Laserfiche WebLink
Designating a Civil Rights Officer; all as required by TxCDBG Main Street Program <br />from the Texas Department of Agriculture (TDA); making other findings and provisions <br />related to the subject; and providing an effective date. <br />9. Authorize final payment in the amount of $22,753.29, close out the contract with Rick <br />Billy Industrial Services (RBIS) for Phase III of the water system replacement projects; <br />and close out the loan with the Texas Water Development Board Phase III Project <br />#62525 CID 003. <br />Regular Agenda <br />10. Discuss and act on an Ordinance Disannexing three tracts of land being 1.16 acres, 2.45 <br />acres and 160.7 acres for a total of 164.31 acres in size located in the southeastern corner <br />of the Chisum Abstract #175 and the northeastern corner of the Bourland Abstract #70 <br />which is 0.75 miles northwest of the intersection of FM Hwy 79 and NW Loop 286, with <br />the 1.16 acre and 160.7 acre tracts being located along the north side of FM Hwy 79 and <br />the 2.45 acre tract being located along the south side of FM Hwy 79and consisting of <br />addresses ranging from 3194 FM Hwy 79 to 3930 FM Hwy 79, of the City of Paris, <br />Lamar County, Texas. <br />11. Conduct a public hearing, discuss and act on an Ordinance considering the petition of <br />Franz Thiessen on behalf of Lee Larue Trustee Estate of Billy Larue for a change in <br />zoning from Commercial District (C) and Single - Family Dwelling District No. 2 (SF -2) <br />to a Commercial District (C) with a Specific Use Permit (55 -Self Storage /Mini <br />Warehouse), on Lot 10, of City Block 316, located at 3380 N.E. Loop 286. <br />12. Conduct a public hearing, discuss and act on an Ordinance considering the petition of <br />Wayne Brown on behalf of Gerald and Lisa Fulton for a change in zoning from <br />Agricultural District (A) to a Multi - Family Dwelling District No. 2 (MF -2) on Tract -63, <br />A208 E Crow Survey, located at 4310 Pine Mill Road. <br />13. Receive construction update report from EST, Inc. regarding construction management <br />and inspections for the 2013 bond project. <br />14. Discuss and act on a contract with Birkoff, Hendricks & Carter, LLC for engineering <br />services on the Texas Capital Fund Main Street Project, for construction of downtown <br />sidewalk improvements. <br />15. Discuss a request from the Trail de Paris Steering Committee regarding a procedure for <br />transferal of funds collected through the city water billing accounts and provide direction <br />to staff. <br />16. Receive presentation and discuss operations plan and budget needs for Public Works, <br />Engineering, Utilities, and Finance Departments including a Public, Educational & <br />Government Channel (PEG) and public information program. <br />17. Receive update for the clean-up of ditches that were in the areas of recent flooded areas, <br />including a timeline present for when trash, brush, dirt, etc. will be removed from the <br />current ditches; and a detailed plan. <br />