Loading...
2008-2009MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, APRIL 17, 2008 1. Election of Chairman and Vice - Chairman. City Manager Kevin Carruth called the meeting to order at 4:00 p.m. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, John R. Kruntorad, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, and Dan Smith. Members absent were Rick McDougall and Richard Quarles. Ex- Officio Members present were Bryon Billman, Renee Harvey, Jim Kays and Frank Wright. Alternate Member Joan Mathis was absent. Also, present were City staff Kevin Carruth, City Manager; Shawn Napier, City Engineer; Kent McIlyar, City Attorney, Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. Kevin Carruth opened the floor for nominations to elect a chairman. A Motion to nominate Reeves Hayter was made by Herb Campbell and seconded by Dan Smith. A Motion to cease nominations was made by Sharron Nabors and seconded by Jim Kays. Reeves Hayter was elected chairman by a unanimous vote. Kevin Carruth opened the floor for nominations to elect a vice - chairman. A Motion to nominate Dennis Chalaire was made by Reeves Hayter and seconded by Herb Campbell. A Motion to cease nominations was made by Sharron Nabors and seconded by John Kruntorad. Dennis Chalaire was elected vice - chairman by a unanimous vote. 2. Answer and discuss any questions related to the briefing books or information to be added to the briefing book. Chairman Hayter inquired if there were any questions about the agenda or the briefing books. Dan Smith recommended in their discussions they talk in terms of gallons of water instead of cubic feet. 3. Discuss the committee's goals and objectives. Chairman Hayter stated the overall goals of the committee was to determine the amount of water in Lake Pat Mayse, the needs of the community and whether or not there was excess water to sell to the City of Irving. Bryon Billman inquired about the studies. Chairman Hayter responded the volumetric study of Lake Pat Mayse was suppose to be completed by September I". Dan Smith recommended they have several meetings prior to establishing the goals and objectives in order to Page 1 of 2 obtain more information. Chairman Hayter suggested that the committee spend the next three meetings reviewing the binder of information prepared by City staff. John Kruntorad said the committee should also review the Memorandum of Understanding. Chairman Reeves stated it was important to note that the State owned all of the water; however issued water rights to the City of Paris. He said that the use of the water by the city perfected the city's water rights. Chairman Reeves also said that in the seventies the State asked everyone to justify why they should retain their water rights. Dennis Chalaire said that fact should be considered when making recommendations. Kevin Carruth reminded the committee that there were more water demands now than in the past. Chairman Hayter moved the committee to chapter 16 of the binder to begin review of the definitions. 4. Set next meeting date and items for future agendas. Chairman Hayter told the committee they would meet every two weeks on Thursdays beginning at 4:00 p.m. and would limit the meeting to two hours in length. The committee decided to include in future agendas a citizen comment section, and limit the total timel for that section to fifteen minutes. They agreed they could hear from five citizens if they limited each person to three minutes. Chairman Hayter and Shawn Napier told the committee they would work together to get the agenda to the committee ten days in advance of meetings. 5. Adjournment. There being no further business, the meeting was adjourned at 5:36 p.m. Approved this 1St day of May, 2008. l Reeves Hayter Chai an Page 2 of 2 MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, MAY 1, 2008 Call the meeting to order. Chairman Hayter called the meeting to order at 4:00 p.m. and welcomed new members Ray Ball and Bob Campbell. Members present were Herb Campbell, Dennis Chalaire, John R. Kruntorad, Rick McDougall, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, Richard Quarles, and Dan Smith. Ex- Officio Members present were Pike Burkhart for Renee Harvey, Frank Wright, Ray Ball, and Bob Campbell. Ex- Officio Member Bryon Billman and Alternate Member Joan Mathis were absent. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. 2. Citizens forum. No one spoke. 3. Receive and act on minutes from the April 17, 2008 meeting. A Motion to approve the minutes was made by Dennis Chalaire and seconded by Jim Noble, motion carried unanimously. 4. Review and discuss the briefing books. Shawn Napier distributed handouts regarding HDR Engineering, an article on Oklahoma water and sediment data from the Corps of Engineers. Mr. Napier and committee members discussed the upcoming volumetric survey and different methods of determining the amount of water in Lake Pat Mayse. Mr. Napier informed the committee that water attorney Jim Matthews was expected to meet with them in the near future. Chairman Hayter asked the committee members to forward to Mr. Napier any questions they may want to ask Jim Matthews. Sharron Nabors asked staff for information regarding the charges to industrial customers for water. For comparison reasons, Dan Smith suggested that staff formulate one chart compiled of contract information from all of the graphs reflecting what each industry pays to the city, including minimum charges. Chairman Reeves informed the committee that a rate consultant would be addressing the committee. Page 1 of 2 In addition, the committee discussed peak data for water consumption. Richard Quarles said they would need to look at the hottest months to determine the most consumption. Rick McDougall said they would also have to take into consideration evaporation during those months. Robert Campbell stated that evaporation losses were probably more than consumption. Herb Campbell told the committee that water evaporation accounted for 29 million gallons a day. As discussed at the last meeting, the committee continued working through the briefing book. 5. Discuss goals and objectives for the committee. Chairman Hayter stated the goal for the committee was to help the City use it's water resources in the most appropriate manner. He summarized the committee's objectives as determining the water needs and supplies of Lake Pat Mayse. He also stated they needed to determine whether or not the City desired to make money; whether or not the City desired recreation opportunity, or whether or not the City wanted to do both. Sharron Nabors said one of the objectives was to develop and help Paris grow. Ray Ball added that the citizens needed to be given an objective view. Herb Campbell emphasized if the decision was going to be to sell water, that they did not need to wait too long. Mr. Campbell said other lakes were being built and there would be a lot of competition. Richard Quarles added that they needed to stay focused on what they were going to accomplish. Dan Smith inquired about forming a sub - committee to work on goals and objectives. Chairman Hayter expressed that was a good ideal and asked Dan Smith to be the chairman and Richard Quarles to be the vice - chairman. He also asked John Kruntorad and Ray Ball to serve on the sub - committee. It was decided that the sub - committee would e -mail information to committee members a couple of days prior to the next meeting. 6. Possible future agenda items. Meeting with Jim Matthews. Report of sub - committee. 7. Adjournment. There being no further business, a motion to adjourn the meeting was made by Dan Smith and seconded by Rick McDougall, motion carried unanimous. The meeting was adjourned at 5:53 p.m. Approved this 15`h day of May, 2008. t 1 Reeves Hayter Chai an Page 2 of 2 MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, MAY 15, 2008 Call the meeting to order. Chairman Hayter called the meeting to order at 4:00 p.m. Members present were Dennis Chalaire, John Kruntorad, Gene McWaters, Sharron Nabors, Jim Noble, Richard Quarles, and Dan Smith. Ex- Officio Members present were Byron Billman, Pike Burkhart for Renee Harvey (Renee Harvey arrived at 5:05 p.m.), Jim Kays, Frank Wright, Ray Ball, and Bob Campbell. Members absent were Herb Campbell, Rick McDougall, and Michael Moffitt. Alternate Member Joan Mathis were absent. Also, present were city staff Kevin Carruth, City Manager; Kent McIlyar, City Attorney; Shawn Napier, City Engineer; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. 2. Citizens forum. No one spoke. 3. Receive and act on minutes from the May 1, 2008 meeting. Subject to a correction to the second paragraph of 5. being changed to read "a couple of days prior to the next meeting," a Motion to approve the minutes was made by Robert Campbell and seconded by Gene McWaters, motion carried unanimously. 4. Receive Sub - Committee report on goals and objectives. Dan Smith presented the Committee with the sub - committee's goals as set out in Exhibit "A" attached hereto. Chairman Hayter stated the goals and key deliverables were straight forward and that he would like for the Committee to reach an agreement on any changes. He also said that tasks would be amended as they worked through this project. After discussion, the Committee did not make any changes to the goals. They made changes to the key deliverables as follows: 1) The word "currently" was inserted between water and available; 2) 2050 was changed to 2060; 3) no changes were made; and 4) The word "routine" was deleted and the word "timely" was inserted in its place. With regard to the Necessary Work Tasks, the Committee changed the title to "Tentative Work Tasks" and changed the word transbasin to "interbasin transfer." The Committee also discussed methods of keeping the public informed of information Page 1 of 3 gathered by the Committee. It was a consensus they would give all of the information gathered to the Paris News reporter and that they would develop a list of frequent asked questions and answers to be placed on the web -site. They also agreed they could give the City Council updates for informational purposes only. Shawn Napier told the Committee that Jim Mathews was tentatively scheduled to meet with them on May 291h and asked that they submit to him any questions they may have for Mr. Mathews. Richard Quarles asked that staff create a calendar reflecting deadlines and meeting dates. John Kruntorad inquired if it would be possible to have the calendar placed on the web -site and Shawn Napier answered in the affirmative. Pike Burkhart wanted to know if the City of Irving was conducting the same studies as the City of Paris. Chairman Hayter said that the City of Irving was doing most of the studies and the City of Paris' consultants would be reviewing those studies and representing Paris' interests. The Committee commended the work done by the sub - committee. 5. Review and discuss the briefing books. Chairman Hayter moved to section 4 of the briefing book for review of the contract with Texas Water Development board for a volumetric study. Subsequently, Chairman Reeves moved to section 5 and referenced the table reflecting the sale of water to various entities. Chairman Reeves stated that all water sold by Paris had been treated water up until Lamar Power Partners. He pointed out that Paris sells Lamar Power both raw and treated water. 6. Receive questions for Attorney Jim Matthews of Mathews & Freeland. Chairman Hayter reminded the members to submit their questions to Shawn Napier prior to May 20`h 7. Possible future agenda items. Chairman Hayter reminded the Committee they had a tentative meeting scheduled for June 5th and a regular meeting for June 12th. 8. Adjournment. There being no further business, a motion to adjourn the meeting was made by John Kruntorad and seconded by Robert Campbell, motion carried unanimous. The meeting was adjourned at 5:55 p.m. Page 2 of 3 Approved this 29t' day of May, 2008. Reeves Hayter, Chai an Page 3 of 3 Goal: Educate, inform, and advise the Paris City Council and citizens of Lamar County as to the best long -range commitment of its water resources. Key Deliverables: 1- Total amount of water available to the community. 2- Amount of water required for local consumption, contractual obligations, reserves, and future needs (current through 2050). 3- Recommendation of additional wafer resources to explore in order to expand our supply base. 4- Routine communications to keep city council and community informed of key learning and progress. Necessary Work Tasks: Develop timely and supportable data about the City's water supply capacity. • Review and reach a general understanding of information available (i.e. briefing books) by May 29. • Hold an initial consultation with Jim Matthews to develop a better understanding of legal issues including water rights issuance and cancellation, transbasin diversions, Red River Compact, return flows, storage contracts, and any other issues he may feel initially appropriate, by May 29. A preliminary list of committee questions for Jim would be to Shawn by May 20th. • Receive information from City staff as to current and future costs to City for the raw water and Pat Mayse facilities by May 15th. • City Council will retain engineering consultant by May 12th. Initial consultant presentation to committee on May 29th. Initial presentation should focus on introductions and proposed scope, and a coordinated scope with Irving's consultants should be presented to the committee. • Identify each possible source of water supply. Initially these would include: Current Pat Mayse allocation. Receive TWDB volumetric study elevation- area - capacity table by September 15th.Review at September 25 committee meeting. Receive consultants opinion of Pat Mayse safe yield by October 9 meeting. Current Lake Crook allocation. TWDB volumetric survey would be utilized by consultants to produce an opinion of safe yield by September 25th. Can Crook be dredged or raised? Consultant's opinion of costs and feasibility by October 23rd Groundwater. Consultants would provide an opinion as to groundwater availability within 30 miles of Paris (including Oklahoma) in sufficient quantity and quality for municipal supply by October 9th. Wastewater return flows. Possibly from LPP, Campbell's Soup or City's wastewater plant. Receive Jim Matthews opinion as to whether these are ours to recapture by May 29th. Receive engineering opinion on safe yield of these sources, if any, by October 9th. Recapture of flows below Pat Mayse spillway. Receive Jim Matthews opinion as to whether these are ours to recapture by May 29th. Engineering opinion on safe yield of this source, if ours to use, by October 23rd meeting. EXHIBIT "A" Reallocation of flood control storage in Pat Mayse. Meet with Corps by June 26th to discuss possibilities related to this option. Input on this option from Jim Matthews by May 29th. Engineering opinion on safe yield possibly available from this source by October 23rd • Summarize and present estimated available safe yield from all sources in 10 year increments beginning 2008 and including 2010 thru 2060, by October 23rd meeting. 2. Develop timely and supportable data about the City's current and future water supply demand and commitments. • Review State Water Plan 50 -year projections for population growth for Lamar and Red River County. Projections should be provided by City staff for discussion at June 13 meeting. • Review and discuss State Water Plan projections for municipal /industrial /steam electric /mining use for Lamar and Red River counties. Projections should be provided by City staff for discussion at June 26 meeting. This may also include input from local institutional, industrial, or heavy commercial users regard future water needs. • Review and discuss State Water Plan projections for agriculture and irrigation uses in Lamar and Red River Counties. This should include input from local state /federal agriculture departments at the July 17th meeting. • Review and discuss any environmental /recreational constraints on Pat Mayse or other sources at July 31St meeting. Which factors affect the lake level significantly, and what degree of elevation change affects recreational /aesthetic qualities? • Determine peak demand needs as well as average demand needs. • Evaporative loss • Summarize and develop consensus regard City's 50 year Water demands and commitments by the August 28 meeting. 3. Develop an understanding of Irving's needs and planning. • Water from Paris, Hugo. Any other sources? • Any planning Irving wants to share with the committee. • Presentation from Irving for the August 14 meeting. 4. Develop an understanding of the market value of any water supply that we may consider excess • Presentation by our rate consultants for the September 11 meeting. • Current Metroplex rates. • Other possible customers for any excess'supply 5. Develop recommendation to City Council. Meetings November 6 and 20. • Submit report to the December 8 Council meeting. i ' MINUTES WORK SESSION O LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, MAY 29, 2008 Call the meeting to order. Vice - Chairman Dennis Chalaire called the meeting to order at 4:00 p.m. Members present were Dennis Chalaire, John Kruntorad, Rick McDougall, Gene McWaters, Sharron Nabors, Jim Noble, and Richard Quarles. Members absent were Herb Campbell, Michael Moffitt, and Dan Smith. Ex- Officio Members present were Renee Harvey, Frank Wright, Ray Ball, and Bob Campbell. Ex- Officio members absent were Byron Billman and Jim Kays. Alternate member Joan Mathis was absent. Also, present were city staff Kevin Carruth, City Manager; Kent McIlyar, City Attorney; Shawn Napier, City Engineer; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. 2. Citizens forum. No one spoke. 3. Receive and act on minutes from the May 15, 2008 meeting. Chairman Hayter arrived to the meeting. Subject to item 4 being changed to reflect there were no changes to number 3 of the goals and objectives; and that Chairman Reeves be corrected to Chairman Hayter, a Motion to approve the minutes was made by John Kruntorad and seconded by Pike Burkhart, motion carried unanimously. 4. Question and Answer session with Jim Mathews. (See Exhibit "A" attached) Chairman Hayter announced that Darrell Cline, the city's water rate consultant was in attendance. Subsequently, he turned the meeting over to Jim Mathews. Jim Mathews acknowledged receipt of questions from Shawn Napier and stated that he would address those questions. The first issue address by Jim Mathews was cancellation of water rights. He said that almost all of surface water was owned by the State of Texas, but that the right to use state water could be obtained through an appropriative water right. The appropriative right gives the right to use the water, but if you do not use it fully there is a statutory duty to return unused return flows back to the river of origin if that is feasible. The Texas Commission on Environmental Quality has the authority by statute to cancel a water right in whole or part for ten years of continuous non -use. There are Page 1 of 3 specific statutory exceptions to cancellation and one important exception that applies to Paris water rights and Lake Pat Mayse is the result of the construction of a reservoir funded in whole or in part by the holder of the permit as part of the holder's long -term water supply plan. The reservoir was built back in the mid -60s and was a Corps of Engineer project. The City of Paris contracted with the Corps for a long term water supply. Mr. Mathews said he thought the City was secure under this specific exception to the cancellation provision. Another exception is if a permit was obtained to meet a demonstrated long -term public water supply need and if it is consistent with the projection of future water needs contained in the state water plan. With regard to most cancellations by the State, they have to do with irrigation water rights that fall into disuse over time. Mr. Mathews stated to perfect your water right means to first get the water right and then put that water to beneficial use. Mr. Mathew addressed why impoundment falls under congressional control. He said that the U.S. government exercises control over things in this state that relate to interstate commerce, and a lot of water relates to interstate commerce, because it flows between states. The federal government operates a permitting program for the discharge of pollutants, and in Texas that program is run by the TCEQ. With regard to the water right, the State is the party that owns the water right except where there may be some need for federal oversight, such as interstate water, and that is the Red River. Mr. Mathews said another question was raised as to whether or not the Red River Compact was relevant to this Committee's charge. He answered in the affirmative. He said all of the water from the Pat Mayse Reservoir upstream is within the sole control of the State of Texas, and they are the entity that issues the permit. Next, Mr. Mathews discussed the issue of either raising the elevation of the reservoir to increase storage, or to reallocate some of the storage. He said the Corps is the one who owns the reservoir and is the one that sets the allocations pursuant to their Congressional mandate for both flood control purposes and beneficial use purposes. In order to have reallocation, the City would have to amend its water right permit. Another question addressed was the possibility of increasing the dam for purposes of increasing storage. Mr. Mathews said this request would have to also go through the Corps, because they actually own the dam. Mr. Mathews discussed the 1997 Compromise dealing with inter -basin transfers. He said an inter -basin transfer is when you move water from one river basin in the state to another river basin for beneficial use. He stated that the Compromise gave inter -basin transfers a new priority date, which was the date of the transfer. Prior to the City of Irving being able to get an inter -basin transfer, the State would take a look at the effects of water quality and water chemistry. If the decision was made to sell water, it would not require that everyone in the Red River Compact approve the transfer. Notices would have to be given to county judges and mayors, because the statute gives the right for comments to be filed with the State. Another question asked was if Irving purchases water from Hugo or other Oklahoma sources and brings it into Texas pipeline, would TCEQ have jurisdiction over the water? Mr. Mathews said this was a complicated issue and was not sure what type of permit might be required. He said they Page 2 of 3 could require a water right permit or a bed and bank permit. Mr. Mathews said he did not have a direct answer as to why Irving would offer Paris $200,000.00 to participate in studies when Irving could have done so on their own. He speculated that it made sense for Irving to approach, because they were looking for a partner and wanted cooperation. Subsequently, Mr. Mathews talked about the possibility for Paris to structure a contract with Irving in light of the existing contractual obligations of the City of Paris. He said there would need to be a considerable amount of analysis concerning contractual rights with the Corps and appropriative waters rights with the State of Texas. He suggested that they review the last five years to determine what the needs of customers had been and work with the customers to determine what their future needs would be. He said the City could find out how much of contractual obligations were surplus to the anticipated needs of the customer and then make arrangements to sell that water to Irving. He also said there would need to be a mechanism in place to get that water back from Irving if it was needed by the customers. Mr. Mathews stated that the City of Paris could make any offer it desired with regard to terms, conditions and limitations on their use of water. Mr. Mathews suggested that if Paris ever had occasion to readdress the water rights, they pursue appropriated use for both municipal and industrial. He also suggested that Paris not sell all of the water out of Pat Mayse, but plan for future grown out of the Pat Mayse source. He suggested that the City develop other alternate sources of water that may be marketable and give a return, because of the revenue stream. 5. Receive questions for HDR Consulting Engineers. Chairman Hayter reminded the members to formulate questions for HDR Consulting Engineers and get them to Shawn Napier no later than Monday. 6. Review and discuss the briefing books. Shawn Napier presented the Committee Members with additional handouts for their briefing books. 7. Possible future agenda items. 8. Adjournment. There being no further business, a motion to adjourn the meeting was made by Robert Campbell and seconded by Rick McDougall, motion carried unanimous. The meeting was adj ourned at 5:55 p.m. -t� Approved this C day of ne, 008 ., I / Reeves Page 3 of 3 Questions for Jim Mathews from the Pat Mayse Water Study Committee May 29, 2008 Cancellation It has been suggested that if we do not use our water rights in Pat Mayse that these could be revoked by the TCEQ. Historically, has this ever happened in Texas? What are some of the reasons why it would or would not be likely in the foreseeable future? 2. In the PMLSC briefing book, there are two references to the possibility of the State reallocating some of the unused water in Pat Mayse Lake, the rights to which The City of Paris currently has or is in the process of acquiring. a What is the statutory or case law that allows this? Are there any precedents for this action being taken? What are they? ! Are the circumstances similar to the situation Paris is currently in? • What factors cause an impoundment to fall under Congressional control? Size? Proposed uses? Drainage basin location? 3. What does it mean to "perfect" water rights? Why would we "never" sell water rights? Red River Compact 4. Is the Red River Compact, or any other interstate compact, relevant to this committee's charge? Does Paris have control of the discharge from its wastewater treatment plant, or water downstream of the Pat Mayse and Lake Crook spillways, or return flows from Lamar Power and Campbell Soup? 5. What effects does the Red River Compact have on our situation (what scenarios can we eliminate up front from the long list of possibilities we have to consider; e.g. is the City prevented from taking action to impound more water, reducing the amount that flows downstream)? Permitting of Inter -basin Transfer 6. What are some of the typical issues that Irving might need to address in a trans - basin permit? 