10/16/1986MINUTES OF THE STREET & DRAINAGE
COMMITTEE MEETING OF THE CITY COUNCIL
October 16, 1986
The Street and Drainage Committee of the City Council of the City of
Paris met in Special session, Thursday, October 16, 1986, 7:30 P. M.,
Council Roan, City Hall. Chairman Mike Folmar called the meeting to
order with the following Councilman present: Mayor Billy J. Burnett,
and Councilman Travis Wortham. Also present was City Attorney, T. K.
Haynes, Director of Engineering, City Engineer, David Tompkins, and
City Clerk, Mattie Cunningham.
Chairman Folmar announced that the special meeting was called for the
purpose of and action on recommendation concerning Drainage
Improvement of Drainage Channel AlA.East of North Collegiate Drive,
and called for a recommendation from the Committee which will be
presented to the City Council at the Regular Council Meeting October
20, 1986.
After discussion, Chairman Folmar made a motion that the Street and
Drainage Committee recommend to the City Council to accept the
donation of easements and authorize the cleaning out of the Drainage
Channel AIA using City forces. The motion was seconded by Mayor
Burnett and carried 3 ayes, 0 nays.
Director of Engineering, John Buss reported that the procurement of
easements in the 1700 Block of Henderson Street was in process. Mr.
Buss also informed the Committee that he would have John Holmes to
update a new map of flood areas within the City and get them copies
as soon as possible.
Mr. Buss presented two articles to the Committee, one regarding
establishing a Stormwater Management Utility, and the other article
was on charges for storm drainage, and Mr. Buss discussed those
articles with the Committee.
Mr. Buss reconmended that there should be parallel activities on
funding construction each year and at the same time the Committee
should recommend that a program from the Council be developed on a
Stormwater Utility District.
The Committee directed Mr. Buss to get the list of top 20 priorities
from 1982, 1983, 1984, 1985 in order for the Committee to go out and
view the problem areas.
There being no further business, the meeting adjourned.
MATTIE CUNNINGHAM, CITY CLERK
why not charge- for storm drainageP
Leal specialist-Patrick Gallagher, - contributions.- Boulder and Denver, litv are the residential commercial and
Esq., and management consultant o ora o;: oivallis; Oregon; and Belle
I. Washin on alread have user
David Laredo, P.E., bothwiththe � . ?'_ . {
arges forstorinwaterdrainage.
Boston -based consulting ;:
Reiyingonyser .fees rather than
engineering firm of Camp Dressejog s.property tax- "revenues means viewing
BcV�CKee sathere are good ?: stormwater ratnage as a u i i y'f w h
reasonsto'charge contributors of .. costs allocate - accor mg to service re-
stormwater flow for the cost of ceive . israisest a problFin o is in-
facilities "-- designed to handle "guishing between users and beneficiaries.
With most utilities users and benefi-
runoff..But can it done eg ru at bly? ciaries are the same. Users o electrical
service, for example, are also the princi-
pal beneficiaries of the electrical system.
Residential and industrial land develop - r-- A stormwater drainage utilitvdiffers'1
ment, by creating impermeable areas
and changing natural drainage ways,
often increases stormwater runoff. The
burden of handling this sncreascd ritnof ,
tain stormwater drainage facilities using
ad valorem property -tax funds. Drain -
age system costs therefore are spread
among nronertv owners without reeard
ening municipal bud
some communities to
are
hrouah user, 6hari=es "and developer
rent. Users of a drainage system are
,e properties adding stormwater runoff,
bile the beneficiaries are the properties
•otectedfrom flooding: The distinction
ot'the hill" resident obiects to paving
iiii
intended to protect the "bottom of the 1
hill- resi ent from flooding. J
Wastewater treatment, commonl~
viewed as a utility service ma Offer
some help in resolving the user vs.
beneficiary conflict in stormwater drain-
rial properties contributing waste
�1
to the sanitary sewer system. e t
The beneficiaries of wastewater treat-',, "`
ment, on the of er hand are those who""
utilize "the river. or lake where water .
gualit is.im rove or protec e y e y
treatment" act ity. This user vs. bene,
ficiary distinciion'is not often raised as
an objection to user charges for waste= .
water treatment, principally because the
users recognize their legal duty to 9r-o-.
vide minimum of levels of treatment.
not as clearly arecognized as the
provi e.•wastewater treatment.
