07/15/1999SPECIAL MEETING OF THE FIRE SERVICE COMMITTEE
JULY 15, 1999
The Fire Service Committee met in special session Thursday, July 15, 1999, at 6:00
o'clock, p.m., Fire Station No. 1, Training Room. Chairman Richard Manning called
the meeting to order with the following members present: Mayor Pro Tern Mary Ann
Fisher, Councilperson John Bell, Dr. Joe Deupree, Fire Chief Steve Burgin, Finance
Director Gene Anderson, City Engineer Earl Smith, City Manager Michael E. Malone,
and City Clerk Mattie Cunningham.
After introductory remarks by City Manager Malone, the presentation was turned
over to Deputy Fire Chief Steve Neece who presented a power point slide
presentation. During the presentation, Deputy Chief Neece gave the history of fire
service in Paris and outlined the needs which prompted the introduction of the fire
department restructuring plan presented in 1998.
Deputy Chief Neece explained how the site for Station 1 was selected and the
original intention to build it and the two other needed substations at the same time.
He discussed the need for and acquisition of fire engines, the ladder truck, and other
equipment and the subsequent decision by the City Council to divide the plan into
two phases, Phase I and Phase II. He explained that Phase I was complete and that
we needed to proceed with Phase II. He discussed budget considerations and the
command and control structure that is needed in operating under the conditions
existing in Paris today. He discussed the present rank structure and the proposed
rank, structure which is a part of the planned improvements in fire service.
Deputy Chief Neece presented a map and stated that it was basically the map seen
in the presentation. The diamonds have been placed as we would like for them to
be arranged. Station 2 and Station 4 are on sites that the city has purchased. The
map illustrates the target hazards that we have identified. This station arrangement
covers those target hazards the overlap of the west side and Station one is no
problem. The diamonds on the map don't mean anything, but what means
something is the response zones.
In the next illustration we have gone back and looked at a map of the current city
limits and these response zones we have illustrated here are almost refined. The
response zones of each of the stations is illustrated. As you can see, the zone for
Station 1, in pink, with the station on N. Main covers the central portion of city all the
way to the wastewater treatment plant and the east side of Lake Crook all the way
out to the waste water treatment plant.
Station 3 would still cover more or less the same area, but a portion of the area
previously covered has been carved out to Station 1. In this configuration, every
response zone has shrunk from the current configuration of response zones, thus
improving service to everyone in city. The west side district response zone has
Fire Service Committee
July 15, 1999
Page 2
shrunk, Station 1 response zone has shrunk some, and the east side has shrunk
considerably.
Station 2, as proposed would cover to the Reno city limits and beyond Reno to Paris
territory east of Reno, also covering area out FM 195. Station 4 would cover the
southern reaches of the city and out to the airport. This is a big area, but contains
little in the way of fire hazards, not being a heavily built upon area and the proposed
location has very good access. The station locations proposed maintain close
proximity to major built upon areas and fire hazards, with the fringe areas farther
away, but still having good response times.
Mr. Neece presents to the committee a map of current response areas in the present
three station alignment and compares it with the four station alignment with the
proposed response zones illustrated. He shows committee that proposed four
station configuration will put stations closer to where they need to be. He states that
on a structure fire, the department responds with two engines. We now have
computer aided dispatch which will allow us to list the first, second, and third out
engine for each fire location in order to get the best response- these will be
programed in. The new configuration will shrink districts so we will have better
response times, the trucks will be quicker to arrive. He points out that if we don't
maintain response times, then other structures will become involved because they
are so close together, unlike sparsely populated areas. For this reason, we must
place stations carefully.
The rationale as to why the stations are so placed is to maintain and provide better
service for all citizens of Paris, to keep a favorable ISO rating, and to keep a
favorable PPC code. Whether we can improve the PPC code or not, the new station
placement and staffing will save the citizens of Paris money. He states that if we
don't do go forward with the plan, then we will deteriorate.
