Laserfiche WebLink
STREET PROJECT CALENDAR <br />2017 <br />E Cherry, 25 NE to 20 NE $136,500 <br />3`d SE, Sherman to Provine $612,518 (with sidewalks) <br />7th NW, Graham to Center $289,354 <br />7th SW, Washington to Bonham $187,950 <br />Replace water line, Graham, 3`d to 7th <br />Engineering design, Church <br />2018 <br />Church, Hearne to Clarksville <br />$2,340,277 <br />Collegiate, Lamar to Clarksville (summer) <br />$419,003 <br />33`d SE, Lamar to Clarksville <br />$508,243 <br />Graham, 3`d to RR <br />$291,375 <br />Clement, Loop to N. Main <br />$397,005 <br />Washington, 7th SW to 1S1 SW <br />$147,420 <br />Fitzhugh, Hickory to Pine Bluff <br />$956,708 (with sidewalks) <br />Hickory, 20th NE to 25th NE <br />$35,438 <br />25th NE, Lamar to Hickory <br />$822,541 (partial full- depth) <br />E. Price, 201h NE to Collegiate <br />$288,750 <br />Engineering, 24th SE & 17th NE <br />2019 <br />1St SE, Kaufman to Pine Bluff $218,768 (with sidewalks) <br />24th SE, Clarksville to Lamar $1,265,115 (full- depth) <br />17th NE, Clarksville to Pine Bluff $1,288,058 (full- depth) <br />Kaufinan, 3`d SE to 7th SW $230,000 <br />Hickory, Main to Fitzhugh $259,875 <br />Tudor, 3`d NE to Fitzhugh $280,035 <br />Graham, RR to 19th NW $1,914,750 <br />