16 - PRESENTATION BY THE ENGINEERING DEPT. ON INFRASTRUCTURE BONDItem No. 16
COUNCIL MEMBER AGENDA ITEM REQUEST
Please complete this form to have an item placed on the agenda for the Council's consideration.
The deadline for requesting an item on an agenda will be the Wednesday before the council
meeting takes place. This time is necessary so that staff can research the matter and
prepare /review an ordinance, resolution, or other document such as a contract. In order for your
fellow Council Members to fully understand your item, have productive discussion, ensure
efficient council meetings, and for staff to be able to assist you as completely as possible, it is
important that you describe the item with as much detail as possible and include any supporting
documentation so that it may be included in the Council's meeting packets. Please return this
completed form to the City Manager's office or the City Clerk's office.
Council member making request:
[] Aaron Jenkins ❑ Matt Frierson
❑ Sue Lancaster ❑ Edwin Pickle
❑ Benny Plata ® A.J. Hashmi
❑ Steve Clifford
Description of Item: Presentation by the engineering g epartment on the infrastructure bond
project progress and the map that was presented to City Council discuss and act
Are additional sheets or supporting materials attached? ® Yes ❑ No
I request that this item be placed on the agenda for the:
® City Council meeting on this date: June 22, 2015
❑ Sometime in the next 2 meetings
❑ No specific time in mind —just keep it on a list of pending issues
Signature: A.J. Hashmi Date: 6 -10 -2015
City of Paris Revised 05/12/2015
DAILY REPORT NO. 23
' Job No. No This Report
Date j
Day Of IvVeek
/ Lrs
Job Name /s/ YL
Location UZ,
' Weather Report 8:00 am
2:00 pm u/
Temperature: 8:00 am jo
2:00 pn)JV
Management Staff
Was work delayed for any reason?
1( yes, describe
'
Was stoppage ordered in writing?
If so. by whom
Staff Total
Contractor Workforce I I
v
v
Force Total
Subcontractor Work
Force
Total Workforce
Sub. Total
Proiect Total
Has letter confirming verbal instructions been written?
Have you given Sub. special written instructions? or verbal
If so, describe
Is your assignment held up because of lack of mat. lack of info.
interferences other trades or for other reasons?
If so describe
Did any disputes arise? Describe
I las dispute been settled?
Was any Sub. scheduled to start or mat. to arrive which did not appear?
Describe
Describe day's activities giving quantities, location of work. etc.
a
" V
�-
f
2 1S.f
C-S-0 Tina .n
c�
•� L
Project Manager Projectlnspcctor
Continued on back File #5.1.0
DAILY REPORT NO. Zy
,lob No. No This Report Date 14 Day Of Week
,lob Name kj L Location
Weather Report 8:00 am 2:00 pm L CY Temperature 8:00 am So 2:00 pm SS
Management staff Was work delayed for any reason? --4 If yes. describe
Staff Total
Contractor Workforce
s
t
a
Force Total
Subcontractor Work
Force
Total Workforce
Sub. Total
Proiect Total
Was stoppage ordered in writing? If so. by whom
Has letter confirnung verbal instructions been written?
Have you given Sub. special written instructions? or verbal
If so, describe
Is your assignment held up because of lack of mat. 1 lack of info.
interferences other trades or for other reasons?
If so describe
Did any disputes arise? Describe
Has dispute been settled?
Was any Sub. scheduled to start or mat. to arrive which did not appear?
Describe
Describe day's activities giving quantities, location of work, etc.