Chairman Manning remarks that we are looking to future and it can be seen that the
zig -zag pattern of station placement can be used to place stations for future needs.
Deputy Chief Neece, using the map, shows why west side is properly located. He
states that the station may move to the Loop in twenty years if growth occurs and
that with this pattern another station can be added very easily. Other that the
possibility of moving west side in the future, these sites will still be needed. The
station sites have been provided to the committee and the council by staff based on
their years of experience. With this plan, the locations will be well usable years into
the future. The present station placement was based on 1963 city limits, which were
much smaller than today, all within the Loop. Fire equipment was different in that it
Fire Service Committee
July 15, 1999
Page 2
Fire Service Committee
July 15, 1999
Page 3
was smaller, slower, and less equipped to do the job.
Deputy Chief Grooms stated that these stations as proposed should never become
obsolete and should remain useful from now on. Chairman Manning observed that
with this placement we are looking to the future. Deputy Chief Grooms explained
that the station placement, set up in zig zag pattern to expand when the city expands
assures that future needs can be met without abandoning these locations.
Chief Burgin points out that the west side hasn't grown in population, but is a very
dense as an industrial zone and industry has expanded. He points out that west side
covers the most dense industrial growth, including Kimberly - Clark, Campbell Soup,
Lamar Power Partners, and Turning Piping Systems. For this type of hazard, we
prefer a short response time. We have good avenues from west side, using 19th SW
and NW and Bonham/ Hwy 82. Deputy Chief Neece points out that the station is on
a large lot and can easily be expanded. The east side station probably was built out
of code on too small a lot.
Councilman Bell questions the sale of the east side station and whether it has been
appraised. Mr. Malone states that there has been no formal appraisal, but that the
old station should bring good money. Deputy Chief Neece points out that the plans
and station configuration have been reviewed by consulting engineers preparing the
City of Paris Master Plan, Bucher, Willis, and Ratliff. Our staff has reviewed the
plans with them and they forwarded a report. He furnished a copy to the Fire
Service Committee. The Bucher report concurs with fire personnel their rationale
and their decision in the plans they have presented.
Bell asks about controlling lights at Pine Mill and Loop 286 and Neece responds that
the light at that location will be controlled. He states that from the beginning, fire
personnel wanted the proposed station located outside the loop and in an area that
we could get back into the city from easily, as well as a controlled intersection where
we would control the light. This would be a preemption system. On a one light
basis, this would cost between $2,000.00 and $5,000.00 and we can control the light
from the truck. The system that we are presently considering costs approximately
$3,500.00. With this type of system, fire equipment can make a safe approach and
proceed through the intersection.
Chief Burgin made the point that the consulting engineers agreed with our staff
because we used resources nationwide - the same planning that the state uses, the
same planning that other cities use. These techniques are widely used throughout
the country. By following that format, guidelines that make sense and are
Fire Service Committee
July 15, 1999
Page 3
Fire Service Committee
July 15, 1999
Page 4
internationally recognized, our plan is entirely acceptable to Bucher, Willis, and
Ratliff and would be acceptable to any authority that examined our plan. Burgin
points out that fire service in Paris is similar to that in other cities. They operate in
zones as we do.
Deputy Chief Neece points out that the biggest difference between Paris and most
other cities is our isolation - there is not adequate mutual aid with no fully paid
professional full time fire service very close, other than Hugo and Greenville. There
are other departments in the area, but they are volunteer departments. The
volunteer departments are not municipal structural trained firefighters and they
don't operate trucks similar to ours or hose or nozzles similar to ours. We are
reluctant to put them into some of our situations. He states that we are not like
Plano who has a lot of money and mutual aid next door. Cities like Plano have
interlocal agreements. Other departments are just appalled that we don't have third
out mutual aid with other departments close by to come and help us. Councilman
Bell points out that we are still in the boonies.
