09 - CODE ENFORCEMENT REPORT 03/23/2016 - 04/18/2016Item No. 9
Code Enforcement Report: 3/23/2016 — 4/18/2016
Cases Worked- 189
Lot Abatements- 15
Miscellaneous:
Worked the ASA Tournament
Abated 4 Illegal Dumping Sites
Abated over 20 -30 Tires from Various Locations
Mowed Cox Field
Mowed Loop 286
Worked Downtown Winefest
Buildings and Standards Report: March, 2016
5 Structures went before the Buildings and Standards Commission:
1518 Pine Bluff
203 W Brame
1616 W Austin
346 NW 3rd
536 NW 3rd
4 Structures were demolished in March, 2016:
644 SE 9th
1640 W Austin
332 Fitzhugh
334 Fitzhugh
*2 other structures were demolish, but not in conjunction with the BSC: 2305 NW
Loop 286 (Oliver Rubber), and 2680 NE Loop 286