Loading...
07/15/1999SPECIAL MEETING OF THE FIRE SERVICE COMMITTEE JULY 15, 1999 The Fire Service Committee met in special session Thursday, July 15, 1999, at 6:00 o'clock, p.m., Fire Station No. 1, Training Room. Chairman Richard Manning called the meeting to order with the following members present: Mayor Pro Tern Mary Ann Fisher, Councilperson John Bell, Dr. Joe Deupree, Fire Chief Steve Burgin, Finance Director Gene Anderson, City Engineer Earl Smith, City Manager Michael E. Malone, and City Clerk Mattie Cunningham. After introductory remarks by City Manager Malone, the presentation was turned over to Deputy Fire Chief Steve Neece who presented a power point slide presentation. During the presentation, Deputy Chief Neece gave the history of fire service in Paris and outlined the needs which prompted the introduction of the fire department restructuring plan presented in 1998. Deputy Chief Neece explained how the site for Station 1 was selected and the original intention to build it and the two other needed substations at the same time. He discussed the need for and acquisition of fire engines, the ladder truck, and other equipment and the subsequent decision by the City Council to divide the plan into two phases, Phase I and Phase II. He explained that Phase I was complete and that we needed to proceed with Phase II. He discussed budget considerations and the command and control structure that is needed in operating under the conditions existing in Paris today. He discussed the present rank structure and the proposed rank, structure which is a part of the planned improvements in fire service. Deputy Chief Neece presented a map and stated that it was basically the map seen in the presentation. The diamonds have been placed as we would like for them to be arranged. Station 2 and Station 4 are on sites that the city has purchased. The map illustrates the target hazards that we have identified. This station arrangement covers those target hazards the overlap of the west side and Station one is no problem. The diamonds on the map don't mean anything, but what means something is the response zones. In the next illustration we have gone back and looked at a map of the current city limits and these response zones we have illustrated here are almost refined. The response zones of each of the stations is illustrated. As you can see, the zone for Station 1, in pink, with the station on N. Main covers the central portion of city all the way to the wastewater treatment plant and the east side of Lake Crook all the way out to the waste water treatment plant. Station 3 would still cover more or less the same area, but a portion of the area previously covered has been carved out to Station 1. In this configuration, every response zone has shrunk from the current configuration of response zones, thus improving service to everyone in city. The west side district response zone has Fire Service Committee July 15, 1999 Page 2 shrunk, Station 1 response zone has shrunk some, and the east side has shrunk considerably. Station 2, as proposed would cover to the Reno city limits and beyond Reno to Paris territory east of Reno, also covering area out FM 195. Station 4 would cover the southern reaches of the city and out to the airport. This is a big area, but contains little in the way of fire hazards, not being a heavily built upon area and the proposed location has very good access. The station locations proposed maintain close proximity to major built upon areas and fire hazards, with the fringe areas farther away, but still having good response times. Mr. Neece presents to the committee a map of current response areas in the present three station alignment and compares it with the four station alignment with the proposed response zones illustrated. He shows committee that proposed four station configuration will put stations closer to where they need to be. He states that on a structure fire, the department responds with two engines. We now have computer aided dispatch which will allow us to list the first, second, and third out engine for each fire location in order to get the best response- these will be programed in. The new configuration will shrink districts so we will have better response times, the trucks will be quicker to arrive. He points out that if we don't maintain response times, then other structures will become involved because they are so close together, unlike sparsely populated areas. For this reason, we must place stations carefully. The rationale as to why the stations are so placed is to maintain and provide better service for all citizens of Paris, to keep a favorable ISO rating, and to keep a favorable PPC code. Whether we can improve the PPC code or not, the new station placement and staffing will save the citizens of Paris money. He states that if we don't do go forward with the plan, then we will deteriorate. Chairman Manning remarks that we are looking to future and it can be seen that the zig -zag pattern of station placement can be used to place stations for future needs. Deputy Chief Neece, using the map, shows why west side is properly located. He states that the station may move to the Loop in twenty years if growth occurs and that with this pattern another station can be added very easily. Other that the possibility of moving west side in the future, these sites will still be needed. The station sites have been provided to the committee and the council by staff based on their years of experience. With this plan, the locations will be well usable years into the future. The present station placement was based on 1963 city limits, which were much smaller than today, all within the Loop. Fire equipment was different in that it Fire Service Committee July 15, 1999 Page 2 Fire Service Committee July 15, 1999 Page 3 was smaller, slower, and less equipped to do the job. Deputy Chief Grooms stated that these stations