Deputy Chief Neece states that our first alarm is two engines dispatched from two
stations. Our second alarm is one more engine and our third alarm is all call - that
is, we call in off duty people to come help. Usually about twice a year we call for
mutual aid. We often handle very large fires with as few as nine men on duty.
Chairman Manning questions about the need for a third lane for Pine Mill Road near
the Loop.
Chief Burgin points out that the key consideration is the ability to move around
inside city. He states that the diamonds on the map are arranged on major
thoroughfares, north and south, throughout the city and that these routes quickly
get the equipment into neighborhoods. He talks about the use of the secondary
streets and neighborhood streets. He states that it is critical for fire and EMS to look
to planning for thoroughfares of the future. Chief Burgin recommended the
completion of the extension of Martin Luther King, Jr. Boulevard and states that
Station 1 was planned to have access to MLK. Chief Burgin states that this is a
critical need in order to move quickly into east and west sections of the city. He
noted that another lane on Pine Mill would help and is needed already.
Deputy Chief Neece pointed out that people don't realize that intersections are not
as difficult for the fire department, if we control the light, as it is for private vehicles.
City Engineer Earl Smith observed that roughly, from the proposed site on Pine Mill
Road, there is about 2500 feet of road, currently thirty feet wide, overlaid a few years
ago which is holding up well. He stated that to build a center turn lane, a left turn
Fire Service Committee
July 15, 1999
Page 4
Fire Service Committee
July 15, 1999
Page 5
lane, would add about fourteen feet of pavement and that we would probably add
curb and gutter, address drainage needs which are fairly trivial compared to project,
and we would have to acquire additional right of way. He stated that we would end
up with forty -four foot wide street, not in conformance with the current city
ordinance, although it meets Texas Department of Transportation standards for lane
widths. The street would be forty -four feet wide from back of curb to back of curb.
The cost estimate is based on improving with asphalt, salvaging what pavement
currently exists. This estimated cost, including legal, engineering, and right of way,
with contingencies would be about $260,000.00. He stated that he did not take a
close look, but was just making a guess estimate.
Deputy Chief Neece stated that we have evaluated the traffic patterns in the area,
been out there at all hours of the day and night and in all traffic situations. The
Deputy Chiefs and the Chief do not feel that it will be a catastrophic situation. He
stated that it was not ideal, but that the Lamar Avenue location is much worse and
trying to get out of the present east side station on Lamar Avenue is a nightmare
because it is too close to the road with too short an entrance ramp. The traffic is
constantly having wrecks in front of east side. He added that we have more
problems with Lamar than any other area.
Deputy Chief Neece explains about the National Fire Protection Association, the
NFPA, which in some states has been adopted and has force of law. He adds that
Texas has not adopted NFPA standards and regulations as law, however, it is seen
as reasonable and prudent standard throughout all fire services in Texas. In Paris,
all of our trucks are NFPA compliant as far as warning lighting, sirens, compartment
space, pumps, hose, bunker gear, helmets, boots, etc., we continue to stay NFPA
compliant. We followed NFPA recommendations as far as land needs, floor space,
building utilities, spaces, response districts, and things of that nature with respect
to these recommendations. Deputy Chief Neece handed out copies of NFPA
standards with some highlighting. He stated that in every aspect of fire service we
try to follow NFPA standards, using the guidelines for sizing of stations and bays.
Deputy Chief Neece, referring to the floor plans, reviewed two options and stated
that we could draw up others. The department would like to construct a station that
would be adequate for at least twenty years, barring unforseen major changes in fire
service. He pointed out that the department no longer just fights fires, but that the
department now goes on medical calls, first responder calls, carries AED and
provides numerous other services. He noted that rescue is one of fastest growing
service areas along with confined space, hazmat, and airport crash rescue. There
is also a lot of service now provided to industry. The department is working with
Fire Service Committee
July 15, 1999
Page 5
Fire Service Committee
July 15, 1999
Page 6
them to keep them safe.