7. If Irving purchases water from Hugo or other Oklahoma sources and brings it into Texas via pipeline, does TCEQ have any jurisdiction over the water? If the water Exhibit "A" were piped into Pat Mayse, who would be responsible for the ultimate water quality? What environmental studies or permits will be required when considering the sale of water from Pat Mayse? Paris/Irving Memorandum of Understanding 9. Why would Irving offer Paris $200,000 to participate in studies when Irving could do these on their own? Water Supply Contract Issues 10. Is it possible for the City of Paris to structure a contract with Irving that would allow Paris to sell water that is contractually obligated to LCWS (12 MGD), Campbell Soup (8 MGD), Lamar Power Partners (8 MGD), and Direct Energy (2.3 MGD), but that is not actually being used by these 4 customers (in addition to the potential sale of the excess water)? Put another way, these 4 customers are using only 9.3 MGD of the 30.3 MGD that they are contracted for. Can the difference (21 MGD) be sold to Irving until it is needed by LCWS, Campbell Soup, LPP, and Direct Energy? 11. Does the City Ordinance adopted by the City Council regarding a needed approval vote by Paris Citizens for direct sale of water outside of Lamar County also apply to subsequent sale of Pat Mayse water by contract users? Examples: a. Contract user purchases water from the City, and subsequently decides to sell to outside Lamar County users? b. Does that citizen vote also prohibit subsequent contractor sales outside the county? Paris /Corps of Engineers Contract 12. Any thoughts regarding the reallocation of water from flood control or sedimentation to water supply- time frames, difficulties, cost, etc. 13. Please walk us through the Corps of Engineers contract and amendments to help our understanding of the water availability issues. 14. When considering Pat Mayse Lake as a reservoir for increasing lake capacity or for a storage pool, what regulatory restrictions or requirements have to be met and P Last 3 Yr Avg Contract MGD MGD LCWS 2.99 12 Campbell 2.58 8 LPP 3.36 8 Direct 0.36 2.3 Total 9.29 30.3 Put another way, these 4 customers are using only 9.3 MGD of the 30.3 MGD that they are contracted for. Can the difference (21 MGD) be sold to Irving until it is needed by LCWS, Campbell Soup, LPP, and Direct Energy? 11. Does the City Ordinance adopted by the City Council regarding a needed approval vote by Paris Citizens for direct sale of water outside of Lamar County also apply to subsequent sale of Pat Mayse water by contract users? Examples: a. Contract user purchases water from the City, and subsequently decides to sell to outside Lamar County users? b. Does that citizen vote also prohibit subsequent contractor sales outside the county? Paris /Corps of Engineers Contract 12. Any thoughts regarding the reallocation of water from flood control or sedimentation to water supply- time frames, difficulties, cost, etc. 13. Please walk us through the Corps of Engineers contract and amendments to help our understanding of the water availability issues. 14. When considering Pat Mayse Lake as a reservoir for increasing lake capacity or for a storage pool, what regulatory restrictions or requirements have to be met and P what studies and permits are required? Does the potential effect on recreational use come into play under these considerations? 15. Does the City of Paris have the legal right to impound water above elevation 451 ft. or below elevation 415 ft. for purposes of selling, or redirecting it from normal down stream flow patterns? Example: Can the City pump from the flood pool or post spillway overflows for storage at other reservoirs? 16. Does the contract for water rights between the Corps of Engineers, and the City of Paris allow for changes in the lake levels for additional holding capacity? Example: Raising the dam height, dredging, or acquiring additional flood plain for holding more water above the 451 ft. elevation? 17. If the water rights have not been fully paid for by the City of Paris, could another entity buy the unpaid portion from the Corps of Engineers and subsequently call the note? New Water Supply Sources 18. Who owns the water that exits the lake via the spillway? 19. At exactly what point does the water exit the lake and become effluent? 20. If it is determined that there is no excess water to sell, or if Paris enters into a contract to sell a large quantity of water to the City of Irving or anyone else, all of the Pat Mayse water to which water Paris owns the rights is or will be effectively accounted for, and the City should begin developing a new source of water for the future (intense competition for existing resources and the length of time required for efforts). In the current regulatory environment, what are the best options available for the development of future water supply sources? 21. Who has legal water rights to all water after it passes the 451 ft. elevation level and progresses down stream from Pat Mayse Lake spillway? Jim Mathews met on Thursday, May 29, from 4 to 6 p.m. with the Pat Mayse Lake Water Study Committee to answer questions submitted last week by committee members. Darrell Cline, the city's water rate consultant, with R.W. Beck, also sat in on the meeting. Jim Mathews: I received a set of questions from Shawn. I compliment you for a set of very arduous questions. I really had to step back and think about these. I'm going to attempt all of these questions. On some, I may not have THE answer, but I'll have some comments to make. The first issue I'll address is Cancellation. know that's been a concern about whether the city's existing water rights in Lake Pat Mayse would be subject to cancellation if it doesn't do something to market that water in the near future. I have a series of questions, some fairly specific about cancellation, including the statutory and case law that applies to this. I will try to be very brief about this, but I think a little bit of basics is really important. In Texas, almost all surface water is owned by the State of Texas. There are a very few minor exceptions that don't apply in your circumstance. The right to use state water can be obtained through what is called an appropriative water right. Texas has a long history of many jurisdictions, and over the decades and centuries we've actually handled water in very different ways, but at this point in time the Legislature has reduced us to a purely appropriative scheme. That means you have to have a piece of paper from the state that gives you the right to use surface water before you can take it and use it. The other thing that's important is, that water always belongs to the state. What they're giving you with this appropriative right is the right to use the water. You can use it fully. You can consume it in the process. But if you don't use it fully, there is a statutory duty to return unused return flows back to the river of origin if that's feasible. So you have this appropriative right scheme, and the state back in 1957 adopted some cancellation statutes. which gave the state agency -- and that's changed over time; it's now the Texas Commission on Environmental Quality -- but that state agency has the authority by statute to come in and cancel a water right in whole or in part for 10 years of continuous non -use. That legislative action was challenged early on, and the Supreme Court issued an opinion that it was constitutional for them to do this, because the state has given a right to USE the water, not to NOT use the water. And this 10 -year mechanism was a way to say if you're not going to really put it to beneficial use we're going to come back and take it back because somebody else might need it for appropriation. So those statutes do exist. However, over time those statutes have been amended to recognize some very specific exceptions. I've been doing this for a fair number of years. The big problem used to be that Dallas accepts it. Dallas has lakes all over East Texas -- one is Lake Palestine, OK? Still not connected to the Dallas system. I suspect that lake has been there for 30 -plus years, so the water has not been put to a beneficial use by Dallas at this point in time. And there used to be some concerns -- because I did some work for Dallas -- about "Oh, if we don't do something, we might end up losing this water." And over the years, there were efforts to amend the statute to address these kinds of situations. Let me tell you of at least a couple of specific statutory exceptions to cancellation that I think would likely apply to the Paris water rights and Lake Pat Mayse. Probably the most important one is, there's an exception if the permit is the result of the construction of a reservoir funded in whole or in part by the holder of the permit as part of that holder's long -term water supply plan. That sounds like that fits to a T your situation. The reservoir was built back in the mid -60s, it was a Corps of Engineer project, you contracted with the Corps, it was for your long -term supply. Those contracts recognize that's what it was for, and so I don't think the state could cancel your rights regardless of whether it's fully utilized today or tomorrow or next week or next year. That's the current law; I'm not telling you the Legislature couldn't change the law, but I think you are secure under that existing exception to the cancellation provision. There are a couple of others that arguably fit your situation, maybe not as closely as the one about the funding the construction of reservoirs, but one that was put in place was to deal with the regional water planning process. If a significant portion of the water under the water rights is authorized pursuant to a permit that's been used in accordance with a specific recommendation for meeting a water need included in a regional water plan. I have not become an expert on your Region D plan, but I'm sure Paris has its water use in there, and it comes from Lake Pat Mayse in part. (Sharron Nabors: it's not.) JM: I've not gone to look at your regional water plan, but certainly the process was for each water user group to have identified what their strategies were for meeting the need, so I don't know whether Pat Mayse Lake is or not mentioned, but it should have been. And one thing you need to understand, when I say the regional water plan, the way I access the regional water plan is I go to the Texas Water Development Board Web site and you will find there are appendices upon appendices upon appendices. So when you read, the plan, you might not see Lake Pat Mayse, but I would be willing to speculate that somewhere in there Pat Mayse has shown up in one of the appendices. (Sharron: I don't think so.) Reeves Hayter: That's not correct. All of Paris' and Lamar County's water comes from Pat Mayse reservoir, and it's all shown in the plan, back there in what they call the database, the DB07 appendix to the plan. That's where it shows all of Lamar County's water coming from. JM: The simple narrative document that you get is supplemented by all these appendices, and sometimes the devil is in the details and sometimes that's where that kind of detail exists. I disclaim express knowledge about your plan, but I would suspect if the issue came up we could look at that and see if that exception exists. Again, my point is I think the first exception I described to you fits your situation to a T. A couple of other exceptions are, is if the permit was obtained to meet a demonstrated long -term public water supply need, and it's consistent with the projection of future water needs contained in the state water plan. There are also others that are more specific and don't quite fit your situation. One deals with the situation where a certified filing, which is a very old water right. Before we even got to the state issuing permits, if you had like a mining claim or something, you could go to the county clerk's office and file what was called a certified filing. So if you happened to have a water right that's based upon one of these certified filings, and you're a city, that water right cannot be canceled if the water has been put to use under the certified filing for municipal purposes during any 10 -year period. So like I said, the Legislature back during the 50s came out with this broad cancellation provision. It wasn't heavily used, but the Legislature over time has recognized that there are people who have done projects, made investments, and are sitting there with concerns about cancellations, and they have come in to try to address those needs. So under current law I do not have any anxiety that there is a grounds to cancel any of your water rights that are not currently being used in Lake Pat Mayse. One part of the question asked me had to do with the history of cancellations. By and large, most of the cancellations the state has done are for irrigation water rights, which can fall into disuse over time, and a lot of them are in the Rio Grande Valley, where there is a water master. And the Rio Grande Valley is different from the rest of the state in that its water rights are the result of a court case as opposed to this legislative scheme, and most of the rights are allocated over time and a water master has been appointed to ride herd over all of that, and if water is not used over there, it is such an arid part of the state, a very precious commodity that they do monitor that situation, and if you've got an irrigation right that goes into 10 years or more of non -use, they may take some action to cancel that. The question was asked about what does it mean to perfect your water right, and why would we never sell our water right. A moment ago when I told you we have this appropriative scheme, if you want a water right from the State of Texas, you have to go in and file an application, and it's a fairly arduous process. They really take a good, close look at it, and the first question is, is there water available for appropriation. But assuming you get your water right granted to you, until you put that water to beneficial use, it is not perfected. But once you do, it is perfected, and it becomes a property right, just like any other property right, and if it's taken from you, you have to be compensated for it. I would submit to you that the exception, as recognized by the Texas Supreme Court, is this cancellation for non -use, because again what you have is a right of use, not the ownership of the corpus of the water. And so the state could come back in and could cancel that, but as opposed to any other party who wants to tread on your property rights, once you've put it to use, it is perfected and the court would recognize it as it would your ownership of a fee simple title. There was also a question here... Reeves Hayter: Before you get away from that, Jim, what effect does that have here. We haven't used all our water, so some of our water rights are not perfected. Jim: I don't see anybody else being able to do that. You have begun the beneficial use of your water right, paid for through the construction of this reservoir and this project. And before the state adopted this exception that basically protected a permitee that had paid for the construction of the Corps project, arguably they could have come in and canceled. They never attempted to do that, and Dallas was sitting out there for decades with these major reservoirs that were planned for decades in the future. And so the state never saw fit to do that, but the Legislature finally stepped up and said, "OK, we understand you've made major capital investments and you'd like to have some protection. We're going to give you that protection." And so I don't see under current law they could cancel any unused portion of your project at this point in time. Sharron Nabors: Tyler lost its water. Surface water. JM: It's my understanding that Tyler still owns its water rights to Lake Palestine, but I don't know for sure. Darrell Cline: I'm their rate consultant, and to my knowledge they haven't lost them. My understanding is that Dallas participated in the construction, so they have a portion of the water rights, and Tyler also participated in the construction, so they have a portion of the water rights. Tyler still has the same amount they've always had. JM: I'll be glad to look into that. JM: I'll move on now to this next question, which is somewhat different, what factors can cause an impoundment to fall under congressional control. Let me give you the legal answer. The United States government exercises control over things in this state that relate to interstate commerce, and lots of water relates to interstate commerce, because it flows between states, or it's the habitat for migratory birds that fly between states. So there are a few case laws that keep evolving at the Supreme Court level about the extent of the reach of the interstate commerce laws. Secondly, Congress exercises control over things that are related to the federal perks, when they spend money. They clearly spent money to construct Lake Pat Mayse, and so they have the onwership interests of Lake Pat Mayse. They own the reservoir. They have contracted with the City of Paris to give you the right to store water in that reservoir, and the right to use the storage space between 415 msl and 451 msl, and it's a quantified amount of space in there, so clearly Congress has some control over Lake Pat Mayse. Let me give you an example that's not only a cost of the water rights subject but a water quality subject. The federal government operates a permitting program for the discharge of pollutants, and in Texas that program is run by the TCEQ, but for the city's wastewater treatment plant and for industrial wastewater discharges, you have to go get a permit. You get it from the state, but really it's a federal permit, and they do that because they have the right to protect water, because it's useful in interstate commerce. With regard to the water right, the state is the party that owns the water right except where there may be some need for federal oversight, such as interstate water, and that would be the Red River, which we're going to get to fairly shortly. I'm going to talk to you about the Red River Compact, which is a division or allocation of the water between Texas, Oklahoma, Louisiana and Arkansas. The water that flows in the Red River. They're exercising that control because it is interstate water. It touches the states as it flows from its origin down to the Gulf of Mexico. Let me move to a brief discussion of the Red River Compact. Questions specifically raised are Is that compact relevnt to this committee's charge. Well, the easy answer to that is yes, because if you were to look at the Paris water rights, the certificates of adjudication that you hold from the state, they expressly say that the rights granted here are subject to the Red River Compact. So by the very terms of the document giving you the right to use it, it is subject to that. Having said that, the Red River Compact while it generally allocates this water between the four different jurisdictions, it is a very complicated compact. It has some defined areas that are subject to the individual control of the individual states. And there is a specific identified subject, Sanders Creek, identified as a water body that up to the point of the last dam on Sanders Creek, which is Pat Mayse Reservoir, is under the exclusive control of the State of Texas, and Texas has the right to all water in the tributary, and Sanders Creek is a tributary to the Red River up to that dam. Beyond that dam, the water that goes over the dam is subject to the compact, and it is subject to having to meet a requirement of the purity, if there is a 3,000 cubic feet per second flow at the border of Arkansas and Louisiana. And each of those four jurisdictions cannot get more than 25 percent of the water that's available above that 3,000 cfs flow. This is getting complicated, but what this means in very lay language is if you went in to get a permit for water below Pat Mayse Reservoir, you would get it from the State of Texas, but in doing their determination about whether there was water available for appropriation, they would run their water availability model, and one of the things that's input to the model is downstream, we've got to have 3,000 cfs of flow. Modeling is very complicated, but it basically tracks all water coming into the Red River, and it can tell you when you're going to have appropriations that will interfere with this 3,000 cfs flow. And once they determine that water is available for appropriation, yet Texas' share of that water cannot exceed 25 percent of that above the 3,000 cfs. I think if they found that there was water available for appropriation, and if there was not more than 25 percent of all of that water that's subject to compact, has already been appropriated in Texas, they could issue an appropriative water right for that. All of their water right permitting decisions take lots of time by most people's standard. Eighteen months is fast to get a water rights permit through the TCEQ, but this one would be complicated and it would require a lot of technical expertise to assist with the analysis, but it should be investigated and should be evaluated. So, the short answer is the Red River Compact does apply; however, by its express terms, all the water from the Pat Mayse Reservoir upstream is within the sole control of the State of Texas, and they're the entity that issues the permit and they don't ever have to release any water from Pat Mayse to satisfy this 3,000 csf flow. That's going to come from the waters below these identified reservoirs. One of the issues y'all have looked at is the issue of either raising the elevation of the reservoir to increase storage, or to reallocate some of the storage that's in there now, and I saw a question raised about could you get a permit for water that flows over the dam into Sanders Creek and off into the Red River. So after having discussed this thing about the compact, let me try to address your specific question. If you were to try to reallocate the water that's in the reservoir now, which is really three levels of water, you have your sedimentation pool, and you have your conservation pool, which is where your water is, between 415 and 451 ms]. And above that you have flood storage.'You could approach the Corps -- and I know your staff has met with the Corps to discuss this issue and how the process would work -- about trying to re- evaluate those pools of water, and see if more water could be moved into the conservation pool, that's a Corps decision. They're the ones who own the reservoir, they're the one who set these allocations in the first place, pursuant to their Congressional mandate for both flood control purposes and beneficial use purposes. So that part of it would be a Corps decision. In order to have any reallocation beneficially affect you with regard to water rights, you would have to go to the state, the TCEQ, and you would have to amend your water right permit. Basically, the water permits authorize you to store water, and they authorize you to divert and use water. And the amount that is authorized for diversion and use is based upon an analysis that would have been done at the time the permit was issued, to determine the firm yield of this project. And the simple explanation of that is if you start into the drought of record, with the reservoir full, how much water can you take out on an annual basis and still have water left by the time the drought of record is over with. And most of the state -- like in Denison, which is where I'm from -- the drought of record was in the 50s -- 1950 to 1956 and 1957. And so they will look at that period and do this calculation, and they will determine how much water you can take out on an annual basis and get through the drought of record with one year's worth of water left in the reservoir. And it's dependent on the storage, and it's dependent on how the drought of record works, from the standpoint of evaporation, temperature, and so forth. So, you'd have to get the Corps to do the re- allocation, and you'd have to get the state, the TCEQ, to change your permit based on that reallocation. If you could accomplish those two steps, you could have a change in the authorized amount of use out of the reservoir. I'm going to give you a huge generalization here -- I cannot tell you this applies in your situation -- I know the Corps has on some frequency engaged in re- allocation. There are two reasons, I think, why that happens. One, the Corps historically has been very conservative in estimating flood storage space. They've been very protective. They want to make sure that their project prevents flooding, etc. Two, if they lose some of that flood storage space into conservation storage and it gets to be beneficial use, that's a revenue enhancement to the Corps, because you're going to have to pay them for the storage space for that water. So they have some incentive to want to do that. It's always going to be fact specific and fact dependent. They're going to take a good, hard look at it if you ask them to do that. That would be a way you could increase the amount of water that's available to you out of Lake Pat Mayse. A second question raised was if you were to try to increase the height of the dam for purposes of increasing storage. That, too, starts with the Corps of Engineers, because as I said it's their reservoir; they actually own the dam. You might have paid for the construction of it, but they're the owners. So they would have to consent to make that change. And in order for that change to be effective for you, in terms of increasing your diversions from the project, you would have to go to the state again, the TCEQ, and you would have to amend your water rights permit. I think I know the answer to this, but I'm not 100 percent sure. I talked to the gentleman at the state who is their staff person over the Red River Compact, and he doesn't know the answer to this either. As I said, the state has the full rights of ownership and control of that water up to Pat Mayse Reservoir. But in the compact, Pat Mayse Reservoir is identified and the storage capacity is identified. If you were to raise the dam, you're going to increase that storage capacity, and so there's at least a bit of an issue, the kind of thing that lawyers love, there's a bit of an issue, and some Oklahoma lawyers would come along and say, "Whoa, you can't do