as proposed should never become obsolete and should remain useful from now on. Chairman Manning observed that with this placement we are looking to the future. Deputy Chief Grooms explained that the station placement, set up in zig zag pattern to expand when the city expands assures that future needs can be met without abandoning these locations. Chief Burgin points out that the west side hasn't grown in population, but is a very dense as an industrial zone and industry has expanded. He points out that west side covers the most dense industrial growth, including Kimberly - Clark, Campbell Soup, Lamar Power Partners, and Turning Piping Systems. For this type of hazard, we prefer a short response time. We have good avenues from west side, using 19th SW and NW and Bonham/ Hwy 82. Deputy Chief Neece points out that the station is on a large lot and can easily be expanded. The east side station probably was built out of code on too small a lot. Councilman Bell questions the sale of the east side station and whether it has been appraised. Mr. Malone states that there has been no formal appraisal, but that the old station should bring good money. Deputy Chief Neece points out that the plans and station configuration have been reviewed by consulting engineers preparing the City of Paris Master Plan, Bucher, Willis, and Ratliff. Our staff has reviewed the plans with them and they forwarded a report. He furnished a copy to the Fire Service Committee. The Bucher report concurs with fire personnel their rationale and their decision in the plans they have presented. Bell asks about controlling lights at Pine Mill and Loop 286 and Neece responds that the light at that location will be controlled. He states that from the beginning, fire personnel wanted the proposed station located outside the loop and in an area that we could get back into the city from easily, as well as a controlled intersection where we would control the light. This would be a preemption system. On a one light basis, this would cost between $2,000.00 and $5,000.00 and we can control the light from the truck. The system that we are presently considering costs approximately $3,500.00. With this type of system, fire equipment can make a safe approach and proceed through the intersection. Chief Burgin made the point that the consulting engineers agreed with our staff because we used resources nationwide - the same planning that the state uses, the same planning that other cities use. These techniques are widely used throughout the country. By following that format, guidelines that make sense and are Fire Service Committee July 15, 1999 Page 3 Fire Service Committee July 15, 1999 Page 4 internationally recognized, our plan is entirely acceptable to Bucher, Willis, and Ratliff and would be acceptable to any authority that examined our plan. Burgin points out that fire service in Paris is similar to that in other cities. They operate in zones as we do. Deputy Chief Neece points out that the biggest difference between Paris and most other cities is our isolation - there is not adequate mutual aid with no fully paid professional full time fire service very close, other than Hugo and Greenville. There are other departments in the area, but they are volunteer departments. The volunteer departments are not municipal structural trained firefighters and they don't operate trucks similar to ours or hose or nozzles similar to ours. We are reluctant to put them into some of our situations. He states that we are not like Plano who has a lot of money and mutual aid next door. Cities like Plano have interlocal agreements. Other departments are just appalled that we don't have third out mutual aid with other departments close by to come and help us. Councilman Bell points out that we are still in the boonies. Deputy Chief Neece states that our first alarm is two engines dispatched from two stations. Our second alarm is one more engine and our third alarm is all call - that is, we call in off duty people to come help. Usually about twice a year we call for mutual aid. We often handle very large fires with as few as nine men on duty. Chairman Manning questions about the need for a third lane for Pine Mill Road near the Loop. Chief Burgin points out that the key consideration is the ability to move around inside city. He states that the diamonds on the map are arranged on major thoroughfares, north and south, throughout the city and that these routes quickly get the equipment into neighborhoods. He talks about the use of the secondary streets and neighborhood streets. He states that it is critical for fire and EMS to look to planning for thoroughfares of the future. Chief Burgin recommended the completion of the extension of Martin Luther King, Jr. Boulevard and states that Station 1 was planned to have access to MLK. Chief Burgin states that this is a critical need in order to move quickly into east and west sections of the city. He noted that another lane on Pine Mill would help and is needed already. Deputy Chief Neece pointed out that people don't realize that intersections are not as difficult for the fire department, if we control the light, as it is for private vehicles. City Engineer Earl Smith observed that roughly, from the proposed site on Pine Mill Road, there is about 2500 feet of road, currently thirty feet wide, overlaid a few years ago which is holding up well. He stated that to build a center turn lane, a left turn Fire Service Committee July 15, 1999 Page 4 Fire Service Committee July 15, 1999 Page 5 lane, would add about fourteen feet of pavement and that we would probably add curb and gutter, address drainage needs which are fairly trivial compared to project, and we would have to acquire additional right of way. He stated that we would end up with forty -four foot wide street, not in conformance with the current city ordinance, although it meets Texas Department of