Each station is capable of accommodating six man staffing per shift. The station
floor plan we are proposing is slightly less than 6000 square feet, having a living
area of 2263 square feet and would adequately house up to six fire persons and
provide for their needs as far as sleeping, dining, preparing to go on runs, as well
as accommodating some training needs. Also, we are proposing a truck bay of 3120
square feet, which would provide three pull- through truck bays of single stack
design which would be fifty feet long inside housing one truck to a bay. There would
also be other miscellaneous square footage for lawnmowers, small equipment, etc.
With porches, the total square footage for the floor plan recommended would total
5935 square feet, and this might be modified by the architect. Staff feels that this
floor plan is very adequate for these two substations and will accommodate female
officers, would accommodate an engine company of up to four men, which currently
we only staff three, would accommodate a grass rig or other minor apparatus, would
accommodate the possibility of housing EMS in the future. This plan also
accommodates another aerial, if needed, which might be particularly relevant in the
southeast location. It was pointed out that we are supposed to have an aerial within
two and one half miles of any structure designated to need it - one three or more
stories. Currently, we make do with one aerial. The layout of the stations is flexible
and should serve for a number of years.
City Manager Malone suggested that the Fire Service Committee focus on station
floor plans, asking Gene Anderson, Finance Director, to review Fair Labor concerns
about EMS. Mr. Anderson explained how we pay fire and EMS personnel. He
explained that while all other employees are paid on a seven day work period, forty
hours, with anything over that being overtime, (unless they are salaried), the fire and
EMS personnel are paid under the 7K provision of the FLSA, which gives them a
twenty eight day cycle, instead of a seven day cycle. He said that by stretching that
from seven days to twenty -eight days, you are more likely to be able to reduce your
overtime hours because anytime they are not actually on the job, or on vacation,
sick, or holiday time, it reduces the likelihood that they are going to draw overtime
during that time period. So, to rephrase it a different way, within twenty -eight days,
fire and EMS personnel have to work more than two hundred and twelve hours
before they draw any overtime pay. Looking at it another way, they have to average
over fifty -three hours a week.
FLSA applies that to EMS under certain conditions, one, they have to be considered
an integral part of the fire department, they have to have certain rescue type training
related to fires, and they have to be regularly dispatched to fires. If they are not,
Fire Service Committee
July 15, 1999
Page 6
Fire Service Committee
July 15, 1999
Page 7
they would not be allowed the 7K exemption. Another issue is the housing of the
two services together. If you look at a typical twenty -eight days, picking a cycle in
December of this past year, there were three hundred and twenty -three hours of EMS
overtime during that twenty -eight days. If those same hours were worked and you
used a seven day, forty hour week pay period, there would have been one thousand
and thirty -seven overtime hours for the EMS personnel. Mr. Anderson indicated that
this would have increased the overtime cost to $14,200.00 for that twenty -eight days.
If that was a typical twenty -eight day period, then, over the course of a year, the cost
of having the EMS personnel would go up $170,400.00. This illustration shows why
it is so very crucial that we be able to maintain the 7K exemption for EMS personnel.
In most cases, all EMS personnel are firemen, housed and identically trained. Our
EMS personnel are not trained firemen and don't go through that same training.
Costs can go up dramatically. Chief Burgin pointed out that more personnel would
be required if you went to a forty hour week. Under that scenario, we would have to
add extra people and that cost was not figured in to Mr. Anderson's calculations.
The City Manager pointed out that we have two hospitals and that conditions are
rapidly changing in medical field. We are currently enjoying the benefits of two
hospitals providing living quarters and stations for our EMS at no cost to the city.
The electricity bill, laundry and cleaning, and many other benefits help our EMS
bottom line in this mutually beneficial relationship. We work closely with the
hospitals and we have a very fine EMS service, one of the best in the state. We
employ people and enjoy an continuity of experience because of job stability. With
the knowledgeable people we have employed, we set a standard to be envied
around the entire state. We are able to promote our city through the Think Child
Safety and Think Senior Safety programs, promoting the Circle of Protection. The
Manager pointed out that we should not want to jeopardize the very existence of this
service which depends upon contributions from our county government as well as
the city government to operate the ambulance service which comes very close to
paying for itself. The Manager stated that, in looking at a floor plan, we wanted to
consider that we might suddenly have to relocate the EMS stations for whatever
reason, FLSA regulations or circumstances where one or both hospitals withdrew
their support.