MCM
•
Project Manager projectlnspectoi
Continued on back hlc tt`. LU
r
PARIS
4000 Pine Mill Road, Suite D
Ma Paris, Texas 75462
Telephone 903.783.0860
PCEOSCIENCE Facsimile 855.581.8089
SOIL DENSITIES
EA'VIRONMEA'TAL GEOTECIINICAL WATER RESOURCES MATERIALS TESTING
Client Name: City of Paris Report Number: 2313- 0021 -00016 / Version: 1
Project Name: City of Paris St. Improvements Report Date: 01.20.2015
Project No.: 2313 -0021 Sampled: 01.16.2015 /Lee, Brad
Location: Paris, TX
I. D. No.: 4850
TEST RESULTS Page 1 of 1
Specification
Moisture Band
Specification No. Compaction, % Minimum Maximum
1 95 -2.0 2.0
Elevation /Lift: 18" BFG
Optimum
Maximum
Wet
Proctor
Moisture
Dry Density
Proctor No Date
(%)
(Pci
Color/ Description
012- 15 -02A 01/08/2015
17.0
107.0
Grey / Lean Clay with Sand
012 -15 -02B 01/08/2015
18.8
103.4
Red / Sandy Lean Clay
Specification
Moisture Band
Specification No. Compaction, % Minimum Maximum
1 95 -2.0 2.0
Elevation /Lift: 18" BFG
Gauge No.: 34307 Daily Standard Counts: 01/16/2015 DS: 2540 MS: 690
Test Methods: AASHTO T310 /ASTM D6938
Orig: City of Paris Attn: Shane Grissom (1 -ec)
TBPE Firm Registration No. F -3179, Expires 01/3112016
David P. McClellan, Manager, Construction Services
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES. MATERIALS OR LOCATIONS TESTED OR OBSERVED AND MAY NOT BE
INDICATIVE OF THE QUALITIES OF SIMILAR MATERIALS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM. THESE REPORTS ARE
FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENTAND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. REPORT CREATED BY EtmTree SYSTEM
www.apexgeo.corn
Apex Oeascience, Inc.
Wet
Moisture
Dry
Percent
Test
Gauge
Density
Content
Density
Proctor
Spec,
Proctor
Pass
No.
Depth
Location
(pcf)
%
(pcf)
Number
No.
Density
Fall
1
6
Across from house #3645
121.1
18,8
101.9
012- 15 -02A
1
95.2
Pass
2
6
Across from house #3615
121.0
16.8
103.6
012- 15 -02A
1
96.8
Pass
3
6
Across from house #3540
120.6
17.9
102.3
012- 15 -02A
1
95.6
Pass
4
6
Across from house #3435
118.4
20.1
98.6
012- 15 -02B
1
95.4
Pass
5
6
Across from house #3415
117.7
1910
98.9
012- 15 -02B
1
95.6
Pass
Gauge No.: 34307 Daily Standard Counts: 01/16/2015 DS: 2540 MS: 690
Test Methods: AASHTO T310 /ASTM D6938
Orig: City of Paris Attn: Shane Grissom (1 -ec)
TBPE Firm Registration No. F -3179, Expires 01/3112016
David P. McClellan, Manager, Construction Services
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES. MATERIALS OR LOCATIONS TESTED OR OBSERVED AND MAY NOT BE
INDICATIVE OF THE QUALITIES OF SIMILAR MATERIALS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM. THESE REPORTS ARE
FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENTAND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. REPORT CREATED BY EtmTree SYSTEM
www.apexgeo.corn
Apex Oeascience, Inc.
'a, r Nex
PC.EOSCIENCE
DAILY INSPECTION REPORT -SOILS
PARIS
4000 Pine Mill Road, Suite D
Paris, Texas 75462
Telephone 903.783.0860
Facsimile 855.581,8081
ENVIRONMENTAL CEOTECHNICAL KIA TER RESOURCES MATERIALS TESTING
Client Name: City of Paris Report Number: 2313 - 0021 -00015 / Version: 1
Project Name: City of Paris St. Improvements Report Date: 01,20.2015
Project No.: 2313 -0021 Sampled: 01. 16.2015 / Lee, Brad
Location: Paris, TX
I. D. No.: 4850
TEST RESULTS
Weather & Temperature:
Partly Cloudy and 38 °F.
Equipment On -Site:
backhoe
Technician:
Brad W. Lee
Page 1 of 1
Description of Progress:
Apex personnel arrived on -site as requested by client representative to perform the inspection and testing as
needed.
Technician performed density testing on the backfili of the above referenced project as requested. 5 In -Place
Density Tests were performed on the trench backfill and recorded. Please see Report No. 2313 - 0021 -00016
titled "Soil Densities" for exact test location(s) and results.