:y of land.developers and pro-
perty owners, "
oun ,ei er in s a u ory
Qr m m
.coon law, genera y is to protect
4ownstream properties from higher than
natural runoff` rates. The precise scope
of this duty.varies from state to state..,
."Once the "user vs. beneficiarv" d istinc -'
age. Users of wastewater treatment faci J .tion has been resolved, the local. gover
's the duty of land developers and property owners to protect downstream properties, says Gallagher.
AMERICAN CITY & COUNTY: May 1983 45
. x
■ CINCINNATI sought to correct such problems as this barricaded street inlet with its new stormwater program.
Establishing a stormwater Management Utility
Cincinnati's success story uses the "people" strategy.
THOMAS A. STITT, P.E., P.S.
City Stormwater Engineer
Department of Public Works,
Division of Stormwater
Management Utility,
Cincinnati, Ohio
N many municipalities, developing
a stormwater management pro-
gram is one of a dozen items on the
public works director's "to do" list.
However, stormwater management
usually remains a low priority unless a
major flood or several severe storms
actually damage property or threaten
lives.
Stormwater management includes
a tota program o routine an reme-
aial aintenance, master planning,
capital needs, regulation, enforce-
ment, and financial management.
After more than three years of
strategic planning, the city of Cincin-
nati recently established the Division
of Stormwater Management Utility
within the Department of Public
Works. The department convinced
the city council and the public that
there should be a comprehensive ap-
proach to Cincinnati's stormwater
needs.
Community development in Cin-
cinnati has spanned almost 200 years.
(The city will celebrate its bicenten-
nial in 1988.) Approximately 90 per-
cent of the city is more than 50 years
old, and about one third of the city's
storm drainage system was built more
than 100 years ago. Cincinnati has ap-
proximately 30,000 inlets, 50 miles of
water courses, more than 250 miles of
storm sewers, 50 miles of channels
and creeks, and 550 miles of ditches to
maintain. In addition, the city has a
combined system of sanitary and
storm sewers with many stormwater
drainage pipes emptying into the sani-
tary sewers.
Mounting Complaints
Because of a lack of city funds and
personnel, no new storm drainage
systems were constructed a ter 196 .
Because of budget restraints vily
,no new maintenance or capital
stormwater improvements were
undertaken. y�l 79 t11e problem
stormwater management was evi-
dent; the number of resident com-
plaints in the city's file had greatly in-
creased. The city called on Woolpert
Consultants, a Cincinnati multidiscip-
linary consulting firm, to study the
complaint file, the city's drainage sys-
tem, and to recommend improve-
ments. The consultants concluded
that more than $53 million in capital
improvements were required to
Rre per y repair, maintain, an man-
tagoestrmw er sys em.
Awareness —stormwater problems
increased further in 1982, when two
100 -year storms dramatically demon-
strated the deficiencies of the drain-
age system. Many residents called
and sent letters requesting an e-
man ing t at repairs be ma e o e-
�rainage system to prevent extensive
flooding an property ama e m Me
future.
Despite the storms, immediate at-
tention to other budgetary considera-
tions dropped stormwater manage-
ment to near the bottom of the list of
city projects. Completing projects that
affected the majority of citizens
seemed the goal; in other words, it
was more expedient to fill a pothole
than clean an inlet.
Cincinnati, however, was already
searching for an equitable way to
manage stormwater. The city man-
ager formed a committee to study al-
ternative methods for funding capital
stormwater projects. The committee
concluded that establishing a user
charge, a concept discussed in the
American Public Works Association
Report No. 49, Urban Stormwater
Management, had potential for meet-
ing Cincinnati's needs.