that, because really what you've really got the right to use is that 109,000 or so acre feet of storage that it was listed at (between 415 and 451 msl)." There are two documents that are attached to the compact that are generally not available; they live over at TCEQ. One is an engineering report, and one is a legal analysis. I talked to him today about the legal analysis, and it says the identification of those projects is not determinative of the rights under the compact.... (Somewhere in there is) the language that says the State of Texas has the right to control all waters up to that reservoir. It's not a matter of how big you make it over time, because some of the reservoirs were even in the planning stages as opposed to the construction stage. So I think the answer is, that would be between the State of Texas and the Corps of Engineers, and the Red River Compact would not come into play. But there is at least an issue out there that somebody would choose to fight about. Let me take the third thing that we talked about, and try to break it down. If you determined that it was prudent, smart, good business, whatever, to try to divert water from downstream of Pat Mayse Reservoir, it is clear to me that the Compact does come into play at that point in time. So while you go to the State of Texas to get your permit, that analysis of the permit applicaiton has to factor in the requirements of the Compact, such as meeting this 3,000 csf flow at the border of Louisiana and Arkansas, and that the State of Texas not get more than 25 percent of the total water that is subject to the Compact. But it still would be determined by Texas. Now, if Oklahoma thought that Texas had gone to 26 percent of that total water, they could choose to litigate it right there. I have no idea what the facts are with regard to that. I would suspect that there's a lot of water unappropriated in the Red River, just because of the salinity of the water. OK, let's talk briefly now about permitting an inter -basin transfer. First let me define an inter -basin transfer. Let me back up and give you some history. In 1997, the Legislature passed Senate Bill 1, which was the first major reorganization of the state water planning process that had been done in decades. They had a huge fight over lots of issues, and one of the big issues that they fought about was whether or not water was going to be moved fairly freely around this state. And there was a big fight between Buster Brown (of Lake Jackson), who was the senator who carried the bill, and the state rep from Mauriceville (Ron Lewis), and as is typical of a lot of these legislative issues, and water issues are always pretty heated in the Legislature, it went down to the last day, and they didn't have a bill, and they were trying to compromise and get a bill out of both bodies that could pass. A lot of time, a lot of work had been invested in this. And the compromise was, inter -basin transfers would be allowed, but that inter -basin transfers would be given a new priority date -- not the priority date attached to the original water right, but the priority date of the transfer itself. And in water law, priority dates are real important, because that controls who gets the water in times of drought. And that was put in the inter -basin requirements back in 1997. There were at the time about 100 inter -basin transfers throughout the state. I had been involved in permitting some before that statute was passed, and I've been involved in permitting some after that statute was passed. And the Legislature really loaded up the inter -basin transfer statute and put a lot of requirements on it to make it procedurally difficult and really to throw some obstacles in terms of doing that. I represented the Greater Texoma Utility Authority, who sold some water to the North Texas Municipal Water District out of Lake Texoma, going from the Red River basin to the Trinity River basin. To my surprise, it went through without opposition and it went through relatively quickly for the TCEQ. That means about 18 months, but that's still relatively quickly for that process. An inter -basin transfer is when you move water from one river basin in the state to another river basin for beneficial use. It's just what it says it is. It's inter basin. And so, the Legislature has made the process a whole lot more complicated. Let me tell you some of the issues that would have to be addressed as part of Irving getting an inter -basin transfer, or the City of Paris getting an inter -basin transfer. The state will look at the effects on water quality, and they look down to the level of the water chemistry. For the water that's coming from Lake Texoma to Lake Lavon, they were concerned about the pds content of Lake Lavon. They required some permit provisions that it had to be blended at a certain ratio to maintain a certain amount of pds content and not exceed that in Lake Lavon. I think it ended up being a 4 -to -1 ratio, four parts of Lavon water to one part of Texoma water. So they couldn't just freely move that water down there, they had to blend it. The state will look at effects on fish and wildlife habitat. They're very serious about this. They raised questions in the North Texas issue about algae blooms on Lake Texoma and how that might affect Lake Lavon. So these are things the state gets into at a serious level. One other requirement that applies to all permits, not just inter -basin transfers, is whether the application is consistent with an approved regional water plan. And so if the regional water plan does not currently have language in it that addresses Irving meeting its needs to inter -basin transfers, they'll have to go get that plan amended and submit it to the water development board in order for an inter -basin transfer to be consistent. Another requirement that was part of the 1997 compromise was that the state will look at the proposed mitigation or compensation -- that is, the rate for water that is going to be applied in the process. And every single county judge in the basin of origin -- the Red River Basin -- will get notice that this application has been filed, and they have a right to file with the state comments on the mitigation of the compensation being paid for this water. So you can see the Legislature tried to make it a very inclusive, politically complicated process. Obviously, the state is going to look at the impact of an inter -basin transfer on existing water rights. Another thing that they will look at is the need for the water in the basin of origin -- that is, the Red River Basin -- and in the receiving basin. For Irving, that would be the Trinity River Basin. So, is there really a need in the Trinity River Basin, and if water from Lake Pat Mayse is going to flow there, how is that going to impact the need for water in this area? Are needs still going to be met? The TCEQ will also look at the projected economic impact that is expected to occur in each basin as a result of the transfer. And in the case I was referring to, an economist was hired to write a report about economic impacts on both basins. It's not something they expect lip service to. They really want to have an analysis of what's going on. So it's a fairly arduous process to get one of these permits. It's not at all impossible; it's been done, but it's something there is a lot of process built into. As I mentioned, these inter -basin transfers will have a junior priority date, so the transfer out of Lake Texoma to Lake Lavon, has, I guess, a 2004 priority date associated with it, where the water rights that Denison holds in Lake Texoma probably go back to the 50s or 60s. That's simply a way for the Legislature to try to discourage the movement of surface water. So, that's the drill on inter -basin transfer permits -- a lot of process, a lot of very detailed questions and analysis that the state takes a look at. But that's not to say that can be a real big impediment to moving water around the state when there is a need for water and a surplus of water in other areas that can meet that need. Question: If the citizens of Paris found we had water to sell, and decided to sell it, we'd have to go through the permitting process, which means everybody in the Red River Compact area would have to approve that transfer? JM: No, not approve. Simply, they have to give notice to all county judges, and I think notice to mayors of all cities that have a population in excess of one thousand. So there's broad notice to elected officials. The county judges are specifically given by statute the right to file comments with the state on what they think is appropriate with regard to either mitigation to the basin of origin, which is the Red River Basin, or the compensation that is going to be paid by the City of Irving. Question: Is that all counties in all four states? JM: No, just in Texas. This is purely a Texas statute and would apply only within the state of Texas. It is a right to comment. It's not control. The thing I'd emphasize here, the only one I've been involved with since the statute passed, there was no mitigation planned with regard to the sale, there was merely a compensation provision. I'm not aware that any county judge commented on that at all. Was no hearing requests, and no hearing granted on the application. It went through surprisingly quickly and efficiently for something that had this much process built into it. Both parties did a good job communicating within their respective areas what they were going to do about it, and everybody pretty much said, "Sounds like a good deal to me." The water that's going to move inter -basin will have a priority date associated with it of the date of application. The priority date means anybody who has an earlier water right has a right to have their water rights met in full before that water right can be exercised. If you didn't have a storage reservoir, if you just had a stream, and I'm downstream and I've got a 1901 water right, and you're upstream and you've got a 2004 water right, in a drought, if I'm not getting the water that applies under my permit, I call the state and say, you know, I think somebody's diverting my water upstream, go talk to them. And they would tell all these newer water rights holders, you got to pass through your water until I got my water first. That's how the priority key works in the appropriative water rights system. It becomes more complicated in a situation like you have here, where there's a storage reservoir, because Paris has a right to capture and store that water with a 1964 priority date to it, and regardless of whether you sell it to Irving, or you use it locally, or it just stays in there as storage, you have that right, with that priority date associated with it. So I'm not sure this junior water thing the Legislature put in to provide some type of disincentive, and clearly that's what it's designed to do, is try to make a disincentive to surface water transfer. I'm not sure they have a lot of application in the real world from the water being diverted from a storage reservoir. Let's address question 7: If Irving purchases water from Hugo or other Oklahoma sources and brings it into Texas via pipeline, does TCEQ have jurisdiction over that water? If the water were piped into Lake Pat Mayse, who would be responsible for the ultimate water quality? I'm going to tell you up front: this is a very complicated issue. First of all, water that is brought into Texas from outside the state, and put into a water course in Texas, becomes state water. And so if water from Hugo is put into Lake Pat Mayse, it is a water course, and that becomes state water at that point in time. I'm not quite sure, and I talked to the gentleman this morning who is the state staff person on the Red River Compact, and he was not quite sure. I'm not quite sure what kind of permit the state might require for this. They have two choices. They could require a water right permit -- we're going to now introduce this water into the state and make it state water. There is also something called a bed and bank permit. So when you're using the beds and banks of the state's water courses to move developed water, you still have to get permission from the state to use those state water courses. Developed water in general is water that would not be here but for your efforts to get it here. For example, because Texas has a different regulatory scheme for surface water and ground water, if you drill a ground water well and put it into a water course, that's developed water, it's YOUR water, but the state has the right to make you get a bed and bank authorization to convey that water in a water course. So, it could be a state water, it could be developed water, or it could be a pollution discharge permit. Let me explain that briefly. As we talked about earlier, the federal government has this program to issue an NTDS permit. Don't worry about what it means, it's just what they call it. When you're going to discharge a pollutant from a point source into any water in the United States, you have to get such a permit. Almost all states have become the administrator of that program, and Texas has done this. So whenever the city wants to amend its wastewater discharge permit, it goes to the TCEQ in Austin and gets what is called a QTDS permit, which is a Texas version vs. the national version. It's still done under this federal permitting program. A few years ago, there was a case in the U.S. Supreme Court that brought to the forefront the issue of whether moving water from water body into another water body required a pollution discharge permit. Because there are many cases that the water that is being moved is very different from the body it's being moved into. An example would be... here's the case... New York City has all these reservoirs up in the Catskills, and it serves the whole city of New York. And in order to get it, they've got to move it. Sometimes they move it in pipes, sometimes they move it in water courses. So New York City was moving some of its water through a pipe and it dropped into a water course and it flowed down into another reservoir, where it became the water for the water treatment plant. Well, this water course they dropped it into was somebody's favorite fly fishing area. And the water they were moving in there had high ? ?? as opposed to very ? ?? water where they had their fly fishing. And so they sued New York City, claiming they didn't have the right to use this water because they didn't have a pollution discharge permit to do it. And the courts said you're right, they're discharge pollutant that's not proceeding naturally, they're introducing it and you got to get a permit for it. They sent the case back to the lower court to see how much New York City ought to be fined for discharging this pollutant, and they got a big fine, $5 million. So they took it back on appeal and said we want you to reconsider this decision about whether we need to get a permit, because the EPA has issued some guidelines that says all water in the United States is part of a unitary body of water and there is really no moving of water from one water course to another, and the courts said we don't find what the EPA has done is persuasive. So I think that the situation we have right now is that as a regular course of busiiness the regulatory agencies do not require pollution permits for moving water from one place to another place even though it may contain different chemical characteristics, but anybody who wants to go to federal court to get an order that says that requires a permit, you got to stop it until you get a permit, and you get fined for the pleasure of doing that. So the State of Texas, to regulate that water from Oklahoma, could issue QTDS permit, can regulate the pollutant content of it, or they could issue a water right permit, and when they issue a water right permit, they're going to look at the water quality impact, they're going to look at the impact on the biology of the receiving water, they're going to be concerned about whether they're introducing non - native species into Lake Pat Mayse, and so there are mechanisms at the state level that can provide a healthy degree of assurance that those issues will be fully vetted before any Oklahoma water flows into Texas. What's going on right now, there's a lot of litigation going on between Texas political subdivisions and Oklahoma about whether they can keep all the water tied up in Oklahoma, and so far the Texas subdivisions are winning that litigation. And there are other cases that are nearly directly on point on this, where states have tried to tie up all their water because they didn't want it going to some other state, and the courts said, you know, this is interstate commerce, you can't do that. You can't just sit on that and hoard it. If you've got a use for it, that's fine, but you can't simply say we're not going to sell Oklahoma water in Texas. And I think that will be the outcome of that litigation. It may take several years to get there, but I think that's going to be the outcome. So once that's over with, there will be are going to be issues potentially about whether that water is compatible with the Texas receiving streams, etc. I'm just telling you all the legal issues that I know exist here. I'm not trying to make it sound like a horror story; these are simply the kind of things that lawyers work through in order to get permits and get legal issues resolved. It may take years, if not decades, to work throgh all of this, but I can tell you the metroplex -- and I'm not talking just about Irving -- the metroplex knows they have pressing needs for water, and they hadn't got a lot of choices -- they can either try to build Marvin Nichols, they can go get Toledo Bend water and pay all the energy costs of pumping it up hill, they can get that Oklahoma water, or they can get a deal with Boone Pickens to move water out of the Ogalalla Aquifer out here. Those are about the four big sources. So, it's a complex maze of legal issues, and I think the issue about the Oklahoma water is moving with a fair degree of rapidity right now, fairly quickly headed toward some resolution. I don't think it's out of the question that at some point in time, whether it's the Upper Trinity Water District, whether it's Irving, somebody is likely to get their hands on some of that Oklahoma water, and to the extent that the City of Paris has an interest in it, you have the potential to generate some revenue off of that, because Lake Pat Mayse is situated in a very ideal spot with regard to being able to be an intermediate transport point for that water. Question: you're saying you don't see any stumbling blocks as far as moving that water from Oklahoma into Texas? JM: No, that's not exactly what I said. I said there are permitting processes that are available to the State of Texas that could require those transfers of water being looked at under either water rights provisions, or bed and banks provisions, or water quality provisions. I don't have a crystal ball that's clear enough to tell you what those issues might be. Very seriously, big issues, an issue that is become of increasing interest to the state and to the federal government, is the species issue. If there was some non - native species, hydrilla or something that's in Oklahoma and they didn't want to have introduced in Texas, they could simply say, "1'm sorry. You have a problem. Until you get control of that problem, we're not taking your water." I'm not at all telling you that I know any such issues exist, but the issues are out there. Question: (inaudible) Yes, if the Corps of Engineers is going to do something that's a major federal action, they're going to go through the ? ?? process. They're going to either do an environment assessment or if it has to be a fullblown analysis they would do a ? ?? impact statement. So they have a separate process with regard to a Corps action. If y'all were to pursue the issue of raising the height of the dam, that probably would go through some type of ?? review. Maybe a more abbreviated environmental assessment, maybe a full - blown ? ?? assessment. Let me address No. 9: why would Irving offer Paris $200,000 to participate in studies when Irving could do these on their own? JM: That's a question I do not have a direct answer to. That would require speculation on my part. It just makes sense for them to approach you in a friendly manner, saying, "We would like to do this, be our partner." Because they'd have a hard as heck time trying to take your water from you, OK? So they're trying to look for a partner and look for some way to work in cooperation with other people. That would be my assessment of it. But only they know what their true motivation is. But to me it only makes good business and political sense to try to find somebody who would participate in the study as a part of that process. You'd be more likely to have some confidence that the study is being done in a fashion that would address your needs. That's all I can tell you about that, but that's my speculation. No. 10, a very good question, and it's basically whether it's possible for Paris to structure a contract with Irving in light of the existing contractual obligations of the City of Paris. This is a question that is going to require a considerable amount of analysis concerning your contractual rights vis a vis the Corps of Engineers, and what are your appropriative water rights vis a vis the State of Texas. You have a large water right with the State'of Texas. You have the right in total to 55 million gallons of water a day of diversions from Lake Pat Mayse alone. That's the equivalent of about 51,610 acre -feet a year. That's a lot of water. You have contracts right now with Campbell Soup, Direct Energy, Lamar County Water Supply District, and Lamar Power Partners, that totals 30.3 million gallons of water, or about 34,000 acre -feet. And so, that plus whatever water the city uses to run its own municipal supply system is the water you're currently obligated to supply. So there's some amount of water over and above your current contractual commitments, plus your own needs, that is clearly surplus water to your needs and would be available for sale to Irving. The thing that complicates this is, many of your contractual obligations are not nearly fully utilized. And so while you may have a entity that has a contractual right to 9,000 acre feet a year, if you look at their last three, four or five years average, it may be 3,000 acre feet a year. So you have a lot of under - utilized contractual water. There are clearly mechanisms by which you could sell that water to Irving as long as that water sale to Irving was subordinate to your existing customers. And that would require a fair amount of technical analysis about how much can you safely commit to Irving. And when I say safely commit, it's always going to be subordinate to your existing contractual arrangements. But if you could do an analysis, and you could find out, if you looked at your last five years and you worked with your customers in terms of what their future needs would be, you could find out how much of your contractual obligations were surplus to the anticipated needs of the customer. And you could make arrangements to sell that water to Irving, as long as you had the right to get that water back if it was truly needed by your customers. And there are currently contracts structured like that in the state of Texas for other courses. I've been involved in some of those. I know there is one between the Sabine River Authority, which contracts to sell water to Greenville and Longview and a number of other smaller communities, but that water is not fully utilized, so they have sold a portion of that water to the North Texas Municipal Water District, subordinated to the rights of those existing customers. But they are getting a revenue off of that sale to North Texas, as well as the revenue they have off contracts with existing customers. So it is possible to structure something like that. Question: (inaudible) This is a technical question you want to have your engineers address for you, but I would submit to you that because you have a storage reservoir, and you have a delivery system that's capable of meeting those peak demands, and because Irving is fixing to take that water and move it to another storage reservoir, that you have a lot of flexibility provided to you in a sale of that sort because of the storage that's available. Take Lamar Power, for example. They have an 8 mgd life on their current plant. If they needed 8 mgd of water to meet that peak demand, it's available for them. But on an annual average basis, they use 3.36 mgd of water. They don't need 8 mgd times 24/7. And yet that's what's tied up in that contract. And so I think that you'll find that there's a lot of flexibility in terms of being able to meet those peak demands and still have access to that water on a long -term average basis, because you don't necessarily have to deliver that water to Irving to meet that peak demand. Their system provides for meeting peak demand but you need to deliver that water to them over an annual average basis, because once it moves from Pat Mayse Lake into Cooper Lake, they've got it stored and they move it into the metroplex and the rest of their system to meet their peak demand. It's an engineering question, not a legal question, but clearly from a contracting standpoint, you could seek to identify a base amount of water that you could supply Irving based on your pure surplus water. You could supplement that base amount with the amount that is reasonably available to you between the contractual obligations and the needs of those customers. And then you could always reserve the right to bring that water back as needed. But I don't even any of that implicates the peak demand issue, because you have the infrastructure capable of meeting those peak demands. Either you have it or you could design for it. Question: you'd also have to provide that when (inaudible), water would not be available to the City of Irving? JM: You certainly could do that. You may choose to do something like that. Question: to eliminate the possibility of having to ration water because of the lake level? JM: You could in essence design in a contract a ration scheme for them which included ultimately a cutoff of delivery during certain circumstances, well in advance of any type of local rationing. So, again, there's a lot of technical issues that would have to be reduced conceptionally to what you want to do, and then abstract it into