Also, we might get into a situation where we had some new service area
requirements, and if this occurred, it would be much cheaper to add this one
thousand square feet now. We recently looked at expansion of the west side station
to accommodate the larger size trucks and found that it would take over $100,000.00
to enlarge that station. The City Manager recommended that this standard floor
plan should be adopted and used until such time as it becomes outdated. If the
Fire Service Committee
July 15, 1999
Page 7
Fire Service Committee
July 15, 1999
Page 8
space is not used for EMS vehicles, it can be used for other types of vehicles or
other storage and our money would be well spent to build it in that configuration.
Deputy Chief Neece noted that, currently, we could store reserve ambulances and
other equipment and that the space will not go unutilized.
The City Manager stated that you could go anywhere in our region or state and
compare, and you would find that we have one of the top fire and one of the top EMS
departments. He said you would not find any more dedicated or better trained
personnel and that we are working to provide them with the equipment that they
need to do the job. Their budget has been constrained for many years and other
needs have taken precedence. He stated that, even though it appears to some that
the fire department is getting more funds than other departments, that it is time to
meet their needs and catch up.
Chief Burgin noted that once we finish this next phase, until there is a definite
growth to this city, we are through for a while. Councilman Bell remembered when
all fire trucks were failing inspections and had gotten outdated and that the new
ones are real close together in year model. He stated that when those start getting
outdated, they are all going to be outdated at the same time. There ensued a group
discussion of buying too many trucks at the same time and admonishments not to
get into that situation again, if it could be helped.
Chief Burgin suggested planning, making decisions, and taking action, and that now
we need to get these two stations built. He stated that we need to move forward
with Phase II. Deputy Chief Neece agreed, saying that we have the trucks in the
house, most of men already hired, and we need the stations constructed as soon as
possible and the three additional men hired and trained. Councilman Bell asked if
the committee needed to present this floor plan to the City Council.
City Manager Malone stated that, the Council having bought the two sites, has made
the decision where the two stations will be located, and although there is some
dissension in that some say build only one station in southeast and keep east side
open, that is not the staff recommendation. He stated that we have had a very
thorough investigation and presentation and that the people who are the
professionals in fire fighting, in conjunction with the professionals in engineering
and planning, those doing the Master Plan, have made a recommendation in
presenting Phase Il. We pay a lot of money for the training these folks have received
and we feel that the plan is capably conceived and presented and recommend that
the committee give support with regard to the floor plan and continuing to carry out
Phase II of the Fire Service Plan as presented.
Fire Service Committee
July 15, 1999
Page 8
Fire Service Committee
July 15, 1999
Page 9
The Manager stated that the next step would be to go forward with the construction
of the two stations by the general contract method and that means that we will
engage an architect to prepare complete plans and specifications to bid this project
out. The Manager pointed out that we have some money in the current budget and
we have some money available from the last issuance of Certificate of Obligations,
and that those amounts combined should be approximately sufficient to build both
stations. Councilman Bell asked if Station 1 was designed by an architect. The
Manager stated that it was not, that it was designed in -house by city staff. The City
Manager recommended that the new stations be built basically like Station 1, stating
that under our proposal that we would recommend this floor plan, turn it over to
architect for plans and specs for bidding and the architect would be directed to use
the style, colors, and comparable construction. We would then bid out the
construction of these two stations, considering them one at a time. The city staff
recommends the same, one floor plan for each substation.
