STREET PROJECT CALENDAR
<br />2017
<br />E Cherry, 25 NE to 20 NE $136,500
<br />3`d SE, Sherman to Provine $612,518 (with sidewalks)
<br />7th NW, Graham to Center $289,354
<br />7th SW, Washington to Bonham $187,950
<br />Replace water line, Graham, 3`d to 7th
<br />Engineering design, Church
<br />2018
<br />Church, Hearne to Clarksville
<br />$2,340,277
<br />Collegiate, Lamar to Clarksville (summer)
<br />$419,003
<br />33`d SE, Lamar to Clarksville
<br />$508,243
<br />Graham, 3`d to RR
<br />$291,375
<br />Clement, Loop to N. Main
<br />$397,005
<br />Washington, 7th SW to 1S1 SW
<br />$147,420
<br />Fitzhugh, Hickory to Pine Bluff
<br />$956,708 (with sidewalks)
<br />Hickory, 20th NE to 25th NE
<br />$35,438
<br />25th NE, Lamar to Hickory
<br />$822,541 (partial full- depth)
<br />E. Price, 201h NE to Collegiate
<br />$288,750
<br />Engineering, 24th SE & 17th NE
<br />2019
<br />1St SE, Kaufman to Pine Bluff $218,768 (with sidewalks)
<br />24th SE, Clarksville to Lamar $1,265,115 (full- depth)
<br />17th NE, Clarksville to Pine Bluff $1,288,058 (full- depth)
<br />Kaufinan, 3`d SE to 7th SW $230,000
<br />Hickory, Main to Fitzhugh $259,875
<br />Tudor, 3`d NE to Fitzhugh $280,035
<br />Graham, RR to 19th NW $1,914,750
<br />
|