Storm drainage user charges are
based on each property's runoff con-
tribution to the system, benefits en-
joyed, and service received. It was
recommended that the city council es-
tablish some form of a user charge for
stormwater and the city manager di-
rected the public works department
to come up with a program within six
months.
The department initially contacted
several cities that had stormwater
agencies, although not necessarily in
t i, orm of a utility, for information on
those cities' experiences. After this
preliminary research, the city sol-
icitor examined the ease 1 i y o es-
tablishing such a uti it y. ega y, es-
tablishing a new utility in Cincinnati
was possible; a section in Ohio's con-
stitution permits corporations to es-
tablish a utility for public purposes.
Because there are many methods for
establishing stormwater management
programs in municipalities, it is im-
126 PUBLIC WORKS for September, 1986
portant for auy municipality consider-
ing a program to consult with its legal
advisors and ensure that the pro-
posed solution coincides with state
laws and the needs of the community.
After six months of research, our
department submitted a report to the
city council in July 1982 that recom-
mended the city create a stormwater
management utility with user fees
based on contribution to runoff'. By
October, the council approved the
recommendation.
Developing the Utility
From its inception, the stormwater
management study was planned to
maximize both interdepartmental
coordination and public participation.
Public input would ensure that the
study did not proceed in a vacuum.
Interdepartmental Coordination.
The department first established a
city management team to monitor the
progress of a drainage finance study
and coordinate activities among city
departments. The team consisted of
representatives from the engineering
and highway maintenance divisions
of the Metropolitan Sewer District of
Greater Cincinnati; the city depart-
ments of buildings and inspections,
law -civil division, law -real estate divi-
sion, planning, finance and neighbor-
hood housing and conservation; and
the division of research, evaluation
and budget in the city manager's of-
fice. A representative from each city
department would ensure that many
diverse needs were accounted for and
that public works managers would be
involved with the implementation of
the program.
The team also drafted two ordi-
nances tTiis project One au-
t zec t e researcTi_an__d pry-
nary planning for a stormwater man-
agement utility, and the secon a Ot-
te or the development
p hase o t e project. Although council
members were tightening their
budget belts, both ordinances passed.
The team then recommended that
Water Resource Associates, Inc.,
Kirkland, Washington, prepare a
drainage finance study. The goal of
the study was to determine an
adequate, stable, and publicly ac-
ceptable method of financing the util-
ity. The final study gave the public
works department a functional re-
quirements analysis, financing op-
tions, a program and financing
strategy, a rate structure analysis,
and a rate study.
After the program and financing
strategy phase of the study was com-
pleted in mid -1983, we submitted a
progress report to the council. The
report contained the study's prelimi-
nary findings, a summary of the city's
needs and functional requirements
and a recommendation that the city
establish a stormwater management
utility.
By this time, more than 10,000 com-
plaints from residents had accumu-
lated in the city's file.
Public Involvement. After the
council approved the progress report,
Water Resource Associates, Inc.
began the rate structure analysis. At
this time, the real public involvement
began, which meant getting to know
the people and their particular
stormwater - related complaints. To
set the groundwork for later public
involvement activities and to compile
fast," a bimonthly meeting attended
by the city manager and the executive
boards of the community councils.
Our challenge was to present this
city -wide problem — which called for
a $50 million solution of planned
routine and remedial maintenance —
and make it a priority in the minds of
the public.
Our presentation consisted of: 1) a
statement of the seriousness of
stormwater drainage in Cincinnati; 2)
a slide show that demonstrated real
drainage problems (inlets blocked
with debris, living rooms damaged by
flood water, and factory workers
wading through a Iocal industrial
■ INADEQUATE roadside drainage was creating severe roadway flooding.
The city's deteriorating drainage system prompted numerous complaints.
information collected by the city man-
agement team, several projects were
established.
