2014-035 - Close out the contract, approve Change Order #1, and authorize final Phase I payment to McInnis Brothers Construction, Inc for Phase I of the TWDBRESOLUTION 2014 -035 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS APPROVING CHANGE ORDER NO. 1 TO THE APRIL 29, 2013 CONTRACT WITH MCINNIS BROTHERS CONSTRUCTION INC. FOR PHASE I WATER SYSTEM REPLACEMENT PROJECT; AUTHORIZING FINAL PAYMENT IN AN AMOUNT UP TO ONE HUNDRED THIRTY -ONE THOUSAND TWO HUNDRED SEVENTY DOLLARS AND 12/100 ($131,270.12) TO MCINNIS BROTHERS CONSTRUCTION, INC.; MAKING OTHER FINDINGS AND PROVISIONS RELATED TO THE SUBJECT; AND DECLARING AN EFFECTIVE DATE. WHEREAS, on April 29, 2013 the City of Paris entered into TWDB Contract #62525 CID 001 for the construction of Phase I Water System Replacement with McInnis Brothers Construction, Inc.; and WHEREAS, on May 22, 2014, the City of Paris staff and consulting Engineer, Hayter Engineering, Inc., certified that the work of the contract was complete and ready for final payment and that it was completed in conformance with the contract documents, plans, specifications, and Change Order No. 1 and Final; and WHEREAS, the construction contractor, McInnis Brothers Construction, Inc. of Minden, Louisiana has certified that they have met all contractual obligations; and WHEREAS, the one -year warranty begins on April 25, 2014 and ends at midnight on April 24, 2015 as provided in the provisions of the contract documents; and WHEREAS, the final contract amount is $1,794,894.62 after change order and reconciliation of final quantities; and WHEREAS, the remaining monies due McInnis Brothers Construction, Inc. is ready for final payment upon the City of Paris' receipt of funds and approvals from the Texas Water Development Board in an amount up to $131,270.12. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PARIS, TEXAS: Section 1. That the findings set out in the preamble to this resolution are hereby in all things approved. Section 2. That the City Council of the City of Paris hereby approves Change Order No. 1 and authorizes close out and final payment in an amount up to One Hundred Thirty -One Thousand, Two Hundred Seventy Dollars and 12/100 ($131,270.12) to McInnis Brothers Construction, Inc. for Phase 1 of the TWDB Contract #62525 CID 001 water line replacement project. Section 3. That this resolution shall be effective from and after the date of passage. PASSED AND ADOPTED this 8th day of December, 2014. f Matt Frierson, Mayor ATTEST: I ice Ellis, City Clerk APPROVED AS TO FORM: 111 � W. Kent McIlyar, Attorney Change Order No. l(Final) Date of Issuance: November 20, 2014 Project: Phase 1 Water System Replacement VEI oject No.: TWDB #62525 CID 001, and #180058 -280B Owner: City of Paris I Date of Contract: April 29, 2013 Contractor: McInnis Brothers Construction, Inc. The Contract Documents are modified as follows upon execution of this Change Order: Description: See attachment. Justification: Adjustment from as-bid to as-built quantities to date. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: Substantial completion days: 180 $1,815,202.95 Substantial completion date: January 20, 2014 [Increase] [Decrease] from previously approved [Increase] [Decrease] from previously approved Change Orders Change Orders No. None to No. None: No. None to No. None: $0.00 Contract Price prior to this Change Order: $1,815,202.95 Decrease of this Change Order: $20,308.33 Substantial completion days: Substantial completion date: Contract Times prior to this Change Order: Substantial completion days: 180 Substantial completion date: January 20, 2014 Increase of this Change Order: Substantial completion days: 51 Substantial completion date: March 12, 2014 Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion days: 231 $1,794,894.62 Substantial completion date: March 12, 2014 RECOMMENDED: ACCEPTED: ACCEPTED: LI-M Engineer (Authorized Signature) Date: LM Owner (Authorized Signature) Date: Loan Contractor (Authorized Signature) Date: Change Order #1 (One) Final Summary November 21, 2014 Value Item No. Description of Item Change Order Quantities Original Bid Unit Price Completed Work 1 Mobilization 0.016 115,185.00 - 1841.30 4 12" C -900 DR 18 PVC water line 44 32.65 - 1436.60 5 10" C-900 DR 18 PVC water line 120 16.65 1998.00 6 10" C -900 DR 18 PVC Certa Lok water line 120 38.05 - 4566.00 7 8" C -900 DR 18 PVC water line 55 12.70 - 698.50 8 8" C -900 DR 18 PVC RJ water line 167 28.75 - 4801.25 9 6" C -900 DR 18 PVC water line 90 16.20 - 1458.00 11 8" SDR 26 Class 160 PVC sewer line 20 26.25 525.00 12 1101, SDR 26 Class 160 PVC sewer line 20 47.75 - 955.00 13 1 Ductile iron fittings 0.59 6,180.00 - 3646.20 14 24" Foster adapter 1 750.00 - 750.00 15 20" Foster adapter 3 650.00 - 1950.00 16 12" Foster adapter 1 318.00 - 318.00 21 Fire hydrant assembly on 10" 1 3,518.00 - 3518.00 22 Fire hydrant assembly on 8" 1 3,313.00 3313.00 25 20" x 4" Service saddle and tie to existing FDC 1 2,363.00 2363.00 26 1 Remove old fire hydrant and abandon 5 530.00 - 2650.00 30 20" x 6" Tapping sleeve and valve w /stem extension box 1 3,830.00 - 3830.00 35 8" Tapping sleeve and valve w /stem extension box 2 3,862.00 - 7724.00 36 6" Tapping sleeve and valve w /stem extension box 3 3,257.00 - 9771.00 37 20" Butterfly valve w /stem extension 1 5,027.00 5027.00 41 6" Gate valve w /stem extension 1 937.00 937.00 43 30" Steel casing 10 109.00 1090.00 44 30" Dry bore 10 228.00 2280.00 45 Horizontal bore for 24" 60 103.00 - 6180.00 46 Horizontal bore for 20" 35 103.00 - 3605.00 47 Horizontal bore for 12" 73 69.00 - 5037.00 49 Bore for 10" C -900 DR 18 PVC 24 59.35 1424.40 53 Connect to 8" line, wet 1 2,809.00 2809.00 54 Connect to 6" line, wet 3 2,279.00 6837.00 55 Connect to 4" line, wet 1 1,696.00 - 1696.00 56 Connect to 3" and smaller existing lines, wet 2 2,815.00 5630.00 57 ASidewalk, remove and replace 5 371.00 - 1855.00 58 lConcrete curb and gutter, remove and replace 45 21.20 - 954.00 60 Line abandonment of existin 20" main, ends, concrete 1,113 18.00 -- 61 Concrete repair 113 80.55 9102.00 - 9102.15 62 Short side water service transfer 5 670.00 3350.00 63 Long side water service transfer 10 1,257.00 12570.00 64 Short side sewer service transfer 8 583.00 4664.00 65 1 Long side sewer service transfer 1 1,113.00 1113.00 66 11 1/2" Water customer service transfer 2 1,458.00 - 2916.00 69 1 New 4' diameter manhole 0.63 2,478.00 - 1561.14 70 Remove 20" valve and deliver to City barn (6), 1,007.00 - 6042.00 71 Remove 18" valve and deliver to City barn 2 1,007.00 - 2014.00 72 ARemove 8" valve and deliver to City barn 1 636.00 - 636.00 73 IClose valve, remove box, repair asphalt 10 159.00 - 1590.00 79 Remove old DFC and deliver to City barn 636.00 - 636.00 81 Provide and install Bell-Spigot joints as required 0.9349390 6,148.00 - 5748.00 CO-1 1 Sewer inside drop sturcture 1 621.73 621.73 CO -1 2 Search for City Valves 1 5,500.00 5500.00 CO -1 3 Liquidated Damages 31 150.00 - 4650.00 CO -1 4 1 Materials Stored 1 53,059.69 53059.69 - 20308.33