the contract, but clearly you could do those kind of things. Question: Can you sell water to someone and keep them from selling it to someone else? JM: If you're going to sell somebody your water, you can limit their use of that water however you see fit. Most of the contracts now with industrial users, they can use it for industrial purposes, and that's it. They can't go resell it to somebody else, or they can't build a different type plant and use it for that purpose. You can choose to do that. You can choose if you want to, to put provisions in there that if he resells the water, if he gets some premium on it you get some portion of that premium. These are clearly negotiated transactions, and I can't tell you what a willing buyer and a willing seller would agree to, but you can offer anything that you want to in regard to terms, conditions and limitations on their use of the water. OK, No. 12 -- the Paris contract with the Corps of Engineers. The contract you have with the Corps identifies your ownership as 100 percent of the water between 415 msl and 451 msl. This is estimated to contain 109,600 acre feet of storage after 100 years of sedimentation. Not as of the time of the contract, but after 100 years of sedimentation. That number is derived after looking at 100 years of sedimentation. So I would submit to you that a question to be raised about this, there's more capacity in this reservoir, more yield in this reservoir, over the next 50 years until we get to 100 years after its creation. And so you have both the sedimentation pool to look at, as well as the flood pool. With regard to time frames and difficulties, I'll be real honest with you. I've not actually ever participated in one of these reallocation studies directly myself, so I don't know what the timelines are. I know that the Corps staff in Tulsa has met with your staff, and I know the Corps staff is very experienced with these things and the Corps has done a number of these things. It's a very legitimate issue for you to inquire into. I can tell you right now everything that is relevant about the Corps contract. You have two different contracts. The first one, and then the supplement, and those deal mostly with the issue of when you pay them and what you pay them. The main thing is, you now have the right to 100 percent of the storage space, between 415 and 451, and you have diversion rights to the extent that such rights are granted by the Texas Water Commission or its successor, and so those issued the diversion permits to you. You had the water rights shown on the lower half of this page, and I tried to give you this in both acre feet per year. This is what confuses me. The impoundment right and your state water right is for 144,500 acre foot of water in Lake Pat Mayse. That's obviously more than 109,600 acre feet you got in storage between 415 and 451. And I don't think that includes the flood pool, so there's some question in my mind as to whether they've already used the sedimentation pool in determining the yield of this project. One of the things I would recommend you have your engineers do is review the yield calculations based on your original water rights and see if it was done correctly and see if there's any more water you can get just on a re- analysis of the yield calculation that was done. I would note that all your water rights now are not both municipal and industrial. You are authorized to use up to 20,000 acre feet out of 36,610 acre feet for annual industrial purposes in the Sulphur River Basin in Lamar County. And part is municipal authorization that can be used outside the Red River Basin for supplying small communities and rural customers in the Sulphur River Basin. If you ever had occasion to readdress the water rights, I would suggest that you get those amounts appropriated for both uses. I know the city of Marshall ran into a big problem when they were trying to provide water to the energy power plant in Harrison County because they didn't have enough industrial water rights, and they had to go switch the municipal to industrial, and they got caught in the spider's web over issues of notice, and that case went all the way to the Supreme Court and after four or five years it's still not clear where they are. So the next time you have a chance to clean up, get your rights authorized for both municipal and industrial I would suggest that you do that. Question 14 is, when considering Pat Mayse Lake as a reservoir for increasing lake capacity or for a storage pool, what regulatory restrictions or requirements have to be met and what studies and permits are required? Does the potential effect on recreational use come into play under these considerations? With regard to the Corps, making a decision to increase the elevation of the reservoir, that would probably have to go through a full -blown environmental statement. I would tend to think that you're going to have flooding. You probably have structures around the lake. If you raise the level, are you going to flood any of those structures? OK, question 15. Does the city have the right to impound water above elevation 451 or below elevation 415 for purposes of selling or redirecting it from normal downstream flow patterns? No, your rights are between 415 and 451, under the Corps contract. Next question, can the city pump from the flood pool or post spillway overflows for storage at other reservoirs? Well, think about it. You have a glass, and you have a straw in that glass, and you're drinking from the middle of that straw, what's going on in the glass? The top of it's coming down. Whenever there's water in the flood pool, they need to get rid of that water anyway, because they're trying to keep that space open in case they have a flood. They got gates open trying to pass that water, and that's one of these records indicates there's a fair amount of water coming out of that reservoir. The other reason that's happening is that you're not fully utilizing that conservation space, OK? You're not fully diverting and using all of your water. If you were, the water elevation would be down and there would be more times when the flood storage is fully ...... So from the standpoint of water, generally the use of it is considered to be the conservation of it. And so, if you put your water to beneficial use, whether you're selling it to Irving or using it locally or whatever, you're going to have a greater utilization of the conservation pool. And when you're drawing water down and there's water in flood storage, you're really taking water from the conservation pool, because that's where your pumps are, but what's happening is the top of the water level is coming down, which is what they want to happen anyway. So the only limitation you have is the diversion rights given to you by the state, the cap on how much you can divert. Something I was talking about with your staff today, there is, I think it's 86.5 cubic feet per second, which is a lot of water, but that's the maximum diversion rate that you can have from the project. If you want to take more than that, you're going to have to go in and amend the permit. If you want to take some from another location, you're going to have to go in and amend the permit. So all of these limitations are spelled out in your water rights permit. Reeves Hayter: 86.5 cubic feet per second is not a new number, now. That's not a new limit. That IS 55 million gallons a day. It's the same number, just expressed in different units. JM: OK, Question No. 16, does the contract for water rights between the Corps of Engineers and the City of Paris allow for changes in the lake levels for additional holding capacity. For example raising the dam height, dredging or acquiring additional flood plain for holding more water above the 451 foot elevation? It doesn't address that. It is silent on it. You'd have to negotiate that with the Corps. They'd have to go through and check those boxes and work out the terms to do that. No. 17, If the water rights have not been fully paid by the City of Paris, could another entity buy the unpaid portion from the Corps of engineers and subsequently call the note? JM: My understanding is the city is attempting to pay off its final payment to the Corps of Engineers and so I don't think that's a problem. And even if you weren't in a position to pay it off, I've never heard of a situation of the Corps relinquishing its rights to a third party and let them go foreclose on another. So I don't think in the real world that that's a problem. OK, the last three or four questions have to do with new sources of supply. 18. Who owns the water that exits the lake via the spillway? It's the state's water, subject to the compact. So it's going to require a new appropriation as long as it's in the state of Texas. I suspect when it hits the Red River, there is an issue, because generally the southern boundary of the Red River is the border between Texas and Oklahoma. But this water is handled via the compact, so I don't know for sure. I would suspect that appropriations on the Texas side would get a permit from the State of Texas and on the Oklahoma side would get a permit from the State of Oklahoma. But it's all subject to this compact. You have a minimum flow requirement to meet, and you have each state can get no more than 25 percent of that total water. And I would submit to you, and I don't meet to be harsh or judgmental about this, but there's not a lot of appropriations out of the Red River for municipal use because of the CDS content. And it looked to me from the map that you're probably two or three miles down Sanders Creek from Pat Mayse Lake until you enter the Red River, so the opportunity to pick that water up would be preferable in that limited space if you felt that would be a beneficial thing to do. But then the question is what are you going to do with it? You certainly not going to pipe it back into Pat Mayse because it would flow back over ... Going on to the next one, Question No. 19, at what point does the water exit the lake and become effluent? When it crosses the threshold of that dam, it ceases to be solely within the control of the State of Texas and subject to the Compact. OK, question No. 20. If it is determined that there is no excess water to sell, or if Paris enters into a contract to sell a large quantity of water to the City of Irving or anyone else, all Pat Mayse water..... Let me make a couple of general obligations: you have a wonderful source of water in Pat Mayse. And so instead of selling all your water out of Pat Mayse, I think it's very prudent to plan for your future growth out of that Pat Mayse source. To the extent that you can develop alternate sources of water that may be marketable and give you a return because of the revenue stream, I would look to do that and try to capitalize off of those. One of the most common ways these days that cities are developing new sources of supplies is beneficial reuse of their treated effluent return flow. I know from talking with your staff today that you have 2 or 3 mgd of discharge out of your wastewater treatment plant. I know that that is situated in a place where it may be possible to combine that with any water sold to Irving out of Lake Pat Mayse. And so that would be one potential way to get revenue off of that resource. Reeves Hayter: is that water controlled by the compact? JM: no. The water you sell by contract to other parties, and they discharge after they use it, is subject to reuse by the city. Because permit wise, it's still your water. I know little of the specifics, but if Lamar Power Partners takes your water for cooling water and after use, they treat and discharge that water into a water course, and there's some economic use of that water downstream, you should go seek a bed and bank authorization to be able to reuse that water and sell it to a third party. A lot of cities are reusing their effluent and other water for landscape irrigation purposes, if you have enough golf courses and other things, so I would look to those kind of things to try to get economic benefit. But for purposes of your planning, whatever transactions you're going to do with Irving or anyone else, I would be looking to your longterm needs and your growth horizon and figure what amount of water you need to reserve for yourself out of Pat Mayse Lake, and when you're trying to determine what's truly surplus, I would look for some amount of reservation of that water. You can sell some of it to Irving with some right to take it back, or sell it to somebody else with the right to take it back, but I would want to go through some sort of engineering analysis, where you knew, here's what Paris' current water demands are, here's what they are projected to be in 2060, and put something in in terms of what you think you're going to need, because, you know, it's a source that's virtually paid for. And so you want to use water as an economic resource to generate revenue for the city and keep costs down, but at the same time you want to be able to take advantage of the resources that you have developed. So just in the planning process, try to look down the road as best you can as to what your needs are going to be, and take those into account. I tend to look at water as a purely economic issue. Water has a lot of value, and it's becoming more valuable everyday. And so I know locally you probably look at it as a lot of different buckets, a lot of different characteristics, but factor in the economic value to you and how it might work to your benefit over the long term. Question: (inaudible) JM: You have to use the best crystal ball analysis of what your future needs are going to be. You can structure that into a contract. You can start off selling to Irving 100 percent of your surplus, and 10 years from now you could sell them 90 percent of your surplus. And then 80 percent. So you can tell them, we have some water. There will be times we'll be needing some of that water back, and so you can have an adjustment mechanism in the contract. I've even seen contracts where you tell them here's how much water we think we can give you, and you can come and take this water with the reservation that if we need it for our customers, our contractual obligations, we get it back, OK? And in the process, as time goes by, we may learn that we actually have more surplus, And we can identify to you under the contract that additional surplus and you can exercise the right of whether you want it or not, and if you want it, you take it. So, a well- written document can give you a lot of flexibility. It depends on the willingness of both parties to live within the flexibility that you need. It can be as simple as you want it to be, or it can be as complicated as you want it to be. What I'm trying to say to you, I think you need a good technical analysis of how much water you're contractually obligated to provide to other parties, and how much you currently use as a city, and how much you reasonably foresee needing as a city over your horizon. You may need to have that last part of it short- staggered. How much will you need in 2020, 2030, etc. You can then take that number and subtract it from your 55 mgd, and that amount is truly surplus, you don't have any plans to use that water, OK? You can tell Irving, we can guarantee we can give you this amount of water, and we think we can give you this under - utilized portion of our contract water. So if you look at all your contracts and they total up to be 30.3 mgd, but over a long -term average, take the peak annual usages of those customers over the last five years, you could multiply that by a factor, and tell Irving we think we can get you that amount of water as surplus, because we haven't been using it. But we always reserve the right that if something happens to change that pattern of use and we need to get it back, we have the right to get it back. So from Irving's standpoint, there is a certain amount of water that is assured. there's a certain amount of water that has a degree of probability that they're going to get, and then there's maybe a third category of, as we learn more about our operations and our customer operations, maybe we can negotiate with our customers about, can we reduce the contractual obligations to more correctly reflect your usage patterns, you may free up more water that you can say we can give you this on a certainty basis. And you could have a contractual mechanism that would allow you to offer that water for them to accept that water, and it goes into a different category at a point in time. What I am saying is, you can try to structure a contract that provides for near full utilization of resource with flexibility as to who has first rights on it, and the city and the city's customers would always have that first right on it, so from Irving's standpoint, they're going to have an interest in purchasing. They're going to be willing to pay you more for that certain supply of water. They may be highly interested in this probable supply of water, but because it's probable and not certain, it might be worth less to them, OK? Reeves Hayter: Another thing to remember there, is that we plan for our needs through 2060. If there is a surplus and if the citizens want, we sell that to Irving. But we are only selling it to them through 2060. So in 2060, we're not out of water. We get back all of the water we sold Irving, unless we want to sell it to them again. JM: You could start by saying we're going to sell you 100 percent of today's surplus plus this other stuff, OK? And in a decade, we may cut it to 90, or 80, or 60, kind of rachet it down, because as you grow, the amount of the water you can free up declines. So if you can be smart enough, and crystal ball enough to tell me what your demands are going to be, I can write you a contract that will reflect that. But the hard job is your job, OK? The hard technical questions are what your needs are going to be in 2020, in 2030, in 2040, in 2050, in 2060. Y'all are going to have to make some assessments about that, and you've got the benefit of your regional plan. You just need to have good assessment in terms of what your demands are going to be, what your available supplies are, and how much you want to make available in different buckets -- different categories of surplus. Some of it can be certain water, some of it can be highly probable water, some of it can be if things happen we'll offer you more water. And there are ways we can construct your contract language to accommodate that. I can help you see the issues and I can work with the staff to do that, but these sort of things require a lot of analysis about your historic water use patterns, a lot of discussion with your customers about what their needs are and well be, and so forth. Reeves Hayter: They (Irving) are not contemplating a short -term contract, OK? (laughter) JM: Anytime you pay $100 million for a pipeline, you're going to have a sufficient amount of water to justify that cost. - - -- -It's 5:50 p.m., and Jim Mathews leaves to catch a plane back to Austin. - - - -- Reeves Hayter: Next week, officials with HDR Consulting will meet with us. If you have questions of HDR Consulting, e -mail them to Shawn no later than Monday. That will allow our consultant to be with us Thursday, June 5. Today, our agenda was very full with Mr. Mathews, and I expect our agenda next week will be very full with the engineers' presentation. They're going to counsel us on any aspects of our study that require engineering expertise. That would be the capacity of the lake, capacity of Lake Crook, the future water use of our city. I would anticipate they would probably look at our population projections. Shawn: This group specializes in water resources, so they will be looking at the full gamut of anything out there related to potable water, non - potable water. Don't hesitate to ask any question. If you'll email me, so I can cut and past them right in. I'm going to try to get them the questions sometime Monday afternoon so they'll have time to look over them and be here Thursday to answer those questions. We also are arranging for some folks from the Corps of Engineers to meet with us, on July 10. A lady by the name of Jan Hotuddy is going to be here along with Mark Ellison, the guy over pat Mayse Lake and several lakes in Oklahoma. Jan is a hydrologist. An expert on water re- allocation, etc. j MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, JUNE 5, 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:00 p.m. City Clerk Janice Ellis called roll. Members present were Herb Campell, Dennis Chalaire, Reeves Hayter, John Kruntorad, Rick McDougall, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, Richard Quarles, and Dan Smith. Ex- Officio Members present were Renee Harvey, Jim Kays, Ray Ball, and Bob Campell. Ex- Officio members absent were Byron Billman and Frank Wright. Alternate member Joan Mathis was absent. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. Darrell Cline, the city's water rate consultant was in attendance. 2. Citizens forum. No one spoke. Question and Answer session with HDR Engineering. (See Exhibit "A" attached) Chairman Hayter introduced Ken Choffel, Corey Shockley, and Sonny Kretzschmar. Ken Choffel addressed questions presented by the Committee. Mr. Choffell said potential obstacles facing Irving concerning the transfer of water from Oklahoma to Texas included environmental issues, water quality, and physically transporting the water across Red River. One question proposed was what was an acceptable recreational level for the lake. Mr. Choffell told the Committee it depended on the type of recreation and that everyone had a different opinion. Another question asked was how many droughts were projected in a 100 year period. Mr. Choffell estimated that once every 100 years there could be a five year drought and maybe two or three times over 100 years there could be a three year drought. He said if rainfall fell short by 4 inches a year for the next 50 years the effect of the current water supply safety margins for daily use would depend on if during the drought water came from stored water or running water. Mr. Choffell said they would be looking at probably two years in duration in determining whether a more favorable allocation for the conservation pool is possible. He said some issues included wildlife, the state park and the cost which would be determined by the Corps of Engineers. He also said that current capacities would need to be looked at to evaluate potential system operation Page 1 of 2 of Lake Pat Mayse and Lake Crook to improve combined yield of both parties. Another question raised was the evaluation of potential uses for return flows of raw water sold to Lamar Power. Mr. Choffell said they would need to obtain additional data prior to making a determination. Mr. Choffell informed the Committee that he did not believe there was much ground water and there had been a lot of opposition every time that issue comes up. Chairman Hayter inquired who would receive HDR's report. Mr. Choffell said their report would be going to the Committee. He said they would be reviewing and evaluating the City's water contract. There was discussion about two different methods in evaluating sediment in Pat Mayse. Chairman Hayter said he was not comfortable with estimates. Ray Ball asked Ken Coffel if there was information he thought was important that the Committee had not inquired about. Mr. Coffel emphasized constructing a contract to protect the interest of Paris. He referenced the amount of water it would take to justify building of a pipeline, interruptible amount of water during wet and dry years, the city's future use, the four big water contracts, commitment for a specified number of years and review prior to expiration. He also suggested during the term of the contract, the entities work together to bolster supply from other sources. 4. Review and discuss the briefing books. Shawn Napier presented the Committee Members with additional handouts for their briefing books. 5. Possible future agenda items. It was a consensus of the Committee to count this meeting as a regular meeting and next meet on June 26t1i 6. Adjournment. There being no further business, a motion to adjourn the meeting was made by Herb Campbell and seconded by John Kruntorad, motion carried unanimous. The meeting was adjourned at 6:10 p.m. 41-1 Approved this:9 day Page 2 of 2 Questions for HDR Engineering t Given HDR's recent experience would you please discuss the (potential) obstacles facing Irving concerning the transfer of water from Oklahoma to Texas, specifically to Pat Mayse Lake. Given HDR's knowledge of current Paris waste streams (industrial waste, the waste water > from the city's waste treatment facility, etc.) can you give your opinion concerning the feasibility of capturing those waste streams for sale, i.e., is there enough waste water to be worth pursuing at nominal sale rates? If surface water from other East Texas counties, e.g., Red River County, Bowie County, etc., are available what are the impediments in securing such water if those counties do not have a recognized water control board? Is HDR aware of any municipality which has sold bonds to construct transport facilities to transfer such waters? What is the current status of the TWDB water availability model that would be applicable to Pat Mayse? At one time there were some problems with the Red River Basin model, and it was being reworked. 5 During a normal rainfall year (42 ") how many days does water flows over the spillway? On a normal daily basis how much water flows into Pat Mayes vs. City drawn down? (i.e. 60. net gain or loss) .1 At the end of the 2067 (100 yr.) useful life of Pat Mayes, after fully silted according to projection, how many gallons of water will be available daily? -:� What is the acceptable recreational level currently, how far below overflow is that? In a projected 100 yr life span of the lake, what is the total number of years figured for excessive (over 42 ") of rainfall ?. In that same 100 year projection, how many droughts years are projected, 1 yr -3 yr, and 1 yr - 5 yrs ? k0 If rainfall just fell short by 4 inches (10 %) a year (from 42" to 38 ") for the next 50 years how would that effect the current water supply safety margins for daily use? 1 From Jim Mathews: During yesterdays meeting of the Lake Pat Mayse study committee I suggested that the committee request the City's engineering consultants to evaluate strategies that could potentially increase the yield of Lake Pat Mayse or otherwise increase the amount of water available for sale. Although I described this as primarily an engineering exercise, I was asked to identify issues that could be evaluated. My suggestions are as follows: Exhibit "A" 6 -5 -2008 Reevaluate the firm annual yield of Pat Mayse Reservoir in order to determine feasibility of increasing authorized diversions. Some of the existing information may need to be reconciled. Examples include: a. Certificate of Adjudication 02 -4940 authorizes the impoundment of 124,500 acre -ft and diversions totaling 61,610acre -ft (55.Omgd). b. The City's Corps of Engineers contract identifies the conservation pool as the space between 415msl and 451ms1 and states that this is estimated to provide 109,600acre -ft of storage after 100 years of sedimentation. See Exhibit A to contract. c. Region D Plan (Table 1.10) identifies the conservation pool as 124,500acre -ft and authorized diversions as 59,750acre -ft. 2. Review the Corps of Engineers' calculations used to establish sediment pool, conservation pool, and flood pool in an effort to determine whether a more favorable allocation for the conservation pool is possible. 