My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-04-16-Minutes
City-of-Paris
>
Boards and Commissions
>
PEDC
>
1993-2016
>
2003
>
2003-04-16-Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:35:37 PM
Creation date
2/21/2017 11:49:54 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
2003
Doc Type
Minutes
CITY CLERK - Date
4/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paris Economic Development Corporation Paris Industrial. Park <br />March 14, 2003 Paris, Texas <br />P2003.068 Page 4 <br /> <br />Direct Costs (Not in Basic Services) <br /> <br /> 1. Reproduction <br /> 2. Travel Expense <br /> 3. Sub-consultants not covered under Basic Services <br /> <br />Direct Costs shall be billed at cost plus 10%. <br /> <br />In general, the scope of work for Additional Services is not well defined until the project is underway. The <br />following lists Additional Services which we can provide in-house upon request: <br /> <br />· Stream hydraulics and related FEMA flood studies or floodplain delineation. <br />· Wetlands delineation, evaluation, permitting and mitigation. <br />· Engiheering for foundations, retaining walls, and pavements. <br />· Off-site engineering studies, including surveying, platting, and plan development for streets, <br /> extending or enlarging sanitary sewer lines, water lines, or storm drainage systems, and including <br /> checking or verifying hydraulic capacity of off-site system(s) as a condition of use. <br />· Multiple comments from reviewing entities. (Multiple comments shall be considered to be any above <br /> the first series). <br />· Extensive coordination between parties (such as owner, developer, City, Contractor or other <br /> Agencies) due to: unclear development issues, ambiguous concepts, or necessary decisions (by <br /> Client) on alternative development schemes, or major options. <br />· Lighting Plans <br />· Review of Shop Drawings2 <br /> Air emissions and related abatement and impact studies. <br />· Structural engineering, Traffic engineering, and Mechanical-Electrical-Plumbing services. <br />· As-Built drawings. <br /> <br />As mentioned above, fee estimates for Additional Sewices are not included herein, unless included in the <br />Basic Services portion of this proposal. <br /> <br />All additional fees required by the project will be billed at a cost pursuant to the rates .listed in the <br />attached Rate Schedule, or based on a supplemental agreement after the scope of services is more <br />defined and shall be in accordance with the General Conditions. The Client will be notified prior to <br />conducting any analyses or initiating any activities that would significantly affect the scope of work. <br /> <br />2 Contract Documents prepared by ACEI will specify review procedures for contractor submittals ('shop drawings"). <br />However, If others provide contract documents, ACEI will not review shop drawings except by special arrangement. <br /> Initial: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.