Transportation standards for lane widths. The street would be forty -four feet wide from back of curb to back of curb. The cost estimate is based on improving with asphalt, salvaging what pavement currently exists. This estimated cost, including legal, engineering, and right of way, with contingencies would be about $260,000.00. He stated that he did not take a close look, but was just making a guess estimate. Deputy Chief Neece stated that we have evaluated the traffic patterns in the area, been out there at all hours of the day and night and in all traffic situations. The Deputy Chiefs and the Chief do not feel that it will be a catastrophic situation. He stated that it was not ideal, but that the Lamar Avenue location is much worse and trying to get out of the present east side station on Lamar Avenue is a nightmare because it is too close to the road with too short an entrance ramp. The traffic is constantly having wrecks in front of east side. He added that we have more problems with Lamar than any other area. Deputy Chief Neece explains about the National Fire Protection Association, the NFPA, which in some states has been adopted and has force of law. He adds that Texas has not adopted NFPA standards and regulations as law, however, it is seen as reasonable and prudent standard throughout all fire services in Texas. In Paris, all of our trucks are NFPA compliant as far as warning lighting, sirens, compartment space, pumps, hose, bunker gear, helmets, boots, etc., we continue to stay NFPA compliant. We followed NFPA recommendations as far as land needs, floor space, building utilities, spaces, response districts, and things of that nature with respect to these recommendations. Deputy Chief Neece handed out copies of NFPA standards with some highlighting. He stated that in every aspect of fire service we try to follow NFPA standards, using the guidelines for sizing of stations and bays. Deputy Chief Neece, referring to the floor plans, reviewed two options and stated that we could draw up others. The department would like to construct a station that would be adequate for at least twenty years, barring unforseen major changes in fire service. He pointed out that the department no longer just fights fires, but that the department now goes on medical calls, first responder calls, carries AED and provides numerous other services. He noted that rescue is one of fastest growing service areas along with confined space, hazmat, and airport crash rescue. There is also a lot of service now provided to industry. The department is working with Fire Service Committee July 15, 1999 Page 5 Fire Service Committee July 15, 1999 Page 6 them to keep them safe. Each station is capable of accommodating six man staffing per shift. The station floor plan we are proposing is slightly less than 6000 square feet, having a living area of 2263 square feet and would adequately house up to six fire persons and provide for their needs as far as sleeping, dining, preparing to go on runs, as well as accommodating some training needs. Also, we are proposing a truck bay of 3120 square feet, which would provide three pull- through truck bays of single stack design which would be fifty feet long inside housing one truck to a bay. There would also be other miscellaneous square footage for lawnmowers, small equipment, etc. With porches, the total square footage for the floor plan recommended would total 5935 square feet, and this might be modified by the architect. Staff feels that this floor plan is very adequate for these two substations and will accommodate female officers, would accommodate an engine company of up to four men, which currently we only staff three, would accommodate a grass rig or other minor apparatus, would accommodate the possibility of housing EMS in the future. This plan also accommodates another aerial, if needed, which might be particularly relevant in the southeast location. It was pointed out that we are supposed to have an aerial within two and one half miles of any structure designated to need it - one three or more stories. Currently, we make do with one aerial. The layout of the stations is flexible and should serve for a number of years. City Manager Malone suggested that the Fire Service Committee focus on station floor plans, asking Gene Anderson, Finance Director, to review Fair Labor concerns about EMS. Mr. Anderson explained how we pay fire and EMS personnel. He explained that while all other employees are paid on a seven day work period, forty hours, with anything over that being overtime, (unless they are salaried), the fire and EMS personnel are paid under the 7K provision of the FLSA, which gives them a twenty eight day cycle, instead of a seven day cycle. He said that by stretching that from seven days to twenty -eight days, you are more likely to be able to reduce your overtime hours because anytime they are not actually on the job, or on vacation, sick, or holiday time, it reduces the likelihood that they are going to draw overtime during that time period. So, to rephrase it a different way, within twenty -eight days, fire and EMS personnel have to work more than two hundred and twelve hours before they draw any overtime pay. Looking at it another way, they have to average over fifty -three hours a week. FLSA applies that to EMS under certain conditions, one, they have to be considered an integral part of the fire department, they have to have certain rescue type training related to fires, and they have to be regularly dispatched to fires. If they are not, Fire Service Committee July 15, 1999 Page 6 Fire Service Committee July 15, 1999 Page 7 they would not be allowed the 7K exemption. Another issue is the housing of the two services together. If you look at a typical twenty -eight days, picking a cycle in December of this past year, there were three hundred and twenty -three hours of EMS overtime during that