Laserfiche WebLink
Lamar County Multi- Jurisdictional Hazard Mitigation Plan <br />Chapter Four <br />Table 4.5: Effects on Existing /Future Buildings and Infrastructure of Hazard Mitigation <br />Actions. <br />Action or <br />Effects on Existing /Future Buildings and Infrastructure <br />Project <br />Jurisdiction(s) <br />Minimize potential impacts for existing development from hazards. <br />Lamar County <br />• Existing infrastructure will be expected to implement new codes <br />City of Blossom <br />as remodeling and updates are planed. <br />City of Deport <br />Code Plus or <br />Minimize potential impacts for future development from Hazards. <br />City of Roxton <br />Building Codes <br />. Results in new constructions that are more resilient to weather <br />City of Reno <br />hazards. <br />City of Paris <br />• Critical infrastructure built code plus will have a longer life <br />expectancy. <br />Minimize potential impacts for existing development from hazards <br />Lamar County <br />• Retrofitting existing structures to contain a safe room can also <br />City of Blossom <br />provide extra support for existing structure. <br />City of Deport <br />Safe Room <br />Minimize potential impacts for future development from Hazards. <br />City of Roxton <br />Projects <br />• New structures with built in safe rooms are the ideal choice. <br />City of Reno <br />With education and possible grant funding more new <br />City of Paris <br />construction will include a safe room in the plans. Future public <br />facilities will be encouraged to incorporate a safe room or a <br />reinforced concrete area into construction plans. <br />Minimize potential impacts for existing development from hazards. <br />Lamar County <br />• Existing structures that may experience multiple flooding events <br />City Of Blossom <br />should be bought out, elevated, etc. to reduce future occurrences. <br />City Of Deport <br />City of Roxton <br />Minimize potential impacts for future development from hazards <br />City of Reno <br />• New road and bridges will be constructed at an elevation to prevent <br />City Of Paris <br />reoccurring flood damage when possible. This will extend their useful <br />life but will add cost to the project. <br />• Working with local health inspector to not allow wastewater permits <br />for locations near floodplains will allow for added regulation of the <br />Floodplain <br />floodplains and structures in flood areas. <br />Management <br />• Strict enforcement of floodplain ordinances will reduce flood damages. <br />Minimize potential impacts or existing development from hazards. <br />Lamar County <br />Owners of existing structures will be educated on <br />City Of Blossom <br />how to maintain a defensible space and protect their <br />City Of Deport <br />Public Awareness <br />home from wildfire whether built in the WUI or not. <br />City Of Roxton <br />& Education <br />Minimize potential impacts for future development from hazards. <br />City of Reno <br />Awareness and Education can have a structural impact <br />City Of Paris <br />on old and new structures. If you are aware of <br />hazards prior to construction you can incorporate <br />191 <br />