Orig: City of Paris Attn: Shane Grissom (1-ec)
TBPE Firm Registration No. F -3179, Expires 01/31/2016
���
David P. McClellan, Manager, Construction Services
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLES, MATERIALS OR LOCATIONS TESTED OR OBSERVED AND MAY NOT BE
INDICATIVE OF THE QUALITIES OF SIMILAR MATERIALS OR PROCEDURES, NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM. THESE REPORTS ARE
FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION. REPORT CREATED BY ElmTreo SYSTEM
www.apexgeo.com
Apex Geoscience, Inc,
Shawn Napier
From: Dustin Emerson <demerson @apexgeo.com>
Sent: Monday, June 15, 2015 2:53 PM
To: Shawn Napier
Subject: Jan 16 Density's Houston Street.
To whom it may concern,
On Jan, 16, 2015 The density test that were performed on the backfill of water line were done on Houston
street, Paris TX.
Thank You,
GEOSC:ENCE
Dustin Emerson, Manager, CMT Services I demerson(o)apexgeo.com
800 755 84611 C. 903.714.2369 1 apexgeo.com
LEGAL, This transmission, including attachments. contains information from Apex Geoscience. Inc. which is confidential
or privileged. If you are not the intended recipient, immediately destroy and/or delete this message. Any disclosure copying
distribution or use of the contents is prohibited.
Please consider the environment before printing this email.
i
P 9
`� _ *�, •' `�, "3y' ±q• �Sp, .l�'+".' /lye` %.i ..a. r < -, } - 1 ..
i 44 "i A�,.. ��'�'= ``• a� ' "+ ` -' •ate �
v-
'. "
a e P -
•i •
w -
+
f •
.,y.. D v•.a"i°� } v`• { `"S ` S M aEr �.�Lr
� . , ��tia ,. .k� •. . � -... f � �. . �' �... ,tom , i]► � +�'" ,.`'
1
.y,g+y+
`�.- ►}� _ l4•'�Fey,•, �;r � '+ter,/ -� t � y ` Sf � , +�' `, ��y�f�� ! .°�• �
•' a� p'1s'i"ra,.�• AY.'µ r. L '�.�., a�c �+ `W +�✓ 4
k� . L t T ,� '1 �.•r , ' w"V�f�. /' Af'• p 4�t �hA'� 'i
_
*r 5 V •y -4 * Y>. +' ` . "1 S.s.
R�CCCR+R �. •"
r
ZlI,ry.
ate- �: :.� ... f • r _1"• .� f .�.a +'" � ,.. • "'r.4✓\ ry. '�µ . ���\ �^ _
�. �� *� a � ��` �� R � '�i; • - � �. r �.. ifi � X14 �
�f 'i +�`rr� � -- �r . r.' ..._ t.; � ,'_ '�' � -� g � _ .,•��r� t �"c _ ! Y�"t�.`.' �aR"'• � "'r a"" _' �► + ` .: c� �,'r,'�, + > `° .
• j y
i4oj
-7e
It t,
'16
44
I-v
WO
� a
�� ivy C_ � ,. -r• �� � �� �i
r.
go
r .:
%S✓ '
ka
.mss,,, _
'`
J
4�
sN
WO
� a
�� ivy C_ � ,. -r• �� � �� �i
r.
go
r .:
%S✓ '
ka
.mss,,, _
J
WO
� a
�� ivy C_ � ,. -r• �� � �� �i
r.
go
r .:
%S✓ '
ka
Of
MIN ■
'Ale"
Awl
, 10
- di - 4"
V VII.,
At
is -_ ..,�,�. >_'�. - �±��� =•,. "� -- -
- � ' .
fitt it 1&C... • .