twenty -eight days. If those same hours were worked and you used a seven day, forty hour week pay period, there would have been one thousand and thirty -seven overtime hours for the EMS personnel. Mr. Anderson indicated that this would have increased the overtime cost to $14,200.00 for that twenty -eight days. If that was a typical twenty -eight day period, then, over the course of a year, the cost of having the EMS personnel would go up $170,400.00. This illustration shows why it is so very crucial that we be able to maintain the 7K exemption for EMS personnel. In most cases, all EMS personnel are firemen, housed and identically trained. Our EMS personnel are not trained firemen and don't go through that same training. Costs can go up dramatically. Chief Burgin pointed out that more personnel would be required if you went to a forty hour week. Under that scenario, we would have to add extra people and that cost was not figured in to Mr. Anderson's calculations. The City Manager pointed out that we have two hospitals and that conditions are rapidly changing in medical field. We are currently enjoying the benefits of two hospitals providing living quarters and stations for our EMS at no cost to the city. The electricity bill, laundry and cleaning, and many other benefits help our EMS bottom line in this mutually beneficial relationship. We work closely with the hospitals and we have a very fine EMS service, one of the best in the state. We employ people and enjoy an continuity of experience because of job stability. With the knowledgeable people we have employed, we set a standard to be envied around the entire state. We are able to promote our city through the Think Child Safety and Think Senior Safety programs, promoting the Circle of Protection. The Manager pointed out that we should not want to jeopardize the very existence of this service which depends upon contributions from our county government as well as the city government to operate the ambulance service which comes very close to paying for itself. The Manager stated that, in looking at a floor plan, we wanted to consider that we might suddenly have to relocate the EMS stations for whatever reason, FLSA regulations or circumstances where one or both hospitals withdrew their support. Also, we might get into a situation where we had some new service area requirements, and if this occurred, it would be much cheaper to add this one thousand square feet now. We recently looked at expansion of the west side station to accommodate the larger size trucks and found that it would take over $100,000.00 to enlarge that station. The City Manager recommended that this standard floor plan should be adopted and used until such time as it becomes outdated. If the Fire Service Committee July 15, 1999 Page 7 Fire Service Committee July 15, 1999 Page 8 space is not used for EMS vehicles, it can be used for other types of vehicles or other storage and our money would be well spent to build it in that configuration. Deputy Chief Neece noted that, currently, we could store reserve ambulances and other equipment and that the space will not go unutilized. The City Manager stated that you could go anywhere in our region or state and compare, and you would find that we have one of the top fire and one of the top EMS departments. He said you would not find any more dedicated or better trained personnel and that we are working to provide them with the equipment that they need to do the job. Their budget has been constrained for many years and other needs have taken precedence. He stated that, even though it appears to some that the fire department is getting more funds than other departments, that it is time to meet their needs and catch up. Chief Burgin noted that once we finish this next phase, until there is a definite growth to this city, we are through for a while. Councilman Bell remembered when all fire trucks were failing inspections and had gotten outdated and that the new ones are real close together in year model. He stated that when those start getting outdated, they are all going to be outdated at the same time. There ensued a group discussion of buying too many trucks at the same time and admonishments not to get into that situation again, if it could be helped. Chief Burgin suggested planning, making decisions, and taking action, and that now we need to get these two stations built. He stated that we need to move forward with Phase II. Deputy Chief Neece agreed, saying that we have the trucks in the house, most of men already hired, and we need the stations constructed as soon as possible and the three additional men hired and trained. Councilman Bell asked if the committee needed to present this floor plan to the City Council. City Manager Malone stated that, the Council having bought the two sites, has made the decision where the two stations will be located, and although there is some dissension in that some say build only one station in southeast and keep east side open, that is not the staff recommendation. He stated that we have had a very thorough investigation and presentation and that the people who are the professionals in fire fighting, in conjunction with the professionals in engineering and planning, those doing the Master Plan, have made a recommendation in presenting Phase Il. We pay a lot of money for the training these folks have received and we feel that the plan is capably conceived and presented and recommend that the committee give support with regard to the floor plan and continuing to carry out Phase II of the Fire Service Plan as presented. Fire Service Committee July 15, 1999 Page 8 Fire Service Committee July 15, 1999 Page 9 The Manager stated that the next step would be to go forward with the construction of the two stations by the general contract method and that means that we will engage an architect to prepare complete plans and specifications to bid