3. Evaluate feasibility and cost - benefits of raising the height of the dam at Pat Mayse Reservoir. The costs /benefits analysis should include evaluation of potential liability due to changes in the release of flood flows. , 4. Evaluate potential system operation of Lake Pay Mayse and Lake Crook to improve combined yield of both projects. 5. Evaluate potential reuse of return flows. Options include: a. Combine City's wastewater return flows with raw water that could be sold to the City of Irving. b. Evaluate potential uses for return flows of raw water sold to Lamar Power. Options include downstream sale of discharge through bed and banks permit or redirecting return flows to Lake Crook or Pat Mayse watershed. You should also ask the engineers to identify other potential evaluations that could be conducted. 6 -5 -2008 MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, JUNE 26, 2008 Call the meeting to order. Chairman Hayter called the meeting to order at 4:05 p.m. 2. Committee member roll call. Janice Ellis called the roll. Members present were Herb Campbell, Dennis Chalaire, John Kruntorad, Rick McDougall, Sharron Nabors, Richard Quarles. Ex- Officio Members present were Byron Billman, Renee Harvey, Bob Campbell, and Jim Kays. Members absent were Gene McWaters, Michael Moffitt, and Jim Noble. Ex- Officio members absent were Frank Wright and Ray Ball. Alternate member Joan Mathis was absent. Also, present were city staff Shawn Napier, City Engineer; Kent McIlyar, City Attorney; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. 3. Approval of minutes from previous meetings. (May 29, 2008; June 5, 2008) John Kruntorad made a motion to approve the minutes. Sharron Nabors asked that it be noted that the minutes did not include Jim Matthews' presentation in its entirety. John Kruntorad withdrew his motion. Dennis Chalaire suggested that the transcript of Jim Matthews' presentation prepared by Charles Richards be attached to the minutes. Mr. Chalaire also suggested the questions be attached for Jim Matthews, as well as HDR Engineering to the minutes. Subject to the attachments being affixed to the minutes, a Motion to approve the minutes was made by Dennis Chalarie and seconded by Sharron Nabors. Motion carried unanimously. 4. Citizens forum. No one spoke. 5. Review Goals and Objectives. Shawn Napier reviewed the goals and objectives with the Committee. It was a consensus of the Committee to make the following changes to the necessary work tasks: Current Pat Mayse stand alone yield. Receive consultants opinion of Pat Mayse safe yield Page 1 of 3 by November 13`h instead of the August 21" meeting. Reallocation of flood control storage in Pat Masse. Engineering opinion on safe yield possibly available from this source by the November 13`h meeting instead of the Octoberl6th meeting. John Kruntorad inquired if the information from Jim Matthews would be made available to the Corp of Engineers and Shawn Napier answered in the affirmative. Mr. Kruntorad asked about the fees for HDR. Mr. Napier said the current spreadsheet reflected HDR' fees would be approximately $133,000.00, but that there were some items that would be coming off of that list. He estimated HDR's fees would come in under $100,000.00 and said that anything over $75,000.00 would have to go back to Council for approval. 6. Review and discuss section 15 of the briefing book. Chairman Hayter referred the Committee to the Chart prepared by Herb Campbell. (See Exhibit "A" attached and incorporated herein) Chairman Hayter reminded the Committee that the figures were based on averages. Next, the Committee discussed data from the Corps of Engineer reflecting intake and outflow. Herb Campbell said there were physical means to keep the water from going over the overflow. Chairman Hayter said the contract did not allow for storage over 451 feet, but that the contract could be amended. 7. Review budgets for consultants. Shawn Napier went over the budget for the consultants (See Exhibit "B" attached and incorporated herein) Chairman Hayter inquired if Shawn had suggested work items that could be deleted and Mr. Napier said there were items in task 3 that could be taken out. 8. Receive questions for the U.S. Corps of Engineers. Chairman Hayter reminded the Committee to submit their questions to Shawn Napier for the July 10`h meeting. 9. Possible future agenda items. Herb Campbell asked that Mr. Napier provided an overlay of Pat Mayse Lake and Cooper Lake reflecting normal pool elevations. Shawn referred the Committee to the briefing book reflecting Cooper Lake elevations during the drought. Dan Smith wanted to know how much water Irving took out of Cooper Lake on a daily basis. Mr. Napier referred the Committee to section 12 of the briefing book. Chairman Hayter said they would hear from the Corps of Engineers on July 10`h and should Page 2 of 3 have population projections on July 24t`' 10. Adjournment. There being no further business, a motion to adjourn was made by Sharron Nabors and seconded by Rick McDougall. Motion carried unanimously. The meeting was adjourned at 5:20 p.m. Approved this day of uly, 208. Reeves Hayter, Page 3 of 3 5h11b'- .1',q,, � ZI y O C ,y, • N 3 H 0 D a .... N rn N N N N N N N N 0 0 0 0 1 0 O O O 0 0 0 0! 0 O O O V T Ut A; W N _ O T T O) O) Ol 01 Ot � T Ol cT I O) . T ' > (0 O t0 O O O (O co f0 (O O O T V T 1 - T T T T T Ol Ut Ol T T �� N N .. y - : O } L I`G N' C 3 OIOO dCC m CD D - 3 N •v .W . m I i O jw I CD - O N: y O O I<I w ln (T T OT w (O W A IT O A N (AD N(011 L 7 ti pi n O 3 O I O O (D N D) 3 G G O II> O. W Q R'I V T (A1t N J (2- O w V N OIW 4.1 A W CO I� O_ V' O O M O O W N N I W �O T 0) W 0 0 0 T � Q _ n u I WI T Iv a N d (O (O 'O (D (D (D O) S w A w o w N 01 A w w Q1 w T (D N ! O O co O N O O T (D iJ . o f •. w T A O V C" O p M S O O ON I � N O CD O O (D +�,7 � � NN N O W T A I f 0> ) N Iw � T O N - y O III�tA A W CO m (D O m ci Gi m 3 j t0 � - CD I o O W �AT A O) ' o0 W (0 O W w (O C w N O N OD co O _. W i T ((1 ND •A O W to O 0, - i 0) o '0 •U p- < j 7i D m m QO 0 < N O 'O N n I N W A 0) N -4 T T > A _ V N C Q CL r- N ��-1 Q ". a `�G 3 L` i -O N -0 O C v U cD PI) N w N T A A A O) O ? N W ! W I N O) O O 0 T C) O) Ol (TO ' W J N (O (n - 7c T 0 I m 'ITI a I"O n a G o o Q D T v I n 0) oho o Lo �O io o oLo w o U1 ID v fD 171 m m CD m -- - - D V J 13 cc (D CD N �I �r- - O N 13 W CD I.CD to O w o ?IT (wp � O O W o V O O V � O (Nn T O O w O w (An (on T 0) 0 0 0 N O O < GD m Qa 'dI= C C7 V O N I A O) A I N W W O V r (gyp -. F_ . O J Ot O h._ .. (W )1 O O N O N N v _ O A (wl) W O O 3 N W 0) T T N N -� Ut w w V! N W T w > T T 0l Ot 0 0 fO w w{ Ol_ r (D y j —�-4) T V J w (0 I w W I V A A N V W A A IT w -D w O Q) A 0.0 (O O (D A T � w O (O W J(0 A W w A (O _- (n T � Q DOj O 11 O y i Ai N o w 'J -+ V A (NT) IN TIN V W 4U D < W W v T 0) V W T V O W J J (O Ol T O A I V QD O W N N (An V -A N O A c N CO N> V w n W V 1V n O N O Q jj1 (D (<D (On W O1 ! ) (D O 0 N N w O w w C" O T w OOw ' T V (T n N T T N w w N CO O) OD (O V (O O j T A N (D w W w IA O A'N W O A w N 0) V O T A V V V (T ' V (D Ot W N w W N O N A T V A j > w N O O w O W NIA ?. T (n W J W V N ( T N O _G G% D? O Q (D' O ! 0 o W N T 101 T V T O) O (n'Ol O O N A A> w V A Ut O V N iA 0) T (O V W O N — O c�m� y O N p 'WIA W W W A A A Oo W (D (O O A A'A .PIA A: C) N O N G:....I D) (O N N 7 < < fD a) O W O V W V A w A W (D W T A w O N W O > T � w A V ! O (O > { 3 N (D Cl NN O f N p IV O N N V O V7 O) N N Ol N O) W O O O O 0 ac, 0 0 O;0 0 0 0 0 0 0 T O) O N O T 0 0 0 0 0 0 0 0 0 0 D] (D p N G O o W 9 -co (� A r T d W A d O w' T T N N. O 10 O O O O j0 O -�+ O N N O) Oo co V OD W O N O) 0) co O) w. O T co Of Of N p O W A A W W A W N 00 d1 (O N AIN Ol � (O Of O O O O O• > N W W -' i� T Cl) o V G O O N w O N T A Ul T w T A 0. `.OG, f � QI� IN C 4U N O �• Op_ m O' I I� _ W A Ot'A A AIUt ,.0 IA A A A A'A 3 0 O V I W W N (O T o A w Q A d (D N O O W W O O A! V V w N j V (O O w w O) N W A O A j N( T O) Ol T T t0 w �.D. O 47 V N n Q 7 A D) N (O A OD OTD N V J (NO T O N O V 4J N �!W D V CD y N W N •P•O A•O) pp A (0 A'O IN O A N w (D N A (0 T A W T O T 01 V p 0 0 0 0 0 0 (O 0 0 0 Vt O O) V W 0) (n O N (O T T T V N. O O O O :O 0 0 1 0 O O 0 :O 610 N O C N G O N ! M i > O O z N N J T O .Y' W O t'D V .( O W I W W A W W W A 1a N O) V O N j N l0 N W W> N T W N V "O Q O CC) C 01 I C c A 0 Vt 0 > 0 r N W 7 SIN N y N V T O O (O O A W W A V O) W N W V W I(WT it0 O T V T w 0 O O O N co O N T iA D � O ; � O (D yIN � e�i l -_ V N (O T O OV) IT T O .+ A W tr O V N T CA A .. 0_ Q I I I�, _ I W w w V• V O < - LL N O i V! W (0 N OD 0) T (0 O V J N !W w O (O .E TT j . OIT v OO ) n N w V V W •W 1-4 N N A O T To •(W (n w N W A O I V IN T N D A A 0 (n O A W A A O W W .V tV O 0 W 0 N W N W W T N p Cn N A I T T O to] OO W J l W O W T N O N O w N ' III A �O ) < DO O O ( 7 1 O (V U CW T ' w 0)•A iN V J I p w 'I Ol T O (O w w l IO O ^ .I 5h11b'- .1',q,, r+ fD r m r+ c CL. w< r) O rot m m • rrDD O 3• cn 3 cr o W =3 O cr 9° X- N K D (D rD O 90 -+ (D o O r+ > C -11 (D t'1 v yr -tn- O -h N F" i./)- O O> -P O O O �. O O O OQ O O O O O O O r+ fD r m r+ c CL. w< r) O rot m m • 3 M W m 9° X- N K 0 (D 90 -+ (D o > -11 (D v 00 W O �+ O � O l0 01 N Q. �! to 00 (D 4j*)- 00 Un (r O O ` 0 O O O O C, O 0 0 0 0 dq O O O O CD 0 0 0 0 0 r+ fD r m r+ c CL. w< r) O rot m m • MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, JULY 10, 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:05 p.m. 2. Committee member roll call. Janice Ellis called the roll. Members present were Herb Campell, John Kruntorad, Rick McDougall, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, and Dan Smith. Ex- Officio Members present were Renee Harvey, Jim Kays, Frank Wright, and Ray Ball. Members absent were Dennis Chalaire and Richard Quarles. Ex- Officio members absent were Byron Billman and Bob Campbell. Alternate member Joan Mathis was absent. Also, present were city staff Shawn Napier, City Engineer; Kent McIlyar, City Attorney; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. 3. Citizens forum. Jackie Alsobrook, 4135 Misty Lane - she spoke in opposition of selling water, but did say if water was sold at all that it should only be sold in Lamar County. 4. Question and Answer session with U.S. Army Corps of Engineers. (See List of Questions for the U.S. Army Corps of Engineers attached as Exhibit "A ") Shawn Napier introduced Randall Dobbs, consultant for the City of Irving, Todd Reck, and Steve Pettit from the City of Irving. Mr. Napier also introduced Jan Hotubee, Mark Ellison and Amy Jordan with the Corps of Engineers. (1) Mark Ellison said the minimum lake level at which the boat ramps at Pat Mayse were operation was approximately 441 feet and the maximum level was approximately 448 feet. He said with regard to road closures you get in trouble around 457 feet. (2) With regard to the conservation pool, Jan Hotubee said anything over 451 feet would cause overflow. She said there was no way to control it without construction and the process was much more involved than just putting in a gate. Prior to construction, a dam safety study would be required, as well as congressional authorization. Page 1 of 3 process was much more involved than just putting in a gate. Prior to construction, a dam safety study would be required, as well as congressional authorization. (3) Ms. Hotubee stated that the stream gauge flow was the method used to measure inflow, outflow and evaporation at Pat Mayse Lake and that it was the scientific method approved. (4) Ms. Hotubee explained they did not have the data to reflect what the daily drawn capacity of the lake would be when fully silted. She said the last sediment survey was done in 1985 and she did not know the amount of silt that had come in since then. (5 -6) Ms. Hotubee said the Corps did not have plans to increase the capacity of the lake, nor did they have the funds available to improve the capacity. (7) Ms. Hotubee said that a daily average was not used for evaporation and spillway discharge in GPD. (8) As to how much water would be available in the conservation pool should a five year drought reduce the replenishing process by just 10% per year of an average annual of rainfall 42.6 inches, Ms. Hotubee reported a determination could not be calculated without review of historic data. (9) Ms. Hotubee said there were big releases out of Hugo and she wasn't sure if those would have a big impact. She also said there was a problem in that there is an endangered species in Pine Creek and identified it as being a Ouachita rock - pocketbook, a rare freshwater mussel. (10) Ms. Hotubee said she was not aware of any mandates. (11) Todd Reek said they were looking at different options and Ms. Hotubee said they would have to conduct studies to make the determination. (12) Ms. Hotubee stated the least expensive and easiest route would be to raise the dam. She said dredging was very expensive and they would have to determine if there was toxic waste. Should there be toxic materials in the sediment, it would require special handling. (13) Ms. Hotubee said the Corps were interesting in participating in improvements and could look at options to obtain funding from the federal government. (14) An environmental impact study will need to be conducted which would be part of the reallocation study. The estimated completion of the study is five years. Page 2 of 3 5. Possible future agenda items. The City of Irving will be at the August 7 t meeting to give a presentation. Next month the Committee will received population and water use projections from HDR. Chairman Hayter announced the next meeting would be Thursday, July 24, 2008, at 4:00 p.m. 6. Adjournment. There being no further business, the meeting was adjourned at 5:40 p.m. Approved this 2"' day of J Reeves Hayter, hairma Page 3 of 3 Questions for the U.S. Army Corps of Engineers 1. What is the maximum lake level and minimum lake level at which the boat ramps at Pat Mayse Lake are operational? Is it feasible to make boats operational at lower lake levels than is now the case? 2. Is there a way to keep the lake level higher at the start of summer by not releasing water unless the level were at 457 or above, instead of at 451? We get very little of our rain in July and August, and evaporation is at its highest. Is there not a way to put a gate where the water leaves the lake so that water levels in the summer start their decline from a higher level? At what lake level does it become a problem in the parks, picnic areas, etc. around Pat Mayse Lake? 3. How accurate are the Corps' data on inflow, outflow and evaporation at Pat Mayse Lake? Just estimates? Is the data scientifically valid? Describe the processes through which inflow, outflow, and evaporation are determined. 4. What will be the daily drawn down capacity of P.M. Lake when fully silted, (2065)? 5. Does the Corps have plans or been asked to prepare plans for increased capacity at P.M. Lake? 6. Are there funds available through the Corps to improve capacity at P. M. Lake? 7. At P. M. Lake what amount does the Corps use for daily average of evaporation and spillway discharge in GPD? 8. How much water would be available in the conservation pool (415 ft. - 451 ft.) if a 5 year drought reduced the replenishing process by just 10 % per year of our average annual of rain fall 42.6 in. ? 9. Would the reduction in current spillway overflow (if water was diverted prior to the spillway) create problems downstream on flowage requirements within the Red River ? 10. Does the Corps require (mandate) certain flows through P. M. Lake that would prohibit City redirection (sale) of water that never reaches overflow capacity? 11. Would the pumping of water from Lake Hugo into P.M. Lake create problems P. M. Lake was not designed to handle? (Quicker silt accumulation, less flood control, water quality, plant. animal or recreational issues) 12. If P. M. Lake's capacity was to be increased which method dredging, raising dam, or moving upstream would increase capacity the best and be the most economical to accomplish? 13. Would the Corps be interested in participating in future P. M. Lake improvements relating to capacity building? Exhibit "A" 14. What environmental studies or permits are required when considering the sale of water from Pat Mayse? 15. When considering Pat Mayse Lake as a reservoir for increasing the lake capacity or for a storage pool, what regulatory restrictions or requirements have to be met? Does the potential effect on recreational use come into play under these considerations? 00 rn O 00 to ao o�U ! Oo v- O x vii x x X x x x v vai x Lon, X X x x V') V) Q Q Q 4 Q Q o c c c c c c N x x x x X N vii x coif X x x x X vvi N x vii UD Q Q Q Q Q Q c c c X X X X X x x x x X X V) X X vii X x N Q Q ! Q 00 c a c c c c N X X X X X N X X X N O X C A X X X - V) Ln Lf) Q Q Q Q Q Q p c c c Ln � vii X X x vii X vai X X X x X X X X X X vii Ln Q Q Q Q a 00 c c c 4-0 ` X X X x X X x x x X x a) 0)(D X x x vi 4-1 Ln Q Q Q Q 00 4-J Q W r; X X X X N X X X X ( A x X X X X I I 0 V a ¢ ¢ a -a s c c c 3 w N x x x x x x x x x� X x x x� r Q Q Q a A — v c c Jz o Y c a - m o 0 a 4) 07 J9 � E '` J Z U. ljU z A W CITY OF PARIS PAT MAYSE LAKE STUDY COMMITTEE 7 -24 -2008 INSERT IN SECT-ION 10 Sanders Creek Sanders Creek begins in western Lamar County and flows northeasterly 23 miles into Red River three miles west of Arthur City. This is one of only two creeks in Texas known to contain the Ouachita rock - pocketbook, a federally endangered freshwater mussel (Howells et al., 1997). It has been indicated that this species of mussel always occurs within large beds containing a diversity of species, thus it is likely that Sanders Creek, much like Pine Creek, contains a diverse mix of freshwater mussels (Howells et al., 1997). The candidate segments are from the confluence with the Red River in Lamar County upstream to Pat Mayse Dam and from Pat Mayse Reservoir upstream to the confluence of Spring Branch in Lamar County. (1) Biological Function- no significant biological function identified. (2) Hydrologic Function- no information available. (3) Riparian Conservation Area fringed by the Pat Mayse State Wildlife Management Area. (4) High Water Quality/Exceptional Aquatic Life/High Aesthetic Value- insufficient data to evaluate criteria. (5) Threatened or Endangered Species/Unique Communities- one of two sites in Texas where the federally endangered Ouachita rock - pocketbook has been collected (Howells, 1995; Howells et al., 1997). UFA 6 [ :1 W, RIM MAfib"""• � `'• it �� '�+;F ! �,.+�� -* . •,Fi` Fj`�'�,Gi -T # j�� � � ' 1!!'� �r�o y y ' rt ;•. ��i7 { a �� k � � � :�� »e�.r CONTENTS 1. History of Pat Mayse Lake 2. Current Water Contracts • U.S. Army Corps of Engineers Contract Synopsis • The United State of America - Water Storage Space in Pat Mayse Reservoir • Supplemental Agreement No. 1- The United State of America - Water Storage Space in Pat Mayse Lake • Campbell's Soup Company (April 12, 2004) Contract Synopsis • Tenaska III Texas Partners (March 13, 1989 assigned to Direct Energy February 27, 2006) Contract Synopsis • Panda Paris Power (September 16, 1998) Contract Synopsis • Lamar County Water Supply District (May 8, 2006) Contract Synopsis 3. Memorandum of Understanding to Exclusively Negotiate 4. Texas Water Development contract to perform a volumetric survey of Pat Mayse Lake. S. Water sales history - Fiscal Year 1997/1998 - Fiscal Year 2006/2007 6. Water and Sewer line Inventory 7. Water System Layout 8. Consultant Information • R.W. Beck, Inc. • Mathews & Freeland, LLP • J. Stowe & Co. • HDR Engineering, Inc. 9. Oklahoma Information • Article from the Tulsa World newspaper "Texas water district seeking permit to obtain Oklahoma water' • Article from the Paris News "Oklahoma may loosen its grip on water sales" • Map of Oklahoma water basins and major tributaries 7 -24 -2008 • Editorial from the Dallas Morning News "Legal case could bring water in from Oklahoma" • Article from NewsOK.com "Hugo to sell extra water to Texas City" • Article from NewsOK.com " Resources: Sale of State water faces court battle" 10. U. S. Army Corps of Engineers Information • Chapter 4 titled "Storage Reallocation" of the "Water Supply Handbook" • Pat Mayse Sediment Data • Threatened or Endangered Species 11. Questions and Answers Relating to Pat Mayse Lake 12. City of Irving Power Point Presentation 13. Articles and letters to the editor that appeared in the Paris News concerning the sell of water from Pat Mayse Lake 14. Letter from Lamar County Water Supply District in reference to the sale of water outside Lamar County 15. Spread sheet from Herb Campbell "Pat Mayse Lake Volume Released Thru Overflow Pipe" 16. Definitions of Terms and Information • Definitions • History of North Texas Municipal Water District (NTMWD) • A Message from James M. Parks, Executive Director of the NTMWD • TCEQ (Texas Commission on Environmental Quality) History • General History of the Texas Water Development Board • Upper Trinity Regional Water District 17. Ordinance No. 2008 -010 - Requiring a vote before any raw water can be sold outside of Lamar County. 7 -24 -2008 MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, JULY 24, 2008 Call the meeting to order. Chairman Hayter called the meeting to order at 4:05 p.m. 2. Committee member roll call. Shawn Napier called the roll. Members present were John Kruntorad, Rick McDougall, Dennis Chalaire, Richard Quarles, Reeves Hayter, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, and Dan Smith. Ex- Officio Members present were Renee Harvey, Bob Campbell, Frank Wright, and Ray Ball. Member absent was Herb Campbell. Ex- Officio members absent were Jim Kays and Bryon Billman. Bryon Billman sent a representative David Allen of Florida Power and Light. Alternate member Joan Mathis was absent. Also, present were city staff Shawn Napier, City Engineer; Kent Mcllyar, City Attorney; Doug Harris, Interim Public Utilities Director; and Nicki Brown, Deputy City Clerk. 3. Approval of Minutes from previous meetings. (June 26, 2008; July 10, 2008) Sharron Nabors made a notion to approve the minutes from the June 26, 2008 Lake Pat Mayse Study Committee. Michael Moffitt seconded the motion. Motion carried unanimously. Sharron Nabors made a motion to approve the minutes from the July 10, 2008 Lake Pat Mayse Study Committee with the amendment that item 4 number 14 be re- worded as follows: An environmental impact study will need to be conducted which would be part of the reallocation study. The estimated completion of the study is five years. Gene McWaters seconded the motion with the amendment. The motion carried unanimously. 4. Citizens forum. Mr. A.W. Clem of Moore Law Firm introduced leases on water in a five county area. He said we need to consider two things. 1.) Paris has not had any renovation in years. 2.) Will Paris have water in future if we sale to 3rd party? Mr. Clem presented an underground study to let the members review and determine if they think there is underground water and if it would be a solution to selling the water. 5. HDR presentation 6. Review budget update. Shawn Napier gave a handout of the Pat Mayse Lake Study Committee budget. The following people left the meeting at 5:30pm. Rick McDougall, Renee Harvey, and Dan Smith. 7. Possible future agenda items. To discuss the presentation from HDR and to obtained the information collected by the Water Development Board. Chairman Reeves Hayter announced the next meeting would be August 7, 2008 and that the City of Irving will be at the meeting. He told the committee if they had any questions for the City of Irving to email them to Shawn Napier by Thursday, July 31 @ noon. Sharron Nabors asked that Pete Kampfer present information to the Lake Pat Mayse Study Committee on the future expansion for PEDC. Chairman Reeves Hayter told the committee that he would be making a presentation to the City Council Monday, July 28, 2008 at the City Council meeting if they would like to attend. 8. There being no further business, Mr. Campbell made a motion to adjourn and Mr. Noble seconded the motion. The meeting was adjourned at 5:43 p.m. Approved this 7th day of Augu , 08. Reeves Hayter, (!J man 2 WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE CITY COUNCIL CHAMBERS 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, JULY 24, 2008 4:00 O'CLOCK P.M. A G E N D A 1. Call the meeting to order. 2. Committee member roll call. 3. Approval of minutes from previous meetings. (June 26, 2008; July 10, 2008) 4. Citizens forum (Persons desiring to address the Committee must limit their presentations to no more than three minutes. The forum will last no longer than 15- �� minutes.) 5. HDR presentation. 6. Review budget update. 7. Possible future agenda items. 8. Adjournment. POSTED: FRIDAY, JULY 18, 2008, Com , CITY HALL BULLETIN BOARD BY: WITNESS: m 4� E E O V cn J H T cv 5; a a cc O o O O d' O o O O %* O O 0 O O N O O 6 00 O I� O O 0 0. r-i O o0 N O O O M M N O O t11 -0 N � 0 O t.n 0.+ � O � f N 0y1 Cy)' V)' -tn N 0 0 rl ri t/� r, d' V -V)- 44- � O U c J }' O to to � Ln J LL 6 � c .Ln E O ) -Y °o t - DC U m w m 3: W E � : �O w O Ln V 2 1 CC -; S O O O O O O pp O O O L ° ° 00 r-I N O V)' -tn V s O O J }' O to ~ Ln � cO G .Ln E t - DC ano PO a) r-t I �J l J o� 3 CD C v rn O0 � rn � cu IL 4%0 N ^ '0 X . ■. �n c� CD o o =9:3 �(D V) O :3 Di CL m ^^3, i.1./ i..i O n O r-i- ul F1 I ■ ■■ ■o n �3� n �� M �°��� =3 3 c n 0 N @ � C- CD =3 ,rt =;; o to a, ro °" cD ro. o 3 � o C: o c Q O 3 UD CD =r to ET Ln �. ro ^^m CDL 0 �. Z ro ro CL ro 3 ro � � ro. F1 %0- O. CD n 0 C' CD l 1 rr O O • Li Z Ul • I n �3� n �� =3 3 c -h 0 cu � n O Ln ^^m CDL %0- O. CD n 0 C' CD l 1 rr O O • Li Z Ul • 9 lidamA Ma C) V. ei fop a� Wo 0 ju Ma 0 fop 0 3 Population 0 cn C) cn CD al C) M 0 0 C) C) b a C) C) 0 0 0 0 0 C 0 C) C) 0 0 CD C) 0 C) CD C) C) O 0) 0 (0 0 00 o o C) 0 C) ID 0' Ip O 0 -n CD -00 0- -U 0 0 -0 0 C) 0 0 PO 0 -U 0 .0 CD CD 0 0 0 =3 cn cn I F 0 d6i 0) Ma C) V. ei fop a� Wo 0 ju Ma 0 fop 0 3 t U It C) a) 0o00� 00 • 00 (D OO 77 Q a D- ID CD- CD- -a -a Q o• o• �,• n o rr; rr; � rD = W n W O� O O N F-s -P O 1-0 IR =r =r N ((D r-r rt =r ? 