i
i
- , J
- i u
N +..,, `` , " row ' � ` .' y �. f ��� � -0`�' J `•��
pp
P J f r
J ,` Lt ''' {r! I f I r. } r iu1 � �;i•h t1 �,!, r . P ,:, � .� 't
, P, � r;• l #. ,r, iJ r Sr1'L�tt4r 1 I., . �(} }, �t,iv�'`i f. .$. L,, y�t f i 1r �1 ti� 1 5F i:, y { �t. J.3�. '?'.! 2 � , � 1.'�� � 4, ��Y '+, tti •� -�+•
-
.��� >;. -S 4•1t(ri.,. y,i v. A1•.. ,.{,j..,v�Pfr��� rv��r•�� "'�� 'f rt��' .rf�i +�� % !r`� ry23. t \.� A,, ti � ��i2Lt .., t. �4` � \ �
mw
LY
1• J.i . ..:t. N � . tr rYi,l..,t'. �.,... ?11r. 1P �. .. ,..,,a. r! J ?7c'J.� ,:n S. y.+i•., r ,. �' �`, 1. ..1 aa.. .� ... ,
AA
I fl
r
1
"'Slt
x k
•� off, i�. �yt4w
r IV, z La
v t
4 �
+C •, ,�1� 7 � Y i
�'q i �( 4^i t�,a' '4 a�'y.1 S :T. �4j�jt � \ �ik •� l
., , �• the
F � � � y � �}
A
!�
4ri
7..
1
I fl
r
1
"'Slt
x k
•� off, i�. �yt4w
r IV, z La
v t
4 �
+C •, ,�1� 7 � Y i
�'q i �( 4^i t�,a' '4 a�'y.1 S :T. �4j�jt � \ �ik •� l
y
1
w
a
• � � .* . -4 as _ -�;-:
At
` T INk
l
3� r r' ' Tj
s t .
f
, 7�7
W4.
SIN
VANII
r.
WIR:?v 44 - T
jwq
m6m
Lid."
4t%l
11 x
N
,
J4
r.
WIR:?v 44 - T
jwq
m6m
Lid."
4t%l
.f
•fit.. .. --
8
a
=i•it' M1 � .! is . , a
.. •"► .,mss'^ ,
e
- r
d IA
7 f
a
�Y
.. PIPWIL-
Y' s j ' l� r. l
J{y� f �� r•. F
,
gMa
Owl
D • s�f-
2` Y ` + t
h,r_
i s
"X\ i 7.1 z. '
aY�a
Y.:
•
Yh
111 i +
•' — Jv. • � � is ,. -. • l w I.
At
s;y+
-
y,
��,4/ l V•. ,." ti
- 1., r J�Y�a �� - ..•..a%� , ,�r b;. �+�w�,IMry /t ff,� .��'� sFi�`�Q /,'.s»
»r` M
i rte, -. S .. • � i'
t
•4 fJ•.. �� cr �f +.
r
..+WOW
.r ice, :'� iii" ,�r��+�yjr�' ��,�j ify� s �. ^• r'° '
- 4�r
.A tom• � I vy � s
�_' � ,�ri� M r4�.�Y 1� � � ;i�..�� 5� �� actin ��; tai ��� � ,,. x4: ��i f'.�:'3r �' t'"� -' -•
/- ��'4x �.s'x- �, ��"• �, '�•" �{ Jr2.y'r,ts i..$,,,yyy+++ r, ry _ •�.
' � . M � Jr A' 1' � "'•I +J'% !. r• /f �i J R a 'y } .! ���� V J. � �i r.., �• '7r
I .J: ?1 •�'" r f� . �.�'' _._.r�".!'fi•.r if ,�t � .* : _��.i�. .� . "?c6i,
t
JIIIIIIIN
;11111111 "r Paris City Limits
Water Service Limits
- CCN
�FM
—FM 1510 FM 1570.E ---
_.. Y11111111111
JSyo
i111111L N
N11111n 1111111=, Z
1111 r
Jltyllr
Jllr S
r�
�i
14
L �t
SIP
IIIIii l /1f1��'
BONHAM
GRAND
,1111 `ice
,..II11111111111
GpOp�
sm
BFI Iii
71Yu
PHASE 1 WATER
SUMMER OF 2015
..........