Dr. Deupree points out that this issue of the floor plan would be a very minor part of
the whole presentation - that the expertise has been the layout and the knowledge
to know where to put these stations. He stated that their training is valuable for the
layout and location. Dr. Deupree states that they have the expertise to do this
planning. City Manager Malone noted that the two things challenged were the Pine
Mill Road location and the floor plan or size of the proposed locations.
A general discussion ensued that we should build for extra space now and it was
noted by the committee that the additional space will never be as cheap if needed
later. Deputy Chief Neece reviewed the basic size comparisons and the various
options and furnished the group with a handout. On the front page, a floor plan for
a six person -three bay station will require about 6,000 square feet; a six person
station with only two bays, allowing for adding the bay later, if needed, is 5,400
square feet.
Another option, the four person -two bay station, which could never house the EMS,
would be about 4,000 square feet, probably closer to 4,900 square feet. For
comparison, the current west side station is a two person, one and one half bay
station and is 3,040 square feet and is packed to the brim. The handout also
included cost estimatesvworked up with engineering department which were based
on more current bids, specifically the airport terminal. With estimates on drives,
parking, etc., and furnishings, a rough estimate of $685,000.00 per station has been
made. This cost might be further refined after consultation with.an architect and
reviewing more current construction costs. The City Manager cautioned that the
committee should keep in mind that these are estimates and that some prices may
Fire Service Committee
July 15, 1999
Page 9
Fire Service Committee
July 15, 1999
Page 10
be much higher now, noting that construction materials are up in price and building
is booming. He noted that sheetrock and concrete are higher.
Deputy Chief Neece reviewed the current proposed site plans for Pine Mill Road and
Jefferson Road and noted that many details would be worked out with the architect.
There followed a discussion of station setback from the right of way and aprons and
a discussion of facing the south east station at Jefferson Road and 24th SE to the
east, facing Dragon Park, providing some security for the walking track as an added
bonus.
Deputy Chief Ronnie Grooms stated that what is now Phase I and Phase 2, when first
proposed, were all one stage and that their original proposal was to build Station 1
at its present location while building the other two substations at the same time.
Department personnel at the time stressed that the other two stations would have
to be built concurrently with Station 1 when it relocated. Because of funding
constraints, it had been decided to put the project in two phases and over time,
various events occurred to stall the completion of Phase II, which is desperately
needed to provide appropriate coverage for all areas of the city. Councilman Bell
stated that he foresees ever increasing needs in the future.
Deputy Chief Neece noted that it is important to have paid full time staff ready to go
and that, in rural areas, a full time paid department might not be needed as much as
in crowded city. In rural areas, generally houses are far apart and are insured. As
long as the people get out, it might be more acceptable that the house burns down
and insurance pays. However, in the city, houses tend to be close to others and
several may catch on fire at the same time, causing a much greater threat to life and
property. He stated that in the country, a house fire is not likely to catch the
neighbors house on fire.
Chief Burgin talked about increased code enforcement, sprinkler systems, and other
things to be considered after the two additional stations are built. He noted that you
can fight fire as good with a pencil as you can with fire trucks and men.
Chairman Manning suggested in a motion that the Fire Service Committee approve
both of these fire stations with the site plans and the floor plans of the buildings and
all of the recommendations of Phase II, with the work to start as soon as possible.
The Fire Service Committee unanimously adopted the recommendations of the fire
department personnel in Phase II, including the two stations, the locations selected,
the approximately 6,000 square foot floor plans for future stations. Chairman
Manning cast his vote and voted the proxies of Mayor Pro Tern Mary Ann Fisher and
Fire Service Committee
July 15, 1999
Page 10
Fire Service Committee
July 15, 1.999
Page 11
Kenneth Webb, and Councilman John Bell and citizen Dr. Joe Depree voting also in
the affirmative.
The City Manager noted that the minutes of the meeting would be prepared and
presented to the City Council for action. The meeting was adjourned.
ATTEST:
MATTIE CUNNINGHAM, CITY CLERK
RICHARD MANNING, CHAIRMAN
Fire Service Committee
July 15, 1999
Page 11