0i Cl) 7D r* (D co m 11 51 Q L Ln cu O Q a(D as � n cu _ �a c� Ln O .O -O fD � O 'v S- 0 N lQ O = � CL .;, v O Ln cn 3 D N '< O r-r O O a N 3 m O CL El M ((D c O- mC 3 CD C) O -v -v CD (D O n O -a -a 3 N = o c c (D O N @ N II it p O� ON t-► N o-po�_ O• O O ((D N !,1 n 0 • n a -• n 4 (D C C) -h 3 k a �Ul CL 3 o r 'a � as v c� a � � N ' 00 00 O O � � In G1 m N ' IIQ O Lrl ko N N O un rn m N O N N N N V 00 00 O rn rn N al o O 0 0 N V V � 00 O N Ln O W to N 00 tD Q � Ln w 01 N Ln tD O n 0 • lot I L Cr. N Retail Municipal Demand (acft) NO W A Cn 0) -4 00 (0 O NJ 0 x 0 N) C) O N) 0 O C) N) 0 M 0 O O 0 c� 3 ❑ Co ❑ ❑ 0 0 CL CD CL 0 c� 3 m lip IN.. L v CD c. D a v C- C� � O C- C D c ca co a O z 0 0 cn 1.64 71 Demand (MGD) O N p O 00 O N v ■ CD k V 0 m CD 3 O Q a, �o n � \ N O � N N � oJ O (D �- C 3 3 � O 3 � N O 7� O� co eft o x @ > 0 � 0 A C 3 =5 CL 3 c. w ui w PQ V w c o N 00 W w w O Ln �p C Ln Lnn � N NJ w 'p .p N OCD O N O w4P O co N O 1 N O � N � N N w to O ko N O N vrm aA �n o n Retail Municipal Demand (acft) A 0) 00 C) N) p 0) 0 L.1 CD O O O cc 0 O O O O 0) CI 7 64 j 3 a. O 7 c� 3 0 Sv ou CD Co o 3 0 0 CD 3 3 a. O 7 c� 3 0 o�° N* c C)OU 2: � 7 � �- r 3 ' =3 0,o0�Q0 -n to �p 3 c-3 ai ci- r-r N O Qm O O- ( (M n 0 a.o a; o m 0 70 O OJ CD p• D �- CD � p � 3 o 3 v. @ (D m 4 D n 3 cn c 0 0) CL a a o r. o � 3 a o �. C 0o 1 0) u, un N O N N O 00 w m (n N i-• V cn O O O O 00 w V cn N 00 w v rn N Un O C) o 00 w V N 0 Q1 (n N Ah O 00 w V ON N °!-+' w O w 00 w 0o V N m Ln -A. N D1 t-+ F-► U9 Ul p 3 a, ei c • F+ O Retail Municipal Demand (acft) W � U7 O v Co CD O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N O O O O O O O O O O O O O O N O O N O N O �p O W � O N O O N O Cn O N O O O a) n c 3' v CD U1 3 a r 0 0 m m Q� �0 O C6 N00:3 NC _ 07���n sv �. G) p r-r X Q" —O p O �.0 CD � :3 r) � �"r" C 3 Q �CD CO o �� 3 (n - c- O N �-+- -o O C * < C cD o �. –h O r�y- -o 3 p N O — O O @ 3 C rt � (D ca m A � q O -h N a Q. v �"' V Ln o N o 0 A Ln N O '- 'u, O0 ON Ln V Ul O Ln w u' °i w 00 � c o `-` I L„ °i °' w ul c o m a) 3 rn rD n rr A v m 3 CL (A Retail Municipal Demand (acft) N O Co O N O 00 O O O O O O O O O N O O O O O O O O O O O O O N O O N O N O N N �p O W � O N O �P O N O Ln O N O 0) 0 rot tv MI 3 m c� n v c� 3 CL (A MNPW t lid W fit A 0 Q C (D rD �o rip Ml =; CD � A 0i CD � �� a' @- `� o CD m La 0 o CD I (D o 0) =; W W N co 00 > p Ul �.o CO "o CO Q °`.,' ... �.� :, 3 3 3 o �C p �- D CD C La p -I co w (n CD ° 0 0 0 > � ol c n m W C @ n �... N F+ p1 N Ln Pr : p o o N 0-3( 0 � 0 fit A 0 Q C (D a� �o rip Ml � A 0 ul F+ A a l I I I I I 3 rOD3Ca =r N N N (D 07 ON al N0 ovao�oQ c 73 o o m c (D • m m cu 3 3 h CD a 3 &) a. Lon- Ls. x 3 c vn 3 ' n m -0 �x.a -�o3 r r cn (D O c d r� lO o @ O O '* 3m"0cu 0 w c 3 m N I art rn �0 v @ m n �o (D K 7 O c UD a o. rt O Di Ol N O r .A 3 7, a r� O C� cr cr `° 3 3 3 N 3 c 9= o CD o v a Vl C: al Nl (� (n C M. m � p C o CD 3 c =3 n m X a 3 rn ,0% ar ul tC O H C O H Oi � a c X N C f 3 O �v o 01 ,p kO cn Go N co 00 w v IN %0 O O O O O Q O O O O O -4 O Im H c a� c W cc a CL �O d 01 O lD Ln W �"` Ln CJ 1 w W Ln NJ V al l O Po N O p p m N o 0 0 0 C O fu a(A 3 Gr (A 3 3 hi O 01 O 1 1 ""o 1.4 Lq 004 0 3 rot CL (A Water Demand (acft) O K) w -Pl. Ul P P P 07 O O C) O CD N) N) po C, 0 0 (D CD :3 3 =3 0- :3 CL CD 0 0 c 0 0 =3 0 3 N) 0 3 CD O CD CL CD CL O LT O CD 004 0 3 rot CL (A t� T.P 7 6a ■ A o Ul C: rt 0 3 Ul 3 � O r—e C7 o m m > Ul m m CL 0 0 3 CU =rc� 0 n� o C: n sue. c� �O, ■ A o Ul C: rt 0 3 Ul 3 � O r—e C7 o m m > Ul m m CL �w V A O 3 3 m 3 rt (A %W*ft tO m (A o' MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY AUGUST 7 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:07 p.m. 2. Committee member roll call. City Clerk Janice Ellis called roll. Members present were Herb Campbell, Dennis Chalaire, John Kruntorad, Rick McDougall, Sharron Nabors, Jim Noble and Dan Smith. Ex- Officio Members present were Renee Harvey, Jim Kays, Frank Wright, Ray Ball and Bob Campbell. Members absent were Gene McWaters, Michael Moffitt and Richard Quarles. Ex- Officio Member Bryon Billman was absent and Alternate Member Joan Mathis was absent. Also, present were city staff Kevin Carruth, City Manager; Kent McIlyar, City Attorney; Shawn Napier, City Engineer; Doug Harris, Interim Public Utilities Director; and Janice Ellis, City Clerk. City of Irving staff included Jim Cline, Public Works Director; Todd Reck, Water Utilities Director; and Steve Pettit, Engineer. Darrell Cline of R.W. Beck and Randel Dobbs with Nathan Maier Consulting Engineers were in attendance. Approval of minutes from previous meeting. (July 24, 2008) A Motion to approve the minutes was made by Jim Noble and seconded by Dan Smith, motion carried unanimously. 4. Citizens forum. No one spoke. 5. Presentation from Pete Kampfer. Chairman Hayter announced that Pete Kampfer would not be giving his presentation. 6. Presentation from the City of Irving. Chairman Hayter said they were waiting on one of the staff members from Irving to arrive and he moved to item 7. Page 1 of 2 7. Discussion and possible action on future water demands. Chairman Hayter recognized that information had been presented by HDR and that no action would be taken at that time. 8. Discussion and possible action on a policy for committee members making presentations to the public. Chairman Hayter inquired of members a process for public education when speaking to civic clubs and organizations. After a brief discussion, it was a consensus that each presentation should contain the same information and that they would add updated information upon receipt. Several members thought it would be best if a sub - committee was formed to prepare a draft power point presentation for review by the Committee at the next meeting. Dennis Chalaire, Ray Ball and Jim Kays volunteered to serve on the sub - committee. Chairman Hayter returned to item 6. 6. Presentation from the City of Irving. Public Works Director Jim Cline gave a presentation to the Committee. (See Exhibit "A" attached and incorporated herein) 9. Possible future agenda items. Chairman announced the next meeting was scheduled for August 21'. He also said they would continue with the future water demands discussion and may have a presentation from Pete Kampfer at the next meeting. Depending on the information gathered and presentations, Ray Ball said they may have to extend their deadline. 10. Adjournment. There being no further business, a motion to adjourn the meeting was made by Sharron Nabors and seconded by Jim Noble, motion carried unanimous. The meeting was adjourned at 5:25 p.m. Approved this 21" day of August, 2008. 1 Reeves Hayt , Cha an Page 2 of 2 Subject: Transcript of Irving's presentation 8/7/08 Transcript of the presentation on Thursday, Aug. 7, to the Pat Mayse Lake Study Committee by Jim Cline, public works director for the City of Irving, and Todd Reck, chief utilities officer for the City of Irving. Also present were Steve Pettit, senior engineer in water utilities, and Randel Dobbs of Nathan Maier Consulting Engineers, whom Irving has hired to do a feasibility study. Jim Cline: we are really proud to be here tonight. we think there is some interesting future with trying to work through all these issues with pans. we have enjoyed working with shawn. and continue to look forward to that in the future. my name is jim cline. I'm public works director for the city of Irving. Todd Reck heads up our water operation, and Steve Pettit is our senior engineer. One of our consultants, Randel Dobbs, is here also with Nathan Maier Engineering, and he's doing a lot of the work on the pipeline. what I'd like to do is take a few minutes to go over our system overall and answer the question, "Why does this make sense ?" in terms of why would Irving be interested in buying water from Paris. I'd like to just cover a couple of things real quick: There were some specific questions that were asked. We'll answer those as best we can -- or at least discuss those, and then go from there. If you saw The Dallas Morning News this morning, having to do with the Hugo, Okla., agreement, that's under consideration tonight in Irving, so I've got to be back in Irving by 7:30 to present that contract. I'm not in a position to talk a whole lot about it tonight -- it's all still up in the air, but one of the reasons I particularly wanted to come tonight and really wanted to reassure you, whatever the right word is, I want to make sure you knew that is part of a picture that still has Paris in it, when we start talking about all these things. I want to make sure that is very clear, that those are not mutually exclusive, that we are still actively seeking to see if we can make this work in Paris. There is such a demand for water in the Metroplex. You know what the population numbers are doing, and you know how that's all at work, you've seen those numbers. That when you think about it logically, with a pipeline that can connect up, if it does come together, then there's a pipeline that goes right by Pat Mayse Lake, and it would sure make sense to think about that. I wanted to say that right up front because that would be the big white elephant in the room, you know, that we weren't talking about, and so I wanted to make sure y'all heard that directly from me, right up front. With that in mind, let me get this map up here and go through how our system works, and why it makes sense, and then talk a little bit about some of the questions about what we've got. Todd Reck was a big part of making this happen, and probably the most significant thing is that our water is ... we own about 45 million gallons a day right now, that we use. About 7 of that, we purchase from Dallas, and the remainder we have in Lake Chapman, or Cooper Lake. And we have an 84 -inch pipeline that's owned half between us and North Texas. It goes down from Lake Chapman to Lake Lavon, and then we own the pipeline that connects from Lake Lavon to Lake Lewisville. There's a pump station at Cooper, a pump station at Princeton, here just east of McKinney. The bottom line is there's a 75 -foot right of way with one pipeline in it, off to one side. My predecessors in the public works business made smart decisions to provide a corridor through a EXHIBIT "A" very busy area. If you've been off (Highway) 380 and seen everything that's happening there, there aren't a whole lot of pipeline corridors left, to bring water in, particularly to the west side of Dallas County, which is where there is a particular shortage. So, to see how all of this fits together, there are a couple of things that are cooking. We know Upper Trinity Regional Water District is working on Lake Ralph Hall, and ultimately that probably ties into our pipeline. Then we've got Hugo and Pat Mayse, and it's important to talk about them both because you can see how they fit together, because they are so close. And also, the Muddy Boggy Basin that comes in here. So there are a lot of pieces that fit together with establishing a smart corridor through this area. Look at a pipeline from Pat Mayse running down, either to Cooper or in another alignment that somehow or another gets to our pipeline as quick as we can. That's why with that infrastructure in place, with that pipeline, that we are so interested in trying to make it work. Because not only are we trying to meet our needs, which is about 35 million gallons a day, or 39,000 acre feet. That's our total need. We are going to meet part of that with re -used water, conservation, and ... we're working all kinds of options. That would get us up to about 80 mgd total. We have about 45 mgd right now. That's ultimate buildout. You have to remember, too, when you talk about water supply, this is 20 -year or 30 -year horizon sort of stuff. Or even longer. We're talking 20/60 for the ultimate demand. And so, how can we make that happen within the resources we have and within the resources available in the region, and what makes sense. Question: What about the Lower Bois d'Arc? Jim Cline: Lower Bois D'Arc? I don't know. That's a North Texas Municipal Water District lake. Question: But you're partners with them. Jim Cline: Not on that particular lake. I don't mean to be short with you, but that's not part of the plan that they've got right now. I don't know a lot of the issues with Lower Bois d'Arc. I'd defer to someone else about that. Todd Reck: Our partnership with North Texas is strictly with Cooper and the first 40 miles of the pipeline. We share the pipeline and the intake pumping facility. They discharge into the creek just north of Lake Lavon, and our pipeline splits off and continues all the way to Lewisville. Jim Cline: Their area is Richardson, McKinney, Plano, Frisco, and all that, and then there's kind of gray area you get into Upper Trinity, and everything south of there is in Dallas, in the Dallas Water Utilities area. Let me finish the story, too, on the pipeline. We bring our water to Lake Lewisville; our water is all treated by Dallas. We have a long -term contract with Dallas Water Utilities. We have some storage in Lake Lewisville that we purchased -- 9700 acre feet. And then in Carrollton, just downstream of Lake Lewisville, is the Elm Fork Treatment Plant, where our water generates from. It enters the north end of the city, and we distribute it throughout. There's another plant by Bachman Lake that we can get some water from. We have another access point, but it's the same Trinity River. It just pulls it out a little farther downstream. So that's kind of how our system works. The water basin for Lake Cooper is up here, for Pat Mayse is here, Hugo is up this way. What we take out of Lewisville will be allowed to go over the dam because it's water we put in that lake. It's an interbasin transfer; it's coming from Region D and going into Region C. And so that's where the re -use comes in; since it's new water we have certain rights to the re -use. And we use that for irrigation and for cooling towers maybe. We just got a report on that this week, so we're kind of sorting through it. But that's part of our obligation to be part about our resources. We can't be ... about finding all the new water without thinking how can we be better about conservation, how can we better about recycling water, and stuff like that. Todd Reck: This map here, you'll see there are a lot of red lakes shown. These are not lakes we have a partnership in. These are just part of the whole picture. Jim Cline: This is Marvin Nichols, which is a big deal in a lot of places, and very sensitive issues. We particiPated in a study on that, but we are not a partner on that lake. One of the things that my predecessors in City Council in Irving established was our commitment to the long term, and to look ahead. And we're debating whether it was the late 50s or the early 60s when the whole issue of increasing the size of Lake Cooper and to build the pipeline, all that. This is the pipeline that we own 50 percent of, here, and then ... Todd Reck, we have 35 percent of Lake Cooper, 39 percent? Todd Reck: in that range, about a third of the capacity, roughly. Jim Cline: We've hardly had some experience dealing with our partners on who draws how much water out of the lake, and how fast. So we've got some experience. One of things I presented to the (Paris) City Council when we brought this whole agreement is, we learned a lot with Cooper. About the time we started pumping water, which was in June of 2003, is when the drought started, and the lake got real low, and we know that and we learned a lot of lessons from that. We want to take those lessons and apply it here and in other places. That's a big deal. Recreation benefits of the lake are significant, and community impact with dropping the lake level real low are a big deal. We recognize that and that's something that we know is going to be a big part of this whole discussion. I'd rather talk about Cooper than let it be an unsaid topic. Because the level of Cooper Lake got real low, no doubt, and we're not going to argue about that. So, that's our story, on how we do our water. Now, the questions. I believe there was one question on drawing water from October through May only. ° Q -Would the City of Irving sign a contract with the City of Paris that would specifically provide little or no water from approximately mid -May through mid - October, and then provide the majority of water from mid - October through mid -May? A -One of the things is, we never say never in these things, OK? But let me say there are some issues with that, because one of the things we are trying to develop -- and again a lesson learned on Cooper -- is we need a diverse water supply, and multiple watersheds, where we can make sure we can provide water to our citizens without grossly impacting somebody else. The concern I've got is if we say the only time we pull water out of Pat Mayse is effectively during the off - peak months, that's exactly it, it's the off -peak months. The water that our peak demand is in is during those same months. So that becomes difficult. We need to analyze that and figure it out. It impacts the value and impacts the feasibility of the pipeline, and does it make sense? It is difficult if we can't pull the water out during the summer months, because that's when we have our highest demand. And we have limited storage. Now we can store water in Chapman; we have rights to do that. We can store some water in Lewisville. As I said, 9700 acre feet, which is say 10,000 out of, we're closing in on needing probably 75,000 to make it through the end of the year. I'm just using rough numbers, OK? So a small portion of what we've got would get us through a couple of months if the pipeline has to go down, or something like that, or we have an issue with the lake. But it's not enough to make a year, for instance. So, that's the story there. Bottom line answer to the question is, it's difficult, OK? And so we need to talk through that. That's an operating question, and how this sorts itself out with multiple lakes, hopefully, and how all those pieces come together. ° The next question: what effect would a vote in May 2009 on water sales have on Irving in relation to your schedule and the MOU, and if the contract is done, what would be a reasonable time frame for the taking of water? Well, let me talk about an election in May, and how that works. First of all, let me tell you something our mayor said, when he came in and made a presentation, was that what happens in Paris with Paris' water is Paris' business. OK? The city of Paris and the citizens of this community, if a vote is what it takes, that is your decision. That lies in your community and how you wish to do that. Would a vote in May negatively impact us? Well, we hope that it would be positive, and the right terms, and all that. But I do not think that is a problem in terms of our overall schedule, OK? Again, the only way this contract works, the only way this really comes together, and we've go to talk long -term relationships and long -term deals, it has to make sense for Paris. It needs to make sense for both of us. Make financially resource preservation, all those issues. This has got to make sense for both of us. If the City Council of Paris has made the decision that an election will be required, those are the rules of the game; we're there. We obviously have an opinion on that. We want to buy water, on the right terms, but those are local decisions that have to be respected by us. And no, it wouldn't impact our ability to make the project feasible. We're a good ways away from building a pipeline and ... Question: How far away, supposing you get a positive response? Todd Reck: At least five years, probably more like seven, by the time we get through the permitting processes and acquire the easements and design the pipelines ... Jim Cline: It's a couple years to build it, a couple years to design it, a couple years to permit it. So, those couples turn into a lot, depending on how the public input goes, and the agency review time, and all the issues, and there are a lot of moving pieces with this. But that's the kind of timeline you're talking about. Todd Reck: When we built that second phase, that line on the map in blue, 33 miles, 72 -inch pipeline, it's about a five -year project from beginning to end, and that was moving really fast on a lot of things. That's a best -case scenario I'd say. Jim Cline: But that was design and construction? Todd Reck: Right. That's planning, picking the route, acquiring the easements, design, all the different steps. Todd Reck: 84, the first phase, we can get 220 million gallons a day through that line. That would require some other pump station improvements. The line itself can accommodate 220 million gallons a day. Jim Cline: And as I said before, there is room for a second pipeline in the same corridor without the acquisition of new easements. Question: Out of curiosity, have you put any thought into, with a positive response from both Oklahoma and Pat Mayse, or Paris, what the pipeline size would be from here to Cooper? Jim Cline: Don't know. It's probably on the same order of magnitude. There are other pieces that factor into this, and once more I'd just say stay tuned and see how things develop. That's all I would say at this point. Todd Reck: There are a lot of iterations we are looking at on pipeline size, and routing, and trying to factor in all these different combinations and how it would work. Question: Do you have the ability to buy more storage? Jim Cline: We don't. Not of a significant amount, because you're talking about thousands of acre feet that you would need to store, which is another lake. One of the things that makes Pat Mayse so attractive is that the lake exists. It's already here. Someone already has the water rights to it that we can contract with, potentially, if it makes sense for the community. Question: Capacity is 220 mgd. That's going gangbusters with new pumps and the same pipe. herb: one acre foot is 325,851 gallons. So three acre feet is about a million gallons. Jim Cline: you have to keep in mind that that's peaking. Our average daily use is 45 mgd in our community. OK, yesterday was closing in on 67 or 68. It's getting real close to 70, which is our cap coming out of the Dallas Treatment Plant. So when we talk about peaking, that's where some of these numbers become really important. When you think about do you have the water you need at the time you need it. We talk about water supply in terms of averages, but at the end of the day you've got to deliver it to the plant in the right quantity at the right time. Question: How much water do you need? Todd Reek: we're looking at 20 to 25 mgd, somewhere in that range. Jim Cline: The key question that I would request that the committee answer -- and your consultants, and the whole group that you go through -- No. 1, does it make sense to sell water to Irving, or anybody else for that matter. And No. 2, under what terms. Cost is part of that, but a big part of that is what is the dependable yield? When do you cut us off? Is there a zero level on the lake when you stop pumping out of the lake? If that's the case, that factors into the water availability, you know, and how reliable that source is. That tells us, based upon that reliability, how much we can depend on it for our future supply and can that factor into everything else we have going on so when you look at Pat Mayse and Cooper, how do those two factor together? Does anything in Oklahoma ever work out? We don't know. Part of the Region C plan actually calls for Irving, as an alternate source, to get water from Oklahoma. So, you know, we're within the bounds of our plan, in which one of our alternatives for water is Oklahoma. In fact, there's a specific project that's called for. But we've been kind of coloring between the lines, so to speak, and in terms of making that work. Question: Is it cut and dried that the pipeline from Pat Mayse would go to Lake Cooper? Jim Cline: Oh, I wouldn't say that. There could be other alignments. That's what (Randel) Dobbs is working on right now. A lot of it isn't just the miles. It's hill and dale, what you have to go over. Because you could be paying as much in pumping costs, as you do in debt service on the pipeline. And so you're consultants run those numbers. With electricity, pumps, pipes -- everything that comes with operations and maintenance -- and then you got to pay the debt service on the pipe. So those are the pieces; when we do our economics that's what we look at. It's what it's going to cost to build a pipeline, to operate that pipeline. We talk in terms of ultimately having to replace that pipeline, because at some point that pipeline has to be redone. Now, I'll be dead and buried. I'm 46, and supposing we have a 60 -year renewal on something, and I was thinking, wow, if I'm 106 and I'm alive to see that renewal come around, I'm sure that will be an interesting day. They'll have to wheel me in for that. I want to be clear. You brought up a really good point. We talk a lot about Chapman and Cooper; we talk a lot about Pat Mayse and other things. The question is, we don't know exactly how we would get the water to Irving. We know ultimately it needs to get to our pipeline, and ultimately it gets to Lake Lewisville. There are a couple of options we're looking at, and we'll be sharing that with your City of Paris staff; there are no secrets. Within the bounds of right of way discussions and dealing with individual property owners, but the big picture is not going to be a secret. There are a couple of options; they make difference sense for different reasons and we have to evaluate those. Again, the question that I would humbly ask the group, is: does it make sense for Paris, and under what terms and conditions? That kind of sums up what we've been talking about in our discussions. And I want to be clear: we have to be respectful of the needs of the citizens of Paris and the leaders of Paris, and we will do so. We will be here if you need us at these meetings. We'll provide the support you need. We're about two weeks out from having a web site up that when