Stormwater Functional Require-
ment Maps. Since 1958, the depart-
ment had kept careful records of the
10,000 stormwater complaints. Using
these records, the locations of the
complaints were noted on neighbor-
hood maps. These 48 "Stormwater
Functional Requirement Maps" were
bound into a separate volume, which
provided excellent source material
for determining the worst drainage
problem areas.
Community Council Rapport. Es-
tablishing a rapport with the commu-
nity councils was crucial. Cincinnati
has more than 48 "recognized" com-
munities that are established political
forces in the city. To ensure their in-
volvement, we presented a program
at the city manager's "working break-
complex); and 3) a presentation of the
"utility" solution.
Because this first program was so
well received, the director of public
works asked each of the community
councils if we could make a similar
presentation at a future meeting.
Property owners would be given the
opportunity to listen to the proposal
and give feedback. Many of the coun-
cils accepted the invitation.
The key to the community council
talks was targeting and tailoring each
presentation to an individual commu-
nity. For example, in the Mt. Airy
neighborhood, we used a map that
pinpointed areas of local drainage
problems and included locations of
resident complaints. Showing photo-
graphs of stormwater problems in
that community, such as clogged in-
lets, basement water destruction, and
on
(Ctinued on page 150)
PUBLIC WORKS for September, 1986 127
i this field will often accept a cost of
bet eexi W to 60 percent of the cost of
buyin new. For anything over 60
percent, experts agree unanimously
that it is, t worth it to refurbish.
When evalua i ig the cost-effective-
ness of refurbi- ing, remember t
subtract any resale value you d
be giving up by not tr in - the ve-
hicle for a new one.
Product Inf ation Networ (P1N)
from it eport entitled Vehicle e-
fur 's ment: Avoid Pitfalls While
S ing Dollars. It is one of approxi-
mate items on fleet mana nt
in PI N's da se of o , 00 prod-
uct �,call d servic uations for the
pubs . For detai this Re-
po (800) 223 -0740.
IV • • •
Stormwater Management
(Continued from page 127)
neighborhood flood damage was also
very helpful.
By relating the neighborhood prob-
lem to the overall city problem we
J
Over 25 Attachments
available now!
• 50" - 60" snowblowers
• 60" - 72" - 84" Angle plows with
heavy duty trip edge
• 50" - 60" V -plows
• 60" - 72" Power angling sweepers
• 175 - 225 gal Rear mounted water
tanks and sprayer booms
(Mall flushers available)
• 74" - 88" Mott designed and
manufactured industrial flail
mowers
• 5 models of salt /sand spreaders
for front, rear, or over axle
mounting
• 7211- 82" Triumph sickle bars
• Triumph under guardrail mower
• 60" - 7211- 83" - 99" Heavy duty
single deck rotary mowers
Technical information
• Two diesel engines available:
56 HP naturally aspirated
64 HP Turbocharged
• Four wheel drive hydraulic
diff-lock
• Heavy duty outboard planetary
axles
• Frametess all cast construction
• Two -man deluxe ROPS cabin with
full instrumentation
• Front and rear P.T.O. standard
• Front and rear Category 13 -PT
linkage
• Hydrostatic articulated steering,
two cylinder closed system
• Fully synchronized transmission,
8 forward and 4 reverse speeds
with shuttle shift
Holder of North America 2079, Bank Place, Ottawa, Ont. Canada K1V 8A8 (613) 523 -8951 Telex: 0533734
For details circle No. A -119 on card
150
showed the people in each commu-
nity that a comprehensive stormwater
management program was neces-
sary. Residents could see that the
stormwater problem was not isolated
— it existed in their own neighbor-
hood, as well as in other neighbor-
hoods throughout the city.
Additional presentations were
made to the chamber of commerce,
the board of realtors, and the city
manager's environmental advisory
council, giving the proposed program
even more public exposure.
