, it is deemed appropriate that such plans and specifications be approved and that such project be authorized for advertisement for bids; and, WHEREAS, it is further deemed appropriate that the City enter into a personal services agreement with Jerry L. Haning for construction management services on said project; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, PARIS, TEXAS: Section 1. That the findings set out in the preamble to this resolution are hereby in all things approved. Section 2. That the plans and specifications for the "Rehabilitation and Reconstruction of the City Hall and Adjacent Old Fire Station Project," be, and the same are hereby, approved. Section 3. That such construction project be advertised for bids to be received after due notice at the office of the City Manager of the City of Paris, City Hall, 135 1 st Street S.E., Paris, Texas 75460, until 3:00 o'clock p.m. on April 6, 2004, or at such other date and time as the City Manager shall direct, at which time said bids will be opened in the City Council Chamber, City Hall, 135 1 st Street S.E., Paris, Lamar County, Texas, and bids will be tabulated and presented to the City Council for the purpose of letting such bid. Section 4. That the City Manager shall be and is hereby authorized to execute and the City Clerk to attest to a personal services agreement with Jerry L. Haning for construction management services on the aforesaid project, under such terms and conditions and in such form as the City Attorney shall approve. Section 5. That this resolution shall be effective from and after its date of passage. PASSED AND APPROVED this 8th day of March, 2004. Curtis Fendley, Mayor ATTEST: Mattie Cunningham, City Clerk APPROVED AS TO FORM: Larry W. Schenk, City Attorney Preliminary Cost Estimate 03/04/04 - 1 City Hall Renovations City of Paris Paris, Texas Building Area (sO: 5,465.00 sf Basement Main Floor Upper Floor 318 sf 4,634 sf 513 sf DESCRIPTION QUANTITY X UNIT COST COST GENERAL Insurance 0.00 $0.00 $0.00 Bonds 0.00 $0.00 $0.00 Special Conditions 0.00 $0.00 $0.00 Testing Services 1.00 Is $1,000.00 $1,000.00 Temporary Utilities 1.00 Is $1,000.00 $1,000.00 Temporary Construction [Dust Walls, etc 1.00 Is $1,250.00 $1,250.00 Construction Cleaning 1.00 Is $1,000.00 $1,000.00 Final Cleaning 1.00 Is $1,000.00 $1,000.00 SITE DEVELOPMENT Site Concrete (Materials Only) 1.00 Is $5,000.00 Traffic Appurtenances 1.00 Is $150.00 Pavement Marking 1.00 Is $0.00 Existing Pavement Repair & Restoration 1.00 Is $0.00 Ornamental Metal Railings 100.00 If $40.00 Outdoor Signs & Graphics 1.00 Is $200.00 STRUCTURAL FOUNDATIONS Structural Concrete [Elevator Pit Materia 1.00 Is $12,500.00 Floor Toppings [Materials Only] 1.00 Is $6,000.00 $5,000.00 $150.00 $o.oo $0.00 $4,000.00 $200.00 STRUCTURAL FRAMING & DECKING Steel Framing $12,500.00 $6,000.00 STRUCTURAL WALLS Masonry Retaining Walls 1.00 Is $15,000.00 $15,000.00 1.00 Is $1,300.00 $1,300.00 BUILDING ENCLOSURES & EXISTING BUILDING MODIFICATIONS Existing Building Modifications 0.00 $0.00 General Demolition 1.00 Is $7,450.00 $0.00 $7,450.00 CARPENTRY, ETC. General Carpentry Elevator Pit Waterproofing Wood Framing Materials Finish Carpentry Modifications to Exist Wood-frmd Roof 1.00 Is $14,000.00 $14,000.00 1.00 Is $1,000.00 $1,000~00 1.00 Is $12,000.00 $12,000.00 1.00 Is $10,000.00 $10,000.00 1.00 Is $2,000.00 $2,000.00 PARTITIONS Metal-framed Drywall Partitions Load-bearing Wall & Floor Framing Elevator Shaft Liner iL&MI 1.00 Is $10,016.00 $10,01600 1.00 Is $7,400.00 $7,400.00 1.00 Is $2,700.00 $2,700.00 COS~SF $0.00 $0.00 $0.00 $0.18 $0.18 $0.23 $0.18 $0.18 $0.91 $O.03 $0.00 $0.00 $0.73 $0.04 $2.29 $1.10 $2,74 $0.24 $0.00 $1.36 $2.56 $0.18 $2.20 $1.83 $0.37 $1.83 $1.35 $0.49 %TOTAL 0.0% 0.0% 0.0% 0.2% 0.2% 0.3% 0.2% 0.2% 1.0% 0.0% 0.0% 0.0% 0.8% 0.0% 2.5% 1.2% 3.0% 0.3% 0.0% 1.5% 2.8% 0.2% 2.4% 2.0% 0.4% 2.0% 1.5% 0.5% Preliminary Cost Estimate 03/04/04 - 2 Modifications to Existing Partitions Sheetrock [Materials] Stairs & Handrails DOORS, WINDOWS & GLASS Personnel Doors Personnel Door Frames Finish Hardware Modifications to Existing Doors Service Door Modifications Special Doors & Windows Operable Window Restoration Fixed Glazing Glass & Glazing CEILINGS & SOFFITS Suspended Lay-in Ceilings Applied Gypsum Board Ceilings Applied Metal Ceiling Restoration Miscellaneous Ceiling Patching FINISHES Ragiliont Tilo fflooring Sheet Carpeting Ceramic Tile Flooring Wall Tile Wall Carpet Painting FIXTURES & SPECIALTIES Custom Wood Casework Architectural Wood Casework Architectural Interior Fascias Raised Platforms for NC Equipment Raised Stage/Rostrum Flooring Toilet & Bath Accessories Interior Signs Fire Extinguishers Fire Extinguisher Cabinets EQUIPMENT & CONVEYING SYSTEMS Residential Appliances Projection Screens Hydraulic Elevators SiTE MECHANICAL Site Plumbing PLUMBING Interior Plumbing 1.00 Is $2,500.00 $2,500.00 1.00 Is $4,620.00 $4,62000 1.00 Is $1,000.00 $1,000.00 $0.46 $0.85 $0.18 20.00 op $300.00 $6,000.00 $1.10 20.00 op $300.00 $6,000.00 $1.10 1.00 Is $10,000.00 $10,000.00 $1.83 1.00 Is $3,000.00 $3,000.00 $0.55 1 00 Is $1,000.00 $1,000.00 $0.18 5.00 op $5,000.00 $25,000.00 $4.57 3.00 op $0.00 $0.00 $0.00 2.00 op $250.00 $500.00 $0.09 1.00 Is $8,000.00 $8,000.00 $1.46 852.00 sf $3.00 $2,556.00 0.00 $0.00 $0.00 1.00 Is $0.00 $0.00 1.00 Is $0.00 SQ00 b00.00 sC 37.00 : 1,000.00 310.00 sf $5.50 $1,705.00 240.00 sf $5.00 $1,200.00 288.00 sy $15.00 $4,320.00 1.00 Is $22,900.00 $22,900.00 0.00 $0.00 $0.00 1.00 Is $20,000.00 $20,000.00 1.00 Is $1,500.00 $1,500.00 5.00 ea $200.00 $1,000.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 1.00 Is $1,500.00 $1,500.00 0.00 $0.00 $0.00 4.00 ea $200.00 $800.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 1.00 ea $50,000.00 $50,000.00 1.00 Is $1,100.00 $1,100~00 1.00 Is $13,200.00 $13,200.00 $0.47 $0.00 $0.00 $0.00 $I $0.31 $0.22 $0.79 $4.19 $0.00 $3.66 $0.27 $0.18 $0.00 $0.00 $0.27 $0.o0 $0.15 $0.00 $0.00 $9.15 $0.20 $2.42 0.5% 0.9% 0.2% 1.2% 1.2% 2.0% 0.6% 0.2% 5.0% 0.0% 0.1% 1.6% 0.5% 0.0% 0.0% 0.0% O.Z°fo 2.1O/o 0.3% 0.2% 0.9% 4.6% 0.0% 4.0% 0.3% 0.2% 0.0% 0.0% 0.3% 0.0% 0.2% 0.0% 0.0% 10.0% 0.2% 2.7% HEATING, VENTILATING & AIR CONDITIONING Preliminary Cost Estimate 03/04/04 - 3 Unitary Heating & Cooling Systems FIRE PROTECTION Wet-pipe Sprinkler System SPECIAL PIPING SYSTEMS SITE ELECTRICAL Electrical [includes Lighting] COMMUNICATIONS Fire Alarm System Sound Reinforcement System Cable TV Signal Distribution System TV Broadcasting System Computer Systems Contingency SUBTOTAL Construction Manager Fee CONSTRUCTION COST Architect/Engineer Fees (8%) 1.00 Is $40,000.00 $40,000.00 0.00 $0.00 $0.00 1.00 Is $65,000.00 $65,000.00 1.00 Is $15,000.00 $15,000.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 0.00 $0.00 $0.00 1.00 Is $25,000.00 $25,000.00 $7.32 8.0% $0.00 0.9% $11.89 13.1% $2.74 3.0% $0.00 09% $0.00 0.0% $0.00 0.0% $0.00 0.0% $0.00 0.0% $4.57 5.0% $461,887.00 $84.52 92.8% $36,00Q00 $6.59 7.2% $497,887.00 $39,830.96 $9t.10 100~0% $7.29 TOTAL PROJECT COST $537,717.96 $98.39 CITY HALL RENOVATIONS CITY OF PARIS, TEXAS Items provided by Ci.ty of Paris forces: 1. Construction Cleaning (cleaning and hauling off) 2. Lead-Based Paint Abatement in exposed areas. 3. Labor & Formwork on all site concrete. 4. All painted pavement marking. 5. All repair and restoration of existing pavement. 6. Labor & Formwork on elevator pit concrete work. 7. General Demolition Labor. 8. Any restoration of existing double-hung windows. 9. Fire Alarm System (if required). Changes to Scope and Quali .ty Features: 1. Simple S4S baseboards or stock moulded baseboards and door frames. 2. Lighter construction on replicated fire bay service doors. 3. Stock 2-panel doorsin lieu of custom doors. 4. Stock mouldings in lieu of custom mouldings. 5. Lay-in ceiling below existing tin ceiling in council chamber. 6. Built-up sheetrock bulkheads, interior fascias and applied mouldings in lieu of wood panel~vork.