your citizens want to look up some of this information, we can have it on the web and let them do so. You know something? Again, we learned a lot of lessons with Cooper in the drought. From a water supply perspective, the lake performed the way it was supposed to. Basically, it provided water until the drought ended; then it filled back up. It didn't provide water ... it provided an environment ... and we paid for it. I mean, we paid for our part of it, and all that, but when you look at a stewardship angle, if there was a better way to be a steward of the lake, multiple lakes, by managing our water differently ... That's one of the reasons we are so interested in Pat Mayse and some of these other locations. We don't want to drain Cooper Lake. you know, that's not the best way. I mean, the bottom of the lake is not the best thing to be putting into your pipeline. We want to be managing that very efficiently and do the right thing, OK? So there's a part of that that goes into this as well. A diverse water supply makes sense for our citizens for a number of reasons. Again, I want to say we learned a lot of lessons, and we're trying to carry that forward. That's why I want to be very upfront about that, that how Cooper Lake went was a function of a number of things, but that is one of the things we're trying to avoid as much as possible. I don't know how other people, any other agency or person may have said this, or stated it, but it's got to work for us, and it's got to work for Paris. And we'll be respectful of that. Question: In terms of bringing water from Oklahoma to Pat Mayse, a problem we already have is everything over 451 feet just goes right out the valve. Would you address that? Jim Cline: All that is still up in the air, so I want to be very circumspect about that one. Once things filter out, we can sit down and have a long talk about that. We want to know under what conditions it would make sense. It may not make sense, but just take any other facility in the world. It might make more sense for the pipeline to go by, rather than pumping water into a lake. You know, it may make more sense to not dump it into Chapman; it may be better to bring it into a pipeline. And that's what may make the most sense; we don't know. Let me be very hypothetical, but if that would be viewed as a negative impact and wasteful, I don't want my water rolling over your dam. If I'm paying to pump it, and paying dearly for it, I really don't want it to go down the river, OK? So I'm going to be a little smarter than that, than to waste it over the dam. But yes, there are a number of different ways it could work, a number of different possibilities. I think the key thing is, what kind of water supply could come out of the lake that the community would find acceptable. There's lots of pieces to this that will take some time. Again, I don't want to rush. My point was not to come in here today and say what are you guys going to do? You know, elections .., those are decisions of the City Council and we'll be respectful of that. Question: What are you going to do if the citizens turn it down? Jim Cline: We'll look somewhere else. Much like we're talking to Hugo, I'm not stopping talking to Paris. That's part of my message today. I wanted to make sure y'all heard it directly from me, that we're not bailing out because we may have found one thing. It's a long way from being done, and there's a lot more demand than a lot of things can provide. Maybe not just in our city, but in others, and how that comes together. Again, if the citizens of Paris say no, then we've taken an opportunity to learn a lot about a lake, we've exhausted an opportunity, and we move down the road. We would hope they wouldn't. But that would be the only option I could see, is that we would move on down the road. Question: Eighty million gallons a day is what you're looking for in 2060? Jim Cline: Eighty million is our whole demand in 2060. Question: Of which today you've accounted for 45 million. So you're technically looking for 35 million a day, from whatever source. Jim Cline: That could include re -use of water we already have access to but can't implement; water conservation; another facility; a number of different things. Now keep in mind, one of the questions that came up, is there a possibility that this effort may entail more water than we need to meet our needs. Well, the question then becomes, does it make sense if this is financially lucrative for, to use an example, the city of Paris, if someone else is using .... because remember, we've got this one pipeline, this corridor that is so key, we think, and what people have told us, it's so important that we look at the opportunity to do different things. We're continuing to look for things, continuing to work for it, and we are a part of that. Todd Reck: The field work on the volumetric study is supposed to be finished by early next week. Steve Pettit: I talked to them today and the results should be ready by Monday -- the report. Todd Reck: They've been responsive and done a good job. We were concerned that they might not be able to meet the deadline, but. Jim Cline: And we've been paying for, helping to fund some of your consultants, and we've been paying some of ours. So I think we've been voting with our feet in terms of answering the questions. Todd Reck: That 80 mgd, that's an ultimate demand. I don't know if there's actually a year tied to it. It's part of a 75 -year plan that we've been looking at. It's on out there ... 2060 ... 2070... Question: Peak or average? Todd Reck: That's a good point. That's an average day demand. Now, peak day demand may be twice that, one and a half times that anyway. Question: does Irving have the right of way for the pipelines it needs to build in the future. Jim Cline: We own that pipeline. Half of the red, and all of it on the blue. We do not own a pipeline easement to build between Pat Mayse Lake and any other point. Cooper to Lewisville, that pipeline is in place. It's carrying water today. Todd Reck: it's got quite a bit of capacity still in it. Jim Cline: we have redundancy in our pumps right now, so if a pump goes down we can swap over, and that's a smart way to run a pump station. We currently have a pipeline that extends from Cooper all the way to Lewisville, either from a partnership or sole ownership. How the water might come from someplace, and what size it would be and what route it would follow, we don't know. We have some ideas. There are a couple of different obvious choices, and we've kind of pointed to them already, you know -- Ralph Hall, Chapman. Some way to tie into the pipeline that makes a lot of sense. And it depends on the topo -- you know, you don't want to have to go over a big hill because then you have to put in a big pump station and you've got to pay for a lot of electricity, and I get hammered on costs. Question: And you could put in another pipeline without having to acquire more right of way? Jim Cline: We could put in another pipeline without buying more right of way between Cooper and Lewisville. The existing one can handle our needs; it can't necessarily handle the needs of the whole area. Again, leaning forward in the saddle, so to speak, we've got another capacity to do that. If we could get somebody else to pay for a pipeline, you bet! That's not y'all, OK, but there are other people who need water. You bet we're going to get somebody else to pay for it if we could. Todd Reck: We only use about 75 mgd of the capacity right now; we could go up to 110. We own half the capacity, half of that 220. Jim Cline: we carry some water for Upper Trinity, under contract. About 23 percent is being committed to Upper Trinity. Jim Cline: we have a permit for 25 million gallons a day of re -use water, and we could purchase it from the Trinity River Authority plant, and we just finished a study on how we can best use that. The short term answer for that is if you use it for irrigation and cooling power. And frankly, in Irving, there's already a great deal of that happening. Todd Reck: there's not a demand for that much irrigation and cooling water. We're looking at about 5 to 10 mgd ultimately. Jim Cline: And what could we do with the rest of it? We don't know, and that's part of what we're continuing to look at. Again, we're keeping our eyes in several different places. We've got to zero in on something ultimately, but that's how we're doing business. Question: Doesn't some of that water that you discharge in Irving go into the Trinity River for down - the -river use? Jim Cline: It does, but keep in mind though that the reason we got the permit for that, to pull that out, is that we brought in water from outside the basin, from Chapman. We developed a water supply, in the east, brought it over the boundary, out of the Sulphur basin and into the Trinity basin, that's why we can re -use it. That was the logic for the permit. Question: Any water from here is going to go to Dallas to be processed. Jim Cline: Technically, it goes into Carrollton, but that's neither here nor there. Dallas is treating it, and we pay them handsomely to treat our water. Todd Reck: We deliver it to their plant, we pay them to treat it, and they turn around and pump it back to us. Jim Cline: If you've got anything for me, that I can answer in terms of what questions you have ... this is not the last time we'll come talk to you. We're available. I see us visiting more and more as this goes on. Shawn has been to Irving, and we've come up on some other occasions. Listen, I want to thank y'all for letting us come. Vall are putting a lot of effort into considering this, and I know that y'all are volunteers working on it, and we appreciate that. I want to thank y'all for doing that. Let us know what we can do to help you out. MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY SEPTEMBER 4 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:10 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, John R. Kruntorad, Rick McDougall, Gene McWaters, Sharron Nabors, Jim Noble, Richard Quarles and Dan Smith. Ex- Officio Members present were Renee Harvey, Jim Kays, Frank Wright, Ray Ball and Bob Campbell. Members absent were Michael Moffitt. Ex- Officio Member Bryon Billman was absent and Alternate Member Joan Mathis was absent. Also, present were city staff Shawn Napier, City Engineer; and Doug Harris, Utilities Director. 3. Approval of minutes from previous meeting. (August 7, 2008) A Motion to approve the minutes was made by John Kruntorad and seconded by Rick McDougall, motion carried unanimously. 4. Citizens forum. No one spoke. 5. Presentation from Pete Kampfer. Chairman Hayter announced that Pete Kampfer would not be giving his presentation. 6. Discussion and possible action on future water demands. Members discussed the population of Lamar County Water Supply District service area (population projections); further discussed new lakes being proposed in our immediate area. 7. Review and discuss the Texas Water Development Board Report on the hydrographic survey of Pat Mayse Lake. Page 1 of 2 Members discussed TWDB hydrographic survey; talked about sedimentation data. 8. Discussion and possible action on a policy for committee members making presentations to the public. Sub - Committee provided draft presentation. Members will wait on final TWDB /HDR stamp on hydrographic survey and population projections. 9. Possible future agenda items. At next meeting on September 18, 2008, U. S. Army Corp of Engineers input on bydrographic survey. Educate the public on the issue. Projection about worth of the water we have. Have R.W. Beck come back with a presentation. 10. Adjournment. There being no further business, a motion to adjourn the meeting was made by Dan Smith and seconded by Rick McDougall, motion carried unanimous. The meeting was adjourned at 5:17 p.m. Approved this 18th day of September Page 2 of 2 ia LAS /51RFF.' eF ��� ,4F Ork 12tj t;� 1 -6 0,-(t 06( t '05 -((0 -IL Pilz L A 6P z�.�u t Vu fZ*P1 -���- j2 CFA �r�l� �J GIs ��kli ,,2 C 1v\ P 1� ( MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, SEPTEMBER 18, 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:04 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, John R. Kruntorad, Rick McDougall, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, Richard Quarles and Dan Smith. Ex- Officio Members present were Renee Harvey, Jim Kays, Frank Wright, Ray Ball and Bob Campbell. Ex- Officio Member Bryon Billman was absent and Alternate Member Joan Mathis was absent. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; and Kent McIlyar, City Attorney. 3. Approval of minutes from previous meeting. (September 4, 2008) A Motion to approve the minutes was made by Herb Campbell and seconded by John Kruntorad, motion carried unanimously. 4. Citizens forum. No one spoke. 5. Discussion and possible action on future water demands. Renee Harvey spoke on population projections (Texas A & M Real Estate Website) 6. Presentation from Darrell Cline with R.W. Beck on pricing raw water. Darrell Cline ga��vl1err 11a power point presentation on pricing raw water. Page 1 of 2 7. _ Discussion and possible action on a policy for committee members making presentation to the public. T� -t.-5 cows --f#Ce ruked r cdc��f�a�...�rti� -t.• kRic KMcDoAiKssuggest searchin ,grater qualWXated iss es intro du(Na Hum Lake at Ma)*/�c!Bob CaImpbel brobht ij� City Of, water 8. Possible future agenda items. Rick McDougall suggested researching water quality related issues of introducing Hugo Lake Water into Pat Mayse. Bob Campbell brought up City of Paris water conservation program. 9. Adjournment. There being no further business, a motion to adjourn the meeting was made by Herb Campbell and seconded Dennis Chalaire, motion carried unanimous. The meeting was adjourned at 5:29 p.m. Approved this 2nd day of October, 2008. Reeves Hayter, Chairman Page 2 of 2 MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, OCTOBER 30, 2008 Call the meeting to order. Chairman Hayter called the meeting to order at 4:05 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, John R. Kruntorad, Rick McDougall, Michael Moffitt, Sharron Nabors, Jim Noble, and Dan Smith. Ex- Officio Members present was David Allen sitting in for Bryon Billman, Renee Harvey, Jim Kays, Frank Wright, and Ray Ball. Members absent were Gene McWaters, and Richard Quarles. Ex- Officio Members absent were Bryon Billman, and Bob Campbell. Alternate Member absent was John Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; Rodney Brashier, Utilities; Ken Choffel and Cory Shockley, HDR; Randall Dobbs, Nathan D. Maier; Todd Reck, City of Irving; Pete Kampfer, PEDC; Charles Richards, Paris News. 3. Approval of minutes from previous meeting. (October 2, 2008) A Motion to approve the minutes was made by Rick McDougall and seconded by Dan Smith. Motion carried unanimously. 4. Citizens forum. No one spoke. Presentation from HDR on Pat Mayse /Lake Crook models and results. Power point presentation by Corey Shockley of HDR on "Water Availability Summary for the City of Paris ". See Exhibit A, "Water Availability Summary for the City of Paris" (Committee Members see Briefing Book Chapter 18). Asked HDR to come back in six weeks. 6. Discussion and possible action on a policy for committee members making presentations to the public. Policy for committee members making public presentations: Dennis Chalaire provided members with a power point on "Public Presentation ". He went through the entire presentation for the committee. 7. Possible future agenda items. Goals and Objectives; HDR in six weeks; Holidays coining up(how 2 schedule meetings ?) 11/13/2008 next meeting; 12/11/2008 next meeting. 8. Adjournment. There being no further business, a motion to adjourn the meeting was made by John Kruntorad and seconded by Dan Smith, motion carried unanimous. The meeting was adjourned at 6:00 p.m. Approved this 13th day of November, 8 Reeves Hayt r, Chairman MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, NOVEMBER 13, 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:03 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Dennis Chalaire, Reeves Hayter, John R. Kruntorad, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, and Dan Smith. Ex- Officio Members present were Renee Harvey, Jim Kays, Frank Wright, Ray Ball, and Bob Campbell. Members absent were Herb Campbell, Rick McDougall, and Michael Moffitt. Ex- Officio Members absent were Bryon Billman. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; and Charles Richards, Paris News. 3. Approval of minutes from previous meeting. (October 30, 2008) A Motion to approve the minutes was made by Dan Smith and seconded by Jim Noble. Motion carried unanimously. 4. Citizens forum. No one spoke. S. Discussion and possible action on the power point presentation to the public. Power Point Presentation by Dennis Chalaire on Public Presentations. Discussion about including peak day information, and possible reduction in number of slides to approximately 10 or 11. 6. Update goals and objectives. Power Point Presentations by Chairman Hayter on initial Deliverables and Objectives. (See copy of Power Point Presentation.) 7. Possible future agenda items. At next meeting on December 11, 2008; HDR to address committee. 8. Adjournment. There being no further business, a motion to adjourn the meeting was made by Sharron Nabors and seconded by Richard Quarles, motion carried unanimous. The meeting was adjourned at 5:47 p.m. Approved this 11 `h day of December, 20 8. Reeves Hayter, Chain'an MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, DECEMBER 11, 2008 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:03 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, Gene McWaters, Sharron Nabors, Jim Noble, Richard Quarles and Dan Smith. Ex- Officio Members present were Jim Kays, Frank Wright, Ray Ball, and Bob Campbell. Members absent were John Kruntorad, Rick McDougall (resigned), and Michael Moffitt. Ex- Officio Members absent were Bryon Billman and Renee Harvey. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; Shannon Barrantine, Chamber of Commerce; Ken Choffel and Cory Shockley, HDR; David Nabors; John McFadden and Charles Richards, Paris News. 3. Approval of minutes from previous meeting. (November 13, 2008) A Motion to approve the minutes was made by Sharron Nabors and seconded by Richard Quarles. Motion carried unanimously. 4. Citizens forum. No one spoke. Presentation from HDR Engineering. HDR presentation (see Power Point Presentation in Section 18 of the Lake Pat Mayse Study Committee Briefing Book). Draft report from HDR by January 22, 2009, HDR and Jim Matthews will meet to discuss information. 6. Discussion and possible action on the power point presentation to the public. Power point due by January 08, 2009. 7. Update goals and objectives. None Possible future agenda items. Meetings schedule for January 08, 2009 and January 22, 2009. 9. Adjournment. There being no further business, a motion to adjourn the meeting was made by Gene McWaters and seconded by Herb Campbell, motion carried unanimous. The meeting was adjourned at 5:20 p.m. Approved this 8�' day of January, 2009. Q'-�4 Reeves Hayte , Chai an MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, JANUARY 8, 2009 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:08 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Dennis Chalaire, Reeves Hayter, Gene McWaters, Sharron Nabors, Jim Noble, Richard Quarles and Dan Smith. Ex- Officio Members present were Jim Kays, Frank Wright, Ray Ball, and Bob Campbell. Members absent were Herb Campbell, and Michael Moffitt. Ex- Officio Members absent were Bryon Billman. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; Shannon Barrantine, Chamber of Commerce; David Nabors; Mike Tibbetts, Hayter and Charles Richards, Paris News. 3. Approval of minutes from previous meeting. (December 11, 2008) A Motion to approve the minutes was made by Dan Smith, and seconded by Sharron Nabors. Motion carried unanimously. Committee members asked Charles Richards to type minutes from his tape recording for the January 08, 2009 meeting. (See attached) Announced Rick McDougall resigned due to business constraints. 4. Citizens forum. No one spoke. 5. Discussion and possible action on the power point presentation to the public. Dennis Chalaire discussed the power point presentation for the public. The presentation is down to a total of thirteen slides. Bob Campbell discussed adding peak day information. 6. Review budget information. Budget amounts provided by Shawn Napier. 7. Possible future agenda items. Wait on HDR Report — No meeting on January 22, 2009. Pete Kampfer presentation on February 5, 2009. Have Jim Matthews come back to address committee (to be determined). Invite Texas Parks and Wildlife to speak to committee. 8. Adjournment. There being no further business, a motion to adjourn the meeting was made by Dan Smith and seconded by John Kruntorad, motion carried unanimous. The meeting was adjourned at 5:20 p.m. Approved this 5th day of February, 2009 Reeves Hayter, Ch a rman 5M-P-t NAllm. MT4, 0 ltDB(�Z00t� Of�i�w— � t+: D,9 PM SID To �(�Vy �► � � n /'��Wf3-T � SIPA &a �—ftM POEd-,,— j N art �i�(�I°.A� F -CA.e. aMlz!F -5, KUktR -� �4m Rwiw -Pact, ��S�tr( 5 �w1-- Omw, � Kim `�G�c�s- �-�-Mr� c t�I�o wst> D�1�LS C4K�- (ice Pd Xr4 . P[t V30C -,-- D2W YJ FJo P3 CPb -7. &��jrC (N ��WA �ftPilvz - No Mr6 , Df l Q t 1-142b[ wW�R* og ��P- �PrS �� rL Il�t VbL(F E °rD IiPEft-K TV-l;- . PML Study Committee members: As requested, here is my transcript of the tape recording of the meeting of the Pat Mayse Lake Study Committee at 4 p.m., Thursday, Jan. 8, 2009: First item, committee chairman Reeves Hayter called the meeting to order. Hayter: "We probably are going to have a very short meeting today. We lost our meeting space temporarily, and we are unable to televise our meeting from this room. I didn't realize, but apparently there are people who watch us on TV. We have a Nielson's rating of some kind, probably single digits. I bet we're not up there with Monday Night Football. At any rate, we probably are going to restrict ourselves to very routine business. Do we have a roll call ?" Present were the following members appointed by the Paris City Council: Reeves Hayter, Dan Smith, Sharron Nabors, Jim Noble, Gene McWaters, Dennis Chalaire, John Kruntorad and Richard Quarles. Absent among the council's appointed members were Herb Campbell, Rick McDougall and alternate Joan Mathis. From the ex- officio members appointed to the committee, present were Robert Campbell, Lamar County Water Supply District; Frank Wright, Kimberly Clark; Jim Kays, Sara Lee; Renee Harvey, Chamber of Commerce; and Ray Ball, Lamar County Commissioners. Absent was Bryon Billman, Lamar Power Partners. A quorum was announced as present, and the meeting proceeded. Third item, approval of minutes. Minutes of the committee's last meeting on Dec. 11, 2008, were approved after a motion by Dan Smith and a second by Sharron Nabors. Hayter: "In connection with roll call and the approval of minutes, I don't know that I announced at the last meeting that Rick McDougall has resigned from the committee. Rick resigned because he has got some business activities that are going to take him on extensive travel over the next two months, so he thought it would be better if he did that. We hate to lose him." City Engineer Shawn Napier: "I did talk to the mayor about that. Because time is of the essence and we are near the end, we are not going to be replacing him." Fourth item, public forum. No one announced as wishing to speak to the committee, and the forum was closed. Fifth item: Discussion and possible action on the committee's PowerPoint presentation to the public. Dennis Chalaire said he is waiting on some data from HDR Consulting to complete a couple of the charts in the presentation. He said all the slides have been cut and modified. He said the number of slides is now 13. He said he had been uncertain whether the committee wanted to separate manufacturing demand from steam electric demand, and at this point there are separate slides. Hayter said he felt 13 is a workable number, and no need to consolidate the manufacturing demand from the steam electric demand. Dan Smith: "I think once we finalize the presentation, we ought to think about what kind of questions do you hear that people are asking in the community. When I thought about that and looked at the presentation, there are a lot of questions that aren't part of the presentation. You know, like if you had a drought while you're pulling 55 million gallons a day from the lake, how long would it take before you lose the boat ramps - things that would interest people. After we finish it, we could think about it and maybe do a Frequently Asked Questions on the back end of the presentation. Dennis Chalaire: "We already have a FAQ list the city came up with early on." Robert Campbell: "Reeves, I think there's one thing that's left out of this presentation, that's pretty important. And that is, the peak days. And I asked Shawn to give me some information on that. The peak days in July of 2006 was 24.820 (million gallons), so that's a long way from the average 10 to 12 (mgd). I think we're misleading the public if we're just giving that information (average) without giving the peak days." Dan Smith: "How long did it last ?" Robert Campbell: "It pumped 24- something million that one day." Dan Smith: "But it would matter, the peak days, how long do they last ?" Robert Campbell: "What it matters is, if you do that very long, it draws it down pretty fast, but the thing that you have to think about is what kind of limitation do you have on the 55 (mgd). You can't pump 56, or 60, when you're limited to 55. So I think that is a ...." Dan Smith: "My question is, that's one day, and we're limited to 55 averages, aren't we? Is there really a one -day max that you can't ever go over 55? I mean, if the peak only lasted one day - it's going to last more than one day, I understand that, but it's not going to last long." Robert Campbell: "Of course, in 2006, near that peak lasted several days." Reeves Hayter: "It would probably be relatively easy to change the peak day limit, but you would have to amend the permit. But that's a good point. Do we have any peak day information in the presentation ?" Dennis Chalaire: "I have a column for that, but no numbers. I'm still looking for the actual numbers." Dan Smith: "It would be useful information." Robert Campbell: "It would give you some idea how you draw down." Dan Smith: "In other words, if you take the peak day in