09-10-Code Enforcement & Buildings & Standards ReportsItem Nos. 9 & 10
Code Enforcement Report: 2/15/2016 — 3/23/2016
Cases Worked- 266
Lot Abatements- 35
Miscellaneous:
Removed 4 Large Brush Piles
Abated 3 Illegal Dumping Sites
Abated over 40 Tires from Various Locations
Changed the Wind Socks at Cox Field
Setup for 100 Anniversary of Paris Fire
Working on Shooting Lanes for the ASA Tournament
Buildings and Standards Report: February, 2016
7 Structures went before the Buildings and Standards Commission:
702 E Booth
1640 W Austin
624 NW 1 lth
645 SE 5th
1011 S Church
709 S Church
3025 Lamar
5 Structures were demolished in January, 2016:
1341 NW 18th
327 SW 4th
835 NW 6th
1410 Fitzhugh
1635 W Walker