Implementing the Utility
An updated progress report pre-
sented to the city council in May 1984
included the following:
♦ A report outlining the status of
stormwater management and the
justification /alternatives for a com-
prehensive program; data gathered
from the regional stormwater agen-
cies; an explanation of the utility con-
cept, the public participation efforts,
and the proposed rate structure.
♦ An ordinance implementing the
utility.
♦ The volume containing the
functional requirement maps.
♦ The drainage finance study.
With the formal legislation process
underway, two public hearings were
held. Although some individuals
voiced their disapproval of the pro-
posal, no organized groups lobbied
against the utility. Following the hear-
ings, the council voted in favor of es-
tablishing the new public works divi-
sion. The new ordinance established
a chapter on management and fi-
nance in the Cincinnati Municipal
Code, a rate structure, and a method
for collecting revenue.
The ordinance provides for: 1) the
collection of stormwater service
charges 2) the establishment of prop-
erty classes within the city, rates and
rate - -calculation method, and 3) a pro-
adjusting charges Toun to
Abe able.
Responsibility for storm drainage
was previously scattered over several
city departments and creating a cen-
ter to assume full responsibility for
stormwater management was im-
perative to the success of the new util-
ity. However, at the same time it was
necessary to avoid creating a new
bureaucracy.
With the division of stormwater
management utility within the de-
partment of public works as this cen-
ter, it would not be necessary to hire a
new engineering staff and support
personnel. Purposely, the staff was to
be kept small, and no new mainte-
nance organization would be built.
Resources within the city would be
used, along with private contractors.
PUBLIC WORKS for September, 1986
To help implement the utility, the city
"loaned" $585,000 to the public works
department.
Other questions remained to be an-
swered. For example, would the user
fee be added onto the customer's
water bill or property tax bill, or
would the property owner be billed
separately? Many Cincinnati prop-
erty owners already believe they are
charged too much for their water. In
addition, the water bill contains a
sewerage service charge for the col-
lection and treatment of sanitary and
industrial wastes. If the fee for the
utility were added onto the bill, v
believed this would have a det-
rimental effect on the public's percep-
tion of the new utility. Adding the user
fee to the property tax bill would be
inconsistent with the philosophy of
the utility concept as the user fee is not
a tax and does not relate to property
valuation. Therefore, we opted for a
separate billing system.
Rate Structure
It was, of course, not feasible to at-
tempt to solve the entire $50 million
problem at once. A modest budget of
$5 million a year for the total operation
of the Stormwater Management Util-
ity was deemed sufficient.
Water Resources, Inc. examined 14
com ma ions of ixe and varia le
rates and recommended a scheme
based on the rationa me )o o
tia ing runoff. n
m
to t e system, the calculation takes
into account the one its _er,)oyed and
service receive Most nnportant y, rt
was desig ne to be applicable and
equitable for the entire city.
To avoid making extremely precise
measurements of each property, in -_
eluding impervious areas, we
adopted the concept o an rea
` ange Number equal
,t\ota of area m square ee ivi e y
2,000 to represent the lot area. The
ntens�ty o eve I opmen actor
(IDF), which is related to land use, not
zoning, is a measurement of impervi-
ousness. The Equivalent Runoff mt
(ERU) is the product of the ARN an
the IDF. The ordinance established
tFimonthly user fee at $1.28 multip-
lied by the number o ERUs.
After a statistical stu y of the 48
neighborhoods, we set flat, annual
rates for one -, two- and three-family
pproperties (which make up 60 percent
of a p-II roperties in the city). I his stud
y
justified assump ions at these prop-
erties are "equal" and contribute rel-
atively the same amount of runoff to
the system. Two flat rates were estab-
lished: one for lot sizes up to 10,000 sq
ft and another for lot sizes more t an
10,000 sq ft.
