Loading...
09-10-Code Enforcement & Buildings & Standards ReportsItem Nos. 9 & 10 Code Enforcement Report: 2/15/2016 — 3/23/2016 Cases Worked- 266 Lot Abatements- 35 Miscellaneous: Removed 4 Large Brush Piles Abated 3 Illegal Dumping Sites Abated over 40 Tires from Various Locations Changed the Wind Socks at Cox Field Setup for 100 Anniversary of Paris Fire Working on Shooting Lanes for the ASA Tournament Buildings and Standards Report: February, 2016 7 Structures went before the Buildings and Standards Commission: 702 E Booth 1640 W Austin 624 NW 1 lth 645 SE 5th 1011 S Church 709 S Church 3025 Lamar 5 Structures were demolished in January, 2016: 1341 NW 18th 327 SW 4th 835 NW 6th 1410 Fitzhugh 1635 W Walker