My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - RESOLUTION ADOPTING THE 2017 LAMAR COUNTY MITIGATION PLAN
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2017
>
02 - FEBRUARY
>
02/27/2017
>
13 - RESOLUTION ADOPTING THE 2017 LAMAR COUNTY MITIGATION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:38:32 AM
Creation date
2/23/2017 2:11:07 PM
Metadata
Fields
Template:
AGENDA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lamar County Multi- Jurisdictional Hazard Mitigation Plan <br />Chapter Four <br />4.4: COST - BENEFIT REVIEW <br />Cost - benefit review for natural disaster projects is extremely difficult. Since the exact damages <br />or even path of destruction cannot be planned in advance, there is little to no way of calculated <br />an expenditure of $x.xx would lead to potential savings of $X.XX. Less tangible mitigation <br />strategies such as public education or improvements in county codes cost relatively little to <br />implement. There is no way to quantify the number of more informed decisions, and hence <br />number of dollars in reduced losses that could occur following these types of programs. <br />For example, a mother driving home with her children reaches a flooded road way. She <br />contemplates just going through, the water doesn't look that deep, or turning around and going <br />the long way home. She recalls seeing an ad in the local paper that said, "Turn around, don't <br />drown." Her ten year old son has just had flood awareness at school, and asks her to take the <br />other way home. The mother turns around and goes the long way home. <br />Was the money spent worth the investment? Maybe the family would have driven right through <br />and made it home safe and sound with net economic loss of $0.00. Maybe the water was <br />moving a little faster than she thought, and the family vehicle washed down river, resulting in at <br />least damage to the vehicle, and more likely a rescue scenario involving several agencies and <br />expense at a cost of approximately $50,000.00. The extreme end to our scenario would have <br />the family drown. Quantifying the loss of human life, especially children, has been and will <br />continue to be a fiercely heated legal debate. For this discussion the loss of life is 5 million <br />each, the emergency responders attempted rescue and retrieval at a cost of $50,000.00. <br />FEMA's Benefit -Cost Analysis (BCA) will be used to evaluate the proposed mitigation strategies <br />that are not obviously have a cost benefit ratio of one or greater. This tool will also be used <br />when applying for grant funds to show that actions are cost effective. <br />4.5: Effects of Mitigation Actions on Existing /Future Building and Infrastructure <br />The majority of the actions to be implemented within a year are public education and <br />awareness. Education will allow residents to make better choices such as not building a home <br />in W UI or flood hazard areas. This education would also educate them on how to make existing <br />structures more resilient to hazards both man -made and natural. This would include individual <br />activities such as how to maintain defensible space to protect from wildfire to the importance of <br />having flood insurance even when not located in a flood hazard area. <br />The increased and regularly maintained building codes proposed by several jurisdictions would <br />provide property protection to new residential, commercial and public structures from hazards. <br />Encouraging local resident to build code plus is great but when the jurisdictions make <br />themselves the example the message seems to be much clearer. Using the goals of the <br />Hazard Mitigation Plan the local jurisdictions plans to lead by example and go a step farther <br />than is necessary to mitigate against threats. <br />Existing structures will be affected as well with the proposed mitigation strategies. As older <br />structures are demolished the updated building codes will go into effect with the new structure <br />being subject to current codes. Local jurisdictions plan to develop ha hazard database that will <br />be a justification tool for repetitive loss properties, unidentified flood hazard areas, and other <br />vulnerabilities that may be questioned. <br />190 <br />
The URL can be used to link to this page
Your browser does not support the video tag.