r Paris CI
Sewer
- CCN
FM 151
CAPITAL IMPROVEMENT PROJECTS PROGRESS
N FHA
gX
d
N�
wPARKST
N
LT., a2 Cq.wN 87
t
CHOOTAWW
�9AGE iPAEOR
4 }
��yRO
aD
g
y 0o
�aouovER LOOgi�"+e
'Ye
Legend
- COMPLETED
- UNDER CONSTRUCTION
DRNE W AVE A9PEM DR
CtEMEwi RD SPUR 1� OCgEERDR
W CENTER 91 n
TO BE BID OUT
WPAM aT .. z i ECERTER Dp01mtM PoIN: S:VGISIDWG5IDM1 MgntOw \2D15bv"reA ma Df NCf1a1CO11R[Il or
" = z Y D Ogress ma0 ma0
� wPARN Si WNICEOHV bT ° EHILRORraT' � � EWLN00.Y °
i EWILUANS 9T ^_ ~ �E'TCRVT011"R OEDR� s O
" JOHNEW 9i
~ C C WMENDERaON eT NLUIHER NNO OR aSrER OR F
ER OR YAGAS ST s & 9
' s w EpfEb2 = WOOµBiTIAM !ANDY 62 " 4 < "RDM EYPgE94�OR NEWDAOR
WLON0a2 Y �EOMRETT ST€ A i C 00.ovE ST'It' i BPIMfwD000R r" RuARULOq
2 e_ F F F PMRPA%AVE �' R IDCEVEW RO rub N Br WPV �J
CAAPNIELL ST Y tl a YN1 IT z 3 z y ~ s W u
WALxER Sr , ttNONT.f YE i i �" ° STLEDA2E DR
DR NE Cia
wLOxar p z '� " ETUOOR9TREET :R TuooR erREEr ~ + 9 ^ L CN
z a € EeooTH g Boo a2 m m oMA9oR
Z�� _ a E NTH EET ENF .2 a
S� KUM SI Z + +2 w OILabON PVE ~L~ ~ _ ECHERRY Si �i myE DRY 6TR = y n LNOT IRIN OR 4 n i T - y
- m w FPGOE SE OWFf ST r 1' 0.^
'W E—EST C EP STi ObiN NN
K fPRICE 9T EMW9TOU 4T
WMWA61�ra t ~ i EXWSTOw BT s
^ LL �WNOU92B t sxoutroN 9r
T A MAPLE AVER- Y ' $ LAwRAVE " vRiuRORF u
4MD ONE9ALLEr � m OLEANDE0.piL x
�_ - ��1Fi0ii0i F a MAr ry " g MAROARETa MARwgErs' .M MiNEST
wFAUF s m °XUBBAaOST� o xu9BARO Sr DewRO e2
w W9TIN BT
IT
N nWAU9TW BT y WAU9 WST " E !!yy 0d11 HACIEV .0 T ALPMf IT
CAM ULEY € N LR Sw00DLA 2 E ^ CULEERT90N aT mm �^ z y N = a
O m WSNERMAN ST n F �, EtHE0. " _ u w uP9PN 6T 5l F ¢E IFIGMDR i
�sxANHwDrt >
W BgAME ST °¢ n XWON a n '^ HEI�i IONST NEN)/N.RYBT=" 91 CLARK LM ttAMW O S F OBON RO DAWN ON
W ON ST EN19M eiw a m" EwASNINOloN 9T EPM T EWA9x1 TON ST EWASWNDiON IT
R ��X 9OTTW ° M
x "s e
t MMAVE EP0.K r z pq i
BROWNAVE CE CEDM ti EPA �_YHPLC u EO T02'` EE
egowN aT
HIT
'4 "sOO(y "sCIR m BV, TeaTY LN ao�
FRISCO AVE YUtSON9 JAC
w NEAMEAVE - -
�EDEaT
SYCAMORE IT 8Y E9T n n ^ i+BEL A RN DN OR
F -
ORANGE ITW PWa9 BLVD
NEADLEAVE 6NFAOLEAVE IXOhFEE0.aON 0.0
R
EVERfAEEx IT NEN1EFFERBON
R
6
Arre MELao g
L49ys
This progress update shows water and RALSTAR
sewer lines that are installed and in- service.
It does not depict closed out contracts.
LD�TMu
X90