09 & 10 - DEMOLITION AND CODE ENFORCEMENTS ACTIVITY REPORTSItem Nos. 9 & 10
Code Enforcement Report: 1/15/2016 — 2/15/2016
Cases Worked- 130
Lot Abatements- 20
Miscellaneous:
Removed 1 Large Tree
Abated 12 Illegal Dumping Sites
Abated over 150 Tires from Various Locations
Buildings and Standards Report: January, 2016
5 Structures went before the Buildings and Standards Commission:
332 Fitzhugh
1870 E Polk
2126 E Polk
1334 W Austin
329 NW 12`h
5 Structures were demolished in January, 2016:
125 NE 12`h
1317 Bonham
1919 E Cherry
1609 Fairfax
1114 SE 15th