the worst year, which is 06, and if we could pump over the limit, and we were contracted out for 55 (mgd), then we handle the peak day for local consumption, how far would that 2' Robert Campbell: "What we've been dealing with, in this information, the average has been a thing that was said quite a bit, but these contracts, you enter into these contracts to give you the peak days, not the average. In other words, our contract, or the power plant contract, is not for the average, it's for the peak. And when we start talking about your contract is for so much more than you use, but that's not the fact. The fact is, your contract meets the peak, and if you don't meet that but two or three days out of the year, you still have to have that contract amount in order to meet your requirements." Dan Smith: "The contracts, I think, list it as per day. I understand what you're saying, but I think it's listed as average per day." Robert Campbell: "No, the contract does not provide for the average per day. It provides for the peak. In other words, when you enter into the contract, you contract for what you're going to have a need for at your highest level. Otherwise, you violate your contract if you go over that." Reeves Hayter: "But we could write those contracts - they're not written, but we COULD write those contracts in such a way to reflect an annual average instead of a peak day." Dan Smith: "Well, if you could write them to guarantee the peak day, and reflect the annual average .2' Jim Kays: "The average day, I think the highest day shown was 22 million. The lowest was actually 8 million." Robert Campbell: "But the pumping and the treatment have to be for that peak. You can't meet your requirements otherwise." Ray Ball: "I played around with that 55 million gallons a day, and tried to calculate how long it would last with no input, in an extended drought. Figuring a half -inch loss a day is about 12 to 14 inches a month - which you only has 36 feet to play with (from 451 feet to 415 feet). Taking out 12 million gallons a day, you got about 36 months worth of water. At 55 million gallons a day, which is three and a half times greater, that reduces it proportionately to maybe less than 12 to 14 months. That's with zero input." Dan Smith: "And if you added the peak, it would be lower than that." Ray Ball: "The other question you raised, the contracts say you have to produce so much good water, I mean usable water, not raw water. What is it, 30 million gallons a day at this point ?" Robert Campbell: "From a treatment plant ?" Ray Ball: "Yes." Robert Campbell: "I don't know what the maximum a day pumping is. Do we have that, Shawn ?" Utilities director David Harris: "Twenty -seven million gallons." Ray Ball: "We technically couldn't produce 55 million gallons a day of drinkable, potable water, or whatever the term is." Shawn Napier: "Not under the present set -up, no." Ray Ball: "Would we want to show that on our chart ?" Robert Campbell: "The average is meaningful, but the peak is meaningful, too. Both of them are relevant for that presentation. Again, I get back to; you've got to meet that requirement on a peak day." Reeves Hayter: "I think, as Dan said earlier, what questions people are going to ask once this presentation is made. And when we show the average day up there, the first thing people are going to say is, yeah, what's the peak? And if we show the peak, they're going to ask you the other side of the question. They're going to say we don't really use that much. So I think they do both have to be in there." Dan Smith: "And if you put that there, because we separate the contracted industries, if we have Campbell Soup separated out, and we have Lamar Power Partners separated out, and we have Lamar County Supply District separated out, I think it would be worthwhile to show what the peak day is for each of those that we have contracts with." Robert Campbell: "Of course, you have some diversity in your customers. For instance, the peak for the water district might be one day, and the next day might be the peak for the power plant, and the thing about it is, those altogether will give you some diversity. It doesn't mean that you use the high of those contracts every day." Dan Smith: "I understand that, but HDR recommended we look at re -doing contracts, so if you wanted to re -do a contract with Lamar Power Partners, they're going to still have to be covered for their peak demand days, so the story they're looking at, Lamar Power Partners, to me it would be interesting to see what is their peak day. We know what their average is, what is their peak day? Because no matter how you re -did a contract, you're going to have to guarantee the peak day." Robert Campbell: "Yeah. But when I talk about diversity, that gives you a little bit of running room for the 55 million, it gives you running room for the pumping; it gives you running room for the treatment. Diversity, the whole system benefits from diversity. If you had just one customer doing that, you wouldn't have any diversity." Sharron Nabors: Remember back in March or April a couple of years, and it got real hot and they weren't expecting it, and they didn't have the power to supply this, and Austin and Dallas and all around the state ... quit. I mean, everything just shut down. You can't (predict) the weather." Ray Ball: "With the exception of Campbell Soup, I would think we'd have not necessarily the same peak times everybody else has, it sounds like the power companies would fall in the same manner." Robert Campbell: "Not necessarily." Dan Smith: "A lot of the residential users, it was explained to me, their peak days are when they're watering their lawns. But the power companies, they're only interested in evaporation. They may not be running all their units." Ray Ball: "If it's hot, they're going to be running air - conditioning units." Robert Campbell: "The power plants sell power to different purchasers, and the thing about it, those purchasers may find a cheaper power supply from the Houston area, rather than here. So they may have only three units operating instead of four. They might be only selling capacity for three." Reeves Hayter: "If you look at the city of Paris usage pattern, as a whole, they use more water on the weekday than on the weekend, and that's because they got a commercial and industrial component. If you look at Lamar County Water, their peak time is the weekend, because that's when everybody is home using water, and they don't have any industrial customers." Robert Campbell: "Right. All that points out that there is diversity in the system." Reeves Hayter: "OK. So, I believe the point here was, we are taking care of getting the peak numbers into the presentation. OK, next item is a review of budget information. Shawn ?" Shawn Napier: "I passed out to everybody the last updated budget, as of Jan. 2, from four different consultants. One thing I am waiting on is for Corey and Ken (from HDR Consulting) to get back with me concerning our tasks list. I was going to pass out a copy of the tasks list whenever it's updated, but they were out of their offices today and yesterday, and I was unable to get hold of them. As soon as I get that, probably the next meeting, I will pass out the list that includes all the tasks, and the breakdowns of it. Reeves and I spoke to Jim Mathews this week, and also Jim Mathews and'HDR got together during the Christmas break, and Jim had a chance to review their last presentations. From what I got back, he pretty much agreed on all major concepts that HDR presented to us. Jim didn't see any major problems with anything. We'll still be working a little with Jim Mathews and with Jack Stowe, and of course with HDR." Reeves Hayter: "Now the next item, Possible Future Agenda Items, I'd like to throw out the possibility of our next meeting date ... we had talked with HDR since the last meeting, and they agreed they would submit their final report by the 22nd, which is our next meeting date. Now, that is going to be a pretty quick report, I'm sure - a substantial amount of information, and I don't expect to get it much ahead of the 22nd. In addition, I've talked with Pete Kampfer today about the Economic Development Corporation's input, and Pete has indicated he hopes to have something within the next two weeks. I asked if that could be made available to us before the 22nd. He did not promise it before the 22nd, but he did promise before our first meeting in February, Feb. 5. I would like to suggest that we receive these reports and distribute them to the committee by about Jan. 22, but not meet on the 22nd unless y'all have something you particularly want to do. I think its going take a little while to assimilate both those pieces of information. If we have other things to discuss, we can certainly meet the 22nd, but I don't see much point in receiving the reports and meeting the same day." Dan Smith: "I'm sure the HDR report is going to be a thick one. Are they going to include a PowerPoint, as if they were going to be here? It would be nice if they could, because their PowerPoint is kind of an objective summary." Shawn Napier: "I think our plan would be to let them present their report and then bring them back February 5th. You would have time to review, and get your questions together, and have they present and you ask them your questions as they do their presentation." Dan Smith: Yeah, but I was saying it would be nice if they could send out their presentation, if they have it, rather than wading through all the minutia of the full binder we're probably going to get." John Kruntorad: "I don't know that we'll have time to go over Pete's presentation and the HDR presentation on the fifth." Dan Smith: "I don't think Pete's presentation is going to be very long." Reeves Hayter: "I'm hoping we're going to get it ahead of time.." Dan Smith: "Well, we (Paris Economic Development Corp.) meet Tuesday, so hopefully we'll stay in touch." Reeves Hayter: "Just sort of a summary of the presentation." Reeves Hayter: "The other item that Shawn and I discussed with Jim Mathews is whether or not you would like to have any information from the Texas Parks and Wildlife Department. Texas Parks and Wildlife has a lot of input when we go to apply for a permit, new water rights, and things of that nature. If the committee would like to have a presentation from them, we could try to arrange that." Ray Ball: "I would also suggest that we have the attorney (Jim Mathews) back before we make our final recommendation, if we've got some alternatives to present, what the legal ramifications of those would be, too. If we're going to send a recommendation to the council that's different, he might advise us yes or no. There might be a question about recycling the water, or if we go out and reclaim more water, if we needed a heads -up on how quick we could do that, and so forth." Reeves Hayter: "I think we have about five thousand dollars left in his budget. I think we have enough to bring him back, if that's what the committee wants. I would suggest we proceed as far as we can on our own, and then bring him up at the last minute to bless whatever we do." Reeves Hayter: "The Parks and Wildlife issue, did I hear a consensus on that? Is there anyone else, any other information that anyone on the committee feels we need at this point, that we should bring in with outside expertise? In our conversation with Mathews yesterday, we came to the conclusion that some of these items that have been proposed as alternate water supplies are possible, but we don't know if they are feasible. In other words, they may be so costly that there are other alternatives for Irving to obtain the water. And one of the things I would like to see, if we have money left in the process, is a cost analysis of these documents. How many pennies per thousand will it cost? I would just say, we don't know at this point. We talked to HDR about that, and they don't know at this point what their final billing is going to be just yet, so we don't know exactly how much money they've got left. They indicated to us that it would probably be very costly to analyze all these alternatives that are in here, but we can agree in that meeting that we would finish up the part of the work that we have here and then look at the budget and determine how far we can go." Dan Smith: "I think the less accuracy we require, the less cost it would be." Reeves Hayter: "True, depending upon the level of effort that we would ask them to put in." Reeves Hayter: "All right, then I believe what I hear is that between now and our next meeting, which will be on Feb. 5, we will receive the report from HDR and the report from the Economic Development Corporation, and we will discuss those items on Feb. 5. We will also try to arrange a presentation from the Parks and Wildlife Department, and I believe that's it." Charles Richards: "Y'all probably talked about this, but I don't recall. Are y'all going to make a recommendation to the city council on whether we do it or not or just give them a report on what you have found ?" Reeves Hayter: "I believe our original scope says we're going to make a recommendation." Dan Smith: "I think that should be what we would do." Reeves Hayter: "We discussed that, viewing our scope as being that, and in the first presentation I made to the city council, I told them that that was an issue with the committee, and they said back to us that our scope should be to make them a recommendation. That was part of our charge, so that's what we're going to try to do." Sharron Nabors (To Charles Richards): "Can your tape be our minutes for today's meeting ?" Shawn Napier: "I guess that's up to Charles, if he's going to type it up verbatim like he did last time." Charles Richards: "It's a short meeting. I could probably do that." Reeves Hayter: "If you don't mind. We appreciate that very much." Shawn: "Just to recap. Our next meeting will be the fifth, but as far as when they start getting these reports in, I will e-mail those out to everybody and hand delivers them to the others (those not on emails). If we can't get those, what I'll try to do is email them as they come, as well as the PDF documents, which I think everyone here can open, but if you do have any problems, just email me back and somehow we'll get a hard copy to you." Reeves Hayter: "Is this a draft report or a final report ?" Shawn Napier: "It will be their final report, but I'm not sure that it might not be in draft form." Reeves Hayter: "If it's possible, I would like for everybody to have a hard copy of the report. If it's subject to revision, I don't mind submitting it by email, but if this is going to be the final one, I'd like to have a hard copy of it." There being no other business, there was a motion and second to adjourn, motion carried. (The meeting lasted 36 minutes.) MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, FEBRUARY 19, 2009 Call the meeting to order. Chairman Hayter called the meeting to order at 4:10 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, Gene McWaters, Jim Noble, and Dan Smith. Ex- Officio Members present were Jim Kays, Ray Ball and Bob Campbell.. Members absent were John Kruntorad, Sharron Nabors and Michael Moffitt. Ex- Officio Members absent were Bryon Billman, Renee Harvey, and Frank Wright. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; John McFadden; Pike Burkhart; Pete Kampfer; Todd Reek, City of Irving; Corey Shockley, HDR; Randall Dobbs, Nathan D. Maier; Kay O'Dell, Workforce Solutions and Charles Richards, Paris News. No quorum, five voting members present. 4. Citizens forum. No one spoke. 5. Question and answer session with Texas Parks and Wildlife Representative. Questions submitted to the Texas Parks and Wildlife Department. 6. Review and discuss PEDC future water demand projections. Dan Smith asked about 2060 water demand. Why did water demands double when population projection did not double for the year 2060? Corey Shockley explained that those projections are based on Texas Water Development Board numbers of peak day water usage per person. Answer to question will be clarified in HDR final report. Gene McWaters arrived at 4:19 p.m. Meeting was officially called to order with a quorum. Motion was made to accept figures provided in PEDC report to be included in HDR final report by Dan Smith, seconded by Dennis Chalaire. Motion carried unanimously. Approval of minutes from previous meeting. (February 5, 2009) Motion was made by Herb Campbell, seconded by Gene McWaters to approve February 5, 2009 meeting. Motion carried unanimously. 7. Review and discuss the draft Water Availability Study report with HDR. Dennis Chalaire asked about recommendations based on safe yield rather than firm yield. Ray Ball wanted to discuss alternate scenarios and water reuse possibilities. HDR will work on a final report. 8. Discussion and possible action on the power point presentation to the public. Power point presentation to be distributed to members. Possible future agenda items. Pursue finishing up committee's work. Prepare a list of issues to discuss to membership, possibly by March 5, 2009 meeting. 10. Adjournment. There being no further business, a motion to adjourn the meeting was made by Herb Campbell, seconded by Jim Noble. Motion carried unanimously. The meeting adjourned at 5:21 p.m. Approved this 19th day of March, 200 . l Reeves Hayte , Chai an 6ommt cT— • M �Tc G T6 p.m. 5 � S � AA t 1 E{ � Wqa> Npc�gs � T� lqc FAC >Db �- 1lfPCZD\JFo,, oF- M(1'UkTF5 P(<Orv�, D�(4�00� MEf-ET-In6, Mo —no rq M "P- y : -l-irA r-Ab13I's BV: ��(3 6,A e6P—rl FoTz-u-,,NA °- t�-\ o rJ S eo KF - �- �2��_S �C �`("'4t►?� �-� S ��rv�2�r `[�-fz.�Gt� N- ��o . —gyp Nu%�'1 g�-s � dr�r✓U�� ��_ � o —��� � c�- f�tf2n -��T' ccs�i�.. �'L#�sc W (ui 13FINC, J-Ms Tb A-Ls o 7)i PrA lFr::A� —oOM C��►SwriPTto� . k ��o� s t,IR A-L so >(sda-5s-F->. KEq � * �3 � D�-- A-� -D (T7D^J tL- WINI Tzt--so(AF -cam To P Cry OR>Lyz -F6 P---�(Perr-j () u,2 S11-Pe1-Y ,rte _ -P t--o ti OT- a -i-,6 —(f k-c s r7 3>tSSC(kst0► -1 onl -P(zi T(f,�� -, ' �zecotAmE/�s�ft-TT o� &RACAL . t �Sf,1- rA-rtool OP Nr'w' ES 'l -Pr--L( V t AZ aL P,5 — i 11 t'0 2 AAv-rt o r4 / sEY`�-t'l f nl A- FDt tR- FA} t 1,,=' 53_ Z,mc p �� r1KA�ts�� �. �✓- m' p Feo/+, Lj ��Qeow, Varfor i To E3 1 Skk � NAOo2s12 Si�-7d4t, �-V eY C --> pr.4 �fEtp ((4(VDA �e,04(i`14A4,1 -5 Af--- /At, � 5 Fw� i is &kss toy dI W--w vEA A-F C, or--gitl or'l pt:UVORA6w-� q--5 �&tp--TIN 4) 61,� 04/0--Y6 5. "IovPt4E-v ,� —( 5:-57 P m . WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE CITY COUNCIL CHAMBERS 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, MARCH 19, 2009 4:00 O'CLOCK P.M. A G E N D A 1. Call the meeting to order. 2. Committee member roll call. 3. Approval of minutes from previous meetings. (February 19, 2009) 4. Citizens forum (Persons desiring to address the Committee must limit their presentations to no more than three minutes. The forum will last no longer than 15- minutes.) 5. Discussion and possible action on the drafting a recommendation to City Council. 6. Possible future agenda items. 7. Adjournment. POSTED: MONDAY, MARCH 16, 2009, , CITY HALL BULLETIN BOARD BY: WITNESS: MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, APRIL 2, 2009 Call the meeting to order. Chairman Hayter called the meeting to order at 4:02 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Herb Campbell, Dennis Chalaire, Reeves Hayter, John Kruntorad, Gene McWaters, Sharron Nabors, Jim Noble, Richard Quarles and Dan Smith. Ex- Officio Members present were Jim Kays, Frank Wright and Bob Campbell. Member absent was Michael Moffitt. Ex- Officio Members absent were Bryon Billman, Renee Harvey and Ray Ball. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; John McFadden; David Nabors; Pete Kampfer; PEDC, and Charles Richards, Paris News. Quorum announced. 3. Approval of minutes from previous meeting. (March 19, 2009) Motion was made by Gene McWaters, seconded by Jim Noble to approve the minutes for the March 19, 2009 meeting. Motion carried unanimously. 4. Citizens forum. No one spoke. 5. Discussion and possible action on drafting a recommendation to City Council. Recommendation to the City Council, Shawn Napier presented information on the three year average, volumes for the City of Paris, contract users and non - contract industrial users. Discussion continued on determining appropriate figures for future uses in 2010, 2030 and 2060. Future year averages were adjusted to reflect 2020, 2040 and 2060. Will attempt to obtain peak day data for LCWSD, Campbell Soup, Lamar Power Partners and Direct Energy. Contact HDR about information regarding putting in place a set lake level for determining how much water might be available to sell. Also discussed available options for increasing supply, ie. Renegotiate contracts, use Lake Crook, and /or additions of return flows. Further discussion on raising the level of Pat Mayse, with possible recommendations to discuss this option with the Corps of Engineers. 6. Possible future agenda items. Continued discussion on moving towards a recommendation. 7. Adjournment. There being no further business, a motion to adjourn the meeting was made by Sharron Nabors, seconded by Jim Noble. Motion carried unanimously. The meeting adjourned at 5:26 p.m. Approved this 16th day of April, 2009. 1 Reeves Hayter, � MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, APRIL 30, 2009 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:03 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Dennis Chalaire, Reeves Hayter, John Kruntorad, Gene McWaters, Sharron Nabors, Jim Noble, Richard Quarles and Dan Smith. Ex- Officio Members present were Frank Wright, Ray Ball and Bob Campbell. Member absent was Michael Moffitt. Ex- Officio Members absent were Bryon Billman, Renee Harvey and Jiro Kays. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; John McFadden; Pike Burkhart; David Nabors; Pete Kampfer; PEDC, and Charles Richards, Paris News. Quorum announced. 3. Approval of minutes from previous meeting. (April 2, 2009) Motion was made by Gene McWaters, seconded by Jim Noble to approve the minutes for the March 19, 2009 meeting. Motion carried unanimously. 4. Citizens forum. No one spoke. Discussion and possible action on drafting a recormnendation to City Council. To the City Council, Note 5: Clarification to be added noting that the Lamar Power Partner Volume of 7 mg is untreated water. Note added showing City of Paris Volume of 5.66 mg is derived by subtracting all other peak day usages from the peak day total consumption. Explanation was provided regarding projected use in 2020, 2040 and 2060 that it was based on 0.6 gallons per minute /meter as required by TCEQ. Add Campbell Soup peak day of 6.07 mgd to explanation noting Campbell Soup largest daily average of -- 4.1 mgd. Direct Energy information was corrected from raw water to treated water. Peak day usage volumes were added to LCWSD, Campbell Soup, Lamar Power Partners and Direct Energy information paragraphs. Correction that 12.8 mgd would be available in 2020. Sharron Nabors made a motion to accept the numbers provided, Dan Smith seconded the motion. Motion carried unanimously. A table regarding alternative water sources, volumes and costs will be prepared for next meeting. 6. Possible future agenda items. Next meeting will be May 14, 2009. 7. Adjournment. There being no further business, a motion to adjourn the meeting was made by Dan Smith, seconded by Gene McWaters. Motion carried unanimously. The meeting adjourned at 5:08 p.m. Approved this 14th day of May, 2009. Reeves Hayter, MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, MAY 14, 2009 Call the meeting to order. Chairman Hayter called the meeting to order at 4:06 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Dennis Chalaire, Reeves Hayter, John Kruntorad, Gene McWaters, Sharron Nabors, Jim Noble and Dan Smith. Ex- Officio Members present were Ray Ball and Renee Harvey. Member absent was Michael Moffitt and Richard Quarles. Ex- Officio Members absent were Bryon Billman, Jim Kays, Frank Wright and Bob Campbell. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; David Nabors and Charles Richards, Paris News. Quorum announced. 3. Approval of minutes from previous meeting. (April 30, 2009) Motion was made by Sharron Nabors, seconded by Dan Smith to approve the minutes for the April 20, 2009 meeting. Motion carried unanimously. 4. Citizens forum. No one spoke. 5. Discussion and possible action on drafting a recommendation to City Council. Table listing five (5) different options distributed (prepared by Reeves Hayter). Table amended from 150% historical max to 125% historical max. Discussion on each option listed in table. Amended table to be provided to committee. 6. Possible future agenda items. Finalize a recommendation to the City Council. Inclusion of additional options. 7. Adjourmnent. There being no further business, a motion to adjourn the meeting was made by Sharron Nabors, seconded by Dan Smith. Motion carried unanimously. The meeting adjourned at 5:36 p.m. Approved this 28th day of May, 2009. Reeves Hayter, Ch tj MINUTES WORK SESSION LAKE PAT MAYSE STUDY COMMITTEE 107 E. KAUFMAN STREET PARIS, TEXAS THURSDAY, MAY 28, 2009 1. Call the meeting to order. Chairman Hayter called the meeting to order at 4:04 p.m. 2. Committee member roll call. City Engineer Shawn Napier called roll. Members present were Reeves Hayter, John Kruntorad, Gene McWaters, Michael Moffitt, Sharron Nabors, Jim Noble, and Richard Quarles. Ex- Officio Members present were Bob Campbell and Renee Harvey. Member absent was Dennis Chalaire and Dan Smith. Ex- Officio Members absent were Bryon Billman, Jim Kays, Frank Wright and Ray Ball. Alternate Member absent was Joan Mathis. Also, present were city staff Shawn Napier, City Engineer; Doug Harris, Utilities Director; David Nabors, Pike Burkhart, Pete Kampfer and Charles Richards, Paris News. Quorum announced. 3. Approval of minutes from previous meeting. (May 14, 2009) Motion was made by Sharron Nabors, seconded by Jim Noble to approve the minutes for the May 14, 2009 meeting. Motion carried unanimously. 4. Citizens forum. No one spoke. 5. Discussion and possible action on drafting a recommendation to City Council. Members discussed options and recommendations. 6. Possible future agenda items. Finalize a recommendation to the City Council. 7. Adjournment. There being no further business, a motion to adjourn the meeting was made by Sharron Nabors, seconded by Richard Quarles. Motion carried unanimously. The meeting adjourned at 6:01 p.m. Approved this 11th day of June, 2009. Reeves Hayter, Chai an