The remaining 40 percent (48,000
proper yes) wou ave a variaD e
ra e s rue ure ca cu a e accor mg to
the ARN and IDF. To calculate the
variable rates, Woolpert Consultants
was hired again to investigate prop-
erty data and tax information from
city sources and to generate a data
base using a Synercom interactive
graphics mapping and data base sys-
tem. Using the county auditor's plats,
Woolpert Consultants digitized all
48,000 properties on the computer
system according o e a s
1?ook, page, and parce num er.-'1 he
area each parcel was computed to
begin creating the data base.
To generate a master account file, a
computer tape from the Hamilton
County real estate files containing
demographic data such as names of
property owners, mailing addresses,
zip codes, and land use codes was
combined with the consultant's gen-
erated file.
In January 1985, the city hired a
joint venture team, Coopers & Lyb-
rand and Automatic Data Processing
(ADP), to design, operate, and main-
tain the separate billing system. The
final master account file contained
property owners' names and ad-
dresses, billing addresses, land use
codes, the property's IDF, ARN,
square footage, and parcel classifica-
For details circle No. A -121 on card
152 PUBLIC WORKS for September, 1986
tion and is now used by ADP for man -
aging acLounts receivable.
'This extensive process for calculat-
ing rates his ensured that, the finni
structure meets the test o equity. T17c,
process was efficient; developing the
gigital data base took essi six
months. In addition. raving a com-
puterized data base makes it easy for
the utility to keep accounts up to date.
The Calm Before the Storm
In early 1985, the council was pre-
sented with another ordinance that
contained the stormwater manage-
ment code, which officially estab-
lished the user fee and permitted the
department to implement the drain-
age code. The stormwater manage-
ment code, prepared by the city staff
working with Burgess & Niple, Lim-
ited, a local consulting firm, also set
the date for the opening of the utility
and defined the utility's respon-
sibilities and the procedures for rnas-
ter planning, inspections, violations,
obtaining permits, and more. An ap-
peals process and an appeals board
were established for resolving in-
equities.
Before the bills were mailed, we
sent a color brochure explaining the
purpose of the utility to property
owners as part of an overall public
For details circle No. A -123 on card
relations information program. (The
mailing also served a dual purpose.
Undeliverable brochures allowed us
to check the accuracy of the names
and addresses in the master account
file.) More than three years of re-
search, investigation, and planning
ended July 11, 1985, when the first
bills were mailed. On that day, a
one -page newspaper advertisement
with the headline, "It's going to keep
on raining,' announced and ex-
plained the new utility. The ad was
still another way to inform people who
might still be unaware of the new pro-
gram.
Prepared for questions from citi-
zens, additional phone lines were in-
stalled, and a temporary staff was
hired from a local service to answer
customer's questions. More than
1,000 phone calls were logged at the
division that day. After a week; the
utility was receiving onlyaout 100
calls a day.
Even with the public involvement
efforts, there were, of course, com-
plaints. Some called to find out "what
this was all about." Other property
owners understood but called to cor-
rect address errors. Still others
t oug t the utility was a goo i ea u
believed that their own bill was incor-
rect. Some even called to say that it
was "about time" the city did some -
tjiing about stormwater.
About 20 percent of the callers
complained that the new utility was
nu fair. We explained the purpose of
the program, answered their ques-
tions and told them about the appeals
process that had been established as
part of the stormwater management
code.
Follow Up
With the program underway, the
division is now finalizing documents
that outline specifics of the utility such
as detailed rules and regulations. This
document will be reviewed by city
departments and then by outside con-
sultants and professional societies.
This review process will ensure the
proposed regulations are effective for
operating the utility.
Also being finalized is a mainte-
nance master plan, which contains
maintenance management objec-
tives, resource requirements, infor-
mation on handling complaints, and
routine and remedial maintenance,
among other guidelines. Six wa-
tershed master plans, expected to be
completed no later than 1988, will be
the basis for the stormwater capital
improvement program and are being
derived directly from reported citizen
complaints.
