Loading...
09 - DEMOLITION REPORTItem No. 9 Buildings and Standards Report: July, 2015 7 Structures were presented to the Buildings and Standards Commission: 1110 SE 3rd 141 NW 25th 2450 W Cherry 3380 NE Loop 286 2245 S Church 546 E Hearon 6th SE & Jackson 4 Structures were demolished: 368 NE 1 st 925 SE 8th 619 Grove 1001 Grove