this project out. The Manager pointed out that we have some money in the current budget and we have some money available from the last issuance of Certificate of Obligations, and that those amounts combined should be approximately sufficient to build both stations. Councilman Bell asked if Station 1 was designed by an architect. The Manager stated that it was not, that it was designed in -house by city staff. The City Manager recommended that the new stations be built basically like Station 1, stating that under our proposal that we would recommend this floor plan, turn it over to architect for plans and specs for bidding and the architect would be directed to use the style, colors, and comparable construction. We would then bid out the construction of these two stations, considering them one at a time. The city staff recommends the same, one floor plan for each substation. Dr. Deupree points out that this issue of the floor plan would be a very minor part of the whole presentation - that the expertise has been the layout and the knowledge to know where to put these stations. He stated that their training is valuable for the layout and location. Dr. Deupree states that they have the expertise to do this planning. City Manager Malone noted that the two things challenged were the Pine Mill Road location and the floor plan or size of the proposed locations. A general discussion ensued that we should build for extra space now and it was noted by the committee that the additional space will never be as cheap if needed later. Deputy Chief Neece reviewed the basic size comparisons and the various options and furnished the group with a handout. On the front page, a floor plan for a six person -three bay station will require about 6,000 square feet; a six person station with only two bays, allowing for adding the bay later, if needed, is 5,400 square feet. Another option, the four person -two bay station, which could never house the EMS, would be about 4,000 square feet, probably closer to 4,900 square feet. For comparison, the current west side station is a two person, one and one half bay station and is 3,040 square feet and is packed to the brim. The handout also included cost estimatesvworked up with engineering department which were based on more current bids, specifically the airport terminal. With estimates on drives, parking, etc., and furnishings, a rough estimate of $685,000.00 per station has been made. This cost might be further refined after consultation with.an architect and reviewing more current construction costs. The City Manager cautioned that the committee should keep in mind that these are estimates and that some prices may Fire Service Committee July 15, 1999 Page 9 Fire Service Committee July 15, 1999 Page 10 be much higher now, noting that construction materials are up in price and building is booming. He noted that sheetrock and concrete are higher. Deputy Chief Neece reviewed the current proposed site plans for Pine Mill Road and Jefferson Road and noted that many details would be worked out with the architect. There followed a discussion of station setback from the right of way and aprons and a discussion of facing the south east station at Jefferson Road and 24th SE to the east, facing Dragon Park, providing some security for the walking track as an added bonus. Deputy Chief Ronnie Grooms stated that what is now Phase I and Phase 2, when first proposed, were all one stage and that their original proposal was to build Station 1 at its present location while building the other two substations at the same time. Department personnel at the time stressed that the other two stations would have to be built concurrently with Station 1 when it relocated. Because of funding constraints, it had been decided to put the project in two phases and over time, various events occurred to stall the completion of Phase II, which is desperately needed to provide appropriate coverage for all areas of the city. Councilman Bell stated that he foresees ever increasing needs in the future. Deputy Chief Neece noted that it is important to have paid full time staff ready to go and that, in rural areas, a full time paid department might not be needed as much as in crowded city. In rural areas, generally houses are far apart and are insured. As long as the people get out, it might be more acceptable that the house burns down and insurance pays. However, in the city, houses tend to be close to others and several may catch on fire at the same time, causing a much greater threat to life and property. He stated that in the country, a house fire is not likely to catch the neighbors house on fire. Chief Burgin talked about increased code enforcement, sprinkler systems, and other things to be considered after the two additional stations are built. He noted that you can fight fire as good with a pencil as you can with fire trucks and men. Chairman Manning suggested in a motion that the Fire Service Committee approve both of these fire stations with the site plans and the floor plans of the buildings and all of the recommendations of Phase II, with the work to start as soon as possible. The Fire Service Committee unanimously adopted the recommendations of the fire department personnel in Phase II, including the two stations, the locations selected, the approximately 6,000 square foot floor plans for future stations. Chairman Manning cast his vote and voted the proxies of Mayor Pro Tern Mary Ann Fisher and Fire Service Committee July 15, 1999 Page 10 Fire Service Committee July 15, 1.999 Page 11 Kenneth Webb, and Councilman John Bell and citizen Dr. Joe Depree voting also in the affirmative. The City Manager noted that the minutes of the meeting would be prepared and presented to the City Council for action. The meeting was adjourned. ATTEST: MATTIE CUNNINGHAM, CITY CLERK RICHARD MANNING, CHAIRMAN Fire Service Committee July 15, 1999 Page 11