To begin implementing some of
these projects, the division is using
microcomputers to help prioritize
154 PUBLIC WORKS for September, 1986
stormwater projects. Each project
can be QxQmined and compared with
other stormwater projects according
to a set of parameters. The immediacy
of each project is evaluated along with
engineering and economic considera-
tions, characteristics of the problem,
public sensitivity to the problem, and
upstream and downstream benefits
from correcting the problem. This
method, being developed jointly by
the stormwater management staff in
cooperation with WEGA. Inc., local
engineering management consult-
ants. allows projects to be judged
fairly and gives the public works de-
partment and city council recom-
mendations for improvements on a
"worst- first" basis.
Because we proposed a modest
budget of $5 million a year for
stormwater management. the plan
was accepted as a way to begin coping
with Cincinnati's stormwater drain-
age needs. If a group of frustrated
public works officials had begged for
$50 million to solve all of the city's
drainage problems, this measure cer-
tainly would have been defeated.
However, by presenting the city gov-
ernment and the citizens with a logi-
cal, thought -out approach, we gener-
ate a certain goo d faith and positive
response that turned the concept into
reality.- LJLF1
4. Lessons to be Learned
You need a storm. Nothing was more helpful for stimulating public
interest in the stormwater problem than the two 100 -year storms that
Cincinnati experienced in 1982. If there is nothing to stimulate public
interest, support for the program will likely be difficult to achieve.
Positive attitudes help push the program. Because the idea of a
stormwater management utility was innovative, there were those who
said it would never work. The engineer or manager that directs a study
on stormwater management needs a positive attitude to combat people
who will give a whole list of reasons why something cannot be done.
Buy a pair of sharp scissors. This is vital for cutting through the
infamous amount of red tape that exists in a municipal government. You
must proceed when there are problems, sell, and then resell your plan.
Inertia is the greatest force in government.
Doing homework paves the road to success. You must document the
problem. Information collected must be accurate and given justification.
It is not enough to say there is a problem. Proper documentation also is
vital when selling the program to the public.
Involve as many people as possible in the process. Within your own
organization and among the public, make people aware of the problem.
The thought of visiting 48 community councils and trying to sell them on a
$50 million program may indeed be frightening, but it could make the
difference between a plan and an implemented program.
Do not create another bureaucracy. Citizens do not want more gov-
ernment, just efficient service. We chose to think small organizationally
— 15 to 20 people. Supplement existing stormwater management staff
with existing city maintenance organizations and contract for needed
design, construction, and additional maintenance services.
156 For details circle No. A -125 on card PUBLIC WORKS for September, 1986
Hydropower Catch Basin Cleaner
•- Designed to vacuum clean catch • Tank is hydraulically raised and
basins. digesters, deep wet wells, lowered for dumping
sludge beds, etc.
hose
•Vacuum reel and operator
• One man operation controls are located on curb side
inches ft.
• Delivers up to 380 of • Operates at depths to 35
water in vacuum (28 Hg.) . Vacuums up to 100 ft. away
. Recovers material under water from unit
i . Available with 1200 gallon . Recovers wet or dry material
(6 cu. yd.) or 2000 gallon
(10 cu. yd.) collector tank
CLEANER CHOICE
Hydropower Sewer & Catch Basin Cleaner
• Combination machine designed . Tank tailgate is liquid tight
to clean sewers and catch basins - Sewer hose reel (600 ft. capacity)
-
t3 One man operation is mounted behind truck cab
`y
/ �! • Triplex pump cleans sewers • All operator controls are located
S with 2000 PSI water pressure on curb side
• Vacuum system removes debris . Vacuum power of 380 inches of
from catch basin or manhole water (28 Hg.)
• Available with 1200 gallon • Fully operational in cold climates
(6 cu. yd.) or 2000 gallon
(10 cu. yd.) collector tank
See The All New HYDROPOWER LOADER MANUFACTURING COMPANY
at Booth 500 APWA Show 3275 E. CENTRAL/ P.O. 80X341 / FRESNO, CA 93708 /PHONE(209) 268.8521
156 For details circle No. A -125 on card PUBLIC WORKS for September, 1986